Piling limiting device of high pile foundation of photovoltaic precast pile and construction method of piling limiting device
By using pile driving and limiting devices of pile foundation positioning components and limiting components in the construction of photovoltaic prefabricated pile high pile foundations, the problems of pile foundation tilt and high pile foundation construction in the existing technology are solved, and rapid and accurate pile driving of pile foundations is achieved , reducing construction costs and time.
Patent Information
- Application Number
- CN202411363509.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing photovoltaic pile foundation construction positioning device easily leads to inclination of the pile foundation during the pile driving process, and it is difficult to be suitable for high pile foundation construction, which increases construction time and cost.
Provide a pile driving limiting device including a pile foundation positioning assembly and a pile foundation limiting assembly. By marking the assembly and a positioning ring, a sleeve structure is formed by forming a sleeve structure to ensure the pile foundation. The verticality and stability of position.
It effectively avoids the inclination of the pile foundation, shortens the construction time, is suitable for high pile foundation construction, reduces production costs, and improves construction efficiency and economic benefits.
Smart Images

Figure CN119041426A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a piling limit device for a photovoltaic prefabricated pile high pile foundation and a construction method thereof, belonging to the technical field of photovoltaic power generation. Background Art
[0002] In recent years, photovoltaic power generation, as an important green, clean and renewable energy source, has developed rapidly in China. In the new era, how to strengthen technological innovation, accelerate the pace of quality improvement, cost reduction and efficiency increase in the photovoltaic industry has become an important goal of photovoltaic power station design and construction. The site for building photovoltaic projects is more flexible than other energy fields. It can be built in fish ponds, mountains, seaside and desert Gobi. Prefabricated piles have the characteristics of strong adaptability, strong flexibility and high construction efficiency, and are widely used in photovoltaic projects. Due to the large number of pile foundations in photovoltaic projects, for photovoltaic projects using prefabricated pile foundations, generally 100MWp has 26,000 piles. Therefore, how to accurately, quickly and safely construct in pile foundation projects determines the construction efficiency and construction cost of the entire photovoltaic project.
[0003] To this end, in the prior art, there is an invention patent application with Chinese patent application publication number CN105040719A, which discloses a photovoltaic pile foundation construction positioning device and a photovoltaic pile foundation construction method. The photovoltaic pile foundation construction positioning device includes a rectangular positioning frame, a height adjustment support foot and an embedded part positioner. The photovoltaic pile foundation construction positioning device is placed in the photovoltaic electric field, and the rectangular positioning frame is adjusted to a preset angle through each height adjustment support foot, and then a mold is installed on each embedded part positioner, and the pile foundation is poured with concrete in the mold to form the pile foundation. Finally, the photovoltaic pile foundation construction positioning device is removed to complete the photovoltaic pile foundation construction. The above technical solution effectively supports the rectangular positioning frame through the height adjustment support foot, so that it can be installed and used on rugged ground. Then, the rectangular positioning frame and the embedded part positioner effectively ensure the accurate and quick construction of the photovoltaic pile foundation, and ensure the installation accuracy of the pile foundation, so that the photovoltaic bracket pile foundation can be accurately, conveniently, quickly and effectively positioned.
[0004] However, there are still the following problems in actual use: It relies on embedded part locators to locate the photovoltaic pile foundation, and then uses concrete to cast the photovoltaic pile foundation. However, in the subsequent piling process, the embedded part locators need to be removed, and there is no corresponding limiting structure for the photovoltaic pile foundation, which makes the photovoltaic pile foundation prone to tilting during the piling process, requiring repeated construction, thereby increasing the construction time.
[0005] At the same time, the particularity of photovoltaic projects is that the site must meet the original use function of the site under the premise of photovoltaic construction. This leads to the photovoltaic project being affected by special conditions such as terrain and floods. The brackets of some ground photovoltaic projects need to significantly increase the design elevation, and the pile top elevation is also increased accordingly. The pile tops of the photovoltaic projects currently encountered are 10 meters above the ground. The positioning device and positioning method provided by the above technical solution are difficult to apply to the construction of high pile foundations. Summary of the invention
[0006] In order to solve the above problems existing in the prior art, the present invention provides a piling limit device for a photovoltaic prefabricated pile high pile foundation and a construction method thereof.
