An inserted steel cylinder wind turbine foundation
Through the plug-in steel cylindrical wind power foundation combined with gravity and air-transmitting conduit frame structure, the problems of large design load and long construction period of offshore wind power foundation are solved, and super stability and wave resistance are achieved in harsh environments and shortened Construction period and reduce costs.
Patent Information
- Application Number
- CN201910713411.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-08-02
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2039-08-02
AI Technical Summary
Offshore wind power foundation design has large loads, short construction period, long construction period and high cost, especially in harsh environments, it is difficult to achieve stable construction.
Adopt insert steel cylinder wind power foundation, combined with gravity foundation and air-permeable conduit frame structure, the weak soil layer load-bearing capacity is maximized through the cylinder-soil coordination mode, avoid rock embedded construction, and utilize the resistance of steel cylinder and conduit frame Wave and easy to construct.
It achieves super stability and wave resistance in harsh marine environments, shortens construction period, reduces project costs, improves the foundation's stiffness and overturn resistance, and adapts to complex geological conditions.
Smart Images

Figure CN110439018B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of offshore wind power foundations, and in particular relates to an inserted steel cylinder wind power foundation. Background Art
[0002] Wind energy is a clean, environmentally friendly renewable energy source. It will not decrease with its own transformation and human use. It has the advantages of long-term, periodic and renewable. Therefore, wind energy is a real green energy. At present, the main application of wind energy is wind turbine power generation. Using wind power to generate electricity can effectively utilize wind energy. With the large-scale development and utilization of offshore wind energy, offshore wind turbine foundations have become another important marine engineering structure, which is increasingly valued by the country.
[0003] At present, offshore wind power construction is mainly concentrated in the southeast coastal area. Due to the influence of monsoons and tropical cyclones, wind energy reserves are sufficient, but the environmental conditions are harsh. In the process of construction, it is necessary to solve the strong corrosion and aging problems caused by high temperature, strong ultraviolet rays, high humidity, and high salt, as well as the impact of strong winds and strong waves caused by monsoons and tropical cyclones on wind power foundation design and construction. Therefore, how to overcome the difficulties of large design loads, short construction periods, and harsh construction conditions of offshore wind power foundations has become the main factor restricting the development of offshore wind power.
[0004] Traditional structural forms of offshore wind power foundations include: gravity structure foundation, high pile pedestal structure foundation, single pile or multi-pile foundation, jacket foundation, suction cylinder foundation, etc. Among them, gravity structure foundation and high pile pedestal structure foundation have large structural cross-sections under deep water conditions and are extremely expensive. Single pile or multi-pile foundation and jacket foundation require rock embedding construction at higher rock surfaces, resulting in long construction period and high project cost. Summary of the invention
[0005] The purpose of the present invention is to provide an inserted steel cylinder wind power foundation, and proposes a new type of gravity foundation combined with an upper hollow structure of a negative pressure cylinder foundation conductor frame, and a vibration sinking large cylinder conductor frame foundation solution, which innovates the cylinder-soil coordinated foundation bearing mode, maximizes the bearing capacity of the soft soil layer above the foundation, avoids the need for traditional pile foundations to be embedded in rocks to meet the bearing capacity requirements, and solves the problem of extremely high cost of traditional offshore wind power foundation structures, and the need for rock embedding construction of single or multi-pile foundations and conductor frame foundations at higher rock surfaces, resulting in long construction period and high project cost.
[0006] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:
[0007] The present invention is an inserted steel cylinder wind power foundation, comprising an upper conductor frame structure, a first lower foundation steel cylinder structure or a second lower foundation steel cylinder structure, wherein the upper conductor frame structure comprises a conductor frame, a diagonal brace, a wind turbine connection transition section, and leg piles.
