By using semi-rigid, semi-flexible protection device and information-based monitoring system on pipe pile heads, the problems of pile head protection and data monitoring during hammering construction are solved, and the safety, precision and efficient protection of pile heads and construction data are achieved. timely feedback improves the safety and accuracy of the construction process.
Patent Information
- Application Number
- CN202411245588.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-29
AI Technical Summary
In the construction of hammering pipe piles, the pile head lacks protection, resulting in cracking, damage or deformation, and the data monitoring is inaccurate, low efficiency, and it is difficult to control the hammering force and crack size, resulting in wasted labor and time costs.
Using semi-rigid and semi-flexible pile head protection device, a rigid gasket and elastic padded pile cap are combined, and an information-based monitoring system is built-in, including wireless stress, cracks and positioning and setting devices to monitor hammer hit count, time, stress, and crack changes and construction displacement, provide timely feedback and early warning.
Effectively prevent pile heads from bursting, improve data recording accuracy and efficiency, reduce labor costs, achieve a safe, accurate and efficient construction process, timely monitor and protect pile heads, and improve construction safety and accuracy.
Smart Images

Figure CN119041397A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pile foundation construction, and in particular to an explosion-proof monitoring device for a pipe pile head, a PHC pipe pile and a monitoring method for pipe pile construction using a hammering method. Background Art
[0002] Prestressed high-strength concrete (PHC) piles are a new type of green pile foundation and are widely used in projects such as super-high-rise buildings, long-span bridges and highways. However, during the construction process of the hammer method, when encountering hard soil layers such as silt sand, penetration difficulties or pile explosion problems may occur. In addition, according to the requirements of the specifications, it is crucial to control the total number of hammer blows: the total number of hammer blows for PHC piles should not exceed 2,500 times, and the number of hammer blows within the last 1 meter should not exceed 300 times. However, there may be deviations in the actual on-site data reading, resulting in a lot of waste of manpower and time costs.
[0003] In the existing construction process of pipe piles using the hammer method, the pile head lacks protection, and repeated impacts of the heavy hammer may cause the pile head to crack, break or deform. In addition, it is difficult to determine the single force and settlement of the pipe pile, the critical hammer force that causes cracks to appear, and the size of cracks during the pile blasting process is difficult to assess. The entire construction process lacks effective pile head protection measures and timely feedback warning devices.
[0004] In summary, there are many problems in the current large-diameter PHC pipe pile hammering method, including backward equipment, strata and technology. Under the repeated impact of the heavy hammer, the pile head is prone to cracking, damage or deformation. In addition, the poor accuracy, low efficiency, difficult reading and cumbersome operation of manually recording hammering data are also problems.
[0005] Therefore, the key to solving the problem of monitoring the construction data of hammer piles lies in exploring new ideas and information / automation methods. The use of new pile head explosion-proof devices and information monitoring technology can achieve safe, accurate and efficient recording of hammer construction data and pile head stress and strain analysis, and effectively prevent pile head explosion. This is a problem that technicians in the current transportation field urgently need to solve. Summary of the invention
[0006] The present invention aims at the above-mentioned technical problems, overcomes the shortcomings of the prior art, and provides a pipe pile head explosion-proof monitoring device, a PHC pipe pile and a pipe pile construction monitoring method by hammering method. A semi-rigid and semi-flexible pile head protection device is formed by a rigid gasket and an elastic liner pile cap, which can alleviate the vibration impact of a heavy hammer directly hammering the pipe pile head, and can monitor and analyze the number of pile head hammerings, hammering time, hammering stress, pile head crack changes, pile body construction displacement and settlement, and monitor the hammering progress.
[0007] In a first aspect, the present invention provides an explosion-proof monitoring device for a pipe pile head, which is applied to a pipe pile head and includes a rigid gasket, an elastic liner pile cap and an information monitoring system. The elastic liner pile cap is composed of an upper large-diameter body and a lower small-diameter body concentrically forming an unequal-diameter double cylinder, and a cavity is opened on the elastic liner pile cap. The information monitoring system includes a cylinder and a wireless stress monitoring device, a wireless crack monitoring device and a positioning height determination device connected to the cylinder; The bottom of the rigid gasket is detachably connected to the information monitoring system to form an integrated device, and the integrated device is plugged into the elastic liner pile cap, and the information monitoring system is accommodated in the cavity of the elastic liner pile cap.
