A buckle operation jig and buckle operation method

By designing a snap-on operation fixture for the electronics industry, the problem of difficult alignment and inconvenient operation of snap-on connections during assembly is solved, efficient snap-on connection and precise alignment in a narrow space is achieved, and production is improved efficiency.

CN110635337BInactive Publication Date: 2025-02-18LUXSHARE ITECH(ZHEJIANG) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN201910999586.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-21
Publication Date
2025-02-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the electronics industry, snap connections are not easy to align during assembly and are inconvenient to operate in a narrow space, resulting in low production efficiency.

Method used

A snap-on operation fixture is designed, including a clamping static arm and a clamping boom. The boom movement is controlled through the control system to achieve precise alignment and fixation of the upper and lower fasteners.

Benefits of technology

The fixture can efficiently complete the snap connection in a small space, ensuring alignment accuracy, simplifying operational processes and improving production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110635337B_ABST
    Figure CN110635337B_ABST
Patent Text Reader

Abstract

The present invention discloses a snap-fit ​​operation jig and a snap-fit ​​operation method. The snap-fit ​​operation jig includes a clamping static arm and a clamping movable arm connected to the clamping static arm. The clamping movable arm is electrically connected to a control system. The clamping static arm includes a first clamping portion and a static arm connecting portion connected in an L shape. The clamping movable arm includes a second clamping portion and a movable arm connecting portion connected in an L shape, wherein the second clamping portion corresponds to the first clamping portion, and the movable arm connecting portion is connected to the static arm connecting portion. When the control system controls the movable arm connecting portion to move relative to the static arm connecting portion, the distance between the first clamping portion and the second clamping portion changes accordingly. The snap-fit ​​operation jig and method of the present invention are used for snap-fit ​​connection of two electronic modules, which can well overcome the problem of inconvenience of snap-fit ​​connection in a narrow space, and has a simple structure, accurate alignment, and easy operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention discloses a jig and method for snap-fit ​​operation. Specifically, the snap-fit ​​operation jig and method of the present invention are applied to the electronic industry to connect two electronic modules (components) through snap-fit ​​for signal transmission, and are applied to the connection of two adjacent circuit boards or electronic components to achieve function conversion and other scenarios. Background Art

[0002] In the electronics industry, cables are usually used as carriers for information transmission between different electronic modules. The connection methods between cables and electronic modules include: welding (soldering, fusion welding, pressure welding), crimping or hinged connection, snap-on connection (terminal connection method), etc. The main advantages of welding are good connection performance, high structural rigidity, wide adaptability and low contact resistance. It is the connection method for most components, but the disadvantages are that it must be heated, poor disassembly, temperature-sensitive electronic components will be damaged, and there may be cold solder joints. If electronic components need to be used in harsh environments, there may be desoldering. Crimping or hinged connections are not reliable, the connection resistance is large, and the failure rate is high.

[0003] Among them, the snap connection can not only avoid high temperature damage during the connection process, but also has good reliability, is convenient for component replacement and debugging, and has a high safety factor for components. However, during the assembly process, the snap connection is not easy to align, and excessive force will damage the snap, especially in the connection position with a small space, which is inconvenient to use tools for assembly, so that the unit time output of the production process of electronic products is affected. The current snap connection uses a manual jig to complete the operation. Specifically, the electronic components to be connected are placed on the stage, and the operator aligns the two snaps to be connected in the vertical direction, and then operates the manual jig so that the pressure head of the manual jig contacts the snap, and the jig pressure head combines the two snaps downward with a certain force. The disadvantage of this process is that the positions of the two snaps must be manually aligned visually. After alignment, there is no auxiliary tool to fix the two aligned snaps. Due to the stress of the cable at the other end of the snap, the cable will gradually return to its original state, causing the snap to deviate from the predetermined position. At this time, the pressure head falls, and the snap will be damaged, resulting in defective products. Summary of the invention

[0004] The purpose of the present invention is to provide a snap-fit ​​working jig for snap-fitting two electronic modules, which can well overcome the problem of inconvenience of snap-fitting in a narrow space, and has accurate positioning and easy operation.

