Unlock instant, AI-driven research and patent intelligence for your innovation.
Method and device for starting and upgrading terminal equipment
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology of terminal equipment and upgrade package, which is applied in the field of wireless communication and can solve problems such as the failure of mobile terminals to start normally
Active Publication Date: 2016-09-28
QINGDAO HISENSE MOBILE COMM TECH CO LTD
View PDF4 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0012] During the boot process of the terminal device, when the QCSBL loads the OEMSBL, if the OEMSBL is damaged, the mobile terminal cannot be started normally.
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment 1
[0076] Such as Figure 4 As shown, the details are as follows:
[0077] Step 1: The mARM of the terminal device loads the QCSBL through the PBL. If the PBL successfully loads the QCSBL, go to Step 2. Otherwise, enter the download (DLOAD) mode to download the mobile phone program and then flash the phone;
[0078] Step 2: Load OEMSBL through QCSBL, perform integrity verification and / or CRC on the OEMSBL; if integrity verification and / or CRC are successful, execute OEMSBL, OEMSBL load APPSBL, and start aARM, APPSBL will open the application on the mobile terminal Program (APPS), so as to complete the boot process; otherwise, load OSBL and execute OSBL. OSBL is a copy of OEMSBL to complete the same function, and OSBL and OEMSBL are located in different BOOT partitions.
[0079] Step 3 performed in parallel with step 2: load AMSS through QCSBL, if the loading is successful, then run AMSS, otherwise, enter DLOAD mode to download the mobile phone program, and then perform flashing;...
Embodiment 2
[0081] Step 1: The mARM of the terminal device loads the QCSBL through the PBL. If the PBL successfully loads the QCSBL, go to Step 2. Otherwise, enter the download (DLOAD) mode to download the mobile phone program and then flash the phone;
[0082] Step 2: Load the OEMSBL through the QCSBL, perform integrity verification and / or CRC on the OEMSBL; if the integrity verification and / or CRC is successful, execute the OEMSBL; otherwise, load the OSBL, and execute the OSBL;
[0083] Step 3: After receiving the upgrade command, download the upgrade package of OEMSBL. If it is currently started from OEMSBL, update OSBL first according to the upgrade package, and then update OEMSBL according to the upgrade package; if it is currently started from OSBL, then update it according to the upgrade package The package first updates the OEMSBL, and then updates the OSBL according to the upgrade package.
[0084] Step 4: After the upgrade is completed, the boot process described in Embodiment ...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The embodiment of the invention provides a terminal equipment booting and updating method and equipment, relating to the field of wireless communication. The terminal equipment booting and updating method and the equipment can be used for improving the success rate of booting the terminal equipment. In the terminal equipment booting and updating method and the equipment provided by the invention, a storage unit of the terminal equipment comprises a first guide BOOT partition and a second BOOT partition; the same system guide programs are respectively arranged in the first BOOT partition and the second BOOT partition; after receiving a boot instruction, the system guide program in the first BOOT partition is loaded, and integrity verification and / or cyclic redundancy check CRC can be carried out on the system guide program; if the integrity verification and / or the cyclic redundancy check CRC is successful, a boot process is executed according to the system guide program; and otherwise, the system guide program in the second BOOT partition is loaded, and a boot process is executed according to the system guide program loaded in the second BOOT partition. With the adoption of the terminal equipment booting and updating method and equipment provided by the invention, the success rate of booting the terminal equipment can be improved.
Description
technical field [0001] The present invention relates to the field of wireless communication, in particular to a method and device for starting and upgrading terminal equipment. Background technique [0002] At present, some external multimedia card (externel MultiMedia Card, eMMC) products, such as mobile phone terminals, adopt a single OEM bootloader (OEM Secondary Bootloader, OEMSBL) solution. [0003] When the single OEMSBL solution is adopted, the activation mechanism of the mobile terminal is as follows: [0004] First, load the second bootloader (Qualcomm Secondary Bootloader, QCSBL) through the primary bootloader (Primary Bootloader, PBL), and then load OEMSBL, Advanced Mobile Subscriber Station program (Advanced Mobile Subscriber Station, AMSS) sequentially through QCSBL. If the loading of the OEMSBL fails or is wrong, the mobile terminal will not be able to start normally. [0005] Such as figure 1 As shown, the existing scheme startup process is described as fol...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.