Method and device for determining deviation of bottom drilling tool assembly, electronic equipment and medium
By measuring the borehole trajectory and drill string parameters in real time, the deviation angle is calculated to describe the deviation between the bottom drilling tool combination axis and the wellbore axis, the problem of inaccurate trajectory measurement caused by spatial deformation of the bottom drilling tool combination in drilling is solved, and the wellbore is improved Trajectory control accuracy.
Patent Information
- Application Number
- CN202411236341.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-12-06
AI Technical Summary
In the existing drilling technology, the spatial deformation of the bottom drilling tool combination in the wellbore results in inconsistent axis, affecting the accuracy of the wellbore trajectory measurement and failing to meet the high-precision control requirements.
By measuring the drill string parameters of the wellbore trajectory parameters and the drill string parameters of the bottom drill tool combination in real time, the calculated deviation angle is used to quantitatively describe the deviation between the bottom drill tool combination axis and the wellbore axis, and then guide the wellbore trajectory control.
It improves the accuracy of wellbore trajectory control, scientifically and accurately evaluates well inclined data, and meets the high-precision control needs of complex structural wells.
Smart Images

Figure CN119083975A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of petroleum exploration, and in particular to a method, device, electronic equipment and storage medium for determining a bottom hole assembly deviation. Background Art
[0002] With the continuous development of unconventional oil and gas resources, various complex wells are constantly being used, and the requirements for drilling wellbore trajectory control are constantly increasing. For example, shale oil in-situ conversion adopts small-spacing intensive horizontal well cluster development, which greatly increases the precision requirements for directional wellbore trajectory control and poses a great challenge to the existing conventional directional drilling wellbore trajectory control methods. In the process of oil and gas drilling construction, wireless measurement while drilling (MWD) tools are usually used to measure and transmit wellbore position parameters to achieve trajectory control. Position parameters include well depth, well inclination, azimuth, etc. However, the current measurement of wellbore trajectory parameters assumes that the measurement tool coincides with the bottom hole assembly (BHA) axis, and the BHA axis is consistent with the wellbore axis, and ignores the influence of other environmental parameters. In practice, the BHA will undergo spatial deformation in the wellbore, and its axis may not be consistent with the wellbore axis, resulting in the measurement results of the measurement while drilling tool in the BHA being inaccurate and unable to meet the subsequent high-precision wellbore trajectory control operation requirements. Summary of the invention
[0003] The present application provides a bottom drill assembly deviation determination method, device, electronic device and storage medium, which can quantitatively describe the deviation between the bottom drill assembly axis and the wellbore axis through the calculated deviation angle, so as to more scientifically and accurately evaluate the well inclination data and guide the subsequent drilling wellbore trajectory control.
[0004] According to one aspect of the present application, a method for determining a bottom hole assembly deviation is provided, the method comprising:
[0005] Determine the borehole trajectory parameters and the drill string parameters of the bottom hole assembly measured in real time in the target measurement section; wherein the target measurement section is a well section with the drill bit of the bottom hole assembly as the lower end and a preset distance above the drill bit as the upper end;
[0006] Determine the coordinates of the borehole axis of the target measuring section according to the borehole trajectory parameters, and determine the coordinates of the bottom hole assembly axis of the bottom hole assembly according to the drill string parameters;
[0007] The deviation angle between the bottom hole assembly axis and the wellbore axis is calculated according to the wellbore axis coordinate and the bottom hole assembly axis coordinate.
[0008] According to another aspect of the present application, a bottom hole assembly deviation determination device is provided, the device comprising:
[0009] A parameter determination module is used to determine the borehole trajectory parameters and the drill string parameters of the bottom hole assembly measured in real time in the target measurement section; wherein the target measurement section is a well section with the drill bit of the bottom hole assembly as the lower end and a preset distance above the drill bit as the upper end;
[0010] A coordinate determination module, used to determine the coordinates of the borehole axis of the target measuring section according to the borehole trajectory parameters, and to determine the coordinates of the bottom hole assembly axis of the bottom hole assembly according to the drill string parameters;
[0011] The deviation determination module is used to calculate the deviation angle between the bottom hole assembly axis and the wellbore axis according to the wellbore axis coordinates and the bottom hole assembly axis coordinates.
[0012] According to another aspect of the present application, an electronic device is provided, the electronic device comprising:
[0013] at least one processor; and
[0014] a memory communicatively connected to the at least one processor; wherein,
[0015] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can perform the bottom hole assembly deviation determination method according to any embodiment of the present invention.
[0016] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the bottom drilling tool assembly deviation determination method described in any embodiment of the present invention when executed.
