By adding a blender and an upright cooling device to the boiler flue gas treatment system, combined with gas heat exchange and cooling technology, the problem of difficulty in eliminating white smoke at low temperatures and decreasing chimney suction is solved, and the problem of the difficulty in eliminating white smoke at low temperatures is achieved, and under any meteorological conditions Effective flue gas dewhitening and chimney operation stably.
Patent Information
- Application Number
- CN201910094317.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-01-30
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2039-01-30
AI Technical Summary
The existing flue gas dewhitening technology is not effective under low temperature conditions, making it difficult to completely eliminate white smoke, and the chimney suction decreases, affecting the stable flow of the system.
A boiler flue gas dewhitening process is adopted. After SCR denitrification, the flue gas is processed by gas heat exchanger, economizer, wet desulfurization tower and flue gas dehumidification cooler. It is added to mix the blender and mix it with high temperature air to adjust the chimney. Temperature and relative humidity, a flue gas dehumidification and cooling device combined with vertical indirect cooling and direct cooling is used to ensure effective elimination of white smoke under any meteorological conditions.
Effectively adjust the moisture content and relative humidity of the flue gas, maintain the chimney suction, ensure that there is no white smoke emission under any meteorological conditions, and improve heat transfer efficiency, simple structure, and convenient installation and maintenance.
Smart Images

Figure CN109724099B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flue gas treatment, and is suitable for dehumidification and dewhitening of boiler flue gas in power plants, heating furnace flue gas in coal coking plants, sintering and ironmaking flue gas in steel plants, furnace flue gas in petrochemical plants and various types of humid gases. Background Art
[0002] With the vigorous development of national economic construction, energy consumption continues to increase, especially the dependence on fossil energy will continue for a long time. Fossil energy includes coal, oil, and natural gas. When burned as fuel, flue gas is generated, and harmful gases such as SO2, SO3, NOx, H2O, CO2, etc. are produced as side reaction products during combustion. Since these harmful gases in the flue gas float in the atmosphere, they will pollute the air, and will dissolve in the condensed water mist and eventually transfer to the ground, causing the soil to be polluted and worsening the environment. Therefore, some national environmental protection regulations require that the flue gas generated by various furnaces must be purified, and the net flue gas after treatment must contain harmful gas concentrations that reach the specified value before it can be discharged into the atmosphere. At present, all newly built power plant boilers, coke ovens, ironmaking sintering furnaces, and other heating furnaces are equipped with denitrification and desulfurization devices, and old plants are also required to be renovated and equipped with denitrification and desulfurization devices. This environmental protection project has been basically completed so far. The processes used can be divided into two types. One is to use the SCR dry process for denitrification, and then use the limestone gypsum wet process or ammonia fertilizer wet process for desulfurization, and also use sodium alkali solution for desulfurization; the other type is to use full wet desulfurization and denitrification.
[0003] The flue gas produced by the power plant boiler production is treated with SCR dry denitrification and wet desulfurization, and the relative humidity in the flue gas increases, and the water content is close to saturation. When it is discharged to the environment through the chimney, white smoke called "smoke plume" is generated. This white smoke dissolves into some fine solid particles and harmful acidic and alkaline media such as SO3, NOx, NH3 in the flue gas, deteriorating the air quality and light transmission performance, and the condensed droplets pollute the environment. Therefore, eliminating white smoke is a requirement for environmental protection.
