Telescopic simple and convenient operation trolley spliced by modules
Through the simple operation of module splicing, the truss frame structure and the extended truss structure are used to solve the problems of high cost and safety hazards of the existing bridge main drainage pipe installation method, and achieve efficient and safe construction results.
Patent Information
- Application Number
- CN202420569756.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-03-22
AI Technical Summary
The existing bridge main drainage pipe installation method is costly and has high requirements for construction sites. The operation of the simple attachment hanger installation platform poses safety hazards and low construction efficiency.
The simple operation trolley with a module splicing is supported on the top of the bridge deck through a truss frame structure, and the construction hanging basket is extended into the bottom end of the bridge by using an extrusive truss structure to realize the installation of the bridge drain pipe.
It improves construction safety and efficiency, reduces construction costs, is suitable for different types of bridges, and simplifies on-site assembly operations.
Smart Images

Figure CN222613962U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction trolleys, in particular to a retractable and simple-to-operate trolley which adopts module splicing. Background Art
[0002] Bridge drain pipes are mainly used for draining water from bridge tops, including branch drain pipes and main drain pipes. Branch drain pipes are installed on the bridge tops at intervals, and the bottom ends of the branch drain pipes are connected to the main drain pipes, while the main drain pipes are usually installed at the bottom of the bridge top by hoisting, in order to realize the installation of the main drain pipes.
[0003] At present, the commonly used method for installing the main drain pipe of the bridge is to use a bridge maintenance trolley or a simple attached hanger installation platform. This installation method has certain defects:
[0004] First, the cost of using a bridge maintenance trolley is high and the requirements for the construction site are high;
[0005] Second, the simple attached hanger installation platform requires the completion of guardrail construction before it can be used, which does not meet the on-site construction progress requirements, and there are major safety hazards in the operation, and the construction efficiency is low. Utility Model Content
[0006] The purpose of the utility model is to provide a retractable and simple-to-operate trolley which adopts modular splicing to solve the above-mentioned problems. The trolley adopts a modular structural design and can be assembled and built on the construction site to adapt to different types of bridges. It adopts a wheeled walking mechanism to be supported on the top of the bridge deck to achieve walking. At the same time, an outward truss structure is adopted to extend the construction basket to the bottom of the bridge so that the installers can complete the installation of the bridge drain pipe at the bottom of the bridge top plate; thus, construction safety is ensured, construction efficiency is improved, and construction costs are reduced.
[0007] In order to realize the above-mentioned technical features, the purpose of the utility model is achieved as follows: a simple and retractable trolley which is spliced with modules, comprises a truss frame structure for supporting the entire trolley, a first running wheel for supporting the bottom of the bridge deck is installed on one side of the bottom of the truss frame structure, and a second running wheel for supporting the top of the road surface on the side of the bridge is installed on the other side of the bottom of the truss frame structure; the truss frame structure is provided with a counterweight structure on the side where the bridge deck is located; the top of the truss frame structure crosses the bridge guardrail, and a vertically arranged personnel passage is installed at the end, and a hanging basket for personnel standing and working is installed at the bottom of the personnel passage, and the hanging basket extends below the bridge deck.
[0008] The truss-type frame structure includes a vertical truss, the top of which is supported by a top truss; adjacent vertical trusses are connected by horizontal truss supports; the vertical trusses, top trusses and horizontal trusses are all assembled from modular trusses of standard sizes; and reinforcing channel steels are provided between the vertical trusses and the top trusses.
[0009] The vertical truss and the top truss are connected by truss diagonal braces for reinforcement.
[0010] The counterweight structure comprises a pressure plate fixed on the side wall of the vertical truss, and the top of the pressure plate is used for placing a counterweight sandbag.
[0011] A telescopic sliding installation is adopted between the hanging basket and the personnel passage, and after sliding into place, a hanging basket pull rod is installed to fix it, and a guardrail is arranged on the periphery of the hanging basket.
[0012] The bridge deck is supported on top of the piers.
[0013] The hanging basket is located directly below the main drainage pipe of the bridge to be installed, and the main drainage pipe of the bridge is connected to the branch drainage pipe of the bridge installed on the bridge deck.
[0014] The top of the top truss is provided with a plurality of lifting rings for lifting the entire truss-type vehicle frame structure.
[0015] The utility model has the following beneficial effects:
[0016] 1. The trolley of the utility model adopts a modular structural design and can be assembled and built on the construction site to adapt to different types of bridges. It adopts a wheeled walking mechanism to be supported on the top of the bridge deck to achieve walking. At the same time, an outrigger truss structure is used to extend the construction hanging basket to the bottom of the bridge so that the installers can complete the installation of the bridge drain pipe at the bottom of the bridge top plate; construction safety is ensured, construction efficiency is improved, and construction costs are reduced.