[0008] Optionally, the wireless stress monitoring device includes a connected pile head pressure sensor, a first data transmission line and a stress monitoring control box, and the pile head pressure sensor is installed at the lower side of the large diameter body, and the stress monitoring control box is installed in the cylinder. Multiple pile head pressure sensors can be installed on the bottom surface of the large diameter body so that they are located between the large diameter body and the pile head to accurately monitor and sense the number of hammer strikes.
[0009] Optionally, the wireless crack monitoring device includes a crack monitoring scanner, a second data transmission line and a crack monitoring control box connected to each other.
[0010] Optionally, the crack monitoring scanner is installed on the circumferential outer side of the elastic liner pile cap, and the crack monitoring control box is installed in the cylinder. The crack monitoring scanner can be arranged in a circular shape on the circumferential side wall of the elastic liner pile cap to monitor the crack status of the pile head in the direction of the outer wall of the elastic liner pile cap.
[0011] Optionally, the rigid gasket includes a circular steel gasket and a first clamping piece connected thereto, and the information monitoring system is connected to a second clamping piece that is adapted to be clamped with the first clamping piece.
[0012] Optionally, the first clamping member and the second clamping member include fan-shaped buckles, and the two fan-shaped buckles are in a male-female buckle connection relationship to achieve a detachable connection between the two.
[0013] Optionally, the cross section of the rigid gasket is adapted to the cross section of the large diameter body of the elastic liner pile cap, so that the integrated device consisting of the rigid gasket and the information monitoring system can be adapted and plugged into the elastic liner pile cap.
[0014] In the second aspect, the present invention provides a PHC pipe pile, comprising a pipe pile and a pile head located on the pipe pile, and the pile head is plugged with the pipe pile head explosion-proof monitoring device described in any scheme in the first aspect, wherein the large-diameter body in the rigid gasket and the elastic liner pile cap is located above the pile head, and the information monitoring system and the small-diameter body in the elastic liner pile cap are located in the inner cavity of the pile head.
[0015] Optionally, the outer diameter of the large-diameter body in the elastic liner pile cap is matched with the outer diameter of the pile head, and the outer diameter of the small-diameter body is matched with the inner cavity diameter of the pile head.
[0016] In a third aspect, the present invention also provides a method for monitoring pipe pile construction by hammering, wherein the pipe pile head explosion-proof monitoring device described in any one of the first scheme is installed on the pile head, and the pipe pile is driven down into the foundation soil by hammering construction. During the hammering construction, a wireless stress monitoring device is used to monitor the hammering data of the pile head, a wireless crack monitoring device is used to monitor the crack change data of the pile head, and a positioning and height determination device is used to monitor the displacement data of the pile body.
[0017] The beneficial effects of the present invention are: (1) The pile head explosion-proof monitoring device of the present invention is a semi-rigid and semi-flexible pile head protection device formed by a rigid gasket and an elastic liner pile cap. The rigid gasket can withstand the hammering force of a heavy hammer to make it more uniform. The elastic liner pile cap is placed between the pipe pile and the rigid gasket as a flexible material to play a transitional connection role, thereby alleviating the vibration impact of the heavy hammer directly hitting the pile head of the pipe pile. It can effectively prevent cracks, breakage, and even pile explosion from occurring on the pile head. (2) The pile head explosion-proof monitoring device of the present invention is prefabricated and spliced by prefabricated rigid gaskets, elastic liner pile caps and information monitoring systems to form an integrated device, which is inserted into the PHC pile to form a composite device; the device is simple to manufacture, easy to operate, maintainable and practical; each component can be disassembled, inspected, repaired and replaced at any time, and can also be recycled for many times, with high economic benefits; (3) Compared with the traditional information monitoring of pile foundation, the pile head explosion-proof device of the present invention has the information monitoring system installed inside to form a detachable integrated device, which is simpler and more convenient, and provides a complete set of pile head monitoring system, which can monitor and analyze the number of pile head hammer blows, hammer blow time, hammer blow stress, pile head crack changes, pile body construction displacement and settlement, and monitor hammer blow progress, etc.; (4) The information monitoring system adopted