[0004] Due to the introduction of wet process in the flue gas purification process, the moisture content of the clean flue gas increases until it reaches the saturated content equivalent to the flue gas temperature. The higher the flue gas temperature, the higher the saturated moisture content. When the flue gas higher than the ambient temperature is discharged into the atmosphere, the flue gas cooling water vapor condenses to form white smoke. The phenomenon of white smoke is actually secondary pollution caused by the wet treatment process. Therefore, the control of white smoke or flue gas de-whitening is the last step of flue gas purification after desulfurization and denitrification. Flue gas de-whitening has received attention. Relevant enterprises and scientific research and technology departments have focused on the research and development of a number of technical routes and devices, which have been implemented and applied in production operations and gained good experience. The various technical routes currently proposed and adopted mainly include the flue gas heating method, the flue gas cooling method, and the flue gas cooling and heating method. The flue gas heating method uses a tubular heat exchanger to indirectly heat the flue gas with high-temperature flue gas as a heat source, or uses steam as a heat source to heat low-temperature wet flue gas. Another flue gas heating method is to use gas to directly burn and heat the flue gas, or to mix ambient air into the flue gas for joint heating, or to use the waste heat of the original flue gas to heat the secondary air intake and mix with the flue gas. This flue gas heating and de-whitening route can raise the flue gas temperature and increase the unsaturation of the flue gas, but it cannot reduce the absolute moisture content in the flue gas. Therefore, it is effective in eliminating smoke plumes in seasons with high ambient temperatures, but for low ambient temperatures, such as below 15°C, white plumes appear in the exhaust gas, and the effect of eliminating white smoke is not good. There are two ways to cool the flue gas: direct cooling and indirect cooling. The flue gas cooling method reduces the flue gas temperature to below the ambient temperature, and the flue gas can only eliminate the white smoke effect when there is no water mist or mist entrained in the flue gas. However, the actual use of the current cooling range is limited, so the wet plume cannot be completely eliminated, especially when the temperature fluctuates or in winter, the flue gas de-whitening effect is poor. The cooling and heating method uses indirect condensation to cool the flue gas and then heat it to precipitate condensed water, or directly cools the flue gas and then heats it to increase the flue gas temperature. Compared with the above methods, this technical route method has a better de-whitening effect and can eliminate white smoke under non-extreme meteorological conditions.
[0005] The factors that affect the effect of flue gas desulfurization include the physical and chemical properties of the flue gas itself, the fluid flow rules of the exhaust system, the limitations of the original process production equipment conditions, and the limitations of meteorological conditions. Even the clean flue gas treated by the denitrification and desulfurization process, especially the clean flue gas using the wet desulfurization process at the end, still contains the saturated water content corresponding to the flue gas temperature, the fine droplets entrained by the mist, and the acidic and alkaline gases such as SO3, SO2, NOx, NH3 remaining in the clean flue gas, as well as a small amount of solid particles. This is the material condition for causing white smoke. The temperature, humidity, and volume flow rate of the flue gas after the flue gas enters the chimney affect the suction or exhaust capacity of the chimney. The condensation of water vapor in the flue gas will also cause the chimney to corrode, the chimney root will be cooled, and the stable flow of the flue gas system will be affected. Therefore, flue gas desulfurization requires not only the elimination of white smoke, but also the effective elimination of white smoke under any meteorological conditions, and the maintenance of the chimney suction, and the chimney load cannot be excessively increased.
[0006] There are many processes for the current flue gas dewhitening technology, such as: the clean flue gas after the wet desulfurization tower is exchanged with the hot flue gas before the desulfurization tower, and the temperature is raised before being sent to the chimney for discharge. This method can increase the lift of the chimney, but it cannot reduce the humidity of the flue gas. Once the flue gas enters the ambient atmosphere and is cooled, it will immediately condense into white water mist. There are multi-stage flue gas dehydration devices and multi-stage gas-liquid separation devices combined, and the dehydrated flue gas is connected to the chimney. This method is effective in removing the entrainment of flue gas mist and can also remove part of the acidic and alkaline media dissolved in water droplets, but it has no effect on the removal of saturated water vapor in the flue gas or reducing the saturation. White smoke will still appear when the flue gas after the chimney is cold. There is a flue gas pressurized membrane separation method, which can effectively reduce the moisture content of the flue gas and recover the compression heat for low-temperature flue gas heating. However, no large-scale devices have been seen so far. There is a method of mixing the new air from the environment with the flue gas and then cooling it, or cooling the flue gas first and then mixing it with the new air from the environment, and heating the mixed gas and sending it to the chimney for discharge. This method can reduce the relative humidity of the exhaust gas, but the subsequent gas processing volume increases and the equipment load increases. There is a de-whitening device, which is a flue gas de-whitening device installed after the wet desulfurization or wet electrostatic precipitator. This device uses cold air to cool the flue gas. After cooling, the flue gas enters the dehydrator to separate and remove condensed water. It is cooled and separated in multiple stages, and the flue gas is discharged into the chimney after treatment. This method cools the flue gas and condenses the condensed water, and at the same time heats the air, effectively utilizing the waste heat, but the cooling range of the flue gas is limited and cannot effectively eliminate white smoke. There is a boiler de-whitening device, which is a heat exchanger that exchanges heat between cold air and hot flue gas, cools the flue gas and precipitates condensed water, and the air is heated. After the heat exchanger, the flue gas and hot air are mixed and discharged into the chimney. This method can reduce the amount of water in the flue gas, and reduce the relative humidity of the mixed gas after mixing with the air, which has a certain effect on de-whitening, but the cooling range of the flue gas and the amount of air added affect the de-whitening effect. Summary of the invention
[0007] In order to effectively eliminate the white smoke generated by the chimney exhaust of various furnaces such as boilers, coke ovens, and sintering furnaces, and to overcome the problems of decreased chimney suction, liquid dripping in the chimney, and the smoke plume elimination effect being limited by environmental meteorological conditions during the flue gas de-whitening operation, the present invention provides a boiler flue gas de-whitening process and device, which can dehumidify and dust the wet flue gas after denitrification and desulfurization and reduce the relative humidity, so as to meet the requirement of white plume-free exhaust under any meteorological conditions.