[0017] 2. The travel wheels of the utility model are in the form of tires, which can be applied to the stepped terrain of bridges and quickly realize the transfer operation.
[0018] 3. The truss frame structure of the utility model adopts a modular splicing structure, and the on-site installation and splicing work is very simple and smooth.
[0019] 4. The construction platform on the side of the utility model has better functional ductility. The platform is longer than a single-section drainage pipe and can be parallel to the guardrail or deep into the bottom of the bridge for construction work. It can also cross the guardrail, lamp poles, billboards and other obstacles by lifting.
[0020] 5. The utility model bridge maintenance and installation construction platform can be modularly spliced and can be applied to construction operations of various lengths. It is simple, safe and convenient.
[0021] 6. The bridge maintenance trolley of the utility model does not require any auxiliary measures for splicing, can be installed in any terrain, and is easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0023] Figure 1 It is the overall structure diagram of the utility model.
[0024] Figure 2 This is a plan view of the vertical truss structure of the utility model.
[0025] Figure 3 This is a plan view of the top truss structure of the utility model.
[0026] In the figure: bridge pier 1, bridge deck 2, first running wheel 3, truss frame structure 4, pressure plate 5, counterweight sandbag 6, bridge guardrail 7, second running wheel 8, bridge side pavement 9, bridge branch drain pipe 10, bridge main drain pipe 11, personnel passage 12, guardrail 13, hanging basket tie rod 14, hanging basket 15, lifting ring 16;
[0027] Vertical truss 401 , reinforcement channel steel 402 , horizontal truss 403 , truss diagonal brace 404 , top truss 405 . DETAILED DESCRIPTION
[0028] The embodiments of the present utility model are further described below in conjunction with the accompanying drawings.
[0029] See also Figure 1-3A retractable and easy-to-operate trolley adopts modular splicing, including a truss frame structure 4 for supporting the entire trolley, a first running wheel 3 for supporting the bottom of a bridge deck 2 is installed on one side of the bottom of the truss frame structure 4, and a second running wheel 8 for supporting the top of a bridge side road surface 9 is installed on the other side of the bottom of the truss frame structure 4; the truss frame structure 4 is provided with a counterweight structure on the side where the bridge deck 2 is located; the top of the truss frame structure 4 crosses the bridge guardrail 7, and a vertically arranged personnel passage 12 is installed at the end, and a hanging basket 15 for personnel standing and working is installed at the bottom of the personnel passage 12, and the hanging basket 15 extends under the bridge deck 2. This trolley adopts a modular structural design and can be assembled and built on the construction site to adapt to different types of bridges. It also uses a wheeled walking mechanism to support the top of the bridge deck to achieve walking. At the same time, an outrigger truss structure is used to extend the construction basket to the bottom of the bridge so that the installers can complete the installation of the bridge drainage pipe at the bottom of the bridge top plate, ensuring construction safety, improving construction efficiency, and reducing construction costs. In the specific use process, the truss frame structure 4 is assembled on site, and is set on the top of the bridge deck 2 by hoisting, and the installation basket 15 is adjusted according to the construction position. After the installation of the basket 15 is completed, the operator goes from the personnel passage 12 to the basket 15 to install the corresponding bridge drainage pipe.
[0030] Furthermore, the truss frame structure 4 includes a vertical truss 401, and the top of the vertical truss 401 is supported by a top truss 405; adjacent vertical trusses 401 are supported and connected by horizontal trusses 403; the vertical trusses 401, the top trusses 405 and the horizontal trusses 403 are assembled by modular trusses of standard sizes; and a reinforcing channel steel 402 is provided between the vertical truss 401 and the top truss 405. By adopting the above-mentioned truss frame structure 4, it adopts a modular assembly structure, which effectively simplifies the on-site assembly process and improves assembly efficiency. In addition, the modular structure effectively reduces costs.
[0031] Furthermore, the vertical truss 401 and the top truss 405 are reinforced by using a truss diagonal brace 404. The structural strength and stability of the entire vertical truss 401 and the top truss 405 are enhanced by the truss diagonal brace 404.
[0032] Furthermore, the counterweight structure includes a pressure plate 5 fixed on the side wall of the vertical truss 401, and the top of the pressure plate 5 is used to place a counterweight sandbag 6. By adopting the counterweight structure, the truss frame structure 4 can be stably loaded to prevent the risk of overturning during operation.
[0033] Furthermore, a telescopic sliding installation is adopted between the hanging basket 15 and the personnel passage 12, and after sliding into place, a hanging basket tie rod 14 is installed to fix it, and a guardrail 13 is arranged on the periphery of the hanging basket 15. By adopting the above-mentioned installation structure, it is ensured that the hanging basket 15 can be conveniently adjusted according to the position of the bridge drainage pipe, thereby achieving the purpose of reliable installation.
