Deep well roadway three-level thick layer anchoring reinforced support method

Through the combination of the three-stage thick layer anchoring strengthening support method and the anchor injection integrated device, the deformation and damage of the surrounding rock in deep thick layer rock tunnels is solved, and the stability and cost of tunnels are improved.

CN118911736AInactive Publication Date: 2024-11-08HUAINAN MINING IND GRP

Patent Information

Application Number
CN202410997512.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively control the deformation and damage of the surrounding rocks in deep thick rock tunnels. The traditional support method is not effective under thick rock conditions and is costly.

Method used

The three-stage thick layer anchoring reinforcement support method is used to determine the range of the loosening ring through theoretical calculations, select flexible anchor rods and long anchor cables of suitable length to build a multi-layer support structure, and grouting and reinforcement is used to use an anchor injection integrated device.

Benefits of technology

It significantly improves the overall strength of the anchor layer, effectively controls the deformation of the surrounding rocks in deep thick rock tunnels, improves the stability of the tunnels during long periods, reduces the construction complexity and cost, and enhances the bearing capacity and stability of the surrounding rock in the tunnels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911736A_ABST
    Figure CN118911736A_ABST
Patent Text Reader

Abstract

The invention discloses a deep well roadway three-level thick layer anchoring reinforced support method which comprises the following steps: step 1, after roadway excavation, determining the range of a loose circle in roadway surrounding rock through calculation and numerical simulation; 2, determining the thickness of an anchoring layer needing to be constructed according to different ranges of the loose circles, and selecting a proper flexible anchor rod; thirdly, a thick anchoring layer is constructed through three-stage supporting, namely, a first-stage supporting structure with anchor rods as supporting materials, a second-stage supporting structure with flexible anchor rods as supporting materials and a third-stage supporting structure with long anchor cables as supporting materials, and the stability of surrounding rock of the deep well roadway is maintained; and 4, according to the crushing degree of the surrounding rock of the roadway and the range of the loose circle, a bolting-grouting integrated device is matched with a flexible anchor rod to conduct shallow surrounding rock grouting, or on the basis of shallow surrounding rock grouting, a long anchor cable is matched with the bolting-grouting integrated device to conduct deep pressurizing grouting. According to the method, the overall supporting effect of the roadway surrounding rock can be remarkably improved, and the control requirement of roadway stability can be met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel support, and in particular to a three-level thick layer anchoring and strengthening support method for a deep well tunnel. Background Art

[0002] In the production process of underground mines, as the mining depth increases, the ground stress is high and the mining impact is strong, resulting in the broken, deformed and severely damaged surrounding rocks of the tunnels, which brings huge challenges to the safe production and efficient mining of the mines. Compared with ordinary tunnels, deep rock tunnels have a larger range of looseness and fragmentation, more serious deformation and damage, and higher difficulty in tunnel support. The existing support methods are difficult to effectively control the deformation of the surrounding rocks of deep thick rock tunnels. Although traditional support methods, such as shotcrete support and steel arch support, can improve the stability of the tunnel to a certain extent, the support effects of these methods are often not ideal under thick rock conditions. Especially in thick rock tunnels, the deformation and damage of the tunnel surrounding rocks are more serious, and traditional support methods are difficult to meet their stability requirements.

[0003] At present, for deep thick rock tunnels, anchor rods and long anchor cables are often used for support, and the tunnels are expanded after large deformation. However, this support method still has the following defects: ① Conventional support methods cannot meet the requirements of tunnel stability control. Deep thick rock tunnel support still adopts conventional anchor rods and long anchor cables for joint support. The length of the anchor rods is about 2 to 2.5 meters. The anchor layer of the anchor rods is thin and the deformation resistance is weak. The length of the anchor cable is more than 6 meters. The anchor cable has poor effect in reinforcing a large range of rock mass under limited prestress, and the coupling support effect of anchor rods and anchor cables is not good. ② The tunnel is loose and broken. Due to the loose and broken surrounding rock and low rock strength, the shallow cracks of the surrounding rock develop quickly under the action of ground stress, mining stress and other stresses, and the degree of crushing is high, which can easily cause large deformation of the tunnel surrounding rock. In severe cases, it may even cause caving, and the range of the crushing circle and plastic circle is greatly increased. ③ Expansion and repair work is frequent. Conventional support methods are difficult to effectively control the long-term stability of deep broken tunnels. After the tunnel is supported, large deformation and other phenomena will still occur. It is necessary to expand and repair the deep thick rock tunnels, which greatly affects the safe production of the mine. After the tunnel is greatly deformed, expansion and brushing are often required to rearrange the support system, which increases the complexity and risk of construction. At the same time, the tunnel space after expansion and brushing increases, and the difficulty of designing and implementing the support structure is further increased.