[0017] The technical solution of the embodiment of the present application determines the borehole trajectory parameters and the drill string parameters of the bottom drill assembly measured in real time in the target measurement section; wherein the target measurement section is a well section with the drill bit of the bottom drill assembly as the lower end and the preset distance above the drill bit as the upper end; the borehole axis coordinates of the target measurement section are determined according to the borehole trajectory parameters, and the bottom drill assembly axis coordinates of the bottom drill assembly are determined according to the drill string parameters; the deviation angle between the bottom drill assembly axis and the borehole axis is calculated according to the borehole axis coordinates and the bottom drill assembly axis coordinates. The technical solution of the embodiment of the present application, taking into account the spatial deformation of the bottom drill assembly in the borehole, quantitatively describes the deviation between the bottom drill assembly axis and the borehole axis through the calculated deviation angle, so as to more scientifically and accurately evaluate the well inclination data and guide the subsequent drilling borehole trajectory control, thereby improving the drilling trajectory control accuracy.
[0018] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0020] Figure 1 is a flow chart of a method for determining a bottom hole assembly deviation according to the first embodiment of the present application;
[0021] Figure 2 is a flow chart of a method for determining a bottom hole assembly deviation according to the second embodiment of the present application;
[0022] Figure 3 It is a specific implementation flow chart of a method for determining a bottom hole assembly deviation provided in Example 3 of the present application;
[0023] Figure 4 is a schematic diagram of a wellbore axis provided according to Embodiment 3 of the present application;
[0024] Figure 5 It is a schematic diagram of a wellbore axis and a bottom hole assembly axis provided according to the third embodiment of the present application;
[0025] Figure 6 is a schematic diagram of a deviation angle within a target measurement section provided according to Embodiment 3 of the present application;
[0026] Figure 7 It is a structural schematic diagram of a bottom drilling assembly deviation determination device provided according to the fourth embodiment of the present application;
[0027] Figure 8 It is a structural schematic diagram of an electronic device for implementing the bottom drill assembly deviation determination method of an embodiment of the present application. DETAILED DESCRIPTION
[0028] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0029] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0030] Embodiment 1
[0031] Figure 1 A flowchart of a method for determining a bottom hole assembly deviation is provided for the first embodiment of the present application. This embodiment is applicable to the case where the bottom hole assembly undergoes spatial deformation during drilling, causing the bottom hole assembly axis to deviate from the wellbore axis, and the resulting deviation is determined. The method can be executed by a bottom hole assembly deviation determination device, which can be implemented in the form of hardware and / or software, and can be configured in an electronic device. Figure 1 As shown, the method includes:
[0032] S110, determining the borehole trajectory parameters and the drill string parameters of the bottom hole assembly measured in real time in the target measurement section; wherein the target measurement section is a well section with the drill bit of the bottom hole assembly as the lower end and a preset distance above the drill bit as the upper end.
[0033] The target measurement section refers to the well section with the current drill bit position of the bottom hole assembly as the lower end and the position at a preset distance above the drill bit as the upper end during the drilling process. The preset distance can be set according to actual needs, such as 30 meters, and the embodiment of the present application is not limited to this. The wellbore trajectory parameters measured in real time in the target measurement section include data such as well depth, well inclination, and azimuth.
[0034] Among them, the bottom hole assembly (BHA) refers to a section of drill string that is located at the bottom of the drill string during drilling and is formed by the cooperation and connection of drilling tools such as drill bits, drill collars, stabilizers, and drill pipes. Common bottom hole assemblies include full-hole drill assemblies, pendulum drill assemblies, and tower drill assemblies. The drill string parameters of the bottom hole assembly measured in real time in the target measurement section include the structure, size, elastic modulus, moment of inertia, line weight, drilling pressure, and torque of the drill string.
[0035] In an embodiment of the present application, the wellbore trajectory parameters measured in real time in the target measuring section can be determined by means of a measuring tool installed in the drilling equipment during the drilling process, so that the wellbore trajectory of the target measuring section and the real-time distribution of the bottom drill assembly in the formation space can be determined by analyzing the wellbore trajectory parameters of the target measuring section and the drill string parameters of the bottom drill assembly, thereby determining the deviation between the axis of the bottom drill assembly and the wellbore axis caused by the spatial deformation of the bottom drill assembly.
[0036] S120, determining the coordinates of the wellbore axis of the target measuring section according to the wellbore trajectory parameters, and determining the coordinates of the bottom hole assembly axis of the bottom hole assembly according to the drill string parameters.
[0037] Among them, the borehole axis coordinates are used to describe the actual spatial form of the borehole axis. In drilling engineering, the borehole axis is regarded as a specific spatial curve of the wellbore in the formation. When describing the actual spatial form of the borehole axis through the borehole axis coordinates, the borehole axis coordinates are usually located in a horizontal plane coordinate system with the wellhead as the origin, including coordinates in the vertical, north, and east directions. The bottom hole assembly axis coordinates are used to describe the position and form of the bottom hole assembly in the wellbore, and also include coordinates in the vertical, north, and east directions.
