A building system for prestressed tensioning construction and a construction method thereof
By adopting the recessed and boss structure in the building system, combined with the splicing method of pre-tightening ribs and tenon heads, the problem of insufficient formwork use and seismic resistance during the construction process of the existing building system is solved, and efficient and fast Construction and improve seismic resistance.
Patent Information
- Application Number
- CN201910009250.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-01-04
- Publication Date
- 2025-01-17
- Estimated Expiration
- 2039-01-04
AI Technical Summary
The existing building system needs to build formwork during construction. The pre-component standardization requirements are high, the seismic resistance is poor, and there are many defects in the connection between the foundation structure and the wall/column, resulting in low construction efficiency and insufficient seismic resistance.
A prestressed tension construction system is adopted, including foundation, wall/column and beams. By setting depressions and bosses on local wall/column and foundation beams, and splicing them with holes and pre-tightening ribs, combined with tenons The structure of Heqikou achieves modular construction and high standardization, and reduces the use of templates.
Modular construction has been realized, the construction speed and standardization level have been improved, the construction personnel and formwork use have been reduced, the seismic performance of the building has been enhanced, and the complete dry construction can be achieved.
Smart Images

Figure CN109797846B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building engineering, and in particular to a building system for prestressed tensioning construction and a construction method thereof. Background Art
[0002] The concrete foundation structure in the prior art is relatively simple. For example, patent application 201610455877.9 discloses a prefabricated foundation for an assembled building, including a convex prefabricated foundation. The convex prefabricated foundation is a concrete foundation with a plurality of longitudinal bars inside. The longitudinal bars extend from both ends of the convex prefabricated foundation and are connected to the longitudinal bars of adjacent convex prefabricated foundations through sleeves. A plurality of vertically upward connecting bars are fixed inside the convex prefabricated foundation. The connecting bars extend from the upper part of the convex prefabricated foundation and are connected to the outer wall through sleeves.
[0003] For another example, patent application 201210026247.1 discloses a U-shaped groove foundation for prefabricated buildings, including a cavity groove excavated on the foundation for inserting prefabricated wall panels, a U-shaped groove is excavated on the outer periphery of the cavity groove, bottom steel bars or steel mesh are installed in the U-shaped groove near the bottom surface of the U-shaped groove, lateral steel bars and vertical steel bars are arranged at intervals near the side walls of the U-shaped groove, and supporting templates for supporting the U-shaped groove into a U-shaped hollow groove are fixed at the bottom of the U-shaped groove, the bottom of the cavity groove, the side walls of the U-shaped groove and the side walls of the cavity groove, a post-anchor pad is fixed on the bottom surface of the cavity groove, a columnar steel member for connecting the wall panel is fixed on the post-anchor pad, and concrete is poured between the U-shaped groove in the foundation, the wall panel and the groove wall of the cavity groove.
[0004] For example, patent application 2017109734230.1 adopts an assembled wall structure, including a plate body and a tube body for connecting the plate body, the outer wall of the tube body is recessed along its radial direction toward the axis of the tube body to form a guide groove, the guide groove runs up and down along the length of the tube body, and grooves adapted to the shape of the tube body are provided on both sides of the plate body. For another example, the assembled wall structure disclosed in patent application 201810697277.2 is spliced in sequence through the outer wall layer, the front load-bearing layer, the rear load-bearing layer and the inner decoration layer.
