Construction technology of constructional column at junction of inner wall building block and outer wall building block with different base elevations

By planting vertical steel bars, binding stirrups and hook bars at the junction of the inner and outer wall blocks of the frame structure, and pouring concrete, the construction problem of structural columns caused by inconsistent elevations of the base layer is solved, and the stability of structural columns is achieved. The simplicity of construction ensures the safety of the overall structure.

CN119243895AInactive Publication Date: 2025-01-03CHINA MCC22 GROUP CORP LTD +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411471075.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2025-01-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In a frame-structured house, inconsistent coagulation elevation of the base layer leads to technical differences and quality problems in the construction of structural columns at the junction of inner and outer wall blocks. How to ensure the seismic performance of structural columns and the safety of the overall structure is a challenge.

Method used

Vertical steel bars are planted on the concrete high and low platforms, tie stirrups and hook bars, and chisel the surface, install the lengthy tie bars, and use the structural column formwork for concrete to ensure the firmness and stability of the structural columns.

Benefits of technology

Under different base elevations, the structural column node structure is stable and the construction is simple, which effectively solves the construction problem of structural column nodes when the base layer is inconsistent and improves the safety of the overall structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119243895A_ABST
    Figure CN119243895A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of constructional column construction, in particular to a constructional column construction process at the junction of inner and outer wall building blocks with different base elevations, which comprises the following steps: S1, respectively planting vertical steel bars on a high concrete platform and a low concrete platform; s2, stirrups are bound on the vertical steel bars; s3, hooking ribs are bound to the bottoms of the vertical steel bars of the concrete low platform till the hooking ribs are flush with the top face of the concrete high platform; s4, the surfaces of the high concrete platform and the low concrete platform are subjected to roughening treatment, full-length tie bars are installed, and an outer wall and an inner wall are built; and S5, a constructional column formwork is installed, and concrete is formed through one-time pouring. According to the construction technology of the constructional column at the junction of the inner wall building block and the outer wall building block with the different base elevations, when the concrete elevations of two brick masonry base layers are inconsistent, the structure of a constructional column joint is firm and stable, construction is easy and convenient, and the problem of how to construct the constructional column joint when the concrete elevations of the two brick masonry base layers are inconsistent is effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of structural column construction technology, in particular to a structural column construction process at the junction of inner and outer wall blocks with different base elevations. Background Art

[0002] Concrete frame structures are widely used in residential buildings, schools, office buildings, and hospitals. Prestressing of concrete beams or slabs is also applied as needed to suit larger spans. Frame steel structures are often used in large-span public buildings, multi-story industrial plants, and some special-purpose buildings, such as theaters, shopping malls, gymnasiums, railway stations, exhibition halls, shipyards, hangars, parking lots, light industrial workshops, etc. The frame structure is composed of beams and columns connected by steel bars to form a load-bearing system, that is, the frame composed of beams and columns jointly resists the horizontal and vertical loads that occur during use. The frame building has flexible space division, light weight, and saves materials. It has the advantage of being able to flexibly cooperate with the building plan layout, which is conducive to arranging building structures that require a larger space.

[0003] However, the walls of frame-structured houses do not bear loads and only serve as enclosures and partitions. They are generally built or assembled using prefabricated aerated concrete, expanded perlite, hollow bricks or porous bricks, pumice, vermiculite, expanded clay and other lightweight panels.

[0004] There are bound to be various intersections in the process of wall construction for the internal filling walls of frame structures made of different materials. Because of the different construction processes of precast bricks made of different materials, the different material properties of precast bricks, the inconsistency of the base concrete elevation when the two bricks are laid, and the overall seismic structure requirements of the internal masonry walls of the frame structure, huge technical differences and quality problems have occurred in the construction treatment of the intersections of two or more precast bricks. Structural columns enhance the integrity and stability of the building. Reinforced concrete structural columns should also be set in the walls of multi-story brick-concrete structures and connected to the ring beams of each floor to form a spatial frame that can resist bending and shearing. This is an effective measure to prevent the collapse of houses. How to set up seismic-resistant structural columns to ensure the safety of the overall structure is the key research content at this stage. Summary of the invention

[0005] In order to solve the problems existing in the above-mentioned prior art, the present invention provides a construction process for structural columns at the junction of inner and outer wall blocks with different base elevations.

[0006] The present invention provides a construction process for a structural column at the junction of inner and outer wall blocks with different base elevations, which adopts the following technical solution: A construction process for structural columns at the junction of inner and outer wall blocks with different base elevations, comprising the following steps: S1. Plant vertical steel bars on the high concrete platform and the low concrete platform respectively; S2. Tie stirrups to the vertical reinforcement; S3. Tie hooks at the bottom of the vertical reinforcement of the concrete low platform until it is flush with the top surface of the concrete high platform; S4. Roughen the surface of the high concrete platform and the low concrete platform, install the full-length tie bars, and build the exterior and interior walls; S5. Install the structural column formwork and pour the concrete in one go.

[0007] By adopting the above technical scheme, the construction process of the structural column at the junction of the inner and outer wall blocks with different base elevations of the present invention, when the concrete elevations of the two brick masonry bases are inconsistent, the structural column node structure is firm and stable, the construction is simple and convenient, and the problem of how to construct the structural column node when the concrete elevations of the two brick masonry bases are inconsistent is effectively solved.

[0008] Optionally, a stirrup reinforcement density zone is provided at the upper and lower thirds of the structural column respectively.

[0009] Optionally, a full-length tie bar is provided at the height of every two exterior wall blocks or interior wall blocks.

[0010] Optionally, both the exterior wall blocks and the interior wall blocks are constructed from the bottom by adopting a masonry method of retreating first and advancing later.

