Power transmission line group tower wiring practical training model and system

A technology of transmission lines and models, applied in the field of training models, can solve problems such as failure of review and check, dull and abstract trainees, inability to discover construction safety, technical measures requirements in time, etc., so as to improve safety management and control capabilities and improve work efficiency. Effect

Pending Publication Date: 2022-03-22
广西电网有限责任公司桂林供电局
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

On the one hand, due to the lack of experience of the operation and maintenance personnel in erecting towers and wiring, when reviewing the construction plans of external construction units, they could not correctly find out whether there were problems in the plans for erecting towers and tightening lines submitted by the construction units, which led to Program review gate failure
Due to insufficient awareness of security measures, it is also impossible to correctly carry out security technology disclosure work
It is impossible to carry out effective safety supervision and inspection work on this type of operation at the construction site, and it is unable to detect in time the behaviors that do not meet the requirements of construction safety and technical measures in the process, and it does not have the ability to detect unsafe behaviors and construction quality in a timely manner.
[0004] On the other hand, there has been less training on tower erection and wiring operations in recent years
The reason is that the tower set-out training requires a wide site and transmission towers that can be used for training. It takes a lot of time and a large number of students to participate in the repeated disassembly and assembly of towers. For trainers, how to ensure the safety of the training process is also a Headache problem
Therefore, the current training conditions cannot meet the practical training requirements for building towers and setting out wires.
Although theoretical training can be carried out, compared with practical training, the effect of theoretical training is extremely poor. Students will feel boring and abstract, and the acceptance of learning is extremely low.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power transmission line group tower wiring practical training model and system
  • Power transmission line group tower wiring practical training model and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of them, and should be It is understood that the present application is not limited by the example embodiments disclosed and described herein. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of this application.

[0018] In describing the present invention, it should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship indicated by "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a power transmission line group tower wiring practical training model. The model comprises a first-aid repair tower, a herringbone holding pole and a traction machine. The first-aid repair tower is horizontally placed, temporary pull ropes are installed at the upper ends of the two sides of the first-aid repair tower respectively, temporary ground anchors are installed at the tail ends of the temporary pull ropes respectively, and the temporary ground anchors are fixedly connected with the ground. The herringbone holding pole is vertically arranged, a pulley rope group is mounted on a top pipe of the herringbone holding pole, and the tail end of the pulley rope group is fixedly connected with a large cross beam of the emergency repair tower; a traction structure is wound on a roller of the traction machine; and the tail end of the traction structure is in sliding connection with a pulley rope group at the upper end of the herringbone holding pole. A user can carry out assembling and disassembling according to the assembling process of an actual pole tower, and the conditions of pole tower assembling and stringing construction on an actual site can be truly simulated.

Description

technical field [0001] The invention belongs to the technical field of training models, and relates to a training model and a system for power transmission line group tower erection. Background technique [0002] In recent years, extreme weather has occurred frequently, natural disasters such as ice disasters and typhoons have caused transmission line towers to fall, broken lines to collapse accidents, and incidents have occurred from time to time. There are fewer and fewer opportunities for maintenance personnel to contact or directly participate in the erection and wiring of transmission line poles and towers. It only stays at the theoretical level and lacks practical experience. [0003] Talent faults and loss of skills have greatly tested the disaster prevention and emergency repair capabilities of transmission line operation and maintenance personnel. On the one hand, due to the lack of experience of the operation and maintenance personnel in erecting towers and wirin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G09B23/18
CPCG09B23/18
Inventor 于校彬胡海斌张清明阳耀鹏谢乔养陈诚李晶李甘友黄康裕肖检平周相伯梁进兴杨忠佳李建宁
Owner 广西电网有限责任公司桂林供电局
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products