[0007] The technical solution of the present invention is as follows: In a first aspect, the present invention provides a piling limiting device for a photovoltaic prefabricated pile high pile foundation, comprising a pile foundation positioning component and a pile foundation limiting component; the pile foundation positioning component comprises a marking component for marking the position of the center point of the pile in the pre-piling point and a positioning ring for positioning, a cross beam in a cross-shaped structure is arranged in the middle of the positioning ring, the cross beam and the positioning ring are arranged coaxially, a positioning hole is opened in the middle of the cross beam, and the positioning hole is aligned with the center point of the pile marked by the marking component; the pile foundation limiting component comprises symmetrically arranged semicircular steel plates, the semicircular steel plates on both sides are spliced with each other by setting a connecting component to form a sleeve structure, a fixing component for connecting to the ground is arranged at the bottom of each semicircular steel plate, and a plurality of limiting auxiliary components are arranged on the inner ring of each semicircular steel plate, and the limiting auxiliary components are distributed in a circular array with the center line of the sleeve structure as the array center on the sleeve structure formed by the semicircular steel plates on both sides, and the diameter of the circle surrounded by the limiting auxiliary components is set to be larger than the diameter of the driven pile foundation.
[0008] Furthermore, the marking component is a total station or a GPS locator.
[0009] Furthermore, the four side ends of the crossbeam are fixedly connected to the positioning ring, and a handle in an L-shaped structure is also provided on the crossbeam.
[0010] Furthermore, the connecting assembly includes a latch ring, which is arranged on both side ends of each semicircular steel plate, and the arrangement of the latch ring satisfies that the longitudinal positions of the latch rings on the same side are overlapped when the semicircular steel plates on both sides are spliced, and the latch rings on the same side can be connected together by inserting connecting bolts and locking locking nuts.
[0011] Furthermore, the inner diameter of the positioning ring is adapted to the inner diameter of the sleeve structure formed by splicing the semicircular steel plates on both sides.
[0012] Furthermore, the fixing assembly includes a plurality of fixing steel bars, one end of which is fixedly arranged at the bottom of the semicircular steel plate, and the other end is arranged vertically downward, the end of the fixing steel bar arranged vertically downward is a pointed structure, and the fixing steel bars are evenly distributed along the bottom of the semicircular steel plate.
[0013] Furthermore, the limiting auxiliary component includes a limiting steel plate, the side wall of the limiting steel plate away from the semicircular steel plate is arranged in a straight structure, and ribs are arranged on both sides of the limiting steel plate, which connect the limiting steel plate and the semicircular steel plate.
[0014] In a second aspect, the present invention provides a construction method of the aforementioned piling limit device for the photovoltaic prefabricated pile high pile foundation, comprising the following steps: Step S1: measure the site, find the center point of the pile at the pre-pile point using the marking component, mark the center point of the pile, and then align the positioning hole on the pile foundation positioning component with the marked center point of the pile at the pre-pile point; Step S2: according to the position of the pile foundation positioning assembly on the ground, draw a corresponding circular line; Step S3: remove the pile foundation positioning assembly, splice the semicircular steel plates to form a sleeve structure, align the sleeve structure with the drawn circular line and apply pressure, so that the sleeve structure is fixedly connected to the ground with the help of the fixing assembly, and then put the pile foundation to be driven into the sleeve structure for piling; after driving this pile foundation, remove the sleeve structure from the pile foundation and continue to use it for the next pile foundation.
[0015] Furthermore, the method for marking the center point of the pile in step S1 includes: using a thin needle to pierce the ground at a position corresponding to the center point of the pile found by the marking component.
[0016] Furthermore, the method of drawing the circular line in step S2 includes: before the pile foundation positioning assembly is placed on the ground, the bottom surface of the pile foundation positioning assembly is covered with marking powder.
[0017] The present invention has the following beneficial effects: 1. The present invention provides a pile foundation positioning component and a pile foundation limiting component. The marking component in the pile foundation positioning component cooperates with the positioning ring to locate the pre-pile point on the ground. The fixing component in the pile foundation limiting component can fix the pile foundation limiting component to the ground. The limiting auxiliary component in the pile foundation limiting component can limit the pile foundation driven into the pile foundation limiting component, so as to solve the problem that the pile foundation is prone to tilting during the piling process, so that the pile foundation can be quickly put into place, and the repeated construction time caused by the deviation of the pile foundation is reduced. Compared with the prior art, the present invention has the advantages of avoiding the tilting of the pile foundation, shortening the construction time, and being applicable to the construction of high pile foundations.
[0018] 2. The overall structural design of the piling limit device provided by the present invention is simple and clear, which is not only convenient for manufacturing and assembly, but also can effectively reduce production costs and save economic investment for users. In addition, the piling limit device is easy to operate during the piling process, so that users can quickly get started without spending too much time on adjustment or operation, which can improve construction efficiency. At the same time, the piling limit device can be reused, which can further improve economic benefits.