[0011] Optionally, a bell mouth for pouring concrete is provided at the top of the formwork of the structural column.

[0012] In summary, the present invention includes the following beneficial technical effects: The construction process of the structural column at the junction of the inner and outer wall blocks with different base elevations of the present invention has a firm and stable structural column node structure and is simple and convenient to construct when the concrete elevations of the two brick masonry bases are inconsistent, and effectively solves the problem of how to construct the structural column nodes when the concrete elevations of the two brick masonry bases are inconsistent. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the installation positions of a concrete high platform, a concrete low platform and a structural column according to an embodiment of the present invention.

[0014] Figure 2 It is a schematic diagram of the installation positions of the exterior wall blocks, interior wall blocks and structural columns according to an embodiment of the present invention.

[0015] Figure 3 The structural column reinforcement of the embodiment of the present invention Figure 1 .

[0016] Figure 4 The structural column reinforcement of the embodiment of the present invention Figure 2 .

[0017] Figure 5 It is a flow chart of the construction process of the structural column at the junction of the inner and outer wall blocks with different base elevations according to an embodiment of the present invention.

[0018] In the figure, 1. Concrete high platform; 2. Concrete low platform; 3. External wall blocks; 4. Internal wall blocks; 5. Structural columns; 50. Vertical steel bars; 51. Stirrups; 52. Hook bars. DETAILED DESCRIPTION

[0019] The following combination Figure 1-Figure 5 The present invention is described in further detail.

[0020] The embodiment of the present invention discloses a construction process for a structural column at the junction of inner and outer wall blocks with different base elevations. Figure 1-Figure 5 The construction process of structural columns at the junction of inner and outer wall blocks with different base elevations includes the following steps: S1. Plant multiple vertical steel bars 50 on the concrete high platform 1 and the concrete low platform 2 respectively. The vertical steel bars 50 are threaded steel bars with a diameter of 14 mm. The thickness of the steel bar protective layer is required to be 15 mm. The cross section of the structural column 5 is T-shaped. S2. Stirrups 51 are provided. Stirrups 51 are made of threaded steel with a diameter of 6 mm. Densification areas are provided at one third of the upper and lower parts of the structural column 5. The spacing between stirrups 51 is 100 mm. The spacing between stirrups 51 in the non-densification area is 200 mm. The spacing between the starting stirrups 51 is 50 mm. S3, install hook bars 52 on the vertical steel bars 50 located on the concrete low platform 2. The hook bars 52 are made of threaded steel bars with a diameter of 6 mm, and the ends are bent at 135 degrees. The starting distance is 50 mm from the ground, and the distance between two adjacent hook bars 52 is 100 mm, until they are flush with the top surface of the concrete high platform 1; S4, before the template of the structural column 5 is closed, the top surface of the concrete low platform 2 and the side and top surfaces of the concrete high platform 1 are roughened, and two full-length tie bars with a diameter of 6 mm are set for every two bricks of the height of the outer wall blocks 3 and the inner wall blocks 4. The full-length tie bars extend into the middle of the structural column 5. The outer wall blocks 3 and the inner wall blocks 4 are laid in a "retreat first and advance later" manner from the bottom, and the roughened areas are moistened with water before pouring the concrete; S5. After the formwork of structural column 5 is firmly installed, concrete is poured. A bell mouth is set on the top of the formwork, and the concrete is poured and formed in one step.

[0021] The construction process of the structural column at the junction of the inner and outer wall blocks with different base elevations of the present invention has a firm and stable structural column node structure and is simple and convenient to construct when the concrete elevations of the two brick masonry bases are inconsistent, and effectively solves the problem of how to construct the structural column nodes when the concrete elevations of the two brick masonry bases are inconsistent.

[0022] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction process for structural columns at the junction of inner and outer wall blocks with different base elevations, characterized in that: The following steps are involved: S1, planting vertical steel bars (50) on the high concrete platform (1) and the low concrete platform (2); S2, tying stirrups (51) on the vertical steel bars (50); S3, tying hook bars (52) at the bottom of the vertical steel bars (50) of the concrete low platform (2) until they are flush with the top surface of the concrete high platform (1); S4, roughening the surface of the high concrete platform (1) and the low concrete platform (2), installing full-length tie bars, and building the exterior and interior walls; S5. Install the formwork of the structural column (5) and pour the concrete into shape in one step.

2. The construction process for structural columns at the junction of inner and outer wall blocks with different base elevations according to claim 1, characterized in that: A reinforcement area (51) is provided at one third of the upper and lower parts of the structural column (5).

3. The construction process for structural columns at the junction of inner and outer wall blocks with different base elevations according to claim 1 is characterized in that: A full-length tie bar is arranged at the height of every two exterior wall blocks (3) or interior wall blocks (4).

4. The construction process for structural columns at the junction of inner and outer wall blocks with different base elevations according to claim 1, characterized in that: The outer wall blocks (3) and the inner wall blocks (4) are constructed from the bottom by using a masonry method of retreating first and advancing later.

5. The construction process for structural columns at the junction of inner and outer wall blocks with different base elevations according to claim 1, characterized in that: The top of the template of the structural column (5) is provided with a bell mouth for pouring concrete.

Citation Information

Patent Citations

  • Reinforcing method for improving bend and shear bearing capacity of independent foundation

    CN102535536A

  • Method for increasing constructional column for brick masonry wall

    CN102889003A

  • Cross-shaped pillar frame built-in single-row reinforcing bar light building block wall and manufacturing method

    CN103711234A

  • Schoolhouse in-vitro reinforcing and strengthening method of prefabricated perforated plate brick mixed structure

    CN106801517A

  • Wall masonry construction technology

    CN110952785A