by the present invention has the characteristics of informatization / automation, time-saving and labor-saving, and timely feedback. The built-in detachable wireless stress monitoring device can timely feedback the pile head hammering time, hammering number and hammering stress. The wireless crack monitoring device can timely feedback the crack changes in the pile head, and warn of pile head breakage, etc. The positioning and height determination device can accurately locate the pile body, the displacement and settlement of the pile body during construction, and monitor the hammering progress, etc.; the cloud server analyzes the changes of pile body settlement with pile head stress, the changes of pile head cracks with pile head stress, etc., and timely feedback the pile head situation to prevent pile head breakage and protect the pile head, etc.; (5) The explosion-proof monitoring device for the pile head of the pipe pile of the present invention is multifunctional and multi-purpose. It can safely and effectively protect the pile head and prevent the pile head from bursting. It can automatically and quickly monitor the pile sinking data and provide timely feedback and warning of the pile head conditions. In the later stage, it can also be used as a pile core protection device for the pile head part and placed in the pile foundation for long-term protection and monitoring of the pile head conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural cross-sectional view of the explosion-proof monitoring device for pile head of the PHC pipe pile hammering method construction of the present invention; Figure 2 It is a schematic diagram of the pile head explosion-proof monitoring device of the present invention; Figure 3 It is a structural schematic diagram of the rigid gasket of the present invention; Figure 4 It is a structural schematic diagram of the information monitoring system of the present invention; Figure 5 It is a schematic diagram of the installation of the pile head explosion-proof monitoring device of the present invention; Figure 6 It is a schematic diagram of information monitoring of the pile head explosion-proof monitoring device of the present invention; Figure 7 It is a construction step diagram of the pile head explosion-proof monitoring device and the information monitoring method thereof of the present invention; Figure 8 It is a construction flow chart of the pile head explosion-proof monitoring device and the information monitoring method thereof of the present invention; In the figure: 1. Rigid gasket; 2. Elastic liner pile cap; 3. Information monitoring system; 4. Pile head explosion-proof device; 5. Pipe pile; 6. Foundation soil; 7. Wireless device; 8. Cloud server; 9. Client; 10. Heavy hammer; 11. Round steel gasket; 12. First sector buckle; 13. Steel rope; 14. Diesel pile driver; 31. Second fan-shaped buckle; 32. Wireless stress monitoring device; 32a. Pile head pressure sensor; 32b. First data transmission line; 32c. Stress monitoring control box; 33. Wireless crack monitoring device; 33a. Crack monitoring scanner; 33b. Second data transmission line; 33c. Crack monitoring control box; 34. Positioning and height setting device. DETAILED DESCRIPTION
[0019] To make the present invention more clear, the following is a further description of the pipe pile head explosion-proof monitoring device, PHC pipe pile and hammer pipe pile construction monitoring method of the present invention in conjunction with the accompanying drawings. The specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0020] See also Figures 1 to 4, a pipe pile head explosion-proof monitoring device, applied to the PHC pipe pile head hammering construction, specifically includes an information monitoring system 3 connected to a rigid gasket 1, inserted in an elastic liner pile cap 2, wherein: The rigid gasket 1 includes a circular steel gasket 11 and a quarter of the first sector-shaped buckle 12 (i.e., the first clip); the information monitoring system 3 is connected to the rigid gasket 1 through a quarter of the second sector-shaped buckle 31 (i.e., the second clip) and a quarter of the first sector-shaped buckle 12, and as an integrated device, is inserted into the elastic liner pile cap 2 to form a pile head explosion-proof device 4 to protect the pile head; The information monitoring system 3 is a cylindrical tube design, and includes, from top to bottom, a quarter second sector buckle 31 connected to the rigid gasket 1, a wireless stress monitoring device 32, a wireless crack monitoring device 33 and a positioning height setting device 34; The wireless stress monitoring device 32 is composed of a pile head pressure sensor 32a, a first data transmission line 32b and a stress monitoring control box 32c; the wireless crack monitoring device 33 is composed of a crack monitoring scanner 33a, a second data transmission line 33b and a crack monitoring control box 33c; the positioning and height determination device 34 described in the present application can specifically adopt a Beidou positioning system or a GPS positioning system, such as a Beidou positioning antenna. During the construction process, the position and height can be accurately recorded through the Beidou positioning antenna.