[0005] The connection between the foundation structure and the wall / column in the prior art is connected by a sleeve connection or a U-shaped groove, and the pre-buried steel bars are used for binding and pouring, and the splicing of the wall / column and the beam is directly bound and poured. The prior art of the prior art of the foundation and the wall / column directly splicing, the wall / column and the beam directly bound and poured has many defects. Therefore, in order to solve the above technical problems, a building system and a construction method for prestressed tensioning construction are needed. Summary of the invention
[0006] One aspect of the present invention is to provide a building system for prestressed tensioning construction, the building system comprising a foundation, a wall / column and a beam, wherein:
[0007] The foundation includes a base, a partial wall / column and a foundation beam, the two sides of the partial wall / column are recessed downward to form a recessed portion, the two ends of the foundation beam are recessed inward, so that the two ends of the foundation beam form a boss, the boss is vertically provided with a first hole passing through the boss, the partial wall / column is vertically provided with a second hole, and the second hole passes through the side of the partial wall / column;
[0008] When the foundation beam is built on the partial wall / column, the upper side surface of the recessed portion supports the bottom surface of the foundation beam; the upper surface of the partial wall / column supports the bottom surface of the boss, and the first hole is aligned with the second hole;
[0009] The wall / column is provided with a third hole which is longitudinally through, and when the wall / column is built on the foundation beam, the third hole is aligned with the first hole,
[0010] The wall / column comprises a first wall / column and a second wall / column, the first wall / column has a tongue and groove at the end and / or the middle, and the second wall / column has a tenon at the end, so that when the first wall / column intersects with the second wall / column, the tongue and groove are connected with the tenon and mortise and tenon joint;
[0011] The third hole of the first wall / column is vertically opened at a position corresponding to the tongue and groove, and the third hole of the second wall / column is vertically opened at a position corresponding to the tenon, and when the first wall / column intersects with the second wall / column, the third hole of the first wall / column is aligned with the third hole of the second wall / column;
[0012] A second stepped groove is provided on the upper side of the end of the wall / column, and a third hole of the wall / column vertically penetrates the support surface of the second groove;
[0013] The end of the beam is provided with a stepped second tenon, and the end of the beam is provided with a fourth hole that passes vertically through the second tenon at the position of the supporting surface of the second tenon. The second tenon of the beam is built on the second tongue and groove of the wall / column, and the supporting surface of the second tenon abuts against the supporting surface of the second tongue and groove, so that the third hole is aligned with the fourth hole;
[0014] When the wall / column is built on the foundation and the beam is built on the wall / column, pre-tightening reinforcement is passed through the first hole, the second hole, the third hole and the fourth hole to apply pre-tightening force to the local wall / column, the foundation beam, the wall / column and the beam.
[0015] Preferably, the building system further comprises a floor slab, and the floor slab is provided with a fifth hole running longitudinally therethrough.
[0016] Preferably, the second tenon of the beam is built on the second tongue and groove of the wall / column, the floor slab covers the upper surface of the wall / column and the beam after being spliced, and the fifth hole is aligned with the fourth hole.
[0017] Preferably, a protrusion is provided on the upper side of the foundation beam, and a groove is provided on the lower side of the wall / column at the position of the third hole, and the first hole passes through the protrusion. When the wall / column is built on the foundation beam, the protrusion is embedded in the groove, and the third hole is aligned with the first hole.
[0018] Preferably, when the second tenon of the beam is built on the second tongue and groove of the wall / column, the upper surface of the wall / column is flush with the upper surface of the beam.
[0019] Preferably, the wall / column, base, partial wall / column and foundation beam are prefabricated in a factory, and the base is integrally formed with the partial wall / column.
[0020] Preferably, a sleeve is embedded in the first hole and / or the second hole and / or the third hole and / or the fourth hole.
[0021] Preferably, the embedded sleeve is a corrugated metal sleeve.
[0022] Preferably, the first wall / column and the second wall / column are spliced into a "T"-shaped wall / column, or are spliced into an "I"-shaped wall / column, or are spliced into an "L"-shaped wall / column.
[0023] Another aspect of the present invention is to provide a construction method for a building system for prestressed tensioning construction, the method comprising:
[0024] (1) Prefabricated components
[0025] It comprises a prefabricated foundation, a wall / column and a beam, wherein the foundation comprises a base, a partial wall / column and a foundation beam, the two sides of the partial wall / column are recessed downward to form a recessed portion, the two ends of the foundation beam are recessed inward, so that bosses are formed at the two ends of the foundation beam, the bosses are vertically provided with a first hole penetrating the bosses, the partial wall / column is vertically provided with a second hole, and the second hole passes through the side of the partial wall / column;
[0026] The wall / column is provided with a third hole which is longitudinally through, and when the wall / column is built on the foundation beam, the third hole is aligned with the first hole,
[0027] The wall / column comprises a first wall / column and a second wall / column, the first wall / column has a tongue and groove at the end and / or the middle, and the second wall / column has a tenon at the end, so that when the first wall / column intersects with the second wall / column, the tongue and groove are connected with the tenon and mortise and tenon joint;
[0028] The third hole of the first wall / column is vertically opened at the position corresponding to the tongue and groove, and the third hole of the second wall / column is vertically opened at the position corresponding to the tenon.