[0038] In an embodiment of the present application, after the borehole trajectory parameters and the drill string parameters of the bottom drill assembly measured in real time in the target measurement section are determined, the borehole axis coordinates of the target measurement section can be determined according to the borehole trajectory parameters, and the bottom drill assembly axis coordinates of the bottom drill assembly can be determined according to the drill string parameters, and the actual spatial form of the borehole axis and the position and form of the bottom drill assembly in the borehole can be described respectively by the borehole axis coordinates and the bottom drill assembly axis coordinates. Optionally, the borehole axis coordinates of the target measurement section can be determined according to the borehole trajectory parameters, and the bottom drill assembly axis coordinates of the bottom drill assembly can be determined according to the drill string parameters. A numerical solution method such as the radius of curvature method and the weighted residual method can be used to obtain an axis coordinate determination model for determining the borehole axis coordinates and the bottom drill assembly axis coordinates, and the borehole axis coordinates and the bottom drill assembly axis coordinates can be determined by the axis coordinate model.
[0039] S130, calculating the deviation angle between the bottom hole assembly axis and the wellbore axis according to the wellbore axis coordinates and the bottom hole assembly axis coordinates.
[0040] The deviation angle is used to quantitatively describe the deviation between the bottom drill assembly axis and the wellbore axis. After determining the deviation angle between the bottom drill assembly axis and the wellbore axis, the subsequent drilling wellbore trajectory control can be guided according to the deviation angle to improve the drilling trajectory control accuracy.
[0041] In an embodiment of the present application, after determining the wellbore axis coordinates of the target measuring section according to the wellbore trajectory parameters and determining the bottom drill assembly axis coordinates of the bottom drill assembly according to the drill string parameters, the deviation angle between the bottom drill assembly axis and the wellbore axis can be calculated based on the wellbore axis coordinates and the bottom drill assembly axis coordinates, so as to evaluate the well inclination data more scientifically and accurately, thereby guiding the subsequent drilling wellbore trajectory control and improving the drilling trajectory control accuracy.
[0042] The technical solution of the embodiment of the present application determines the borehole trajectory parameters and the drill string parameters of the bottom drill assembly measured in real time in the target measurement section; wherein the target measurement section is a well section with the drill bit of the bottom drill assembly as the lower end and the preset distance above the drill bit as the upper end; the borehole axis coordinates of the target measurement section are determined according to the borehole trajectory parameters, and the bottom drill assembly axis coordinates of the bottom drill assembly are determined according to the drill string parameters; the deviation angle between the bottom drill assembly axis and the borehole axis is calculated according to the borehole axis coordinates and the bottom drill assembly axis coordinates. The technical solution of the embodiment of the present application, taking into account the spatial deformation of the bottom drill assembly in the borehole, quantitatively describes the deviation between the bottom drill assembly axis and the borehole axis through the calculated deviation angle, so as to more scientifically and accurately evaluate the well inclination data and guide the subsequent drilling borehole trajectory control.
[0043] Embodiment 2
[0044] Figure 2 This is a flow chart of a method for determining a bottom drilling tool assembly deviation provided in Example 2 of the present application. The present application example is optimized based on the above example. For solutions not described in detail in the present application example, see the above example. Figure 2 As shown, the method includes:
[0045] S210, determining the well depth, well inclination and azimuth data measured in real time by the wireless measurement while drilling tool in the target measurement section as wellbore trajectory parameters.
[0046] Among them, the wireless measurement while drilling tool MWD (Measurement While Drilling) is a measurement device widely used in the drilling process. It can measure geological parameters, trajectory parameters, drilling parameters, evaluation parameters and other data in real time while drilling. By analyzing the measured data, it can provide a scientific basis for the next step of drilling construction.
[0047] Among them, the well depth refers to the length from the turntable surface to a certain position of the wellbore trajectory at the bottom of the well, and the unit is meter. Well inclination refers to the phenomenon that the actual wellbore trajectory deviates from the designed vertical or predetermined direction. The well inclination angle is the angle between the wellbore axis and the plumb line, and the unit is degree (°) or radian (rad). The azimuth is the angle between the projection direction of the wellbore axis on the horizontal plane and the true north direction, and the unit is degree (°) or radian (rad).
[0048] In an embodiment of the present application, the well depth, well inclination and azimuth data of the upper end of the target measuring section, as well as the well depth, well inclination and azimuth data of the lower end of the target measuring section can be measured by the downhole measuring part of the wireless while drilling measurement tool, and the well depth, well inclination and azimuth data of the upper and lower ends of the target measuring section are used as wellbore trajectory parameters, which are sent by the downhole measurement part to the ground receiving and processing part of the wireless while drilling measurement tool through a signal sending device, so as to determine the wellbore axis coordinates of the target measuring section.
[0049] S220, determining the structure, size, elastic modulus, moment of inertia, line weight, drilling pressure and torque data of the drill string measured in real time in the target measuring section as drill string parameters.