[0005] Another object of the present invention is to provide a buckle operation method using the above-mentioned buckle operation jig.

[0006] In order to achieve the above-mentioned purpose, the clamping operation jig of the present invention includes a clamping static arm and a clamping movable arm connected to the clamping static arm, the clamping movable arm is electrically connected to a control system, the clamping static arm includes a first clamping portion and a static arm connecting portion connected in an L-shape, the clamping movable arm includes a second clamping portion and a movable arm connecting portion connected in an L-shape, wherein the second clamping portion corresponds to the first clamping portion, and the movable arm connecting portion is connected to the static arm connecting portion, and when the control system controls the movable arm connecting portion to move relative to the static arm connecting portion, the distance between the first clamping portion and the second clamping portion changes accordingly.

[0007] In one embodiment of the above-mentioned buckle operation tool, the second clamping portion includes an upper baffle plate and a lower clamping arm arranged up and down, and there is a thickness distance between the upper baffle plate and the lower clamping arm.

[0008] In one embodiment of the above-mentioned clip operation fixture, the lower clamp arm includes a fixed lower clamp arm and a movable lower clamp arm, and when the movable lower clamp arm moves relative to the fixed lower clamp arm, the distance between the fixed lower clamp arm and the movable lower clamp arm changes accordingly.

[0009] In one embodiment of the above-mentioned buckle operation jig, the second clamping portion includes an upper baffle and a suction mechanism disposed on the upper baffle.

[0010] In one embodiment of the above-mentioned buckle operation fixture, a limited position enclosure is provided on the periphery of the adsorption mechanism.

[0011] In one embodiment of the above-mentioned clip operation jig, the first clamping portion includes a fixed static clamping arm and a movable static clamping arm, and when the movable static clamping arm moves relative to the fixed static clamping arm, the distance between the fixed static clamping arm and the movable static clamping arm changes accordingly.

[0012] In one embodiment of the above-mentioned clip operation jig, the stationary arm connection part includes a stationary arm guide rail, and the movable arm connection part includes a movable arm motion guide rod, and the movable arm motion guide rod can slide on the stationary arm guide rail.

[0013] In one embodiment of the above-mentioned clip operation fixture, the control system includes a reciprocating motion control module for controlling the reciprocating motion of the movable arm connection part relative to the stationary arm connection part.

[0014] In one embodiment of the above-mentioned buckle operation fixture, the control system also includes a pressure control module and a pressing time control module, the pressure control module is connected to the reciprocating motion control module, and the pressing time control module is connected to the pressure control module.

[0015] The buckle operation method of the present invention uses the above-mentioned buckle operation jig to perform buckle operation on the buckle component, the buckle component includes a lower buckle part and an upper buckle part, and the method includes the following steps:

[0016] S100, the lower fastener is fixed by the first clamping part, the upper fastener is fixed by the second clamping part, and the upper fastener is positioned relative to the lower fastener;

[0017] S200, controlling the movable arm connecting part to move relative to the stationary arm connecting part through the control system until the upper fastener is correspondingly engaged with the lower fastener.

[0018] In one embodiment of the above-mentioned buckling operation method, the step 100 further comprises: the flat cable of the upper buckling member is clamped and fixed between the upper baffle plate and the lower clamping arm of the second clamping portion.

[0019] In one embodiment of the above-mentioned buckling operation method, the step S100 further includes: adjusting the sizes of the openings of the first clamping portion and the second clamping portion to accommodate buckling components of different sizes.

[0020] In one embodiment of the above-mentioned buckling operation method, the step 100 further includes: the flat cable of the upper buckle is adsorbed and fixed on the second clamping portion.

[0021] In one embodiment of the above-mentioned buckling operation method, the step S200 further includes: the control system controls the distance that the movable arm connection part moves relative to the stationary arm connection part.

[0022] In one implementation of the above-mentioned buckling operation method, the step S200 further includes: the control system controls the pressure applied by the upper buckling component to the lower buckling component.

[0023] In one implementation of the above-mentioned buckling operation method, the step S200 further includes: the control system controls the buckling pressing time of the upper buckling component and the lower buckling component.