[0008] The present invention is achieved through the following technical solutions:
[0009] A boiler flue gas denitrification process, the process flow is that the boiler high-temperature flue gas passes through an SCR denitrification device and then passes through a gas heat exchanger A7, an economizer 2, a dust collector 13, a gas heat exchanger B8, a flue gas cooler 3, a wet desulfurization tower 4 and a flue gas dehumidification and cooling device 9 in sequence to form cold and clean flue gas. The cold and clean flue gas leaving the flue gas dehumidification and cooling device 9 then enters the flue gas channel of the gas heat exchanger B8 and enters the blender 11; the air is sucked by a blower 12 to pass through the hot end of the gas heat exchanger B8 and the gas heat exchanger A7 in turn, and the cold air is heated and heated to become high-temperature air. A part of the high-temperature air enters the blender 11 through a regulating valve F to mix with the clean flue gas and is finally sent to the chimney 5 by an induced draft fan 6 to be discharged into the atmosphere, and the rest of the high-temperature air is directly sent to the bottom of the chimney 5 to heat the flue.
[0010] The cold air first exchanges heat with the flue gas after the dust collector, and then exchanges heat with the flue gas before the economizer. The air temperature rises from room temperature to 80 to 100°C, and then to 150 to 200°C. The air flow rate is 10-20% of the flue gas volume. The air flow rate is related to the temperature of the air after heat exchange to adjust the opening of the gate valve K1. The amount of high-temperature air mixed with the flue gas is related to the flue gas temperature before the chimney after the induced draft fan to adjust the opening of the regulating valve F.
[0011] A boiler flue gas denitrification device, comprising an SCR denitrification device 1, an economizer 2, a flue gas cooler 3, a wet desulfurization tower 4, a chimney 5, an induced draft fan 6, a gas heat exchanger A7, a gas heat exchanger B8, a flue gas dehumidification and cooling device 9, a liquid collecting tank 10, a blender 11, a blower 12 and a dust collector 13, the SCR denitrification device 1 is sequentially connected to the gas heat exchanger A7, the economizer 2, the dust collector 13, the gas heat exchanger B8, the flue gas cooler 3, the wet desulfurization tower 4 and the flue gas dehumidification and cooling device 9, and one side of the flue gas dehumidification and cooling device 9 is connected to the gas The lower end of the gas heat exchanger B8 is connected to the chimney 5 through the mixer 11 and the induced draft fan 6. The blower 12 is connected to the gas heat exchanger B8 and the gas heat exchanger A7 in sequence through a pipeline and connected to the chimney 5. A gate valve K1 is set on the flue from the SCR denitrification device 1 to the economizer 2, a gate valve K2 is set on the flue from the dust collector 13 to the flue gas cooler 3, a gate valve K3 is added to the flue from the wet desulfurization tower 4 to the induced draft fan 6, and a regulating valve F is set between the pipeline from the gas heat exchanger A7 to the chimney 5 and the mixer 5.
[0012] The gas heat exchanger A7 and the gas heat exchanger B8 adopt metal flat plate heat exchange, which is composed of a single or multiple metal boxes. A certain number of distance rods are welded between the plates. The smoke channel of the gas heat exchanger flows from top to bottom, and the air channel flows from left to right or from right to left. An ash collection and discharge device is provided at the turning point where the smoke flows downward to the heat exchanger outlet.