[0004] Anchor rods are mainly used to control shallow deformation of tunnels, while long anchor cables are used to control the stability of deep rock masses. In some cases, the two may not form a coordinated support system, resulting in poor support effects in local areas. In addition, the anchor rods and anchor cables used in existing solutions are structures with grouting steel pipes in the middle, and their strength is significantly lower than that of traditional solid anchor rods and anchor cables. At the same time, the cost of special steel pipes is high and the cost is high.

[0005] Therefore, in order to effectively control the deformation of the surrounding rock of deep thick rock tunnels and meet the control requirements of tunnel stability, it is urgent to provide a method for strengthening the support of the surrounding rock of deep thick rock tunnels. Summary of the invention

[0006] The technical problem to be solved by the present invention is: how to provide a method for strengthening support of surrounding rock of deep thick rock tunnels.

[0007] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0008] A method for three-level thick layer anchoring and strengthening support of deep well tunnels, comprising the following steps:

[0009] S1. After the tunnel is excavated, the scope of the loose zone in the tunnel surrounding rock is determined by theoretical calculation, numerical simulation or on-site measurement;

[0010] S2. Determine the thickness of the anchoring layer to be constructed according to the range of the loose circle, and select a flexible anchor rod of suitable length;

[0011] S3, construct a thick anchoring layer through three-level support, that is, a primary support structure with anchor rods as support materials, and anchor several anchor rods around the tunnel into the loose circle to form a shallow extrusion arch bearing structure;

[0012] S4, a secondary support structure with flexible anchor rods as support materials, where several flexible anchor rods are anchored around the tunnel into the stable surrounding rock outside the loose circle to construct a thick anchoring layer structure;

[0013] S5, a three-level support structure with long anchor cables as support materials, where several long anchor cables are anchored around the tunnel into the deep elastic zone rock mass, and the thick anchor layer structure is suspended to a deeper stable rock mass;

[0014] S6. According to the degree of surrounding rock fragmentation and the range of loosening zone, shallow surrounding rock grouting is carried out by using an integrated anchor-grouting device in combination with flexible anchor rods, or deep pressurized grouting is carried out by using a long anchor cable in combination with an integrated anchor-grouting device on the basis of shallow surrounding rock grouting.

[0015] The present application innovates the existing support technology for the surrounding rock of deep thick rock tunnels. The three-level thick layer anchoring and strengthening support method can significantly improve the overall strength of the anchoring layer, effectively control the deformation of the surrounding rock of deep thick rock tunnels, improve the long-term stability of the tunnel, ensure the bearing capacity and stability of the tunnel surrounding rock structure, and meet the tunnel stability control requirements; the method has a simple implementation process and low support cost, can effectively deal with the situation of deep rock tunnels with a large loose and broken range, serious deformation and damage, and difficult tunnel support, and significantly improves the overall support effect of the tunnel surrounding rock, especially under thick rock conditions, it can also effectively achieve good support effects; and the use of an integrated anchor-injection device in conjunction with a flexible anchor rod for shallow surrounding rock grouting can use the grouting liquid to fully cement the loose surrounding rock, improving the defect of insufficient bearing capacity due to relying solely on the strength of the broken rock itself to bear the force.

[0016] As a further solution of the present invention: in step S1, the radius of the loose circle is set to R, wherein the calculation formula (1) of the radius R is:

[0017]

[0018] Where c is the cohesion of the rock mass; γ is the bulk density of the rock mass; φ is the internal friction angle of the rock mass; σ0 is the initial ground stress; σ c is the compressive strength of rock mass.

[0019] As a further solution of the present invention: in step S3, the radius range of the extrusion arch formed by the anchor rod is set to b, wherein the calculation formula (2) of the radius b is:

[0020]

[0021] Where l is the length of the anchor, α is the control angle of the anchor on the broken rock mass, and a is the spacing between the anchors.

[0022] As a further solution of the present invention: in the step S4, the thickness of the thick anchoring layer constructed by the flexible anchor rod is greater than the radius R of the loose circle.