[0024] The beneficial effect of the present invention is that the buckle operation jig of the present invention is used for the buckle connection of two electronic modules, has a simple structure, can well complete the operation even if the operating space is small, and the upper and lower buckle parts are accurately aligned.

[0025] The first clamping part and the second clamping part of the buckle operation fixture of the present invention are variable in size, so the application range is wide and can be used in many scenes.

[0026] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments, but is not intended to limit the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a three-dimensional structural schematic diagram of an embodiment of the buckle operation fixture of the present invention (first viewing angle);

[0028] Figure 2 It is a three-dimensional structural schematic diagram of an embodiment of the buckle operation fixture of the present invention (second viewing angle);

[0029] Figure 3 It is a three-dimensional structural schematic diagram of an embodiment of the buckle operation jig of the present invention (after the upper buckle part and the lower buckle part of the buckle component are installed respectively);

[0030] Figure 4 for Figure 1 Partial view at point E;

[0031] Figure 5 It is a three-dimensional structural schematic diagram of an embodiment of the buckle operation fixture of the present invention (first viewing angle);

[0032] Figure 6 It is a three-dimensional structural schematic diagram of an embodiment of the buckle operation fixture of the present invention (second viewing angle);

[0033] Figure 7 It is a module block diagram of a control system of an embodiment of a buckle operation fixture of the present invention.

[0034] Among them, the reference numerals

[0035] 10, 40: Snap-on fixture

[0036] 100, 400: Clamping static arm

[0037] 100S: static arm horizontal plane

[0038] 110, 410: first clamping part

[0039] 111: Fixed static clamp arm

[0040] 112: Movable static clamp arm

[0041] 113: Telescopic arm

[0042] 114: Telescopic control button

[0043] 120, 420: Static arm connection

[0044] 200, 500: Clamping boom

[0045] 210, 510: Second clamping part

[0046] 211: Upper baffle

[0047] 212: Lower clamp arm

[0048] 2121: Fix the lower clamp arm

[0049] 2122: Movable lower clamp arm

[0050] 2123: Rails

[0051] 2124: Screw

[0052] 2125: Control knob

[0053] 220, 520: Boom connection

[0054] 300, 600: Control system

[0055] 310: Reciprocating motion control module

[0056] 320: Pressure control module

[0057] 330: Pressing time control module

[0058] 301: Pressure adjustment button

[0059] 302 time adjustment button

[0060] 20: Buckle parts

[0061] 21: Lower buckle

[0062] 22: Upper fastener

[0063] 22a: Flat cable

[0064] 22b: Buckle structure

[0065] 30: Electronic component board DETAILED DESCRIPTION

[0066] The technical solution of the present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments to further understand the purpose, solution and effect of the present invention, but it is not intended to limit the scope of protection of the claims attached to the present invention.

[0067] References in the specification to "an embodiment", "another embodiment", "this embodiment", etc., mean that the described embodiment may include specific features, structures or characteristics, but not every embodiment must include these specific features, structures or characteristics. In addition, such expressions do not refer to the same embodiment. Further, when describing specific features, structures or characteristics in conjunction with an embodiment, whether or not there is an explicit description, it has been shown that it is within the knowledge of those skilled in the art to combine such features, structures or characteristics into other embodiments.

[0068] Certain words are used in the specification and subsequent claims to refer to specific components or parts. It should be understood by those of ordinary skill in the art that technical users or manufacturers may refer to the same component or part by different nouns or terms. This specification and subsequent claims do not use differences in names as a way to distinguish components or parts, but rather use differences in functions of components or parts as the criteria for distinction. The words "include" and "comprising" mentioned throughout the specification and subsequent claims are open-ended terms and should be interpreted as "including but not limited to". In addition, the word "connected" herein includes any direct and indirect means of connection.