[0008] The lower foundation steel cylinder structure includes a steel cylinder, on the inner wall of which transverse trapezoidal ribs are fixed at equal intervals along the circumferential direction, and the transverse trapezoidal ribs are penetrated by reserved steel sleeves that cooperate with the leg piles, long ribs are fixed on the inner wall of the steel cylinder and at positions on both sides of the reserved steel sleeves, and the transverse trapezoidal ribs are penetrated by short ribs coaxial with the reserved steel sleeves.
[0009] The second lower basic steel cylinder structure includes a second steel cylinder, the inner wall of the second steel cylinder is fixed with an inner cylinder through main short ribs, a second reserved steel sleeve is arranged between the outer wall of the inner cylinder and the inner wall of the second steel cylinder, the second reserved steel sleeve is fixed with sleeve reinforcement ribs, and secondary short ribs are arranged between the main short ribs and the second reserved steel sleeve.
[0010] Furthermore, the upper conductor frame structure is composed of a conductor frame, diagonal braces, a fan connection transition section, and leg piles to form a truss structure.
[0011] Furthermore, the diagonal braces are mainly arranged in an X shape, with a diameter greater than 0.8 m, the diameter of the conductor frame is selected in the range of 1.5 m to 2.0 m, and the bottom end of the conductor frame is fixedly connected to the leg piles.
[0012] Furthermore, the diameter of the steel cylinder is between 20m-40m, the wall thickness is between 15mm-40mm, and the height is between 10m-45m.
[0013] Furthermore, the reserved steel sleeve is connected to the inner wall of the steel cylinder through a short rib plate extending vertically downward. The short rib plate is located in the middle of the reserved steel sleeve. The upper end of the short rib plate is flush with the top of the steel cylinder. The length is 5m-25m, which is adjusted according to the soft foundation and stress range.
[0014] Furthermore, the long ribs are vertically arranged at 1-2m from the edges of both sides of the reserved steel sleeve, and the long ribs are the same length as the steel cylinder.
[0015] Furthermore, the transverse trapezoidal ribs are arranged at equal intervals on the inner wall of the steel cylinder along the axial direction of the reserved steel sleeve, with a spacing of 0.5m-1m and a number of 4-8.
[0016] The present invention has the following beneficial effects:
[0017] 1. The present invention breaks through the traditional structural type and can comprehensively absorb the advantages of the traditional structure. It proposes a new type of gravity foundation combined with a negative pressure cylinder foundation conductor frame with an upper hollow structure, and a vibration-sinking large cylinder conductor frame foundation solution. It innovates the cylinder-soil coordinated foundation bearing mode, maximizes the bearing capacity of the soft soil layer above the foundation, avoids the need for traditional pile foundations to be embedded in rocks to meet the bearing capacity requirements, and utilizes the characteristics of steel cylinders and conductor frames that are easy to prefabricate, easy to transport, easy to construct, and have good wave resistance to achieve super stability and wave resistance in the harsh offshore environment. At the same time, it can reduce the construction period for construction and ensure that a large number of offshore wind power foundations are constructed and installed within a limited operating time.
[0018] 2. The foundation of the present invention has high rigidity, strong anti-overturning ability and strong anti-deformation ability. Since the conductor frame is a hollow structure, it is subject to small wave and water flow loads and has high safety. The steel cylinder itself serves as the basic structure, has good sinking ability and fast speed, and can adapt to various geological conditions. All components are prefabricated on land and transported to the construction site for installation. It is highly efficient and less affected by weather. It can be used for wind power foundation applications under complex sea conditions.
[0019] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0021] Figure 1 It is a structural schematic diagram of the upper jacket structure of the present invention;
[0022] Figure 2 The first lower foundation steel cylinder structure of the present invention;
[0023] Figure 3 The second lower foundation steel cylinder structure of the present invention;
[0024] Figure 4 It is a schematic structural diagram of the upper jacket structure of the present invention cooperating with the first lower foundation steel cylinder structure;
[0025] Figure 5 It is a schematic structural diagram of the upper jacket structure of the present invention cooperating with the second lower foundation steel cylinder structure.