[0023] As a further solution of the present invention: in step S5, after the tunnel support is completed, the surface of the tunnel that has been anchored is sprayed to seal the surrounding rock surface, and the thickness of the sprayed layer is ensured to be in the range of 5 to 30 mm, so as to provide a stop layer for subsequent grouting.

[0024] As a further solution of the present invention: in the step S6, when the shallow surrounding rock of the tunnel is grouting-modified by the integrated anchoring and grouting device in cooperation with the flexible anchor rod, the slurry is diffused from the integrated anchoring and grouting device to the cracks of the broken surrounding rock, the surrounding rock within the anchoring range of the flexible anchor rod is fully reinforced, and the injected slurry and the primary support are used together to maintain the stability of the surface surrounding rock.

[0025] As a further solution of the present invention: in step S4, the spacing and row spacing of the flexible anchor rods are both in the range of 600 to 1000 mm.

[0026] As a further solution of the present invention: in the step S6, when shallow surrounding rock grouting is performed, cement slurry or other grouting materials with low permeability are selected; when deep pressurized grouting is performed, a chemical slurry with strong permeability and high fineness is used.

[0027] As a further solution of the present invention: the flexible anchor rod includes a flexible anchor rod body, a locking sleeve, a ball nut, a pressure ring and an arched tray, wherein one end of the flexible anchor rod body is inserted into the loosening circle and the plastic zone, and a locking sleeve is provided on the outside of the other end. An arched tray is arranged on the outside of the locking sleeve and fixed to the inner wall of the tunnel, and a pressure ring is also fixed on the outside of the locking sleeve and on one side of the arched tray through a ball nut.

[0028] As a further solution of the present invention: the integrated anchoring and grouting device includes an anti-twist tray, an anchoring and grouting sleeve, a sealing sleeve and a grouting bent pipe, wherein an anti-twist tray is also provided on the outside of the flexible anchor rod body and inside the arched tray, and an anchoring and grouting sleeve is also provided on one side of the anti-twist tray, one end of the anchoring and grouting sleeve is inserted into the loosening ring, and a sealing sleeve is set between the loosening ring to fix it, and the other end of the anchoring and grouting sleeve is connected to the grouting bent pipe.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] 1. The present application innovates the existing support technology for surrounding rock of deep thick-layered rock tunnels. The three-level thick-layer anchoring and strengthening support method can significantly improve the overall strength of the anchoring layer, effectively control the deformation of the surrounding rock of deep thick-layered rock tunnels, improve the long-term stability of the tunnel, ensure the bearing capacity and stability of the tunnel surrounding rock structure, and meet the requirements for tunnel stability control; the method has a simple implementation process and low support cost, and can effectively deal with the situation of deep rock tunnels with large loose and broken range, serious deformation and damage, and difficult tunnel support, and significantly improves the overall support effect of the tunnel surrounding rock, especially under thick rock conditions, it can also effectively achieve good support effects;

[0031] 2. The present application uses a plurality of anchor rods anchored deep in the loosening circle to construct a primary support structure, and the anchor rods can be used to tightly combine the loose surrounding rocks within the loosening circle into an integral structure, which not only avoids further crushing of the loose surrounding rocks, but also enables the loose surrounding rocks within the loosening circle to have self-bearing capacity, which is conducive to uniform load transfer for the secondary support structure and the tertiary support structure;

[0032] 3. The present application uses a number of flexible anchor rods anchored in the shallow stable surrounding rock outside the loose circle to construct a secondary support structure, which can tightly combine the loose circle anchored as an integral structure with the shallow stable surrounding rock, further forming a larger overall structure. In this way, the confining pressure of the tunnel surrounding rock is significantly increased by the combined support of anchor rods and flexible anchor rods, and the self-bearing capacity of the overall structure is effectively improved, which is conducive to the transmission of a larger load;

[0033] 4. The present application uses a number of long anchor cables anchored in the deep stable surrounding of the outer periphery of the shallow stable surrounding rock to construct a three-level support structure, which can closely combine the loose circle anchored as an integral structure, the shallow stable surrounding rock and the deep stable surrounding rock, further forming the largest overall structure. Thus, the tunnel surrounding rock is reinforced three times by the coupling support of anchor rods, flexible anchor rods and long anchor cables, which significantly increases the overall strength of the anchor layer, and constructs a thick anchor layer with good stability and strong bearing capacity, effectively improving the stability of the thick rock tunnel and ensuring the safety of tunnel construction;