[0069] It should be noted that, in the description of the present invention, the orientation or position relationship indicated by terms such as "horizontal", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0070] like Figure 1 and Figure 2 As shown, Figure 1 and Figure 2 They are three-dimensional structural schematic diagrams of different viewing angles of an embodiment of the buckle operation jig of the present invention. The buckle operation jig 10 of the present invention includes a clamping static arm 100 and a clamping movable arm 200. The clamping static arm 100 is a relatively static fixed part of the jig. The clamping movable arm 200 is connected to the clamping static arm 100, and the clamping movable arm 200 can move relative to the clamping static arm 100. The buckle operation jig 10 of the present invention also includes a control system 300 electrically connected to the clamping movable arm 200. The control system 300 can be set on the clamping static arm 100, or on the clamping movable arm 200. For ease of use, in this embodiment, the control system 300 is connected to the back of the clamping static arm 100.

[0071] The clamping stationary arm 100 and the clamping movable arm 200 are L-shaped, respectively. Specifically, the clamping stationary arm 100 includes a first clamping portion 110 and a stationary arm connecting portion 120, wherein the first clamping portion 110 is horizontally arranged, the stationary arm connecting portion 120 is vertically arranged, and the first clamping portion 110 and the stationary arm connecting portion 120 are connected in an L shape. The clamping movable arm 200 includes a second clamping portion 210 and a movable arm connecting portion 220, wherein the second clamping portion 210 is horizontally arranged, the movable arm connecting portion 220 is vertically arranged, and the second clamping portion 210 and the movable arm connecting portion 220 are connected in an L shape.

[0072] The clamping stationary arm 100 comprises a stationary arm horizontal surface 100S, and the stationary arm horizontal surface 100S is located at the bottom surface of the first clamping portion 110. The second clamping portion 210 is disposed above the first clamping portion 110.

[0073] The first clamping part 110 for clamping the stationary arm 100 corresponds to the second clamping part 210 for clamping the movable arm 200, ensuring the accuracy of the upper and lower positioning during the buckling action, which will be described in detail in the following description. The movable arm connecting part 220 for clamping the movable arm 200 is connected to the stationary arm connecting part 120 for clamping the stationary arm 100. When the control system 300 controls the movable arm connecting part 220 to move relative to the stationary arm connecting part 120, the distance between the first clamping part 110 and the second clamping part 120 is driven to change accordingly.

[0074] like Figure 3 As shown, Figure 3 The schematic diagram of the three-dimensional structure of an embodiment of the buckle operation jig of the present invention and the upper and lower buckle parts of the buckle component are respectively installed. The buckle component 20 includes a lower buckle part 21 and an upper buckle part 22, and the lower buckle part 21 and the upper buckle part 22 are connected by the buckle operation jig 10 of the present invention.

[0075] The buckle operation method of the present invention comprises the following steps:

[0076] S100, the lower fastener 21 of the fastener component 20 is clamped and fixed by the first clamping portion 110 of the fastener working fixture 10 that clamps the static arm 100, and the upper fastener 22 is clamped and fixed by the second clamping portion 210 that clamps the movable arm 200, and the upper fastener 22 is positioned relative to the lower fastener 21.

[0077] S200, controlling the movable arm connecting part 220 of the clamping movable arm 200 to move relative to the stationary arm connecting part 120 of the clamping stationary arm 100 through the control system 300, until the upper fastener 22 fixed by the second clamping part 210 of the clamping movable arm 200 is correspondingly clamped and connected with the lower fastener 21 fixed by the first clamping part 110 of the clamping stationary arm 100.

[0078] In the present invention, the first clamping part 110 is arranged corresponding to the second clamping part 210, that is, the first clamping part 110 and the second clamping part 210 are arranged in an up-down position, so as to ensure that the lower clip 21 fixed on the first clamping part 110 is aligned with the upper clip 22 fixed on the second clamping part 210. As the movable arm connecting part 220 moves relative to the stationary arm connecting part 120, the second clamping part 210 gradually approaches the first clamping part 110, driving the upper clip 22 and the lower clip 21 to gradually approach each other until they are snap-connected.

[0079] In detail, the lower fastener 21 is connected to the electronic component board 30 , and the upper fastener 22 includes a flat cable 22 a and a fastener structure 22 b connected to the flat cable 22 a , and the fastener structure 22 b is fastened to the lower fastener 21 .