[0013] The flue gas dehumidification and cooling device 9 is composed of a direct cooling section and an indirect cooling section, a partition plate 24 is arranged between the direct cooling section and the indirect cooling section, the direct cooling section is composed of a concentric inner cylinder 20 and a lower cylinder 19, the annular space formed between the inner cylinder 20 and the lower cylinder 19 is a flue gas washing area, an annular partition plate 32 is arranged above the annular space, a lower flue gas inlet pipe 21, a lower circulating washing cooling water inlet pipe 22 and a lower circulating washing cooling water outlet pipe 33 are arranged on the side of the lower cylinder 19, a sludge outlet pipe 18 is arranged at the bottom, a lower flue gas outlet pipe 23 is arranged at the top, and the indirect The cooling section includes an upper cylinder 34, in which a plurality of groups of horizontally rowed tubes are arranged to form a cooling water pipe box 28, and the upper and lower ends of the cooling water pipe box 28 are respectively connected to an upper circulating cooling water outlet pipe 27 and an upper circulating cooling water inlet pipe 29, and an upper flue gas inlet pipe 26 is arranged at the top of the upper cylinder 34, and the upper flue gas inlet pipe 26 is connected to the lower flue gas outlet pipe 23 through an upper and lower flue gas connecting pipe 25, an upper flue gas outlet pipe 30 is arranged on the side of the upper cylinder 34, and an upper condensate outlet pipe 31 is arranged on the bottom, and the upper flue gas outlet pipe 30 is located below the cooling water pipe box 28.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] The flue gas dewhitening process of the present invention can effectively adjust the moisture content and relative humidity of the flue gas, and at the same time can change the lift and smoke exhaust capacity of the chimney by adjusting the air volume and wind temperature of the hot air and hot flue gas; the air and clean flue gas are heated by the waste heat of the boiler, and the temperature of the chimney is adjusted by high-temperature air to maintain the temperature of the chimney root, and the air usage is small; the relative density and relative humidity of the flue gas are adjusted by hot air, which can adapt to changes in meteorological conditions; a flat plate combined gas heat exchanger is used to implement flue gas and air heat exchange and cold and hot flue gas heat exchange, which has a simple structure, convenient processing, installation and maintenance, and high heat transfer efficiency; a vertical indirect cooling flue gas condensing cooler is used, and the direction of the flue gas flow is the same as the direction of the condensate flow during the process, and the flue gas after cooling has no mist and particulate entrainment; the flue gas dehumidification and cooling device washes and cools the flue gas at the same time, and the main direction of the air flow is the same as the direction of the liquid flow, so that the separation effect of the flue gas, the condensate and the washing water is good, and part of the sulfate and solid particles can be removed to ensure the smoke exhaust dewhitening effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a process system diagram of the present invention;
[0017] Figure 2 It is a structural schematic diagram of the gas heat exchanger in the present invention;
[0018] Figure 3 It is the flue gas dehumidification and cooling device in the present invention.
[0019] In the figure: 1. SCR denitrification; 2. Economizer; 3. Flue gas cooler; 4. Wet desulfurization tower; 5. Chimney; 6. Induced draft fan; 7. Gas heat exchanger A; 8. Gas heat exchanger B; 9. Flue gas dehumidification and cooling device; 10. Liquid collecting tank; 11. Blender; 12. Blower; 13. Dust collector; K1. Gate valve; K2. Gate valve; K3. Gate valve; F. Regulating valve; 14. Flue gas channel; 15. Air channel, 16. Combined space; 17. Flat box; 18. Sludge water outlet pipe; 19. Lower cylinder; 20. Inner cylinder; 21. Lower section flue gas inlet pipe; 22. Lower section circulating washing cooling water inlet pipe; 23. Lower section flue gas outlet pipe; 24. Partition plate; 25. Upper and lower section flue gas connecting pipe; 26. Upper section flue gas inlet pipe; 27. Upper section circulating cooling water outlet pipe; 28. Cooling water pipe box; 29. Upper section circulating cooling water inlet pipe; 30. Upper section flue gas outlet pipe; 31. Upper section condensate outlet pipe; 32. Annular partition; 33. Lower section circulating washing cooling water outlet pipe; 34. Upper cylinder. DETAILED DESCRIPTION
[0020] The present invention is further described below in conjunction with the accompanying drawings:
[0021] The medium for the operation of the gas heat exchanger in the present invention is air and hot flue gas and wet hot flue gas and cold clean flue gas. The structure of the gas heat exchanger is a flat plate combination type, and two gases at different temperature positions are separated by parallel metal partitions. The two gases flow in their respective channels and transfer heat. The partition is made of a single metal plate or a metal box, and a metal box group is composed of two or more metal boxes. Each group has two gas channels. Finally, multiple metal box groups are used to form a gas heat exchanger with a heat transfer area that meets the requirements.