[0019] 3. The present invention proposes a construction method for a piling limit device for a photovoltaic prefabricated pile high pile foundation. The pile foundation positioning component is used to locate a suitable pre-piling position, and a suitable circular line is drawn on the ground. Then, the pile foundation limiting component is pressed into the circular line position, so that the position where the pile foundation is driven can be quickly located. During the piling process, the pile foundation limiting component can limit the driven pile foundation to avoid the phenomenon of tilting of the pile foundation. The present invention can be well applied to the construction of high pile foundations of photovoltaic projects, such as the construction of high pile foundations of photovoltaic projects where the pile top is 10m above the ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 is a wireframe diagram of the pile foundation positioning assembly of the present invention; Figure 2 It is a wireframe diagram of the pile foundation limiting assembly in the present invention; Figure 3 A wireframe diagram of a connecting bolt and a locking nut in the present invention; Figure 4 A wireframe diagram of one of the semicircular steel plates in the present invention; Figure 5 It is a wireframe diagram of another semicircular steel plate in the present invention.
[0021] The reference numerals in the figure are as follows: 1. Pile foundation positioning assembly; 11. Positioning ring; 12. Crossbeam; 13. Positioning hole; 14. Handle; 2. Pile foundation limit assembly; 21. Semicircular steel plate; 22. Pin ring; 23. Connecting bolt; 24. Locking nut; 25. Fixed steel bar; 26. Limiting steel plate; 27. Rib plate. DETAILED DESCRIPTION
[0022] The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0023] Example 1: Please refer to Figures 1 to 5 This embodiment provides a piling limiting device for a photovoltaic prefabricated pile high foundation, including a pile foundation positioning component 1 and a pile foundation limiting component 2.
[0024] In this embodiment, the pile foundation positioning component 1 includes a marking component for marking the position of the pile center point in the pre-pile point and a positioning ring 11 for positioning. The marking component is a total station or GPS positioning device commonly used in the prior art. The inner diameter of the positioning ring 11 is set larger than the diameter of the pile foundation. The specific inner diameter of the positioning ring 11 can be determined according to actual conditions, and is preferably 5 to 10 cm larger than the diameter of the pile foundation. A crossbeam 12 with a cross-shaped structure is provided in the middle of the positioning ring 11. The four side ends of the crossbeam 12 are fixedly connected to the positioning ring 11. The crossbeam 12 provides the required structural strength for the positioning ring 11 to avoid deformation of the positioning ring 11. The crossbeam 12 is coaxially arranged with the positioning ring 11, and a positioning hole 13 is opened in the middle of the crossbeam 12. The position setting of the positioning hole 13 satisfies that the positioning hole 13 is also coaxially arranged with the positioning ring 11. The positioning hole 13 is also aligned with the pile center point marked by the marking component.
[0025] In this embodiment, the pile foundation limiting assembly 2 includes a symmetrically arranged semicircular steel plate 21, and the semicircular steel plates 21 on both sides are spliced together to form a sleeve structure by setting a connecting assembly. The inner diameter of the positioning ring 11 is adapted to the inner diameter of the sleeve structure formed by splicing the semicircular steel plates 21 on both sides, and is specifically the same, so as to facilitate the subsequent installation of the sleeve structure. The bottom of each semicircular steel plate 21 is provided with a fixing assembly for connecting to the ground, and a plurality of limiting auxiliary assemblies are provided on the inner ring portion of each semicircular steel plate 21. The number of limiting auxiliary assemblies can be determined according to actual conditions. The limiting auxiliary assemblies are distributed in a circular array on the sleeve structure formed by the semicircular steel plates 21 on both sides, with the center line of the sleeve structure as the array center. The diameter of the circle surrounded by the limiting auxiliary assemblies is set to be larger than the diameter of the driven pile foundation. The specific diameter can be determined according to the actual accuracy requirements, and is preferably larger than 5 mm of the diameter of the driven pile foundation.
[0026] In this embodiment, the connecting assembly includes a latch ring 22, which is arranged at both side ends of each semicircular steel plate 21, and the arrangement of the latch ring 22 satisfies that the longitudinal positions of the latch rings 22 on the same side are overlapped when the semicircular steel plates 21 on both sides are spliced together, that is, when the semicircular steel plates 21 on both sides are spliced with each other, the lateral positions of the latch rings 22 on the same side do not interfere with each other. After the semicircular steel plates 21 on both sides are spliced to form a sleeve structure, the latch rings 22 on the same side are connected together by inserting the connecting bolts 23 and locking the locking nuts 24, so that the semicircular steel plates 21 on both sides can be fixedly connected together.
