Regional power grid reference risk online acquisition method and system
A technology for regional power grids and acquisition methods, applied in the direction of instruments, data processing applications, resources, etc., can solve the problems of high risk error rate in manual statistics, heavy workload of dispatchers, etc., and achieve the effect of reliable and accurate power grid risk assessment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] see figure 1 and Figure 12 , the first embodiment of the online acquisition method for regional power grid benchmark risk provided by the present invention: an online acquisition method for regional power grid benchmark risk, comprising:
[0038] Obtain power flow results before equipment failure;
[0039] Obtain power flow results after equipment failure;
[0040] Call the healing program to judge whether the power flow acquisition result is converged;
[0041] Compare the power flow results before the equipment failure and the power flow results after the equipment failure, and obtain the results converted into accident event levels, so as to realize the online acquisition of the grid benchmark risk.
[0042]Among them, the power flow results before the equipment failure are obtained are as follows:
[0043] Based on any optional fault condition, including tripping of any section of busbar, tripping of any transformer, tripping of any AC line, tripping of double-...
Embodiment 2
[0079] see Figure 3-11 , as in image 3 A 110kV substation's "single substation is completely lost, all voltage level busbars are completely lost" condition is taken as an example to describe the present invention in detail, which is the second embodiment of the online acquisition method for the regional power grid benchmark risk provided by the present invention:
[0080] 1) if Figure 4 to Figure 7 As shown, before the equipment fails, the power flow is obtained from the DAT network frame file, and the total load of the network frame, line power flow, equipment overload information, and whether the obtained results are converged are obtained;
[0081] 2) if Figure 8 to Figure 9 As shown in , click on the faulty device set to obtain the power flow again;
[0082] 3) if Figure 10 As shown in , it is judged whether the DAT grid file is converged, and if it is not converged, the healing program is invoked until the DAT grid file converges, and the previous step is repeate...
Embodiment 3
[0088] see figure 2 , the first embodiment of the regional power grid benchmark risk online acquisition system provided by the present invention: an online regional power grid benchmark risk acquisition system, including:
[0089] An acquisition module 100, configured to acquire power flow results before equipment failure and power flow results after equipment failure;
[0090] Calling module 200, used to call the healing program to judge;
[0091] The transformation and extraction module 300 is used to obtain and convert into a series of accident event level results according to the accident event level criteria, and extract the maximum value of the accident event level results as the final accident event level of this risk, so as to realize the online grid benchmark risk Obtain.
[0092] Further, the calling module 200 includes:
[0093] A mobilization unit is used to realize the invocation of the healing program;
[0094] The judging unit is used to judge whether the D...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com