[0029] A second stepped groove is provided on the upper side of the end of the wall / column, and a third hole of the wall / column vertically penetrates the support surface of the second groove;
[0030] The end of the beam is provided with a stepped second tenon, and the end of the beam is provided with a fourth hole which is vertically through at the position of the supporting surface of the second tenon;
[0031] (2) Build foundation beams and walls / columns
[0032] Fix the local wall / column, build the foundation beam on the local wall / column, the upper side of the recessed portion supports the bottom surface of the foundation beam, the upper surface of the local wall / column supports the bottom surface of the boss, and the first hole is aligned with the second hole; build the wall / column on the foundation beam, and align the third hole with the first hole;
[0033] (3) Build beams and walls / columns
[0034] After the wall / column is built on the foundation beam, the wall / column is fixed, and the second tenon of the beam is built on the second tongue and groove of the wall / column, so that the third hole is aligned with the fourth hole;
[0035] (4) Apply preload
[0036] Pre-tightening bars are inserted into the first hole, the second hole, the third hole and the fourth hole, the pre-tightening bars are tensioned and grout is poured into the first hole, the second hole, the third hole and the fourth hole.
[0037] The present invention provides a building system for prestressed tensioning construction and a construction method thereof, which can be constructed in a modular manner, have a high degree of standardization, and a fast construction speed. The entire construction can be implemented in a completely dry method, which reduces the use of templates and construction personnel.
[0038] It should be understood that the foregoing general description and the following detailed description are exemplary illustrations and explanations and should not be used as limitations on the content of the invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] With reference to the accompanying drawings, further objects, functions and advantages of the present invention will be clarified through the following description of embodiments of the present invention, in which:
[0040] Figure 1 The schematic diagram of the connection between the wall / column and the foundation of the building system of the present invention is schematically shown.
[0041] Figure 2 A schematic diagram showing the connection between walls / columns and beams of the building system of the present invention is shown.
[0042] Figure 3 The exploded schematic diagram of the partial wall / column and foundation beam of the building system of the present invention is shown.
[0043] Figure 4 A side view of the foundation of the building system of the present invention is shown.
[0044] Figure 5 A top view of the foundation of the building system of the present invention is shown.
[0045] Figure 6 A schematic diagram of the connection between walls / columns and foundation beams in an embodiment of the building system of the present invention is shown.
[0046] Figure 7 An exploded schematic diagram of a wall / column in one embodiment of the building system of the present invention is shown.
[0047] Figure 8 A schematic diagram of the mortise and tenon joints of walls / columns in one embodiment of the building system of the present invention is shown.
[0048] Fig. 9 A schematic diagram of the mortise and tenon joints of walls and columns in another embodiment of the building system of the present invention is shown.
[0049] Fig.10 A schematic diagram of the mortise and tenon connection of walls / columns in another embodiment of the building system of the present invention is shown.
[0050] Fig.11 A schematic diagram showing the decomposition of walls / columns and beams of the building system of the present invention is shown. DETAILED DESCRIPTION
[0051] By referring to the exemplary embodiments, the objects and functions of the present invention and the methods for achieving these objects and functions will be explained. However, the present invention is not limited to the exemplary embodiments disclosed below; it can be implemented in different forms. The essence of the description is only to help those skilled in the relevant art to comprehensively understand the specific details of the present invention.
[0052] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings, and relevant technical terms should be well known to those skilled in the art. In the accompanying drawings, the same reference numerals represent the same or similar components, or the same or similar steps, unless otherwise specified.
[0053] In order to solve the problems in the prior art that the building system needs to build a template during the construction process, the prefabricated components have high standardization requirements, and the building has poor seismic performance, the present invention proposes a building system for prestressed tensioning construction and a construction method thereof. Figure 1 The schematic diagram of the connection between the wall / column and the foundation of the building system of the present invention is shown in FIG. Figure 2 The schematic diagram of the connection between the wall / column and the beam of the building system of the present invention is shown. According to an embodiment of the present invention, a building system for prestressed tensioning construction includes a foundation, a wall / column 4, a beam 5 and a floor slab 6.