[0080] In one embodiment of the buckle operation fixture 10 of the present invention, as shown in FIG. Figure 3 and Figure 4 As shown, Figure 4 for Figure 1 The second clamping part 210 of the clamping arm 200 includes an upper baffle 211 and a lower clamping arm 212 arranged up and down, and there is a thickness distance D between the upper baffle 211 and the lower clamping arm 212. The thickness distance D corresponds to the thickness of the flat cable 22a of the clamped upper fastener 22. The flat cable 22a is clamped and fixed between the upper baffle 211 and the lower clamping arm 212, and the buckle structure 22b is connected to the lower surface of the flat cable 22a to correspond to the lower fastener 21.

[0081] In this embodiment, both the first clamping portion 110 and the second clamping portion 120 include a clamping groove, wherein the clamping groove of the second clamping portion 120 is located on the lower clamping arm 212 .

[0082] The specific operation process is as follows: first, the horizontal surface 100S of the static arm 100 of the clamping static arm is brought into contact with the electronic component board 30, and the lower clamping member 21 located on the electronic component board 30 is clamped in the clamping groove of the first clamping part 110 of the clamping static arm 100. In this embodiment, the two short sides and one long side of the lower clamping member 21 are clamped and fixed by the first clamping part 110. In addition, the flat cable 22a of the upper clamping member 22 is placed between the upper baffle 211 and the lower clamping arm 212 of the second clamping part 210. Preferably, the upper surface of the flat cable 22a is in contact with the lower surface of the upper baffle 211, and the clamping structure 22b located on the lower surface of the flat cable 22a is located in the clamping groove of the lower clamping arm 212. In this embodiment, the short side of the clamping structure 22b is clamped and fixed by the lower clamping arm 212. Moreover, the clamping orientation of the clamping structure 22b and the lower clamping member 21 is kept consistent. Thereafter, under the control of the control system 300, the second clamping portion 210 approaches the first clamping portion 110 until the buckle structure 22b of the upper buckle 22 is buckled and connected with the lower buckle 21. Then, the clamping stationary arm 100 and the clamping movable arm 200 are separated from the lower buckle 21 and the upper buckle 22 respectively, and the entire buckling action is completed.

[0083] The lower surface of the upper baffle 211 contacts the flat cable 22a to limit the flat cable 22a, so as to prevent the upper clamping member 21 from being lifted up when the second clamping portion 210 approaches the first clamping portion 110. The thickness distance D between the upper baffle 211 and the lower clamping arm 212 is slightly greater than the thickness of the flat cable 22a of the clamped upper clamping member 22. It is ensured that the contact between the flat cable 22a and the upper baffle 211 is neither too tight nor too loose, so as to avoid the problem that the cable protective skin may be damaged and the copper may be exposed due to too tight contact, or even the signal transmission at the contact between the cable and the metal part of the clamp is poor, which may also cause the assembly operation to be unsmooth, and the problem that the contact is too loose and cannot achieve accurate alignment.

[0084] After the buckling operation jig 10 is separated from the buckled buckled component 20, the control system 300 controls the clamping arm 200 to move away from the clamping arm 100 and the second clamping part 210 to move away from the first clamping part 110, so as to prepare for the next buckling operation.

[0085] The control system 300 of the present invention includes a reciprocating motion control module 310 for controlling the reciprocating motion of the movable arm connection part 220 of the clamping movable arm 200 relative to the stationary arm connection part 120 of the clamping stationary arm 100. Figure 7 As shown, Figure 7 The module block diagram of the control system of one embodiment of the buckle operation fixture of the present invention is shown in FIG. The stationary arm connection part 120 and the movable arm connection part 220 are connected by guide rails and guide rods, and the control unit 300 is controlled by compressed air or a transmission shaft, which is not limited by the present invention.

[0086] The opening sizes of the first clamping portion 110 and the second clamping portion 210 of the present invention can be adjusted, so that the buckle operation fixture of the present invention has a wider application range and can be used in multiple scenarios.

