BIM-based project progress and project payment management system and method

A management system and engineering technology, applied in data processing applications, special data processing applications, instruments, etc., can solve the problems of data flow, BIM and construction project management deep integration obstacles, management measures out of touch, BIM model data update is not timely, etc. Achieve the effect of reducing engineering disputes, reducing workload and improving management efficiency

Pending Publication Date: 2021-11-02
GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO LTD +1
View PDF2 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in general, the current application of BIM technology in construction project management still faces problems such as untimely update of BIM model data and di

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based project progress and project payment management system and method
  • BIM-based project progress and project payment management system and method
  • BIM-based project progress and project payment management system and method

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0048] Below in conjunction with the accompanying drawings of the present invention, the technical solutions in the embodiments of the present invention will be clearly and fully described embodiments, obviously, the described embodiments are merely part of embodiments of the present invention rather than all embodiments. Based on the embodiments in the present invention, there are all other embodiments obtained without making creative labor without making creative labor.

[0049] The invention provides a BIM-based project schedule and money payment management system, such as figure 1 As shown, the management system includes BIM model management module 10, 20 project schedule management module, material management module for projects management module 30 and 40, in which:

[0050] BIM model management module 10, and project schedule management module 20 is connected; BIM model management module 10 for a complete BIM model projects; and, according to the project status, project man...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of construction project management, and particularly discloses a BIM-based project progress and project payment management system and method. The system comprises a BIM model management module, a project progress management module, a material management module and a project payment management module; the BIM model management module is used for establishing a complete BIM model of an engineering project, dividing an engineering project into a plurality of construction areas and sub-item projects, and calculating project amount information for the construction areas and the sub-item projects; the project progress management module is used for setting a project plan progress, generating an identification code of current transportation and obtaining an actual project progress; the material management module is used for acquiring material entry information and material exit information; and the project fund management module sets a payment scheme and performs project fund settlement. According to the invention, the real condition of engineering progress can be obtained, so that related information forms closed-loop circulation, the workload of managers is reduced, the management efficiency is improved, and engineering disputes are reduced.

Description

technical field [0001] The invention relates to the technical field of construction project management, in particular to a BIM-based project progress and project payment management system and method. Background technique [0002] Progress management is not only an important part of construction project management, but also an important part that reflects the competitiveness of construction enterprises in the industry. In the process of project construction, the management level of project progress and project payment affects the construction cost and also determines the profit level of the construction enterprise. Facing the highly competitive construction market, how to improve the efficiency and level of project progress and project payment management, and avoid the cost increase caused by material backlog, waste and progress delay, has become an important issue for construction enterprises. [0003] The emergence of BIM (Building Information Modeling, Building Informatio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F30/13G06Q10/10G06F30/20
CPCG06F30/13G06Q10/103G06F30/20
Inventor 杨志陈航郭美贤黎杰明周武涛谭灵生张辉春林东里赵思远何永鸿
Owner GUANGZHOU INSTITUTE OF BUILDING SCIENCE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products