[0026] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0027] 1- pipe frame, 2- diagonal brace, 3- fan connection transition section, 4- leg pile, 5- steel cylinder, 6- transverse trapezoidal rib, 7- reserved steel sleeve, 8- long rib plate, 9- short rib plate, 10- second steel cylinder, 11- main short rib, 12- inner cylinder, 13- second reserved steel sleeve, 14- sleeve reinforcement rib, 15- secondary short rib. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] See also Figure 1-5 As shown, the present invention is an inserted steel cylindrical wind power foundation, including an upper conductor frame structure, a first lower foundation steel cylindrical structure or a second lower foundation steel cylindrical structure, and the upper conductor frame structure includes a conductor frame 1, a diagonal brace 2, a wind turbine connection transition section 3, and leg piles 4.
[0030] The lower foundation steel cylinder structure includes a steel cylinder 5, on the inner wall of which transverse trapezoidal ribs 6 are fixed at equal intervals along the circumferential direction, and the transverse trapezoidal ribs 6 are penetrated by reserved steel sleeves 7 that cooperate with the leg piles 4, long ribs 8 are fixed on the inner wall of the steel cylinder 5 and at positions on both sides of the reserved steel sleeves 7, and the transverse trapezoidal ribs 6 are penetrated by short ribs 9 that are coaxial with the reserved steel sleeves 7.
[0031] The second lower basic steel cylinder structure includes a second steel cylinder 10, an inner cylinder 12 is fixed to the inner wall of the second steel cylinder 10 through a main short rib 11, a second reserved steel sleeve 13 is arranged between the outer wall of the inner cylinder 12 and the inner wall of the second steel cylinder 10, a sleeve reinforcement rib 14 is fixed to the second reserved steel sleeve 13, and a secondary short rib 15 is arranged between the main short rib 11 and the second reserved steel sleeve 13.
[0032] The upper conductor frame structure is composed of a conductor frame 1, a diagonal brace 2, a fan connection transition section 3, and leg piles 4 to form a truss structure, and the conductor frame 1 structure can be a three-tube type or a four-tube type, which is determined by load calculation.
[0033] The diagonal braces 2 are mainly arranged in an X shape, with a diameter greater than 0.8 m. The diameter of the jacket 1 is selected in the range of 1.5 m to 2.0 m. The bottom end of the jacket 1 is fixedly connected to the leg pile 4 .
[0034] Among them, the reserved steel sleeve 7 is connected to the inner wall of the steel cylinder 5 through a short rib plate 9 extending vertically downward. The short rib plate 9 is located in the middle of the reserved steel sleeve 7. The upper end of the short rib plate 9 is flush with the top of the steel cylinder 5. The length is 5m-25m, which is adjusted according to the soft foundation and stress range.
[0035] The long ribs 8 are vertically arranged at 1-2 m from the edges of both sides of the reserved steel sleeve 7 , and the long ribs 8 are the same length as the steel cylinder 5 .
[0036] The transverse trapezoidal ribs 6 are arranged on the inner wall of the steel cylinder 5 at equal intervals along the axial direction of the reserved steel sleeve 7, with a spacing of 0.5m-1m and a number of 4-8.