[0022] The gas heat exchanger described in the present invention includes a gas heat exchanger A and a gas heat exchanger B. The gas heat exchanger A is used for heat exchange between air and high-temperature flue gas. The front section of the gas heat exchanger B is used for heat exchange between air and hot flue gas, and the rear section is used for heat exchange between cold clean flue gas and hot flue gas.
[0023] The air is drawn by the blower into the front section of the gas heat exchanger B to exchange heat with the hot flue gas, and then enters the gas heat exchanger A to exchange heat with the high-temperature flue gas. The high-temperature air after heat exchange is divided into two parts. One part is mixed with the net hot flue gas after heat exchange in the rear section of the gas heat exchanger B through the mixer to adjust the relative humidity of the flue gas and supplement heat; the rest is input into the chimney to maintain the chimney operating temperature and flue gas lifting capacity, and finally the two gases merge and are discharged into the environment through the chimney. The hot flue gas mentioned above refers to the flue gas before the wet desulfurization tower and after the dust collector, and the high-temperature flue gas refers to the flue gas after the SCR denitrification device.
[0024] The flue gas dehumidification and cooling device is a vertical heat exchange device that combines indirect cooling with direct cooling, in which the operating medium is flue gas and circulating cooling water. The flue gas dehumidification and cooling device consists of two sections, the upper section is the indirect cooling section, and the lower section is the direct cooling section, and the upper and lower sections are separated by a partition plate.
[0025] The upper cooling section is provided with 6 to 8 groups of cooling pipes, each group of cooling pipes is provided with 6 to 8 rows of horizontally arranged pipes, each group of pipes is equally divided into two groups, each group of pipes constitutes a channel, and the two ends of the adjacent upper and lower groups of pipes are connected by connecting boxes respectively, so that all the pipe groups are connected in series to form a cooling water channel. The top of the upper indirect cooling section is provided with a flue gas inlet pipe, the lower part of the upper indirect cooling section is provided with a flue gas outlet pipe, the bottom is provided with a condensate outlet pipe, the connecting box of the uppermost pipe row is provided with a cooling water outlet pipe, and the connecting box of the lowermost pipe row is provided with a cooling water inlet pipe.
[0026] The lower direct cooling section is a cylindrical structure with a concentric cylinder in the middle. The annular surface between the inner and outer cylinders is provided with an annular partition. A flue gas outlet pipe is provided on the upper side of the annular partition. The pipe is connected to the flue gas inlet of the upper indirect cooling section with the upper and lower flue gas connecting pipes. A flue gas inlet pipe is provided on the lower side of the annular partition. The air inlet pipe is connected to the flue gas after the wet desulfurization tower. A plurality of circulating water nozzles are provided around the circumference below the annular partition, a sludge outlet pipe is provided at the bottom of the lower direct cooling section, and a circulating washing cooling water outlet pipe is provided below the inner cylinder.
[0027] When the flue gas dehumidifier is in operation, the flue gas first cuts in from the flue gas inlet pipe of the lower direct cooling section, and rotates down from the annular space between the inner and outer cylinders. During this period, the flue gas is sprayed and washed with circulating water to cool it. The solid impurities and sulfates entrained in the flue gas are washed off and flow to the bottom of the cooling section together with the circulating water. After the flue gas rotates to the lower edge of the inner cylinder, it rises from the space of the inner cylinder, rises to the upper edge of the inner cylinder and enters the space above the annular partition. It is guided out from the lower flue gas outlet pipe into the upper and lower connecting pipes and enters the upper indirect cooling section for cooling. After the lower circulating water washes and cools the flue gas, it falls to the bottom of the cylinder, and then flows into the circulating water system through the lower circulating washing cooling water outlet pipe. The sludge water settled at the bottom of the cylinder is discharged regularly.
[0028] After the flue gas enters the upper indirect cooling section, it flows through the pipe row from top to bottom. The circulating cooling water enters from the pipe of the lowest pipe row connection box, flows out of the pipe of the uppermost pipe row connection box from bottom to top along the channel, and then enters the upper circulating cooling water system. When the flue gas passes through the pipe row in the upper indirect cooling section, it is cooled by the cooling water and condensed water is precipitated. The condensate and the flue gas have the same flow direction. After cooling, the flue gas does not carry condensate mist. After separation from the condensate, it is discharged from the upper flue gas outlet pipe. The flue gas temperature out of the cooler is close to the circulating cooling water outlet temperature. The condensate is discharged from the coolant outlet pipe at the bottom of the cooling section and flows into the liquid collecting tank for storage.