[0021] For the large-diameter PHC pile with a diameter of 1m and a wall thickness of 13mm, the pile head explosion-proof monitoring device is designed that the upper part of the rigid gasket 1 has a diameter of 1m and a thickness of 5mm, and the lower part (i.e., the space occupied by the plurality of first clamping parts distributed in a circular shape) has a diameter of 20cm and a length of 20cm; the upper part of the elastic liner pile cap 2 has a large diameter of 1m and a thickness of 15mm, and the lower part has a small diameter of 74cm and a length of 1.5m; the information monitoring system device 3, i.e., the cylinder has a diameter of 20cm and a length of 1m; See also Figure 5 and Figure 6 , the pile head explosion-proof device 4 is inserted and placed in the pipe pile 5 to form a composite device (i.e., PHC pipe pile) for reinforcing the foundation soil 6; The pile head explosion-proof device 4 is inserted and placed in the pipe pile 5, and is driven into the foundation soil 6 by hammering with a heavy hammer 10. The heavy hammer 10 is connected to a diesel pile driver 14 through a steel rope 13; the monitoring data is uploaded to the cloud server 8 for analysis through a wireless device 7, and the results can be viewed through a mobile terminal and a client 9.
[0022] See also Figure 7 and Figure 8 The method for using the above-mentioned pipe pile head explosion-proof monitoring device to perform information monitoring has the following specific steps, including: (1) Device prefabrication: prefabricate rigid gasket 1, elastic liner pile cap 2 and information monitoring system 3 and its internal components; (2) Assembling the information monitoring system: Assembling the monitoring devices inside the information monitoring system 3, and splicing and installing the rigid gasket 1 and the information monitoring system 3 through a quarter of the first fan-shaped buckle 12 and a quarter of the second fan-shaped buckle 31 to form an integrated device; (3) Splicing pile head explosion-proof device: insert the integrated device consisting of the rigid gasket 1 and the information monitoring system 3 into the elastic liner pile cap 2 to form a complete pile head explosion-proof device 4; (4) Installing the pile head explosion-proof device: inserting the pile head explosion-proof device 4 into the pipe pile 5 to form a composite device; (5) Pile driving construction and information monitoring: The pile head explosion-proof device 4 and the pipe pile 5 composite device are driven into the foundation soil 6 by a heavy hammer 10, and the heavy hammer 10 is connected to the diesel pile driver 14 through a steel rope 13. During the construction process, the monitoring data of the pile head explosion-proof device 4 is uploaded to the cloud server 8 for analysis through the wireless device 7, and the results can be viewed through the mobile terminal and the client 9; During the specific hammering construction, the wireless stress monitoring device 32 is used to monitor the hammering data of the pile head, the wireless crack monitoring device 33 is used to monitor the crack change data of the pile head, and the positioning height determination device 34 is used to monitor the displacement data of the pile body.
[0023] It is worth noting that in a specific embodiment of the present invention, the rigid gasket 1 is composed of a circular steel gasket 11 and a quarter of the first fan-shaped buckle 12. The circular steel gasket 11 is used to withstand the hammering force of the heavy hammer 10 during hammering construction, so that the hammering force is distributed more evenly, and the pile head is prevented from being cracked and broken locally due to uneven force; the elastic liner pile cap 2 is placed between the pipe pile 5 and the rigid gasket 1 as a flexible material, and plays a transitional connection role to alleviate the impact of the heavy hammer 10 directly hammering the pile head of the pipe pile 5, and prevent cracks in the pile head, and even pile explosion; the overall pile head explosion-proof device 4 uses the steel hoops at both ends of the large-diameter PHC pipe pile (the steel hoops are prone to bursting at the contact position with the concrete) to set it into a semi-rigid (rigid gasket 1) and semi-flexible (elastic liner pile cap 2) material to alleviate the impact of the heavy hammer during hammering and prevent pile explosion.
[0024] In a specific embodiment of the present invention, the pile head explosion-proof device 4 is prefabricated and spliced by a prefabricated rigid gasket 1, an elastic liner pile cap 2, an information monitoring system 3 and various monitoring devices therein, which can be disassembled, inspected, repaired and replaced at any time, and can also be recycled for many times, with high economic benefits.
[0025] In this embodiment, the pile head explosion-proof device 4 monitors and records the construction data of the pipe pile by the hammering method, and uploads it to the cloud server 8 through the wireless device 7. The analysis can obtain the number of pile head hammering, hammering time, hammering stress, pile head crack changes, pile body construction displacement and settlement, and monitoring hammering progress, etc. The monitoring results can be viewed and fed back in time through the mobile terminal and client 9; when the pile head crack reaches the monitoring warning value, an early warning warning will be issued, and the pile head condition will be checked in time or corresponding measures such as reducing the hammering force of the heavy hammer will be taken to protect the pile head.