[0037] The steel cylinder is manufactured by vertical block method and finally closed into a whole; the jacket is made of pipe segments, assembled, welded into steel pipes, and assembled by overall welding. The steel cylinder 5 and the jacket 1 adopt a vertical loading scheme; the steel cylinder 5 has a diameter of 20m-40m, a wall thickness of 15mm-40mm, and a height of 10m-45m. There are two implementation cases of the steel cylinder structure: Example
[0038] Reference Figure 1 , Figure 2 and Figure 4 , reserved steel sleeves 7 are welded at four positions corresponding to the steel cylinder 5 and the leg piles 4 of the upper conductor frame structure. If the upper conductor frame is a three-tube type, the reserved steel sleeves 7 and its adjacent components are reduced accordingly. The reserved steel sleeves 7 and the upper conductor frame 1 are arranged at equal intervals along the circumference of the steel cylinder 5. The diameter of the reserved steel sleeves 7 is 2.0m-3.0m. The leg piles 4 and the reserved steel sleeves 7 are connected by grouting. The ends of the reserved steel sleeves 7 are sealed with inclined plates to avoid hole cleaning. The length is 10m-45m, depending on the soft soil conditions. The reserved steel sleeve 7 is connected to the steel cylinder 5 through a short rib plate 9 located vertically downward. The short rib plate 9 is located in the middle of the reserved steel sleeve 7. The upper end of the short rib plate 9 is flush with the top of the steel cylinder 5. The length is 5m-25m, which is adjusted according to the soft foundation and stress range. Vertical long rib plates 8 are provided at about 1m-2m on both sides of the edge of the reserved steel sleeve 7. The long rib plates 8 can be the same length as the steel cylinder 5. At the top of the reserved steel sleeve 7, transverse trapezoidal ribs 6 are arranged at equal intervals. The spacing can be 0.5m-1m, and the number can be 4-8. The length of the short side of the transverse trapezoidal rib 6 can be the spacing of the long rib plates 8, and the length of the long side can be twice the length of the short side. The reserved steel sleeve 7 is closely connected to the steel cylinder 5 through the long ribs 8 and the transverse trapezoidal ribs 6 to form a whole, ensuring that the load of the upper structure conductor frame can be effectively transmitted to the steel cylinder 5 of the lower foundation, while increasing the overall stiffness of the steel cylinder 5 and improving the anti-twisting ability of the steel cylinder 5. Example
[0039] Reference Figure 1 , Figure 3 and Figure 5The second reserved steel sleeve 13 is welded with four positions of the second steel cylinder 10 corresponding to the leg piles 4 of the upper conductor frame structure. If the upper conductor frame is a 3-tube type, the reserved steel sleeve and its adjacent components are also reduced accordingly. The reserved steel sleeve and the upper conductor frame are arranged at equal intervals along the circular direction of the steel cylinder. The diameter of the second reserved steel sleeve 13 is 2m-3m. The leg piles 4 and the second reserved steel sleeve 13 are connected by grouting. The end of the second reserved steel sleeve 13 is sealed with an inclined plate to avoid hole cleaning. The second reserved steel sleeve 13 adopts a hole-shaped structure. The top and bottom of the second reserved steel sleeve 3 are welded with steel plates and welded to the inner cylinder 12 as a whole. The length of the second reserved steel sleeve 13 can be 5m-10m. The top steel plate is the top sealing plate, the bottom steel plate is the bottom sealing plate, and the steel plates on both sides are sleeve reinforcement ribs 14, which are right-angled trapezoids. The height is the distance between the inner cylinder 12 and the second steel cylinder 10. The diameter of the inner cylinder 12 is about 3m-5m smaller than the diameter of the second steel cylinder 10. The length of the short side is the depth of the inner cylinder 12, and the length of the long side is The depth is consistent with the second steel cylinder 10. A main short rib 11 is arranged between the inner cylinder 12 and the second steel cylinder 10. The main short rib 11 is a rectangular structure. The height is the distance between the inner cylinder 12 and the second steel cylinder 10, and the length is the depth of the inner cylinder 10. A secondary short rib 15 is arranged between the main short rib 11 and the second reserved steel sleeve 13. It is a right-angled trapezoid. The number can be evenly arranged 2-4, depending on the diameter of the second steel cylinder 10. The length of the long side of the secondary short rib 15 can be twice the length of the short side. The other parameters are consistent with the sleeve reinforcement rib 14. The inner cylinder 12 is connected to the second steel cylinder 10 as a whole through the sleeve reinforcement rib 14, the main short rib 11, and the secondary short rib 15. The upper structure is connected to the second reserved steel sleeve 13 through the grouting of the legs 4 to form an integral new wind power foundation.