[0050] Among them, the elastic modulus is used to describe the relationship between stress and strain of the material during the elastic deformation stage. The moment of inertia is used to describe the inertia of an object when it rotates. Line weight can be understood as the weight per unit length of the drill string. The drilling pressure is the pressure applied by the drill bit to the formation during drilling operations. The torque is the product of the force and the radius of rotation of the force, and is used to describe the effect of the force causing an object to rotate around a point or axis.
[0051] In the embodiment of the present application, the structure, size, elastic modulus, moment of inertia, line weight, drilling pressure and torque data of the drill string can be measured through an engineering logging parameter record table or a special tool. Specifically, the elastic modulus can be determined according to the material of the drill string, usually between 196 MPa and 220 MPa; the moment of inertia can be calculated according to the inner and outer diameters of the drill string, the line weight can be calculated according to the weight of the drill string, and the size and weight of the drill string can be obtained according to the parameters of the bottom drill assembly; the drilling pressure and torque can be obtained according to the engineering logging parameter record table. After determining the elastic modulus, moment of inertia, line weight, drilling pressure and torque data of the drill string in the target measurement section, the above data can be used as the drill string parameters of the bottom drill assembly to determine the coordinates of the bottom drill assembly axis.
[0052] S230, interpolating the wellbore trajectory parameters to determine the wellbore axis coordinates of the target measurement section.
[0053] In the embodiment of the present application, the well depth, well inclination and azimuth data of the upper and lower ends of the target measurement section in the wellbore trajectory parameters can be interpolated to determine the wellbore axis coordinates of the target measurement section. Among them, the interpolation calculation method can adopt the curvature radius method, cubic spline interpolation, cylindrical spiral method, balanced tangent method, tangent method, corrected average angle method, minimum curvature method, etc., and the embodiment of the present application is not limited to this.
[0054] Optionally, the wellbore trajectory parameters are interpolated to determine the wellbore axis coordinates of the target measurement section, including: determining the radius of curvature of the projection arc of the target measurement section on the vertical section view and the horizontal projection view according to the wellbore trajectory parameters; calculating the coordinate increment of each point on the wellbore axis according to the curvature radius through a curvature radius interpolation calculation method; and determining the vertical, north, and east coordinates of each point on the wellbore axis according to the coordinate increments as the wellbore axis coordinates of the target measurement section.
[0055] Among them, the curvature radius interpolation method is a method that takes into account the change of curvature radius when interpolating on a curve or surface. The curvature radius interpolation method not only focuses on the interpolation of position (coordinates), but also focuses on the interpolation of curvature radius to ensure that the interpolation result meets the requirements of the geometric shape and satisfies the physical or engineering constraints.
[0056] In the embodiment of the present application, the curvature radius method is taken as an example to explain the process of determining the borehole axis coordinates of the target measurement section. First, the curvature radius of the projected arc of the target measurement section on the vertical section view and the horizontal projection view is determined according to the borehole trajectory parameters, wherein the calculation formulas for the curvature radius of the target measurement section on the vertical section view and the horizontal projection view are respectively:
[0057]
[0058]
[0059] Among them, R refers to the curvature radius of the target section on the vertical profile, r refers to the curvature radius of the target section on the horizontal projection, L1, α1 and They refer to the well depth, well inclination and azimuth at the upper end of the target measurement section, L2, α2 and They refer respectively to the well depth, well inclination and azimuth at the lower end of the target measuring section.
[0060] Secondly, determine the inclination angle and azimuth angle of any point on the borehole axis, and determine the coordinate increment of any point in combination with the curvature radius of the target measurement section on the vertical section and horizontal projection. Among them, considering the calculation accuracy, any point on the borehole axis refers to the point obtained by dividing the target measurement section into equal parts according to the preset interval. The preset interval can be set according to the actual situation, such as 0.1 meters, and the embodiment of the present application does not limit this. Among them, the calculation formulas for the inclination angle, azimuth angle and coordinate increment of any point on the borehole axis are:
[0061]
[0062]
[0063]
[0064] Among them, R refers to the curvature radius of the target measurement section on the vertical section diagram, r refers to the curvature radius of the target measurement section on the horizontal projection diagram, α1 and They refer to the well inclination and azimuth at the upper end of the target measuring section, ΔL and ΔS refer to the curve length and arc length from any point to the upper end of the target measuring section, α and They refer to the well inclination and azimuth of any point respectively, and ΔX, ΔY and ΔZ refer to the coordinate increments of any point in the north, east and vertical directions respectively.
[0065] Finally, the coordinate increments are accumulated to obtain the vertical (Z w )、North(X w ), East(Y w ) coordinates as the borehole axis coordinates of the target measurement section.
[0066] S240, performing a three-dimensional spatial configuration analysis on the bottom drilling assembly according to the drill string parameters, and determining the coordinates of the bottom drilling assembly axis according to the three-dimensional spatial configuration analysis results.