[0054] The foundation includes a base 1, a partial wall / column 2 and a foundation beam 3. The foundation beam 3 is built on an adjacent foundation wall / column. The foundation beam 3 has a first hole 301. The partial wall / column 2 has a second hole 201. The wall / column 4 has a third hole 401 that passes through longitudinally. When the wall / column 4 is built on the foundation beam 3, the third hole 401 is aligned with the first hole 301. When the foundation beam 3 is built on the partial wall / column 2, the first hole 301 is aligned with the second hole 201.
[0055] like Figure 2 As shown, a second stepped tongue and groove is provided on the upper side of the end of the wall / column 4, a second stepped tenon is provided at the end of the beam 5, a fourth hole 501 is provided in the second tenon and a fifth hole 601 is provided in the floor slab 6 and when the beam 5 is built on the wall / column 4 and the floor slab 6 is covered on the beam 5, pre-tightening force is applied to the local wall / column 2, foundation beam 3, wall / column 4, beam 5 and floor slab 6 by passing the pre-tightening reinforcement through the first hole 301, the second hole 201, the third hole 401, the fourth hole 501 and the fifth hole 601.
[0056] The following embodiments provide a detailed explanation of the various components of a building system for prestressed tensioning construction provided by the present invention. Figure 3 The exploded schematic diagram of the partial wall / column and foundation beam of the building system of the present invention is shown, and the foundation includes a base, a partial wall / column and a foundation beam 3. According to the present invention, in this embodiment, the wall / column 4, the base, the partial wall / column 2 and the foundation beam 3 are prefabricated in the factory, and the base 1 and the partial wall / column 2 are formed in one piece. The two sides of the partial wall / column 2 are recessed downward to form a recessed portion 202, and the two ends of the foundation beam 3 are recessed inward to form a boss 302 at both ends of the foundation beam. The boss 302 vertically defines a first hole 301 that passes through the boss 302, and the partial wall / column 2 vertically defines a second hole 201, and the second hole 201 passes through the side of the partial wall / column. Specifically, as Figure 4As shown in the side view of the foundation of the building system of the present invention, the second hole 201 of the partial wall / column 2 penetrates from the vertical hole 205 at the top of the partial wall / column, extends to the inside of the partial wall / column 2, and passes out from the horizontal hole 206 on the side of the partial wall / column 2.
[0057] When the foundation beam 3 is built on the local wall / column 2, the upper side surface 203 of the recessed portion 202 supports the bottom surface 303 of the foundation beam 3; the upper surface 204 of the local wall / column 2 supports the bottom surface 304 of the boss 302, and the first hole 301 is aligned with the second hole 201, specifically, the first hole 301 is aligned with the vertical opening 205 of the second hole. During the construction process, the pre-tightening force is applied to the foundation beam 3 and the local wall / column 2 by passing the pre-tightening reinforcement through the first hole 301 and the second hole 201.
[0058] like Figure 5 The top view of the foundation of the building system of the present invention is shown. In this embodiment, the foundation is an "L"-shaped structure. In some embodiments, the foundation of the prestressed tensioning construction building system provided by the present invention can be an "I"-shaped or "T"-shaped structure.
[0059] The wall / column 4 of the present invention is prefabricated in a factory, and a third hole 401 is provided in the wall / column 4 which is longitudinally penetrated. When the wall / column 4 is built on the foundation beam 3, the third hole 401 is aligned with the first hole 301, and a pre-tightening force is applied to the wall / column 4, the foundation beam 3 and the partial wall / column 2 by passing the pre-tightening bar through the third hole 401, the first hole 301 and the second hole 201. According to the present invention, a sleeve is embedded in the third hole 401 and / or the first hole 301 and / or the second hole 201. The embedded sleeve is a corrugated metal sleeve, and the pre-tightening bar is a prestressed steel bar or a steel strand.