[0034] 5. Based on the thick anchoring layer, the present application utilizes an integrated anchor-injection device in conjunction with flexible anchor rods to carry out shallow surrounding rock grouting, and can utilize the grouting liquid to fully cement the loose surrounding rock, thereby improving the defect of insufficient bearing capacity due to relying solely on the strength of the broken rock itself, thereby changing the mechanical properties of the loose circle surrounding rock, avoiding the short-board effect of the support, and improving the overall bearing capacity of the surrounding rock; deep pressurized grouting is carried out on the basis of shallow surrounding rock grouting, which can effectively improve the modification effect of deep surrounding rock grouting, and thus can significantly enhance the strength and stability of the deep surrounding rock. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a schematic diagram of the structure of the three-level thick layer anchoring and strengthening support of the deep well tunnel according to the embodiment of the present invention;

[0036] Figure 2 It is a schematic diagram of the coordination of the anchoring and grouting integrated device and the flexible anchor rod according to an embodiment of the present invention;

[0037] Description of reference numerals:

[0038] 1. Tunnel; 2. Loose circle; 3. Anchor rod;

[0039] 4. Flexible anchor rod; 41. Flexible anchor rod body; 42. Locking sleeve; 43. Ball nut; 44. Pressure ring; 45. Arched tray;

[0040] 5. Long anchor cable; 6. Plastic zone; 7. Anti-twist tray; 8. Grouting elbow; 9. Anchor casing; 10. Sealing sleeve. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] Reference Figure 1 A method for reinforcing support of three-level thick-layer anchoring in deep well tunnels comprises the following steps:

[0043] Step S1, after the tunnel 1 is excavated, the range of the loose zone 2 in the tunnel surrounding rock 6 is determined;

[0044] It should be noted that in step S1, the range of the loose zone 2 in the tunnel surrounding rock 6 is determined by theoretical calculation, numerical simulation, or field measurement, and the radius of the loose zone 2 is R;

[0045] In order to accurately determine the range of the loose zone 2, in step S1, the radius R of the loose zone 2 in the surrounding rock 6 of the tunnel is determined according to formula (1);

[0046]

[0047] Where c is the cohesion of the rock mass; γ is the bulk density of the rock mass; φ is the internal friction angle of the rock mass; σ0 is the initial ground stress; σ c is the compressive strength of rock mass.

[0048] Step S2, determining the thickness of the anchoring layer to be constructed according to the range of the loose circle 2, and selecting a flexible anchor rod 4 of suitable length;

[0049] It should be noted that in order to ensure the effect of subsequent support and to fully improve the bearing capacity and stability of the tunnel surrounding rock structure, in step S2, the thickness of the anchoring layer to be constructed (i.e., the thickness of the plastic zone 6) is greater than the radius R of the loosening circle 2.

[0050] Step S3, construct a thick anchoring layer through three-level support, that is, a primary support structure with anchor rods 3 as support material, anchoring several anchor rods 3 around the tunnel 1 into the deep part of the loosening circle 2 to form a shallow extrusion arch bearing structure (that is, the arch radius range formed after the anchor rods are introduced into the loosening circle 2), a secondary support structure with flexible anchor rods 4 as support material, anchoring several flexible anchor rods 4 around the tunnel 1 into the shallow stable surrounding rock outside the loosening circle 2, that is, the plastic zone 6, to construct a thick anchoring layer structure; and a tertiary support structure with long anchor cables 5 as support material, anchoring several long anchor cables 5 around the tunnel 1 into the deep stable surrounding rock outside the shallow stable surrounding rock to maintain the stability of the deep well tunnel surrounding rock 6.

[0051] In step S3, the radius range of the extrusion arch formed by the anchor rod is set to b, where the calculation formula (2) of the radius b is:

[0052]

[0053] Where l is the length of the anchor, α is the control angle of the anchor on the broken rock mass, and a is the spacing between the anchors;

[0054] As a preferred embodiment, the anchor rod 3 is a threaded steel anchor rod;

[0055] In order to ensure the effect of subsequent grouting modification and to effectively utilize the injected slurry in conjunction with anchor rods and anchor cables to synergistically improve the anchoring effect, in step S3, after the tunnel 1 is supported, the surface of the tunnel 1 that has been anchored is sprayed to seal the surrounding rock surface, and ensure that the thickness of the sprayed layer is in the range of 5 to 30 mm, providing a grouting stop layer for subsequent grouting. The thickness range here is for reference only and should not be construed as a limitation on this application.