[0026] Among them, the hammering time, number of hammering and hammering stress of the pile head are monitored by the wireless stress monitoring device 32; the possible crack changes in the pile head are monitored by the wireless crack monitoring device 33, and the pile head breakage is warned; the positioning and height determination device 34 is used to determine the pile body positioning, the pile body construction displacement and settlement, and the hammering progress; the cloud server 8 is used to analyze the changes in the pile body settlement with the pile head stress, the changes in the pile head cracks with the pile head stress, etc., to timely feedback the pile head situation, prevent the pile head from being broken, and protect the pile head.
[0027] The device of the present invention is fully functional and can safely and stably protect the pipe pile head, informationize / automatically monitor and process the pipe pile construction data, timely monitor feedback and give early warning of the bearing characteristics of the pipe pile head, and greatly improve the safety and accuracy of the pipe pile head during the hammering construction process.
[0028] In addition to the above embodiments, the present invention may also have other implementation modes. Any technical solution formed by equivalent replacement or equivalent transformation falls within the protection scope required by the present invention.
Claims
1. An explosion-proof monitoring device for a pipe pile head, applied to a pipe pile head, characterized in that: The invention comprises a rigid gasket (1), an elastic liner pile cap (2) and an information monitoring system (3); the elastic liner pile cap (2) is composed of an upper large-diameter body and a lower small-diameter body which are concentrically connected to form a double cylinder of unequal diameters, and a cavity is provided on the elastic liner pile cap (2); the information monitoring system (3) comprises a cylinder and a wireless stress monitoring device (32), a wireless crack monitoring device (33) and a positioning height determination device (34) connected to the cylinder; The bottom of the rigid gasket (1) is detachably connected to the information monitoring system (3) to form an integrated device, and the integrated device is plugged into the elastic liner pile cap (2), and the information monitoring system (3) is accommodated in the cavity of the elastic liner pile cap (2).
2. The pipe pile head explosion-proof monitoring device according to claim 1 is characterized in that: The wireless stress monitoring device (32) comprises a pile head pressure sensor (32a), a first data transmission line (32b) and a stress monitoring control box (32c) which are connected to each other, and the pile head pressure sensor (32a) is installed at the bottom surface of the large diameter body so as to be located between the pile head and the large diameter body, and the stress monitoring control box (32c) is installed in the cylinder.
3. The pipe pile head explosion-proof monitoring device according to claim 1 is characterized in that: The wireless crack monitoring device (33) comprises a crack monitoring scanner (33a), a second data transmission line (33b) and a crack monitoring control box (33c) which are connected to each other.
4. The pipe pile head explosion-proof monitoring device according to claim 3 is characterized in that: The crack monitoring scanner (33a) is installed on the circumferential outer side of the elastic liner pile cap (2), and the crack monitoring control box (33c) is installed in the cylinder.
5. The pipe pile head explosion-proof monitoring device according to claim 1, characterized in that: The rigid gasket (1) comprises a circular steel gasket (11) and a first clamping piece connected thereto, and the information monitoring system (3) is connected to a second clamping piece adapted to be clamped with the first clamping piece.
6. The pipe pile head explosion-proof monitoring device according to claim 5, characterized in that: The first clamping member and the second clamping member include fan-shaped buckles.
7. The pipe pile head explosion-proof monitoring device according to claim 1, characterized in that: The cross section of the rigid gasket (1) is adapted to the cross section of the large diameter body of the elastic liner pile cap (2).
8. A PHC pile, characterized in that: The invention comprises a pipe pile (5) and a pile head located on the pipe pile (5), and a pipe pile head explosion-proof monitoring device according to any one of claims 1 to 7 is plugged into the pile head, wherein the large-diameter body in the rigid gasket (1) and the elastic liner pile cap (2) is located above the pile head, and the information monitoring system (3) and the small-diameter body in the elastic liner pile cap (2) are located in the inner cavity of the pile head.
9. The PHC pile according to claim 8, characterized in that: The outer diameter of the large-diameter body in the elastic liner pile cap (2) is matched to the outer diameter of the pile head, and the outer diameter of the small-diameter body is matched to the inner cavity diameter of the pile head.
10. A method for monitoring construction of pipe piles by hammering method, characterized in that: The pipe pile head explosion-proof monitoring device according to any one of claims 1 to 7 is installed on the head of the pipe pile (5), and the pipe pile (5) is driven downward into the foundation soil (6) using a hammering method. During the hammering method, a wireless stress monitoring device (32) is used to monitor the hammering data of the pile head, a wireless crack monitoring device (33) is used to monitor the crack change data of the pile head, and a positioning height determination device (34) is used to monitor the displacement data of the pile body.