[0060] In some embodiments, the connection between the wall / column 4 and the foundation beam 3 is performed by splicing through a stepped interlocking method, such as Figure 6 The schematic diagram of the connection between the wall / column and the foundation beam in one embodiment of the building system of the present invention is shown, the upper side of the foundation beam 3 is provided with a protrusion 305, the lower side of the wall / column 4 is provided with a groove 402 at the position of the third hole 401, the first hole 301 passes through the protrusion 305, when the wall / column 4 is built on the foundation beam 3, the protrusion 305 is embedded in the groove 402, and the third hole 401 is aligned with the first hole 301. By splicing the protrusion 305 and the groove 402, the first hole 301 and the third hole 401 can be accurately aligned, reducing the calibration during the construction process. In other embodiments, the wall / column 4 and the foundation beam 3 are directly spliced by tongue-and-groove connection.
[0061] According to an embodiment of the present invention, the wall / column structure includes a first wall / column and a second wall / column, the first wall / column has a tongue and groove at the end and / or the middle, and the second wall / column has a tenon at the end, so that when the first wall / column intersects with the second wall / column, the tongue and groove are connected with the tenon and mortise and tenon joint.
[0062] The third hole of the first wall / column is vertically opened corresponding to the tongue and groove position, and the third hole of the second wall / column is vertically opened corresponding to the tenon position. When the first wall / column intersects with the second wall / column, the third hole of the first wall / column is aligned with the third hole of the second wall / column.
[0063] In this embodiment, a groove is provided in the middle of the first wall / column as an example. Figure 7 The figure shows an exploded schematic diagram of a wall / column in an embodiment of the building system of the present invention. In this embodiment, a tongue and groove 4031 is opened in the middle of the first wall / column 403, and the first wall / column 403 intersects with the second wall / column 404 to form a "T"-shaped wall / column structure.
[0064] The wall / column 4 includes a first wall / column 403 and a second wall / column 404. The first wall / column 403 and the second wall / column 404 are both prefabricated in a factory. The first wall / column 403 or the second wall / column 404 is in the shape of a letter "I". A tongue and groove 4031 is provided in the middle of the first wall / column 403, and a tenon 4041 is provided at the end of the second wall / column 404, so that when the first wall / column 403 and the second wall / column 404 intersect, the tongue and groove 4031 and the tenon 4041 are connected by mortise and tenon joints.
[0065] According to the embodiment of the present invention, the third hole 401 of the first wall / column 403 vertically penetrates at the position corresponding to the tongue and groove 4031, and the third hole 401 of the second wall / column 404 vertically penetrates at the position corresponding to the tenon. When the first wall / column 403 intersects with the second wall / column 404, the third hole 401 of the first wall / column 403 is aligned with the third hole 401 of the second wall / column 404, and is spliced into a complete third hole 401 of the wall / column 4, and a pre-tightening force is applied to the first wall / column 403 and the second wall / column 404 by passing the pre-tightening rib through the third hole 401 of the first wall / column 403 and the third hole 401 of the second wall / column 404.
[0066] The invention forms a complete wall / column structure by splicing the wall / column by means of tenons and tongues, and pre-buries sleeves at the positions of the tenons and tongues to apply pre-tightening force to the spliced walls / columns, which effectively increases the seismic performance of the wall / column structure, and can achieve 6 to 8 levels of seismic resistance according to requirements. Moreover, the wall / column structure of the invention can greatly reduce the use of templates during construction, and reduce the requirements for templates.
[0067] Fig. 9A schematic diagram of the mortise and tenon connection of walls / columns in another embodiment of the building system of the present invention is shown, wherein a tongue and groove is provided at the end of the first wall / column, and a tenon is provided at the end of the second wall / column, so that when the first wall / column intersects with the second wall / column, the tongue and groove are connected with the tenon and mortise and tenon to form an "I"-shaped wall / column structure.
[0068] Fig.10 A schematic diagram of the mortise and tenon connection of walls / columns in another embodiment of the building system of the present invention is shown, wherein a tongue and groove is provided at the end of the first wall / column, and a tenon is provided at the end of the second wall / column, so that when the first wall / column intersects with the second wall / column, the tongue and groove are connected with the tenon and mortise and tenon to form an "L"-shaped wall / column structure.