[0056] As a preferred embodiment, in step S3, the length of the anchor rod 3 is not greater than 3m, the length of the flexible anchor rod 4 is in the range of 3 to 6m, and the length of the long anchor cable 5 is greater than 6m. The length ranges of the anchor rod 3, the flexible anchor rod 4 and the long anchor cable 5 are one of the embodiments provided in this application and cannot be understood as limiting this application.

[0057] Furthermore, in order to enable the loosening zone and the deep stable surrounding rock to form an integral structure with a tight structure and stable performance, in step S3, the spacing and row spacing of the flexible anchor rods 4 are both in the range of 600 to 1000 mm; the range of the flexible anchor rods 4 here is for reference only and cannot be understood as a limitation on this application.

[0058] In order to facilitate the coordinated control of the surrounding rock through the three-layer anchoring structure, so that the thick rock tunnel can form a whole to fully improve the anchoring effect, and at the same time, in order to reduce the breakage of the anchor rod, the flexible anchor rod 4 and the long anchor cable 5, in step S3, the difference between the length of the long anchor cable 5 and the length of the flexible anchor rod is not more than 3m, and the difference between the length of the flexible anchor rod 4 and the length of the anchor rod 3 is not more than 3m.

[0059] Step S4, according to the degree of crushing of the tunnel surrounding rock 6 and the range of the loose circle 2, the anchor-grouting integrated device is used in conjunction with the flexible anchor rod 4 to perform shallow surrounding rock grouting;

[0060] Alternatively, based on the actual crushing conditions of the tunnel surrounding rock and the obtained range of the loose circle 2, the original supporting mid-length anchor cable 5 can be optionally replaced with a hollow grouting anchor cable, and deep hole pressurized grouting can be performed on the basis of the shallow grouting layer to increase the grouting pressure and thus improve the grouting modification effect of the deep surrounding rock.

[0061] It should be noted that in order to fully ensure the effect of grouting and anchoring, in step S4, when shallow surrounding rock grouting is used, cement slurry or other grouting materials with low fluidity are selected; when deep pressurized grouting is used, chemical slurry with strong fluidity and slow setting time is selected.

[0062] Furthermore, in order to fully improve the bearing capacity and stability of the tunnel surrounding rock structure, in step S4, when the shallow surrounding rock of the tunnel is grouting-modified by the integrated anchoring and grouting device in cooperation with the flexible anchor rod 4, the slurry is diffused from the integrated anchoring and grouting device to the cracks of the broken surrounding rock, and the surrounding rock within the anchoring range of the flexible anchor rod 4 is fully reinforced, and the injected slurry and the primary support are used together to maintain the stability of the surface surrounding rock.

[0063] The flexible anchor rod 4 includes a flexible anchor rod body 41, a locking sleeve 42, a ball nut 43, a pressure relief ring 44 and an arched tray 45. One end of the flexible anchor rod body 41 is inserted into the loose circle and the plastic zone, and a locking sleeve 42 is provided on the outside of the other end. The arched tray 45 is arranged on the outside of the locking sleeve 42 and fixed to the inner wall of the tunnel. A pressure relief ring 44 is also fixed on the outside of the locking sleeve 42 and on one side of the arched tray 45 through the ball nut 43.

[0064] The anchoring and grouting integrated device comprises an anti-twist tray 7, an anchoring and grouting sleeve 9, a sealing sleeve 10 and a grouting elbow 8, wherein an anti-twist tray 7 is further provided on the outside of the flexible anchor rod body 41 and inside the arched tray 45, and an anchoring and grouting sleeve 9 is further provided on one side of the anti-twist tray 7, one end of the anchoring and grouting sleeve 9 is inserted into the loosening ring, and a sealing sleeve is provided between the loosening ring to fix it, and the other end of the anchoring and grouting sleeve 9 is connected to the grouting elbow 8;

[0065] The construction method of the flexible anchor rod 4 in conjunction with the anchor-injection integrated device is as follows: first, the anti-twist tray 7 is put on the anchor-injection sleeve 9, and then the sealing sleeve 10 is put on the flexible anchor rod body 41, and then the grouting elbow 8 is tightened and adjusted to the opposite direction of the flexible anchor rod body 41, and finally, the sealing ring is used to install it on the rock surface side of the anchor rod to carry out the construction of the flexible anchor rod and the anchor-injection integrated device.