[0067] In the embodiment of the present application, the bottom drill assembly can be subjected to a three-dimensional spatial configuration analysis based on the elastic modulus, moment of inertia, line weight, drilling pressure and torque data in the drill string parameters, and the coordinates of the bottom drill assembly axis can be determined based on the three-dimensional spatial configuration analysis results.
[0068] Optionally, a three-dimensional spatial configuration analysis is performed on the bottom drill assembly according to the drill string parameters, including: establishing a three-dimensional small deflection model of the bottom drill assembly according to the drill string parameters; solving the three-dimensional small deflection model by a weighted residual method to obtain the deformation of the bottom drill assembly at different well depths in the target measuring section as a three-dimensional spatial configuration analysis result; wherein the deformation includes the deformation on the well inclination plane and the deformation on the azimuth plane.
[0069] Among them, the three-dimensional small deflection model is a mathematical model used to analyze the mechanical behavior of an object when its deformation (deflection) is relatively small when subjected to external forces. In drilling engineering, this model is used to analyze the three-dimensional static characteristics of the bottom hole assembly (such as drill bit, stabilizer, flexible joint, etc.) in the wellbore, especially playing a key role in controlling the wellbore trajectory and ensuring the drilling quality. The Weighted Residual Method (WRM) is a mathematical method for solving approximate solutions to partial differential equations (PDEs) and other types of mathematical equations. The basic idea of this method is to transform the original equation into a residual equation, and then minimize the residual by selecting an appropriate weight function to obtain an approximate solution to the original equation.
[0070] In the embodiment of the present application, a three-dimensional small deflection model of the bottom hole assembly can be established according to the drill string parameters of the bottom hole assembly, and then the three-dimensional small deflection model can be solved by the weighted residual method to obtain the deformation of the bottom hole assembly at different well depths in the target measurement section as the three-dimensional spatial configuration analysis result. Among them, the three-dimensional small deflection model of the bottom hole assembly is as follows:
[0071]
[0072] Where E is the elastic modulus of the drill string, I is the moment of inertia of the drill string, q is the linear weight of the drill string, M t is the moment of the drill string, B is the drilling pressure of the drill string, U is the deformation of the bottom hole assembly on the well inclination plane, V is the deformation of the bottom hole assembly on the azimuth plane, α is the well inclination angle of any point on the axis of the bottom hole assembly, and l is the length of the curve from any point on the axis of the bottom hole assembly to the lower end of the target measuring section.
[0073] By solving the three-dimensional small deflection model using the weighted residual method, the deformation at different positions of the bottom hole assembly can be obtained:
[0074]
[0075] Among them, a ir , b irAt this time, for any position of the bottom hole assembly, that is, when l takes different values, that is, different well depths W, the corresponding deformations U and V can be obtained as the results of the three-dimensional spatial configuration analysis.
[0076] Optionally, determining the coordinates of the bottom drill assembly axis according to the three-dimensional spatial configuration analysis results includes: determining the three-dimensional coordinates of the axis of the bottom drill assembly in the wellbore according to the three-dimensional spatial configuration analysis results; converting the three-dimensional coordinates into vertical, north, and east coordinates through a coordinate conversion matrix as the coordinates of the bottom drill assembly axis of the bottom drill assembly.
[0077] In the embodiment of the present application, after obtaining the three-dimensional spatial configuration analysis result, the three-dimensional coordinates (U, V, W) of the axis of the bottom hole assembly in the wellbore can be determined according to the three-dimensional spatial configuration analysis result, and then the three-dimensional coordinates are converted into vertical, north, and east coordinates through a coordinate conversion matrix as the coordinates of the axis of the bottom hole assembly. Among them, the three-dimensional coordinates are converted into vertical, north, and east coordinates through a coordinate conversion matrix, which can be performed in the following manner:
[0078]
[0079] Among them, α and are the well inclination and azimuth of any point on the wellbore axis, Z B , X B , Y B are the vertical, north and east coordinates of the bottom hole assembly axis respectively.
[0080] S250. For any target point on the borehole axis of the target measurement section, determine a first tangent vector at the target point according to the coordinates of the borehole axis.
[0081] In the embodiment of the present application, the first tangent vector at any target point on the wellbore axis can be calculated according to the coordinates of the target point and the coordinates of the points closely adjacent to the target point, and the calculation formula is as follows:
[0082] m W =X W2 -X W1 ;
[0083] n W =X W2 -Y W1 ;
[0084] p W =Z W2 -Z W1 ;
[0085] Among them, X W1 , Y W1 and Z W1is the coordinate of the target point, X w2 , X W2 and Z W2 is the coordinate of the point closely adjacent to the target point, m W 、n W and p W are the components of the first tangent vector in the x, y, and z axis directions respectively.
[0086] S260: Determine a second tangent vector at a point on the bottom hole assembly axis corresponding to the target point according to the bottom hole assembly axis coordinates.
