Hydropower station adaptive power generation optimization scheduling method based on classification and grading of constraint conditions

A technology to optimize scheduling with constraints, applied in data processing applications, system integration technology, forecasting, etc., can solve problems such as high experience requirements for dispatchers, insufficient emergency response capabilities, and low work efficiency, so as to reduce bad experience and human resources. The computer interactive scheduling process is friendly and the effect of reducing excessive requirements

Active Publication Date: 2018-04-13
福建华电福瑞能源发展有限公司古田溪水力发电厂 +1
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] In order to solve the deficiencies in the prior art, the present invention provides a hydropower station adaptive power generation optimization dispatching method based on the classification and classification of constraint conditions, which solves the problem of unsolvable problems, low work efficiency, and high labor intensity in the process of solving constraint optimization problems. , Insufficient emergency response capabilities when encountering emergencies, and high requirements for dispatchers' own experience

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hydropower station adaptive power generation optimization scheduling method based on classification and grading of constraint conditions

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] Such as figure 1 As shown, taking the dynamic programming algorithm to solve the optimal dispatching model of hydropower generation as an example, when the benefit calculation is performed for a certain period of time and it is found that there is no solution for this period of time, check whether there is a relaxable scheduling constraint in this period. If there is a slackable scheduling constraint, relax the scheduling constraint with the lowest priority in this period, and recalculate the period benefit until there is a feasible solution space in this period. Only when all scheduling constraints have been relaxed and no feasible solution space can be found, the optimal scheduling problem is considered unsolvable. According to this method, it is recursively time-period until all time periods have been traversed, and then reverse recursively to obtain the optimal scheduling scheme. During the solution process, the relaxed constraints should be automatically recorded ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a hydropower station adaptive power generation optimization scheduling method based on classification and grading of constraint conditions. The hydropower station adaptive power generation optimization scheduling method is characterized by comprising the steps of 1) building a hydropower station adaptive optimization scheduling model based on classification and grading of the constraint conditions, wherein the constraint conditions of hydropower station optimization scheduling comprise physical constraint conditions, scheduling constraint conditions and boundary constraint conditions according to the category; and 2) solving the hydropower station adaptive optimization scheduling model based on classification and grading of the constraint conditions. The hydropowerstation adaptive power generation optimization scheduling method avoids the workload of repeated adjustment and trial-and-error of the scheduling personnel and improves the compiling efficiency of a power generation optimization scheduling scheme; the hydropower station adaptive power generation optimization scheduling method solves a problem that the traditional method excessively depends on theexperience of the scheduling personnel and reduces excessively high requirements for the technical level of the scheduling personnel; the hydropower station adaptive power generation optimization scheduling method makes full use of the fast computation ability of a computer and can quickly work out a scheduling scheme which is the most consistent with the scheduling intention; and adaptive adjustment is performed through the model, bad experience brought about by a condition that the problem has no solution for the scheduling personnel is reduced, and the human-computer interactive schedulingprocess is more friendly.

Description

technical field [0001] The invention relates to the technical field of optimal scheduling of power generation in hydropower stations, in particular to a method for optimal scheduling of adaptive power generation in hydropower stations based on classification and classification of constraint conditions. Background technique [0002] The optimal scheduling of hydropower generation is to find the optimal scheduling scheme that maximizes power generation or minimizes water consumption under given constraints, so as to achieve efficient use of water energy resources. Since the power generation process of a hydropower station itself involves three elements of water, machinery, and electricity, and also needs to take into account various types of comprehensive utilization requirements such as flood control, water supply, irrigation, and shipping, there are many constraints that need to be considered in the optimal dispatch of power generation, which is a multi-constraint Optimizati...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCG06Q10/04G06Q10/06312G06Q50/06Y02E40/70Y04S10/50
Inventor 叶子国芮钧林秉良殷召生林茂张金华卢秋生华涛胡少英
Owner 福建华电福瑞能源发展有限公司古田溪水力发电厂
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products