[0029] The flue gas temperature after treatment by the dehumidifier can be reduced to below the ambient temperature, which is equivalent to the dew point temperature of the flue gas, by adjusting the circulating cooling water temperature and water volume to meet the requirements.
[0030] After dehumidification and cooling, the flue gas is sent to the gas heat exchanger to exchange heat with the hot flue gas to raise its temperature close to the chimney's exhaust temperature requirement. In order to meet the stable operating conditions of the chimney, some high-temperature air is added to the flue gas before entering the induced draft fan to adjust the flue gas temperature and relative humidity. The purpose of adjusting the flow and temperature of the high-temperature air is to ensure that no white smoke is generated when the flue gas is discharged from the chimney, and no dripping of the flue gas occurs in the chimney. The relative density of the gas discharged from the chimney can also be adjusted.
[0031] The process technology of the present invention is applicable to boiler flue gas denitration. The boiler flue gas system is already provided with an SCR denitration device 1, after which an economizer 2 is provided, and after which a dry dust collector 13, a flue gas cooler 3, a wet desulfurization tower 4, an induced draft fan 6 are successively provided, and finally the flue gas is sent into a chimney 5.
[0032] The process technology route of the present invention is shown in the attached specification. Figure 1 A gas heat exchanger A7 is added between the SCR denitrification device 1 and the economizer 2, a gas heat exchanger B8 is added between the economizer 2 and the flue gas cooler 3, and a flue gas dehumidification and cooling device 9 is added after the flue gas desulfurization tower 4 and before the induced draft fan 6. A gate valve K1 is provided on the flue from the SCR device 1 to the economizer 2, a gate valve K2 is provided on the flue from the dust collector 13 to the flue gas cooler 3, and a gate valve K3 is added to the flue from the wet desulfurization tower 4 to the induced draft fan 6. The gate valves are adjusted to disconnect the original flue gas channel, so that the flue gas flow is changed to the SCR denitrification device and then passes through the gas heat exchanger A7, economizer 2, dust collector 13, gas heat exchanger B8, flue gas cooler 3, wet desulfurization tower 4, flue gas dehumidification and cooling device 9 in sequence. The cold and clean flue gas leaving the dehumidification and cooling device enters the flue gas channel of the gas heat exchanger B8 again, and finally mixes with part of the high-temperature air through the mixer 11. The mixed gas is sucked into the chimney 5 by the induced draft fan 6 and discharged into the atmosphere.
[0033] The newly added hot air route uses the blower 12 to draw air through the hot end of the gas heat exchanger B8 and the gas heat exchanger A7, and the cold air is heated to become high-temperature air. Finally, part of the high-temperature air enters the mixer 11 through the regulating valve F and mixes with the clean flue gas, and is finally sent to the chimney 5 by the induced draft fan and the environment. Most of the remaining high-temperature air is directly sent to the heating flue at the bottom of the chimney.
[0034] The amount of high-temperature air added to the flue gas is adjusted in relation to the exhaust temperature to maintain a stable exhaust temperature.
[0035] The temperature control of the heated air is related to the opening of the flue gate valve K1, and the opening of the gate valve K1 is adjusted to schedule the ratio of the flue gas flow rate to the air volume.
[0036] The present invention utilizes the waste heat of the recovery boiler to heat the air, utilizes the hot air to adjust and control the temperature at the root of the chimney and the relative density of the exhaust smoke, and simultaneously utilizes part of the high-temperature air to mix with the smoke to adjust the relative humidity of the smoke, and the adjusted smoke is sent to the chimney for discharge.
[0037] The dehumidification and cooling device 9 of the present invention is a vertical washing and cooling device that combines indirect cooling and direct cooling. Figure 3 The device is divided into an upper cooling section and a lower cooling section. The lower section adopts direct cooling, and the upper section adopts indirect cooling. The lower section uses circulating cooling water to spray and flush the flue gas to remove some sulfates and fine solid particles and pre-cool the flue gas. The flue gas temperature is cooled down to a temperature close to the ambient temperature. The upper indirect cooling section uses low-temperature circulating water to cool the flue gas to below the ambient temperature.
