Positioning plate exchange device for high-integration full-automatic production equipment of air conditioner heat exchanger
A technology for heat exchangers and production equipment, applied in the field of positioning plate position exchange technology, can solve the problems of long production lines, many process flows, complex equipment, etc., achieve safe and reliable work, simple structure, and solve the effect of positioning plate exchange
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2019-09-20
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to an air conditioner production technology, in particular to an automatic pipe threading technology for an air conditioner heat exchanger, specifically a technology that only needs two stations to complete fin material connection, fin arrangement and pipe threading In the process, it is a positioning plate position exchange technology used in highly integrated automatic pipe-piercing production equipment that does not require a large number of returning tooling and large-scale rotary devices. Background technique
[0002] For decades, the manufacturing process and manufacturing equipment of air-conditioning heat exchangers have been restricting the air-conditioning manufacturing industry
[0003] A major bottleneck in automatic production, especially the assembly process of copper tubes and fins of air-conditioning heat exchangers, is still in the state of manual production at home and abroad. In recent years, a small amount of ...
Examples
Embodiment Construction
[0019] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0020] Such as figure 2 shown.
[0021] A positioning plate exchange device for highly integrated automatic production equipment of air-conditioning heat exchangers, characterized in that it includes: a movable lifting plate 5, a fixed bracket 13, a track 24 that can move to both sides and its lateral moving guide rail 28 and side Push the cylinder 29, the track 24 is installed on the lateral moving guide rail 28, and the side push cylinder 29 is installed on the fixed platform 3; the liftable support 11 for holding up the positioning plate 9 is installed in the middle of the two secondary tracks 24, the liftable support 11 It is driven by a cylinder, and two vertical guide rods and movable rollers are arranged on both sides of the cylinder. The piston rod of the cylinder and the two movable rollers are connected with the top plate; a pair of position...