Project cost and working hour management method and system

A technology of project management system and man-hour management, which is applied in the field of project cost and man-hour management methods and systems, can solve problems such as unrelated data, lack of performance appraisal of employees in company resource allocation decisions, and high pressure on financial salary calculations, etc., to achieve efficient management work, Increased accuracy, reduced rework effects

Pending Publication Date: 2022-03-08
中建电子商务有限责任公司
View PDF10 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in actual management, there are often multiple system entries, various types of data are not related, resources cannot be shared, there is a lag in filling in project working hours data, the accuracy of project working hours data is not high, and there is duplication in filling in project working hours and submitting daily work reports work problem
Combining the above problems, it will lead to time-consuming and labor-intensive verification of working hours, repetitive work of employees, high pressure on financial salary calculation, company resource allocation decisions, and lack of reliable data for employee performance appraisal.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project cost and working hour management method and system
  • Project cost and working hour management method and system
  • Project cost and working hour management method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings. Apparently, the described embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0032] Such as figure 1 As shown, a kind of project cost man-hour management method provided by the present invention includes:

[0033] Step S1, enter project working hours in the project management system, and record attendance working hours in the attendance system;

[0034] Step S2, obtain the project man-hours, attendance man-hours and work saturation coefficient filled in on the specified date, and fill in the data in the work daily ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project cost man-hour management method and system, and the method comprises the steps: recording project man-hours in a project management system, and recording attendance man-hours in an attendance system; acquiring project working hours, attendance working hours and working saturation coefficients filled in a specified date, and filling data in a daily work report auditing system according to a daily work report template; the work daily checking system checks the filling data; generating a daily work report based on the final filling data after verification; and the management end checks the daily work report for auditing. According to the invention, daily attendance and project working hours of employees are input, and daily work daily report integration, verification and submission are carried out, so that real-time acquisition of attendance data and project working hour data is ensured, managers are helped to carry out management work more efficiently, the accuracy of the working hour data is improved, repeated work of common employees is reduced, and the work efficiency is improved. And a reliable data basis is provided for company project cost management, employee cost analysis, employee management and company decision making.

Description

technical field [0001] The invention belongs to the technical field of labor cost management, and in particular relates to a method and system for project cost and man-hour management. Background technique [0002] For industries with high labor costs such as IT companies, design companies, accounting / law firms, etc., it is necessary to accurately manage the content and time spent on various tasks and time spent by employees on projects and non-projects, and use it to count project standard working hours and calculate project manpower Costs, employee performance assessment, and resource scheduling combined with company strategy. However, in actual management, there are often multiple system entries, various types of data are not related, resources cannot be shared, there is a lag in filling in project working hours data, the accuracy of project working hours data is not high, and there is duplication in filling in project working hours and submitting daily work reports work...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q10/06G06F16/28G06F16/27
CPCG06Q10/103G06Q10/06311G06Q10/0637G06F16/27G06F16/283
Inventor 陈聪蒋敏陈晓美陈洁胡小楠张镜马洋刘映希程俊杰
Owner 中建电子商务有限责任公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products