[0038] The cooling and dehumidification process of the device for flue gas is as follows: the hot flue gas from the wet flue gas desulfurization tower first enters the lower flue gas inlet pipe 21 of the lower section of the device, and the flue gas enters the annular space between the lower cylinder 19 and the inner cylinder 20 in a cut-in manner and rotates down. The lower circulating washing cooling water inlet pipe 22 sprays washing cooling water into the annular space to the flue gas, and the fine particles and sulfates in the flue gas are washed off, and the flue gas is initially cooled; the washing water falls into the bottom of the lower cylinder, and flows out from the lower circulating washing cooling water outlet pipe 33 after full flow into the lower circulating water system. The flue gas rotates down to the lower edge of the inner cylinder 20, then turns to the space of the inner cylinder 20 and rises to the space between the annular partition 32 and the partition plate 24, enters the lower flue gas outlet pipe 23, enters the upper cylinder 34 through the upper and lower flue gas connecting pipes 25, and enters the upper cooling operation.
[0039] The flue gas enters from the upper flue gas inlet pipe 26, flows from top to bottom through the low-temperature circulating cooling water pipe box 28, and the low-temperature circulating cooling water enters from the upper circulating cooling water inlet pipe 29, flows through the entire pipe row from bottom to top, and finally flows out from the uppermost circulating cooling outlet pipe 27 to return to the circulating cooling water system. As the flue gas is cooled, the water vapor in the flue gas condenses and precipitates, and the saturated water vapor content of the flue gas gradually decreases. The cooling water volume is controlled to adjust the final cooling temperature of the flue gas. The final cooling temperature of the flue gas is controlled in order to meet the technical requirements of flue gas de-whitening and the economic benefits of production operations, and the final cooling temperature is determined according to environmental meteorological conditions. The flue gas temperature after cooling is adjusted in association with the low-temperature circulating water flow rate. The cooled flue gas leaves the device from the upper flue gas outlet pipe 30 below the cooling water pipe row.
[0040] The condensate at the bottom of the upper section is led out from the upper section condensate outlet pipe 31 and flows into the liquid collecting tank by gravity.
[0041] The sludge water deposited in the lower section is regularly led out from the sewage outlet pipe 1 to the sludge place.
[0042] The lower cooling section of the flue gas dehumidification and cooling device of the present invention uses 30℃ circulating water to reduce the flue gas after the wet desulfurization tower from 50 to 60℃ to 33 to 35℃, close to the ambient temperature. The upper cooling section uses 18℃ low-temperature water to further cool the flue gas to 20℃ to 22℃. The water content of the flue gas is reduced to the standard condition per 1m 3 The moisture content of dry gas is less than 25g, which provides a reliable guarantee for flue gas decolorization.
[0043] The advantages of the flue gas dehumidification and cooling device described in the present invention are: it is divided into two stages for treatment, the consumption of low-temperature water is low, and the operation intensity of the upper stage can be adjusted according to the season and meteorological conditions; it adopts a combination of direct cooling and indirect cooling, first direct cooling and then indirect cooling, which can wash out impurities in the flue gas first to prevent scaling of subsequent equipment; the cooling process adopts a flue gas flow from top to bottom, which can make the condensate fall smoothly to avoid back mixing and mist entrainment, and improve the quality of flue gas dehumidification and purification; the flue gas is first washed to remove impurities, and then indirect cooling is performed, and the condensate can be recycled.
[0044] The gas heat exchanger of the present invention is a combined flat plate type gas-to-gas heat exchange device, in which the cold and hot gases flow in adjacent channels respectively, and the flow mode can be countercurrent, crosscurrent or parallel flow. The special high-efficiency gas heat exchanger of the present invention is characterized by low gas flow resistance, heat conduction between the cold and hot fluids on both sides of the flat plate, uniform heating surface of the cold gas without the heat-facing surface and the heat-receiving surface, and high heat transfer efficiency. The gas exchanger adopts a combined structure, which is easy to install, disassemble and repair, and has low material cost.
[0045] In summary, the above are only preferred embodiments of the present invention and are not intended to limit the scope of implementation of the present invention. All equivalent changes and modifications to the shapes, structures, features and spirits described in the claims of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A boiler flue gas dewhitening process, characterized in that: The process flow is as follows: the boiler high-temperature flue gas passes through the SCR denitration device and then passes through the gas heat exchanger A (7), the economizer (2), the dust collector (13), the gas heat exchanger B (8), the flue gas cooler (3), the wet desulfurization tower (4) and the flue gas dehumidification and cooling device (9) in sequence to form cold clean flue gas. The cold clean flue gas after leaving the flue gas dehumidification and cooling device (9) then enters the flue gas channel of the gas heat exchanger B (8) and enters the blender (11); the air is sucked by the blower (12) and passes through the front section of the gas heat exchanger B (8) and the gas heat exchanger A (7) in sequence, and the cold air is heated to become high-temperature air. A part of the high-temperature air passes through the regulating valve F and enters the blender (11) to mix with the clean flue gas and is finally sent to the chimney (5) by the induced draft fan (6) to be discharged into the atmosphere, and the rest of the high-temperature air is directly sent to the bottom of the chimney (5) to heat the flue.