[0069] like Fig.11 The schematic diagram of the decomposition of the wall / column and beam of the building system of the present invention is shown. According to an embodiment of the present invention, a second stepped groove is provided on the upper side of the end of the wall / column 4, and the third hole 401 of the wall / column 4 vertically penetrates the supporting surface of the second groove.
[0070] In this embodiment, a second tongue and groove is formed by an inward depression of the wall surface on the upper side of the end of the wall / column 4, and a second stepped tenon 502 is provided at the end of the beam 5. A fourth vertical hole 501 is provided at the end of the beam 5 at the position where the supporting surface 503 of the second tenon 502 overlaps the supporting surface of the second tongue and groove of the wall / column 4.
[0071] The second tenon 502 of the beam 5 is built on the second tongue and groove of the wall / column 4, and the supporting surface 503 of the second tenon 502 abuts against the supporting surface of the second tongue and groove, so that the third hole 401 is aligned with the fourth hole 501, and the preload force is applied to the wall / column 4 and the beam 5 by passing the preload reinforcement through the third hole 401 and the fourth hole 501.
[0072] According to the embodiment of the present invention, when the second tenon 502 of the beam 5 is built on the second tongue and groove of the wall / column 4, the upper surface of the second wall / column body 404 of the wall / column 4 is flush with the upper surface 504 of the beam 5. The second tenon 502 of the beam 5 is built on the second tongue and groove of the wall / column 4, the floor slab 6 covers the upper surface after the wall / column 4 and the beam 5 are spliced, the fifth hole 601 is aligned with the fourth hole 501, and the pre-tightening bar passes through the third hole 401, the fourth hole 501 and the fifth hole 601, so as to apply pre-tightening force to the floor slab, the beam and the wall / column.
[0073] According to an embodiment of the present invention, a pre-buried sleeve is inside the first hole 301 and / or the second hole 201 and / or the third hole 401 and / or the fourth hole 501 and / or the fifth hole 601, the pre-buried sleeve is a corrugated metal sleeve, and the pre-tensioning bars are prestressed steel bars or steel strands.
[0074] The present invention provides a building system for prestressed tensioning construction, in which a tongue and groove is arranged on the upper side or the lower side of the wall / column end, different walls / columns are spliced together, the walls / columns and beams are spliced together through the tongue and groove, and the local walls / columns and foundation beams are spliced together by means of bosses and recesses, so that the construction of templates can be omitted during the construction process, reducing the standardization requirements of prefabricated parts.
[0075] The present invention adopts a structure of tongue and groove or boss and recessed parts, which, combined with prestressed tensioning construction, can effectively increase the seismic performance of the connection structure between the foundation beam and local wall / column, the wall / column and the foundation beam, and the wall / column and the beam.
[0076] The following is a description of a construction method of a building system for prestressed tensioning construction according to the present invention. According to an embodiment of the present invention, the construction method of a building system for prestressed tensioning construction includes:
[0077] (1) Prefabricated components.
[0078] The prefabricated component includes a prefabricated foundation, a wall / column 4 and a beam 5. The foundation includes a base 1, a partial wall / column 2 and a foundation beam 3. The two sides of the partial wall / column 2 are concave downward to form a concave portion, and the two ends of the foundation beam are concave inward to form a boss at both ends of the foundation beam. The boss is vertically provided with a first hole 301 that passes through the boss, and the partial wall / column is vertically provided with a second hole 201, and the second hole 201 passes through the side of the partial wall / column. The wall / column is provided with a third hole 401 that passes through longitudinally. When the wall / column is built on the foundation beam, the third hole 401 is aligned with the first hole 301.
[0079] The wall / column 4 comprises a first wall / column and a second wall / column. The first wall / column has a tongue and groove at its end and / or middle, and a tenon is provided at its end, so that when the first wall / column intersects with the second wall / column, the tongue and groove are connected with the tenon and mortise and tenon joint.
[0080] The third hole of the first wall / column is vertically penetrated at the position corresponding to the tongue and groove, the third hole of the second wall / column is vertically penetrated at the position corresponding to the tenon, a second stepped tongue and groove is arranged on the upper side of the end of the wall / column, and the third hole of the wall / column is vertically penetrated at the support surface of the second tongue and groove.
