Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application
A technology of roadside support and empty roadway retention, which is used in surface mining, mining equipment, underground mining, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] 1. Set up prestressed anchor cables (12) on the old roof (1) and direct roof (2) of the roadway (3) to mobilize the bearing capacity of the deep stable rock formation. )0.5m, row spacing 2m. The vertical old roof (1) and direct roof (2) are set at an angle of 5° downward, and the bearing capacity and length of the prestressed anchor cable (12) are determined by the lithology of the roof.
[0019] 2. Two single hydraulic props (5) and hinged top beams (6) are respectively installed at 0.5m and 1.0m away from the upper side (4) for support, and the single hydraulic props (5) are in firm contact with the bottom plate (7). The single hydraulic prop (5) has sufficient initial supporting force, and the working resistance is not less than 250KN. The retention time of the pillar (5) is generally preferably 28 days. After the specific time needs to be observed, it is determined to flip forward after the top plate is stable.
[0020] 3. Repair the roof bolt (11) 1.7m away from...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com