[0027] In this embodiment, the fixing assembly includes a plurality of fixing steel bars 25, and the specific number of the fixing steel bars 25 can be determined according to actual conditions. One end of the fixing steel bar 25 is fixedly set at the bottom of the semicircular steel plate 21, and the other end is set vertically downward. The end of the fixing steel bar 25 set vertically downward is a pointed structure so that it can be inserted into the ground to play the required fixing role. The fixing steel bar 25 is evenly distributed along the bottom of the semicircular steel plate 21, so that uniform force can be achieved, thereby ensuring the fixing effect it plays.
[0028] In this embodiment, the limiting auxiliary component includes a limiting steel plate 26. The side wall of the limiting steel plate 26 away from the semicircular steel plate 21 is arranged in a straight line structure to ensure that the circle formed by it can play a good limiting role. Ribs 27 are arranged on both sides of the limiting steel plate 26. The ribs 27 connect the limiting steel plate 26 with the semicircular steel plate 21. The ribs 27 are arranged to strengthen the structural strength of the limiting steel plate 26 to avoid deformation of the limiting steel plate 26 during the process of limiting the pile foundation, which can well ensure the limiting effect of the limiting steel plate 26.
[0029] In order to facilitate the operator to move the pile foundation positioning assembly 1, in this embodiment, a handle 14 in an L-shaped structure is further provided on the crossbeam 12. The operator can move the pile foundation positioning assembly 1 by holding the handle 14.
[0030] Example 2: Please refer to Figures 1 to 5 This embodiment provides a construction method for a piling limit device for a photovoltaic prefabricated pile high pile foundation, including using a piling limit device for a photovoltaic prefabricated pile high pile foundation provided in Embodiment 1, and further comprising the following steps: Step 1: Measure the site, use the marking component to find the center point of the pile at the pre-pile point according to actual needs, and mark the center point of the pile. The specific marking method is: use a fine wire needle to pierce the ground at the corresponding position of the pile center point found by the marking component. After that, when the pile driver is in place, in order to avoid a large offset of the marked pile center point, the pile position can be re-aligned to ensure that the pile center point is the point where the fine wire needle is inserted. Then align the positioning hole 13 of the positioning circle 11 in the pile foundation positioning component 1 with the marked pile center point of the pre-pile point.
[0031] Step 2: Place the positioning ring 11 on the ground. The position of the positioning ring 11 on the ground satisfies the setting of the fine outline needle to penetrate the positioning hole 13. Then, draw a corresponding circular line according to the position of the positioning ring 11 on the ground. The specific drawing method is: before placing the positioning ring 11 on the ground, cover the bottom surface of the positioning ring 11 with marking powder. The marking powder can be common magnesium powder.
[0032] Step 3: Remove the positioning ring 11. Since the ground of the positioning ring 11 is covered with marking powder, a corresponding circular line can be formed on the ground after the positioning ring 11 is removed. Then, the two semicircular steel plates 21 are spliced together with the help of connecting bolts 23 and locking nuts 24 to form a sleeve structure. The sleeve structure is aligned with the drawn circular line and pressure is applied to insert the fixed steel bar 25 into the ground. Thus, the sleeve structure can be fixedly connected with the ground with the help of the fixed steel bar 25 and stand on the ground. Then, the pile foundation is lifted with a pile driver, and the lower end of the pile foundation to be driven is sent into the sleeve structure. At this time, the prefabricated pile foundation is accurately positioned, and piling can be carried out. To ensure the accuracy of piling, you can continue to use Use the marking component to make bidirectional corrections to the pile foundation position. After confirmation, preliminarily pressurize the pile foundation. During the pressurization process, check the verticality of the pile body in real time, and then start the formal pile driving. During the pressurization process, continuously observe and correct the verticality of the pile body. When the top of the pile is pressed to 1 meter from the ground, hoist the second section of the pile into place, align the two pile ends and weld the connected piles. After the connection is completed, continue to press the pile to the designed elevation of the pile top to complete the piling. After this pile foundation is driven, remove the sleeve structure from the pile foundation and continue to use it for the next pile foundation.