[0087] In the embodiment of the present application, the second tangent vector m at the point on the bottom hole assembly axis corresponding to the target point can be determined according to the same method as in step S250. B 、n B and p B .
[0088] S270, calculating the angle between the first tangent vector and the second tangent vector as the deviation angle between the bottom hole assembly axis and the wellbore axis.
[0089] In the embodiment of the present application, after the first tangent vector and the second tangent vector are determined, the angle between the first tangent vector and the second tangent vector can be calculated as the deviation angle between the bottom hole assembly axis and the wellbore axis. The calculation formula of the angle between the first tangent vector and the second tangent vector is as follows:
[0090]
[0091] Wherein, β is the angle between the first tangent vector and the second tangent vector, that is, the deviation angle between the bottom hole assembly axis and the wellbore axis.
[0092] The technical solution of the embodiment of the present application determines the well depth, well inclination and azimuth data measured in real time by the wireless measurement while drilling tool in the target measuring section as wellbore trajectory parameters; determines the structure, size, elastic modulus, moment of inertia, gravity, drilling pressure and torque data of the drill string measured in real time in the target measuring section as drill string parameters; interpolates the wellbore trajectory parameters to determine the wellbore axis coordinates of the target measuring section; performs a three-dimensional spatial configuration analysis on the bottom drill assembly according to the drill string parameters, and determines the bottom drill assembly axis coordinates according to the three-dimensional spatial configuration analysis results; for any target point on the wellbore axis of the target measuring section, determines the first tangent vector at the target point according to the wellbore axis coordinates; determines the second tangent vector at the point on the bottom drill assembly axis corresponding to the target point according to the bottom drill assembly axis coordinates; and calculates the angle between the first tangent vector and the second tangent vector as the deviation angle between the bottom drill assembly axis and the wellbore axis. The technical solution of the embodiment of the present application takes into account the spatial deformation of the bottom drill assembly in the wellbore, and quantitatively describes the deviation between the axis of the bottom drill assembly and the axis of the wellbore through the calculated deviation angle, so as to more scientifically and accurately evaluate the well inclination data and guide the subsequent drilling wellbore trajectory control, thereby improving the drilling trajectory control accuracy.
[0093] Embodiment 3
[0094] Figure 3 This is a specific implementation flow chart of a method for determining a bottom drilling assembly deviation provided in Example 3 of the present application. Based on the above embodiments, a preferred embodiment is provided, which is as follows:
[0095] S310. Determine the current well depth, well inclination, azimuth, and the well depth, well inclination, and azimuth at a position 30 m away from the current well depth through wireless measurement while drilling tools. Determine the structure, size, elastic modulus, moment of inertia, line weight, drilling pressure, and torque of the drill string of the bottom drilling assembly through engineering design or measurement with special tools.
[0096] S320, using the curvature radius method to interpolate the well depth, well inclination, and azimuth within the target measurement section to obtain the vertical, north, and east coordinates of the wellbore axis.
[0097] For example, Figure 4 A schematic diagram of a borehole axis is shown. In the embodiment of the present application, the coordinates (X w, Y w, Z w ), as well as the well inclination angle α, azimuth
[0098] S330, establishing a three-dimensional small deflection model of the bottom hole assembly, solving it using a weighted residual method, and obtaining the deformation of the bottom hole assembly in the wellbore within the target measurement section.
[0099] For example, Figure 5 A schematic diagram of the wellbore axis and the bottom hole assembly axis is shown, as Figure 5 As shown in the figure, the solid line is the bottom drill assembly axis, and the dotted line is the wellbore axis. It can be clearly seen that the wellbore axis and the bottom drill assembly axis do not coincide with each other, and there is a significant difference.
[0100] S340. Convert the coordinates of the bottom drilling tool assembly axis in the wellbore into vertical, north, and east coordinates through coordinate conversion.
[0101] S350, selecting two adjacent points at corresponding positions of the bottom drilling assembly axis and the wellbore axis, and calculating their tangent direction vectors.
[0102] S360. Calculate the deviation angle between two tangent lines at any corresponding point on the bottom drilling tool assembly axis and the wellbore axis according to the angle calculation formula between spatial straight lines.
[0103] For example, Figure 6 A schematic diagram of the deviation angle within a target measurement section is shown. Figure 6 As shown in the figure, at a position 21.44 meters away from the drill bit, the deviation angle between the wellbore axis and the bottom hole assembly axis is the largest, about 1.2°. It is necessary to avoid placing the wireless measurement while drilling tool here or to evaluate the authenticity of the measurement data of the measurement device here and adjust the subsequent wellbore trajectory control direction.
[0104] The embodiments of the present application have the same beneficial effects as the above embodiments.