[0081] The end of the beam 5 is provided with a second stepped tenon, and the end of the beam is provided with a fourth vertically penetrating hole 501 at the position of the supporting surface of the second tenon.
[0082] (2) Build foundation beams and walls / columns.
[0083] At the construction site, fix the local wall / column 2, build the foundation beam 3 on the local wall / column, the upper side of the recessed part supports the bottom surface of the foundation beam, the upper surface of the local wall / column supports the bottom surface of the boss, and the first hole 301 is aligned with the second hole 201; build the wall / column 4 on the foundation beam 3, so that the third hole 401 is aligned with the first hole 301.
[0084] (3) Build beams and walls / columns.
[0085] After the wall / column is built on the foundation beam, the wall / column 4 is fixed, and the second tenon of the beam 5 is built on the second tongue and groove of the wall / column 4 so that the third hole 401 is aligned with the fourth hole 501.
[0086] (4) Apply preload.
[0087] Pre-tightening bars are inserted into the first hole, the second hole, the third hole and the fourth hole, the pre-tightening bars are tensioned and grout is poured into the first hole, the second hole, the third hole and the fourth hole.
[0088] The present invention provides a building system for prestressed tensioning construction, in which a tongue and groove is arranged on the upper side or the lower side of the wall / column end, different walls / columns are spliced together, the walls / columns and beams are spliced together through the tongue and groove, and the local walls / columns and foundation beams are spliced together by engaging convex and concave parts, so that the construction of templates can be omitted during the construction process, reducing the standardization requirements of prefabricated parts.
[0089] The present invention adopts a structure of tongue and groove or boss and recessed parts, which, combined with prestressed tensioning construction, can effectively increase the seismic performance of the connection structure between the foundation beam and local wall / column, the wall / column and the foundation beam, and the wall / column and the beam.
[0090] The present invention provides a building system for prestressed tensioning construction and a construction method thereof, which can reduce the standardization requirements for prefabricated parts, reduce the use of templates, and increase the seismic performance of wall / column structures.
[0091] Other embodiments of the present invention will be readily apparent to those skilled in the art from the description and practice of the invention disclosed herein. The description and embodiments are to be considered exemplary only, and the true scope and spirit of the present invention are to be limited by the claims.
Claims
1. A building system for prestressed tensioning construction, characterized in that: The building system includes foundation, walls / columns and beams, wherein: The foundation includes a base, a partial wall / column and a foundation beam, the two sides of the partial wall / column are recessed downward to form a recessed portion, the two ends of the foundation beam are recessed inward, so that the two ends of the foundation beam form a boss, the boss is vertically provided with a first hole passing through the boss, and the partial wall / column is vertically provided with a second hole; When the foundation beam is built on the local wall / column, the upper side surface of the recessed portion supports the bottom surface of the foundation beam; The upper surface of the partial wall / column supports the bottom surface of the boss, and the first hole is aligned with the second hole; the wall / column is provided with a third hole which passes through longitudinally, and when the wall / column is built on the foundation beam, the third hole is aligned with the first hole; The wall / column comprises a first wall / column and a second wall / column, the first wall / column has a tongue and groove at the end and / or the middle, and the second wall / column has a tenon at the end, so that when the first wall / column intersects with the second wall / column, the tongue and groove are connected with the tenon and mortise and tenon joint; The third hole of the first wall / column is vertically opened at a position corresponding to the tongue and groove, and the third hole of the second wall / column is vertically opened at a position corresponding to the tenon, and when the first wall / column intersects with the second wall / column, the third hole of the first wall / column is aligned with the third hole of the second wall / column; A second stepped groove is provided on the upper side of the end of the wall / column, and a third hole of the wall / column vertically penetrates the support surface of the second groove; The end of the beam is provided with a stepped second tenon, and the end of the beam is provided with a fourth hole that passes vertically through the second tenon at the position of the supporting surface of the second tenon. The second tenon of the beam is built on the second tongue and groove of the wall / column, and the supporting surface of the second tenon abuts against the supporting surface of the second tongue and groove, so that the third hole is aligned with the fourth hole; When the wall / column is built on the foundation and the beam is built on the wall / column, pre-tightening reinforcement is passed through the first hole, the second hole, the third hole and the fourth hole to apply pre-tightening force to the local wall / column, the foundation beam, the wall / column and the beam; The building system further comprises a floor slab, wherein the floor slab is provided with a fifth hole running longitudinally therethrough; The second tenon of the beam is built on the second tongue and groove of the wall / column, the floor slab covers the upper surface of the wall / column and the beam after being spliced, and the fifth hole is aligned with the fourth hole; When the second tenon of the beam is placed on the second tongue and groove of the wall / column, the upper surface of the wall / column is flush with the upper surface of the beam.
