A Calculation Method of Air Volume Required by Full-jet Longitudinal Ventilation in Multi-ramp Urban Road Tunnel

A calculation method and a technology of required air volume, applied in calculation, instrumentation, geometric CAD, etc., can solve the problems of complex ventilation network and lack of guidance for ventilation engineering design, and achieve clear theoretical significance, good engineering adaptability and operability Effect

Active Publication Date: 2018-10-12
SICHUAN UNIV
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] Because the tunnel air inlet (corresponding to the diversion tunnel) or outlet air (corresponding to the confluence tunnel) enters or exits through one opening, the ventilation of the main line tunnel and the ramp tunnel and the ventilation between the ramp tunnels affect each other, the tunnel ventilation system There are multiple branches, the ventilation network is complex, and the air volume required to dilute harmful gases cannot be designed with conventional ventilation calculation methods
In this regard, the existing research and design codes do not give clear methods and regulations, resulting in a lack of guidance for the design of corresponding ventilation projects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Calculation Method of Air Volume Required by Full-jet Longitudinal Ventilation in Multi-ramp Urban Road Tunnel
  • A Calculation Method of Air Volume Required by Full-jet Longitudinal Ventilation in Multi-ramp Urban Road Tunnel
  • A Calculation Method of Air Volume Required by Full-jet Longitudinal Ventilation in Multi-ramp Urban Road Tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0052] The present invention is a method for calculating the required air volume of full-jet longitudinal ventilation in multi-ramp urban road tunnels, such as figure 1 , figure 2 As shown, it includes the following steps: Step 1: According to the total traffic flow of the entire tunnel design and the design traffic flow of the ramp tunnel, the traffic flow of each section of the main tunnel is obtained in turn; Step 2: The connection point between the ramp tunnel and the main tunnel is At the demarcation point, the main line tunnel is decomposed into several sections and numbered; Step 3: Calculate the soot and CO emissions of each ramp tunnel and each section of the main line tunnel, and summarize and calculate the total amount of soot and CO emissions of the entire tunnel ; Step 4: According to the total amount of soot and CO emissions...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a multi-ramp urban road tunnel full jet flow longitudinal ventilation required airflow calculation method, and belongs to the technical field of tunnel ventilation. The methodincludes the steps: S1 sequentially calculating the traffic flow of sections of a mainline tunnel; S2 decomposing the mainline tunnel into a plurality of sections and numbering the sections; S3 calculating smoke dust and CO discharge amount of branched tunnels and the mainline tunnel, and collectively acquiring the total smoke dust discharge amount and the total CO discharge amount of the whole tunnel; S4 calculating total required airflow for diluting smoke dust and CO of the whole tunnel; S5 calculating the required airflow for diluting smoke dust and CO of the branched tunnels, and furthercalculating the final required airflow of the branched tunnels; S6 calculating the final required airflow of the sections of the mainline tunnel according to the final required airflow of the branched tunnels. The method has good engineering adaptability and operability, theoretical significance is clear and definite, and the required airflow for diluting harmful gas in multi-ramp urban road tunnel full jet flow longitudinal ventilation can be effectively calculated.

Description

technical field [0001] The invention belongs to the technical field of tunnel ventilation, and relates to a method for calculating the air volume required for full-jet longitudinal ventilation of multi-ramp urban road tunnels. Background technique [0002] Multi-ramp urban road tunnel is a new type of unconventional tunnel. There are few relevant studies on the ventilation design of multi-ramp urban road tunnel, especially the calculation of the air volume required for full-jet longitudinal ventilation to dilute harmful gases. [0003] Chen Yuyuan used the subway environmental control calculation software SES to assist in the calculation of the ventilation system of the multi-ramp urban road tunnel project, which strengthened the rationality of the ventilation design. Wang Yan et al. used SES software to analyze the ventilation system of a multi-ramp urban road tunnel under various vehicle speed conditions, and optimized its ventilation system operation mode. Hu Qinghua use...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F17/50
CPCG06F30/13
Inventor 龙恩深毛伟张华廷
Owner SICHUAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products