[0105] Embodiment 4
[0106] Figure 7 This is a schematic diagram of the structure of a bottom drilling tool assembly deviation determination device provided in Example 4 of the present application. Figure 7 As shown, the device comprises:
[0107] The parameter determination module 410 is used to determine the wellbore trajectory parameters and the drill string parameters of the bottom hole assembly measured in real time in the target measurement section; wherein the target measurement section is a well section with the drill bit of the bottom hole assembly as the lower end and a preset distance above the drill bit as the upper end;
[0108] A coordinate determination module 420, configured to determine the coordinates of the borehole axis of the target measuring section according to the borehole trajectory parameters, and determine the coordinates of the bottom hole assembly axis of the bottom hole assembly according to the drill string parameters;
[0109] The deviation determination module 430 is used to calculate the deviation angle between the bottom hole assembly axis and the wellbore axis according to the wellbore axis coordinates and the bottom hole assembly axis coordinates.
[0110] Optionally, the parameter determination module 410 includes:
[0111] A wellbore trajectory parameter determination unit, used to determine the well depth, well inclination and azimuth data measured in real time by the wireless measurement while drilling tool in the target measurement section as the wellbore trajectory parameters;
[0112] The drill string parameter determination unit is used to determine the structure, size, elastic modulus, moment of inertia, gravity, drilling pressure and torque data of the drill string measured in real time in the target measurement section as the drill string parameters.
[0113] Optionally, the coordinate determination module 420 includes:
[0114] A wellbore axis coordinate determination unit, used to perform interpolation calculation on the wellbore trajectory parameters to determine the wellbore axis coordinates of the target measurement section;
[0115] The bottom drill assembly axis coordinate determination unit is used to perform a three-dimensional spatial configuration analysis on the bottom drill assembly according to the drill string parameters, and determine the bottom drill assembly axis coordinate according to the three-dimensional spatial configuration analysis result.
[0116] Optionally, the wellbore axis coordinate determination unit comprises:
[0117] A curvature radius determination subunit, used to determine the curvature radius of the projection arc of the target measurement section on the vertical section view and the horizontal projection view according to the wellbore trajectory parameters;
[0118] A coordinate increment determination subunit is used to calculate the coordinate increment of each point on the wellbore axis according to the curvature radius through a curvature radius interpolation calculation method;
[0119] The borehole axis coordinate determination subunit is used to determine the vertical, north and east coordinates of each point on the borehole axis according to the coordinate increment as the borehole axis coordinates of the target measurement section.
[0120] Optionally, the bottom drilling assembly axis coordinate determination unit comprises:
[0121] A deflection model building subunit, used to build a three-dimensional small deflection model of the bottom hole assembly according to the drill string parameters;
[0122] The analysis result determination subunit is used to solve the three-dimensional small deflection model by the weighted residual method to obtain the deformation of the bottom drilling tool assembly at different well depths in the target measuring section as the three-dimensional spatial configuration analysis result; wherein the deformation includes the deformation on the well inclination plane and the deformation on the azimuth plane.
[0123] Optionally, the bottom drilling assembly axis coordinate determination unit comprises:
[0124] A three-dimensional coordinate determination subunit, used to determine the three-dimensional coordinates of the axis of the bottom hole assembly in the wellbore according to the three-dimensional spatial configuration analysis result;
[0125] The bottom hole assembly axis coordinate determination subunit is used to convert the three-dimensional coordinates into vertical, north and east coordinates through a coordinate conversion matrix as the bottom hole assembly axis coordinates of the bottom hole assembly.
[0126] Optionally, the deviation determination module 430 includes:
[0127] A first tangent vector determining unit is used to determine, for any target point on the borehole axis of the target measurement section, a first tangent vector at the target point according to the coordinates of the borehole axis;
[0128] A second tangent vector determining unit, configured to determine a second tangent vector at a point on the bottom drill assembly axis corresponding to the target point according to the bottom drill assembly axis coordinates;
[0129] The deviation angle determination unit is used to calculate the angle between the first tangent vector and the second tangent vector as the deviation angle between the bottom hole assembly axis and the wellbore axis.
[0130] The bottom drill assembly deviation determination device provided in the embodiment of the present application can execute the bottom drill assembly deviation determination method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0131] Embodiment 5
[0132] Figure 8A schematic diagram of an electronic device 10 that can be used to implement an embodiment of the present application is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0133] like Figure 8 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0134] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0135] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a bottom hole assembly deviation determination method.
[0136] In some embodiments, the bottom hole assembly deviation determination method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the bottom hole assembly deviation determination method described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to perform the bottom hole assembly deviation determination method in any other appropriate manner (e.g., by means of firmware).
[0137] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0138] The computer programs for implementing the methods of the present application may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer programs are executed by the processor, the functions / operations specified in the flow charts and / or block diagrams are implemented. The computer programs may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0139] In the context of the present application, a computer readable storage medium may be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, device or equipment. A computer readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer readable storage medium may be a machine readable signal medium. A more specific example of a machine readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0140] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0141] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0142] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0143] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this application can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document is not limited here.