[0040] This patented foundation has high rigidity, strong anti-overturning and anti-deformation capabilities. In addition, since the conductor frame is a hollow structure, it is subject to small wave and water flow loads and has high safety. The steel cylinder itself serves as the basic structure, has good sinking ability and fast speed, and can adapt to various geological conditions. All components are prefabricated on land and transported to the construction site for installation. It is highly efficient and less affected by weather. It can be used for wind power foundation applications under complex sea conditions.
[0041] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0042] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. An inserted steel cylinder wind power foundation, characterized by: It comprises an upper jacket structure, a first lower foundation steel cylindrical structure or a second lower foundation steel cylindrical structure, wherein the upper jacket structure comprises a jacket (1), a diagonal brace (2), a fan connection transition section (3), and leg piles (4); The first lower foundation steel cylinder structure comprises a steel cylinder (5), on the inner wall of the steel cylinder (5) are transverse trapezoidal ribs (6) fixed at equal intervals in the circumferential direction, the transverse trapezoidal ribs (6) are penetrated by a reserved steel sleeve (7) matching with the leg pile (4), long rib plates (8) are fixed on the inner wall of the steel cylinder (5) and at positions on both sides of the reserved steel sleeve (7), and the transverse trapezoidal ribs (6) are penetrated by a short rib plate (9) coaxial with the reserved steel sleeve (7); The second lower basic steel cylinder structure comprises a second steel cylinder (10), the inner wall of the second steel cylinder (10) being fixed with an inner cylinder (12) via a main short rib (11), a second reserved steel sleeve (13) being arranged between the outer wall of the inner cylinder (12) and the inner wall of the second steel cylinder (10), a sleeve reinforcing rib (14) being fixed to the second reserved steel sleeve (13), and a secondary short rib (15) being arranged between the main short rib (11) and the second reserved steel sleeve (13).
2. The inserted steel cylinder wind power foundation according to claim 1 is characterized in that: The upper conductor frame structure is composed of a conductor frame (1), diagonal braces (2), a fan connection transition section (3), and leg piles (4) to form a truss structure.
3. The inserted steel cylinder wind power foundation according to claim 1 is characterized in that: The diagonal braces (2) are mainly arranged in an X shape and have a diameter greater than 0.8 m. The diameter of the conductor frame (1) is selected in the range of 1.5 m to 2.0 m. The bottom end of the conductor frame (1) is fixedly connected to the leg pile (4).
4. The inserted steel cylinder wind power foundation according to claim 1 is characterized in that: The steel cylinder (5) has a diameter between 20m and 40m, a wall thickness between 15mm and 40mm, and a height between 10m and 45m.
5. The inserted steel cylinder wind power foundation according to claim 1 is characterized in that: The reserved steel sleeve (7) is connected to the inner wall of the steel cylinder (5) via a short rib plate (9) extending vertically downward. The short rib plate (9) is located in the middle of the reserved steel sleeve (7). The upper end of the short rib plate (9) is flush with the top of the steel cylinder (5). The length is 5m-25m and is adjusted according to the soft foundation and stress range.
6. The inserted steel cylinder wind power foundation according to claim 1, characterized in that: The long ribs (8) are vertically arranged at 1-2 m from the edges of both sides of the reserved steel sleeve (7), and the long ribs (8) are the same length as the steel cylinder (5).
7. The inserted steel cylinder wind power foundation according to claim 1, characterized in that: The transverse trapezoidal ribs (6) are arranged on the inner wall of the steel cylinder (5) along the axial direction of the reserved steel sleeve (7) at equal intervals, with the interval being 0.5m-1m, and the number being 4-8.
8. The inserted steel cylinder wind power foundation according to claim 1 is characterized in that: The second reserved steel sleeve (13) adopts a hole-shaped structure. The top and bottom of the second reserved steel sleeve (13) are welded with steel plates and are welded to the inner cylinder (12) as a whole. The length of the second reserved steel sleeve (13) is 5m-10m.