[0066] The construction method of the long anchor cable 5 in combination with the anchor injection integrated device is as follows: increase the length of the anchor injection sleeve 9, install the anchor injection integrated device on the outside of the long anchor cable 5 in the same way, and then perform the construction in the same way;

[0067] The deep pressurized grouting method is: first, shallow surrounding rock grouting is carried out through the grouting bend pipe 8 exposed by the installed and constructed flexible anchor rod 4 and the integrated anchor-injection grouting device, in order to form a grouting stop layer within the shallow surrounding rock range of the tunnel, and then grouting is carried out in the deep surrounding rock through the installed and constructed long anchor cable 5 and the integrated anchor-injection device with a longer anchor-injection casing 8. Due to the effect of the shallow grouting stop layer, a larger grouting pressure and diffusion range are allowed.

[0068] The specific operating principles of this application are as follows:

[0069] By using a number of anchor rods anchored deep in the loosening circle 2 to construct a primary support structure, the loose surrounding rock within the loosening circle 2 can be tightly combined into an integral structure using anchor rods 3, which not only avoids further crushing of the loose surrounding rock, but also enables the loose surrounding rock within the loosening circle to have self-bearing capacity, which is beneficial to uniform load transfer for the secondary support structure and the tertiary support structure.

[0070] A secondary support structure is constructed by using several flexible anchor rods 4 anchored in the shallow stable surrounding rock outside the loose circle 2, which can tightly combine the loose circle 2 anchored as an integral structure with the shallow stable surrounding rock, further forming a larger overall structure. In this way, the confining pressure of the tunnel surrounding rock is significantly increased by the combined support of the anchor rods 3 and the flexible anchor rods 4, and the self-bearing capacity of the overall structure is effectively improved, which is conducive to the transmission of larger loads.

[0071] By constructing a three-level support structure using several long anchor cables 5 anchored in the deep stable surrounding rock outside the shallow stable surrounding rock, the loose circle 2 anchored as an integral structure, the shallow stable surrounding rock and the deep stable surrounding rock can be tightly combined to further form an overall structure with the largest range. Thus, the tunnel surrounding rock is reinforced three times by the coupling support of the anchor rod 3, the flexible anchor rod 4 and the long anchor cable 5, which significantly increases the overall strength of the anchor layer and constructs a thick anchor layer with good stability and strong bearing capacity, effectively improving the stability of the thick rock tunnel and ensuring the safety of tunnel construction.

[0072] On the basis of the thick anchoring layer, the shallow surrounding rock grouting is carried out by using the anchor-injection integrated device in conjunction with the flexible anchor rod 4, and the loose surrounding rock can be fully cemented by the grouting liquid, improving the defect of insufficient bearing capacity due to the single reliance on the strength of the broken rock itself, thereby changing the mechanical properties of the loose circle surrounding rock, avoiding the short board effect of the support, and improving the overall bearing capacity of the surrounding rock. Deep pressurized grouting on the basis of shallow surrounding rock grouting can effectively improve the modification effect of deep surrounding rock grouting, and thus significantly enhance the strength and stability of the deep surrounding rock.

[0073] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A three-level thick layer anchoring and strengthening support method for deep well tunnels. It is characterized in that The steps include: S1. After the tunnel is excavated, the scope of the loose zone in the tunnel surrounding rock is determined by theoretical calculation, numerical simulation or on-site measurement; S2. Determine the thickness of the anchoring layer to be constructed according to the range of the loose circle, and select a flexible anchor rod of suitable length; S3, construct a thick anchoring layer through three-level support, that is, a primary support structure with anchor rods as support materials, anchoring several anchor rods around the tunnel into the loose circle to form a shallow extrusion arch bearing structure; S4, a secondary support structure with flexible anchor rods as support materials, where several flexible anchor rods are anchored around the tunnel into the surrounding rock in the plastic zone outside the loose circle to construct a thick anchoring layer structure; S5, a three-level support structure with long anchor cables as support materials, where several long anchor cables are anchored around the tunnel into the deep elastic zone rock mass, and the thick anchor layer structure is suspended to a deeper stable rock mass; S6. According to the degree of surrounding rock fragmentation and the range of loosening zone, shallow surrounding rock grouting is carried out by using an integrated anchor-grouting device in combination with flexible anchor rods, or deep pressurized grouting is carried out by using a long anchor cable in combination with an integrated anchor-grouting device on the basis of shallow surrounding rock grouting.