2. A boiler flue gas decolorization process according to claim 1, characterized in that: The cold air first exchanges heat with the flue gas after the dust collector, and then exchanges heat with the flue gas before the economizer. The air temperature rises from room temperature to 80 to 100 o C, then rise to 150 to 200 o C, the air flow is 10-20% of the flue gas volume. The air flow is related to the temperature of the air after heat exchange to adjust the opening of the gate valve K1. The amount of high-temperature air mixed with the flue gas is related to the flue gas temperature before the chimney after the induced draft fan to adjust the opening of the regulating valve F.
3. A boiler flue gas deoxidation device, characterized in that: The invention comprises an SCR denitration device (1), an economizer (2), a flue gas cooler (3), a wet desulfurization tower (4), a chimney (5), an induced draft fan (6), a gas heat exchanger A (7), a gas heat exchanger B (8), a flue gas dehumidification and cooling device (9), a liquid collecting tank (10), a blender (11), a blower (12) and a dust collector (13). The SCR denitration device (1) is connected to the gas heat exchanger A (7), the economizer (2), the dust collector (13), the gas heat exchanger B (8), the flue gas cooler (3), the wet desulfurization tower (4) and the flue gas dehumidification and cooling device (9) in sequence. One side of the flue gas dehumidification and cooling device (9) is connected to the gas The heat exchanger B (8) is connected to the chimney (5) through the mixer (11) and the induced draft fan (6) at the rear section. The blower (12) is connected to the gas heat exchanger B (8) and the gas heat exchanger A (7) in sequence through a pipeline and is connected to the chimney (5). A gate valve K1 is provided on the flue from the SCR denitration device (1) to the economizer (2). A gate valve K2 is provided on the flue from the dust collector (13) to the flue gas cooler (3). A gate valve K3 is provided on the flue from the wet desulfurization tower (4) to the induced draft fan (6). A regulating valve F is provided between the pipeline from the gas heat exchanger A (7) to the chimney (5) and the mixer (11).
4. A boiler flue gas deoxidation device according to claim 3, characterized in that: The gas heat exchanger A (7) and the gas heat exchanger B (8) adopt metal plate heat exchange, which is composed of a single or multiple metal boxes. A certain number of distance rods are welded between the plates. The flue gas channel of the gas heat exchanger flows from top to bottom, and the air channel flows from left to right or from right to left. An ash collection and discharge device is provided at the turning point where the flue gas flows downward to the heat exchanger outlet.
5. A boiler flue gas deoxidation device according to claim 3, characterized in that: The flue gas dehumidifying and cooling device (9) is composed of a direct cooling section and an indirect cooling section, a partition plate (24) is provided between the direct cooling section and the indirect cooling section, the direct cooling section is composed of a concentric inner cylinder (20) and a lower cylinder (19), the annular space formed between the inner cylinder (20) and the lower cylinder (19) is a flue gas washing area, an annular partition plate (32) is provided above the annular space, a lower flue gas inlet pipe (21), a lower circulating washing cooling water inlet pipe (22) and a lower circulating washing cooling water outlet pipe (33) are provided on the side of the lower cylinder (19), a sludge outlet pipe (18) is provided at the bottom, and a lower flue gas outlet pipe (23) is provided at the top, and the indirect cooling section The cooling water pipe box (28) comprises an upper cylinder (34), wherein a plurality of groups of horizontally arranged pipes are arranged in the upper cylinder (34) to form a cooling water pipe box (28), wherein the upper and lower ends of the cooling water pipe box (28) are respectively connected to an upper circulating cooling water outlet pipe (27) and an upper circulating cooling water inlet pipe (29), wherein an upper smoke gas inlet pipe (26) is arranged at the top of the upper cylinder (34), wherein the upper smoke gas inlet pipe (26) is connected to a lower smoke gas outlet pipe (23) via an upper and lower smoke gas connecting pipe (25), wherein an upper smoke gas outlet pipe (30) is arranged on the side of the upper cylinder (34), and an upper condensate outlet pipe (31) is arranged at the bottom, wherein the upper smoke gas outlet pipe (30) is located below the cooling water pipe box (28).