Multi-loop multi-splitting ground wire three-dimensional model real-time construction method for 500kV tower

A construction method and technology of three-dimensional models, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve the problems of inability to carry out accurate three-dimensional modeling of pole-tower connections, and achieve important economic and social value effects

Active Publication Date: 2015-08-12
FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In this case, the existing method makes it impossible to carry

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-loop multi-splitting ground wire three-dimensional model real-time construction method for 500kV tower
  • Multi-loop multi-splitting ground wire three-dimensional model real-time construction method for 500kV tower
  • Multi-loop multi-splitting ground wire three-dimensional model real-time construction method for 500kV tower

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] In order to better understand the present invention, the content of the present invention is further illustrated below in conjunction with the examples, but the content of the present invention is not limited to the following examples. Those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms are also within the scope of the claims listed in this application.

[0022] The method of the invention is mainly applied in the field of three-dimensional simulation of transmission lines, and the poles and towers need to be connected by analog wires to form a complete space model as a whole. The three-dimensional space simulation of transmission lines mainly includes the three-dimensional space simulation of towers and ground wires between towers. Transmission line towers can be modeled "in advance" using modeling software such as 3dmax, but how to model the wire after modeling is a difficult problem. At the same tim...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a multi-loop multi-splitting ground wire three-dimensional model real-time construction method for a 500kV tower. The method is characterized in that firstly, according to basic machine account data, tower and mount point model construction is finished in advance, the corresponding relationship of tower mount points is determined by means of a tower mount point encoding relation algorithm, and a ground wire sag curve in a design state is simulated; then, by means of business parameter fusion, ground wire spatial connection is carried out automatically according to actual conditions, and the ground wire sag curve in the design state is corrected; then, by means of business parameter fusion, ground wire spatial connection is carried out automatically according to actual conditions. The method guarantees modular generation of three-dimensional forming, accords with actual operation conditions, achieves the aim of three-dimensional simulation of a power transmission line, and has important economic and social value.

Description

technical field [0001] The invention belongs to the field of three-dimensional simulation of power systems, and in particular relates to a method for real-time construction of a three-dimensional model of a 500kV tower multi-circuit multi-split ground conductor. Background technique [0002] Facing the vertical and horizontal power grid distribution, increasingly complex power equipment, ever-changing power grid information, and constantly changing changes in ground features along the line, it is difficult to manage the power grid in a traditional way to meet management and business needs. In terms of operation and maintenance, 3D visualization is used to truly restore the real terrain and landform scenes of the transmission corridor, as well as the towers and ground wires, with superior realism and intuition. [0003] The three-dimensional space simulation of transmission lines mainly includes the three-dimensional space simulation of towers and ground wires between towers....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F17/50G06Q50/06
Inventor 杨超杰何通杨毅候虎伟吴利强夏晓斌吴宾秦鹏陈静豪司马学凯宁小亮
Owner FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products