2. A three-level thick layer anchoring and strengthening support method for deep well tunnels according to claim 1, Features: In step S1, the radius of the loose circle is set to R, wherein the calculation formula (1) of the radius R is: Where c is the cohesion of the rock mass; γ is the bulk density of the rock mass; φ is the internal friction angle of the rock mass; σ 0 is the initial geostress; σ c is the compressive strength of rock mass.

3. A three-level thick layer anchoring and strengthening support method for deep well tunnels according to claim 1, Features: In step S3, the radius range of the extrusion arch formed by the anchor rod is set to b, wherein the calculation formula (2) of the radius b is: Where l is the length of the anchor, α is the control angle of the anchor on the broken rock mass, and a is the spacing between the anchors.

4. A three-level thick layer anchoring and strengthening support method for deep well tunnels according to claim 1, Features: In the step S4, the thickness of the thick anchoring layer constructed by the flexible anchor rod is greater than the radius R of the loose circle.

5. A three-level thick layer anchoring and strengthening support method for deep well tunnels according to claim 1, Features: In step S5, after the tunnel support is completed, the surface of the tunnel that has been anchored is sprayed to seal the surrounding rock surface, and the thickness of the sprayed layer is ensured to be in the range of 5 to 30 mm, so as to provide a stopper layer for subsequent grouting.

6. A three-level thick layer anchoring and strengthening support method for deep well tunnels according to claim 1, Features: In step S6, when the shallow surrounding rock of the tunnel is grout-modified by the integrated anchor-grouting device in cooperation with the flexible anchor rod, the slurry is diffused from the integrated anchor-grouting device to the cracks of the broken surrounding rock, the surrounding rock within the anchoring range of the flexible anchor rod is fully reinforced, and the injected slurry and the primary support are used together to maintain the stability of the surface surrounding rock.

7. A three-level thick layer anchoring and strengthening support method for deep well tunnels according to claim 1, Features: In step S4, the spacing and row spacing of the flexible anchor rods are both in the range of 600 to 1000 mm.

8. A method for reinforcing support of three-level thick layers of deep well tunnels according to claim 1, Features: In step S6, when shallow surrounding rock grouting is performed, cement slurry or other grouting materials with low permeability are selected; when deep pressure-boosting grouting is performed, chemical slurry with strong permeability and high fineness is used.

9. A method for reinforcing support of three-level thick layers of deep well tunnels according to claim 1, Features: The flexible anchor rod comprises a flexible anchor rod body (41), a locking sleeve (42), a ball nut (43), a pressure relief ring (44) and an arch tray (45), wherein one end of the flexible anchor rod body (41) is inserted into the loosening circle and the plastic zone, and a locking sleeve (42) is provided on the outside of the other end; an arch tray (45) is arranged on the outside of the locking sleeve (42) and fixed to the inner wall of the tunnel; and a pressure relief ring (44) is fixed on the outside of the locking sleeve (42) and on one side of the arch tray (45) through a ball nut (43).

10. A method for reinforcing support of three-level thick layers of deep well tunnels according to claim 9, Features: The anchoring and grouting integrated device comprises an anti-twist tray (7), an anchoring and grouting sleeve (9), a sealing sleeve (10) and a grouting elbow (8), wherein an anti-twist tray (7) is further provided on the outside of the flexible anchor rod body (41) and inside the arched tray (45), and an anchoring and grouting sleeve (9) is further provided on one side of the anti-twist tray (7), one end of the anchoring and grouting sleeve (9) is inserted into the loosening ring, and a sealing sleeve is arranged between the loosening ring to fix it, and the other end of the anchoring and grouting sleeve (9) is connected to the grouting elbow (8).

Citation Information

Patent Citations

  • A support technology for roadways in poorly stressed rock formations

    CN102278128A

  • Anchor cable partition anchoring and segmented pre-tightening stratum control method

    CN104989437A

  • Building method of collaborative anchoring duplex structure of thick layer composite roof coal roadway

    CN110230510A

  • Supporting and protecting method based on mining roadway full life circle

    CN110593924A

  • High-stress roadway combined ring beam supporting structure and construction method thereof

    CN110939456A

Cited By

  • Partition targeted control method based on power exponential deformation distribution rule of fractured surrounding rock

    CN119618826A

  • Prevention and control collaborative design method for coping with dynamic heaving floor of deep gob-side roadway

    CN121351232A