[0144] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of this application.
Claims
1. A method for determining a bottom hole assembly deviation, characterized in that: The method comprises: Determine the borehole trajectory parameters and the drill string parameters of the bottom hole assembly measured in real time in the target measurement section; wherein the target measurement section is a well section with the drill bit of the bottom hole assembly as the lower end and a preset distance above the drill bit as the upper end; Determine the coordinates of the borehole axis of the target measuring section according to the borehole trajectory parameters, and determine the coordinates of the bottom hole assembly axis of the bottom hole assembly according to the drill string parameters; The deviation angle between the bottom hole assembly axis and the wellbore axis is calculated according to the wellbore axis coordinate and the bottom hole assembly axis coordinate.
2. The method according to claim 1, characterized in that Determine the wellbore trajectory parameters and bottom hole assembly drill string parameters measured in real time within the target section, including: Determine the well depth, well inclination and azimuth data measured in real time by the wireless measurement while drilling tool in the target measuring section as the wellbore trajectory parameters; The structure, size, elastic modulus, moment of inertia, line weight, bit pressure and torque data of the drill string measured in real time in the target measuring section are determined as the drill string parameters.
3. The method according to claim 1, characterized in that Determining the coordinates of the borehole axis of the target measuring section according to the borehole trajectory parameters, and determining the coordinates of the bottom hole assembly axis of the bottom hole assembly according to the drill string parameters, including: Performing interpolation calculation on the wellbore trajectory parameters to determine the wellbore axis coordinates of the target measurement section; A three-dimensional spatial configuration analysis is performed on the bottom drilling assembly according to the drill string parameters, and the coordinates of the bottom drilling assembly axis are determined according to the three-dimensional spatial configuration analysis results.
4. The method according to claim 3, characterized in that Performing interpolation calculation on the wellbore trajectory parameters to determine the wellbore axis coordinates of the target measurement section includes: Determine the curvature radius of the projection arc of the target measurement section on the vertical section view and the horizontal projection view according to the wellbore trajectory parameters; By using a curvature radius interpolation calculation method, the coordinate increment of each point on the wellbore axis is calculated according to the curvature radius; The vertical, north and east coordinates of each point on the borehole axis are determined according to the coordinate increments as the borehole axis coordinates of the target measurement section.
5. The method according to claim 3, characterized in that: Performing a three-dimensional spatial configuration analysis on the bottom hole assembly according to the drill string parameters includes: Establishing a three-dimensional small deflection model of the bottom hole assembly according to the drill string parameters; The three-dimensional small deflection model is solved by the weighted residual method to obtain the deformation of the bottom drilling tool assembly at different well depths in the target measuring section as a three-dimensional spatial configuration analysis result; wherein the deformation includes the deformation on the well inclination plane and the deformation on the azimuth plane.
6. The method according to claim 3, characterized in that Determine the coordinates of the bottom hole assembly axis based on the results of the three-dimensional spatial configuration analysis, including: Determining the three-dimensional coordinates of the axis of the bottom hole assembly in the wellbore according to the three-dimensional spatial configuration analysis results; The three-dimensional coordinates are converted into vertical, north and east coordinates through a coordinate conversion matrix as the bottom hole assembly axis coordinates of the bottom hole assembly.
7. The method according to claim 1, characterized in that Calculating the deviation angle between the bottom hole assembly axis and the wellbore axis according to the wellbore axis coordinate and the bottom hole assembly axis coordinate, comprising: For any target point on the borehole axis of the target measurement section, determine a first tangent vector at the target point according to the coordinates of the borehole axis; Determine a second tangent vector at a point on the bottom drill assembly axis corresponding to the target point according to the bottom drill assembly axis coordinate; The angle between the first tangent vector and the second tangent vector is calculated as the deviation angle between the bottom hole assembly axis and the wellbore axis.
8. A bottom hole assembly deviation determination device, characterized in that: The device comprises: A parameter determination module is used to determine the borehole trajectory parameters and the drill string parameters of the bottom hole assembly measured in real time in the target measurement section; wherein the target measurement section is a well section with the drill bit of the bottom hole assembly as the lower end and a preset distance above the drill bit as the upper end; A coordinate determination module, used to determine the coordinates of the borehole axis of the target measuring section according to the borehole trajectory parameters, and to determine the coordinates of the bottom hole assembly axis of the bottom hole assembly according to the drill string parameters; The deviation determination module is used to calculate the deviation angle between the bottom hole assembly axis and the wellbore axis according to the wellbore axis coordinates and the bottom hole assembly axis coordinates.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor to enable the at least one processor to perform the bottom hole assembly deviation determination method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the bottom hole assembly deviation determination method according to any one of claims 1 to 7 when executed.
Citation Information
Cited By
Well pattern parameter generation method, device and equipment for small-well-spacing horizontal well cluster and medium
CN120506219A