[0034] Furthermore, the bridge deck 2 is supported on the top of the bridge pier 1. The bridge deck 2 can be reliably supported by the bridge pier 1.
[0035] Furthermore, the hanging basket 15 is located directly below the main bridge drain pipe 11 to be installed, and the main bridge drain pipe 11 is connected to the branch bridge drain pipe 10 installed on the bridge deck 2. Through the above arrangement position relationship, it is ensured that the installation operation of the main bridge drain pipe 11 can be just achieved.
[0036] Furthermore, a plurality of lifting rings 16 for lifting the entire truss frame structure 4 are provided on the top of the top truss 405. The lifting rings 16 facilitate the subsequent lifting operation of the entire operating trolley.
[0037] Working process and principle of this utility model:
[0038] First, when it is necessary to install the main drainage pipe 11 of the bridge under the bridge deck 2, the truss frame structure 4 is assembled and welded on site according to the actual construction position and the specific size of the bridge deck. After the truss frame structure 4 is installed, the corresponding personnel passage 12 is installed. After the installation of the personnel passage 12 is completed, the hanging basket 15 is arranged and installed, and the position of the hanging basket 15 is adjusted, and then the counterweight sandbags 6 are placed, wherein the counterweight sandbags 6 are weighed more than 1.5t and are stacked close to the inner side of the bridge. Two steel wire ropes are added to the hanging basket working platform, and the steel wire ropes are suspended on the upper truss frame structure 4 to increase safety. The lower working platform is a detachable structure, which is convenient for hanging basket hoisting. When the wind force reaches level 5 or above, construction is prohibited; finally, the operating personnel go up to the hanging basket 15 through the personnel passage 12, and install the main drainage pipe 11 of the bridge on the hanging basket 15;
[0039] It is strictly forbidden to stand when the hanging basket is moving. When lifting and moving, remove the extra sandbags on the outside to press the weight, and keep 100Kg of counterweight on each truss before moving. Use [20 channel steel as a shoulder beam for lifting. Find the balance point in advance before lifting, and only after the balance point is fixed can the lifting operation be carried out. A dedicated person must be assigned to direct the lifting operation. The lifting point uses a buckle to fix the wire rope on the longitudinal channel steel.
Claims
1. A simple and retractable operating trolley using modular splicing, characterized in that: The truss frame structure (4) includes a truss frame structure (4) for supporting the entire trolley, wherein a first running wheel (3) for supporting the bottom of a bridge deck (2) is installed on one side of the bottom of the truss frame structure (4), and a second running wheel (8) for supporting the top of a bridge side road surface (9) is installed on the other side of the bottom of the truss frame structure (4); the truss frame structure (4) is provided with a counterweight structure on the side where the bridge deck (2) is located; the top of the truss frame structure (4) crosses the bridge guardrail (7), and a vertically arranged personnel passage (12) is installed at the end portion, and a hanging basket (15) for personnel to stand and work is installed at the bottom of the personnel passage (12), and the hanging basket (15) extends below the bridge deck (2); The truss-type vehicle frame structure (4) comprises a vertical truss (401), the top of the vertical truss (401) being supported by a top truss (405); adjacent vertical trusses (401) are supported and connected by horizontal trusses (403); the vertical trusses (401), the top trusses (405) and the horizontal trusses (403) are all assembled from modular trusses of standard size; and a reinforcing channel steel (402) is provided between the vertical truss (401) and the top truss (405); The vertical truss (401) and the top truss (405) are reinforced and connected by using a truss diagonal brace (404); The counterweight structure comprises a pressure plate (5) fixed on the side wall of the vertical truss (401), and the top of the pressure plate (5) is used to place a counterweight sandbag (6).
2. According to claim 1, a retractable and simple operation trolley using modular splicing, characterized in that: A retractable sliding installation is adopted between the hanging basket (15) and the personnel passage (12), and after sliding into place, a hanging basket pull rod (14) is installed to fix it, and a guardrail (13) is arranged on the periphery of the hanging basket (15).
3. According to claim 1, a modular and retractable simple operation trolley is characterized by: The bridge deck (2) is supported on the top of the bridge pier (1).
4. According to claim 1, a modular and retractable simple operation trolley is characterized by: The hanging basket (15) is located directly below a main bridge drain pipe (11) to be installed, and the main bridge drain pipe (11) is connected to a branch bridge drain pipe (10) installed on the bridge deck (2).
5. According to claim 1, a retractable and simple operation trolley using modular splicing is characterized by: A plurality of lifting rings (16) for lifting the entire truss-type vehicle frame structure (4) are arranged on the top of the top truss (405).