2. The building system according to claim 1, characterized in that: A protrusion is provided on the upper side of the foundation beam, and a groove is provided on the lower side of the wall / column at the position of the third hole. The first hole passes through the protrusion. When the wall / column is built on the foundation beam, the protrusion is embedded in the groove, and the third hole is aligned with the first hole.
3. The building system according to claim 1, characterized in that: The walls / columns, base, partial walls / columns and foundation beams are prefabricated in a factory, and the base is integrally formed with the partial walls / columns.
4. The building system according to claim 1, characterized in that: A sleeve is pre-buried in the first hole and / or the second hole and / or the third hole and / or the fourth hole.
5. The building system according to claim 1, characterized in that: The first wall / column and the second wall / column are spliced into a "T"-shaped wall / column, or spliced into an "I"-shaped wall / column, or spliced into an "L"-shaped wall / column.
6. A construction method for a building system for prestressed tensioning construction, characterized in that: The method comprises: (1) Prefabricated components It comprises a prefabricated foundation, a wall / column and a beam, wherein the foundation comprises a base, a partial wall / column and a foundation beam, the two sides of the partial wall / column are recessed downward to form a recessed portion, the two ends of the foundation beam are recessed inward, so that bosses are formed at the two ends of the foundation beam, the bosses are vertically provided with a first hole penetrating the bosses, the partial wall / column is vertically provided with a second hole, and the second hole passes through the side of the partial wall / column; The wall / column is provided with a third hole which penetrates longitudinally, and when the wall / column is built on the foundation beam, the third hole is aligned with the first hole; The wall / column comprises a first wall / column and a second wall / column, the first wall / column has a tongue and groove at the end and / or the middle, and the second wall / column has a tenon at the end, so that when the first wall / column intersects with the second wall / column, the tongue and groove are connected with the tenon and mortise and tenon joint; The third hole of the first wall / column is vertically opened at the position corresponding to the tongue and groove, and the third hole of the second wall / column is vertically opened at the position corresponding to the tenon. A second stepped groove is provided on the upper side of the end of the wall / column, and a third hole of the wall / column vertically penetrates the support surface of the second groove; The end of the beam is provided with a stepped second tenon, and the end of the beam is provided with a fourth hole which is vertically through at the position of the supporting surface of the second tenon; (2) Build foundation beams and walls / columns Fix the local wall / column, build the foundation beam on the local wall / column, the upper side of the recessed portion supports the bottom surface of the foundation beam, the upper surface of the local wall / column supports the bottom surface of the boss, and the first hole is aligned with the second hole; build the wall / column on the foundation beam, and align the third hole with the first hole; (3) Build beams and walls / columns After the wall / column is built on the foundation beam, the wall / column is fixed, and the second tenon of the beam is built on the second tongue and groove of the wall / column, so that the third hole is aligned with the fourth hole; (4) Apply preload Pre-tightening bars are inserted into the first hole, the second hole, the third hole and the fourth hole, the pre-tightening bars are tensioned and grout is poured into the first hole, the second hole, the third hole and the fourth hole.
Citation Information
Patent Citations
U-shaped groove base for prefabricated building and construction method thereof
CN102535495B
Assembled construction prefabricated foundation
CN105970987A
Assembled wall structure
CN108678270A
Function recoverable prefabricate column base node
CN103243814A
Integrated foundation of low-layer steel structure buildings and construction method thereof
CN106436729A