Scaffold wall connecting part and curtain wall replacement method
A replacement method and scaffolding technology, which are applied to scaffolding accessories, walls, building components, etc., can solve problems such as increasing construction period, existing safety hazards, and reducing construction efficiency, and achieve the goal of improving construction efficiency, reducing safety hazards, and improving construction quality. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] refer to Figure 1 to Figure 2 , a scaffolding wall part provided in this embodiment includes a buried board 1 and a steel plate 2, the buried board 1 is fixed on the main structure of the building 3, and the inner end of the steel plate 2 is fixed on the buried board 1, so The steel plate 2 passes through the gap between the curtain wall 4 and the curtain wall 4 along the horizontal direction to expose the outer end of the steel plate 2, and the outer end of the steel plate 2 is fixed on the steel pipe of the scaffold 5, and the thickness of the steel plate 2 is smaller than that of the curtain wall 4 and the curtain wall 4. The thickness of the gap between.
[0030] Since the thickness of the steel plate 2 of a scaffold connecting wall part of this embodiment is smaller than the thickness of the gap between the curtain wall 4 and the curtain wall 4, it is only necessary to connect the scaffold 5 and the building main structure 3 together through this embodiment. Afte...
Embodiment 2
[0035] refer to Figure 1 to Figure 2 , a curtain wall replacement method provided in this embodiment, the steps are as follows:
[0036] The first step is to build scaffolding 5 around the old curtain wall of the lowest floor, and remove the old curtain wall of this floor;
[0037] In the second step, the scaffolding 5 and the building main structure 3 are connected through several scaffolding wall parts as described in embodiment 1, and the steel plates 2 of the scaffolding wall parts are arranged between the new curtain wall to be installed and the new curtain wall gap between
[0038] In the third step, on the basis of the scaffolding 5 built, one floor is raised, and the first step to the second step are repeated until all old curtain walls on all levels are removed, and the whole scaffolding 5 is built;
[0039] The fourth step is to install new curtain walls on all levels;
[0040] The fifth step is to cut off the steel plate 2 of the scaffold connecting wall part co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com