[0033] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A piling limit device for a photovoltaic prefabricated pile high foundation, characterized in that: It comprises a pile foundation positioning component (1) and a pile foundation limiting component (2); The pile foundation positioning component (1) comprises a marking component for marking the position of the pile center point in the pre-pile point and a positioning ring (11) for positioning, a cross beam (12) in a cross-shaped structure is arranged in the middle of the positioning ring (11), the cross beam (12) and the positioning ring (11) are arranged coaxially, a positioning hole (13) is opened in the middle of the cross beam (12), and the positioning hole (13) is aligned with the pile center point marked by the marking component; The pile foundation limiting assembly (2) comprises symmetrically arranged semicircular steel plates (21), the semicircular steel plates (21) on both sides are spliced with each other by arranging connecting assemblies to form a sleeve structure, the bottom of each semicircular steel plate (21) is provided with a fixing assembly for connecting with the ground, and a plurality of limiting auxiliary assemblies are arranged on the inner ring portion of each semicircular steel plate (21), and the limiting auxiliary assemblies are distributed in a circular array on the sleeve structure formed by the semicircular steel plates (21) on both sides with the center line of the sleeve structure as the array center, and the diameter of the circle surrounded by the limiting auxiliary assemblies is set to be larger than the diameter of the driven pile foundation.
2. The piling limit device for a photovoltaic prefabricated pile high foundation according to claim 1, characterized in that: The marking component is a total station or a GPS locator.
3. The piling limit device for a photovoltaic prefabricated pile high foundation according to claim 1 is characterized in that: The four side ends of the crossbeam (12) are fixedly connected to the positioning ring (11), and a handle (14) in an L-shaped structure is also provided on the crossbeam (12).
4. The piling limit device for a photovoltaic prefabricated pile high foundation according to claim 1, characterized in that: The connection assembly comprises a latch ring (22), which is arranged at both ends of each semicircular steel plate (21), and the arrangement of the latch ring (22) satisfies that the longitudinal positions of the latch rings (22) on the same side are overlapped when the semicircular steel plates (21) on both sides are spliced, and the latch rings (22) on the same side can be connected together by inserting a connecting bolt (23) and locking a locking nut (24).
5. The piling limit device for a photovoltaic prefabricated pile high foundation according to claim 1, characterized in that: The inner diameter of the positioning ring (11) is adapted to the inner diameter of a sleeve structure formed by splicing two semicircular steel plates (21) together.
6. The piling limit device for a photovoltaic prefabricated pile high foundation according to claim 1, characterized in that: The fixing assembly comprises a plurality of fixing steel bars (25), one end of the fixing steel bars (25) being fixedly arranged at the bottom of the semicircular steel plate (21), and the other end being arranged vertically downward, the end of the fixing steel bars (25) being arranged vertically downward is a tip structure, and the fixing steel bars (25) are evenly distributed along the bottom of the semicircular steel plate (21).
7. The piling limit device for a photovoltaic prefabricated pile high foundation according to claim 1, characterized in that: The limiting auxiliary component comprises a limiting steel plate (26), the side wall of the limiting steel plate (26) away from the semicircular steel plate (21) is arranged in a straight line structure, and ribs (27) are arranged on both sides of the limiting steel plate (26), and the ribs (27) connect the limiting steel plate (26) and the semicircular steel plate (21).
8. A construction method for a piling limiter device for a photovoltaic prefabricated pile high foundation according to any one of claims 1 to 7, characterized in that: The following steps are involved: Step S1: measuring the site, and using a marking component to find the center point of the pile at the pre-pile point, marking the center point of the pile, and then aligning the positioning hole (13) on the pile foundation positioning component (1) with the marked center point of the pile at the pre-pile point; Step S2: drawing a corresponding circular line according to the position of the pile foundation positioning component (1) on the ground; Step S3: remove the pile foundation positioning assembly (1), splice the semicircular steel plates (21) to form a sleeve structure, align the sleeve structure with the drawn circular line and apply pressure, so that the sleeve structure is fixedly connected to the ground with the help of the fixing assembly, and then place the pile foundation to be driven into the sleeve structure to start piling; after the pile foundation is driven, the sleeve structure is removed from the pile foundation and is used for the next pile foundation.
9. The construction method of the piling limit device of the photovoltaic prefabricated pile high pile foundation according to claim 8, characterized in that: The method for marking the pile center point in step S1 includes: using a thin needle to pierce the ground at a position corresponding to the pile center point found by the marking component.
10. The construction method of the piling limit device of the photovoltaic prefabricated pile high foundation according to claim 8, characterized in that: The method for drawing the circular line in step S2 comprises: before placing the pile foundation positioning component (1) on the ground, the bottom surface of the pile foundation positioning component (1) is covered with marking powder.
Citation Information
Patent Citations
Prestressed pipe pile precision positioning device
CN110820743A
Auxiliary positioning device for bridge pile foundation construction
CN215925970U
Prefabricated tubular pile foundation construction surveying and setting-out tool
CN220266553U
Photovoltaic pile foundation construction positioning device
CN221681836U
Pile holder installed on existing pile and method for connecting and burying existing pile
JP2008248493A
Cited By
Positioning device for photovoltaic pile foundation construction
CN119640796A