[0087] like Figure 1 and Figure 4 As shown, the first clamping portion 110 includes a fixed static clamping arm 111 and a movable static clamping arm 112 . When the movable static clamping arm 112 moves relative to the fixed static clamping arm 111 , the distance between the fixed static clamping arm 111 and the movable static clamping arm 112 changes accordingly, thereby changing the opening size of the first clamping portion 110 .

[0088] The lower clamping arm 212 of the second clamping portion 210 includes a fixed lower clamping arm 2121 and a movable lower clamping arm 2122 . When the movable lower clamping arm 2122 moves relative to the fixed lower clamping arm 2121 , the distance between the fixed lower clamping arm 2121 and the movable lower clamping arm 2122 changes accordingly, thereby changing the opening size of the lower clamping arm 212 .

[0089] In this embodiment, the movable static clamp arm 112 is connected to the fixed static clamp arm 111 through a static arm telescopic rod 113, and the movable static clamp arm 112 is driven to move relative to the fixed static clamp arm 111 through a telescopic control button 114, thereby changing the distance between the fixed static clamp arm 111 and the movable static clamp arm 112.

[0090] In this embodiment, the movable lower clamping arm 2122 is connected to the fixed lower clamping arm 2121 through the guide rail 2123 and the screw rod 2124. The movement of the screw rod 2124 is controlled by the control knob 2125 to drive the movable lower clamping arm 2122 to move along the guide rail 2123, thereby changing the distance between the fixed lower clamping arm 2121 and the movable lower clamping arm 2122.

[0091] The above are only two examples of structural forms of opening adjustment, and the present invention is not limited thereto.

[0092] In other embodiments, the openings of the first clamping part and the second clamping part can be adjusted synchronously, for example, the opening adjustment structure is associated with the first clamping part and the second clamping part at the same time, and the opening sizes of the first clamping part and the second clamping part are adjusted synchronously according to actual operation requirements.

[0093] Combination Figure 7 The control system 300 further includes a pressure control module 320 and a pressing time control module 330. The pressure control module 320 is used to control the clamping pressure of the lower clamping member 21 and the upper clamping member 22, and the pressing time control module 330 is used to control the clamping time of the lower clamping member 21 and the upper clamping member 22.

[0094] like Figure 1 As shown, the pressure control module 320 is adjusted, for example, through the pressure adjustment button 301 , and the pressing time control module 330 is adjusted, for example, through the time adjustment button 302 .

[0095] The pressure control module 320, for example, includes a pressure sensor, which senses the pressure between the lower fastener 21 and the upper fastener 22. The pressure adjustment button 301 is used to set a locking pressure value. When the pressure sensor senses that the locking pressure value has been reached, the pressure control module 320 notifies the reciprocating motion control module 310 to stop moving.

[0096] The time control module 330, for example, includes a timer, through which the engagement time between the lower fastener 21 and the upper fastener 22 is controlled. The time adjustment button 302 is used to set an engagement holding time. When the pressure control module 320 senses that the engagement pressure between the lower fastener 21 and the upper fastener 22 reaches the set engagement pressure value, and the time control module 330 determines that the engagement time reaches the set engagement holding time, the fastener operation jig 10 and the fastener component 20 can be separated.

[0097] The setting of the clamping pressure value is related to the buckle material, the weight of the pressure head, the required clamping effect, etc. Therefore, the actual setting of the clamping pressure value can be determined after the fixture and buckle test demonstration.

[0098] In addition, whether the buckle pressing is complete can also be confirmed by the "click" sound when fastening, visually checking the degree of buckle fastening completion, etc.

[0099] like Figure 5 and Figure 6 As shown, Figure 5 and Figure 6 The three-dimensional structural schematic diagrams of another embodiment of the buckle operation jig of the present invention from different perspectives are shown respectively. The buckle operation jig 40 of this embodiment includes a clamping static arm 400, a clamping movable arm 500 and a control system 600, wherein the clamping movable arm 500 is connected to the clamping static arm 400 and the clamping movable arm 500 can move relative to the clamping static arm 400.

[0100] The clamping stationary arm 400 includes a first clamping portion 410 and a stationary arm connecting portion 420 connected in an L shape, and the clamping movable arm 500 includes a second clamping portion 510 and a movable arm connecting portion 520 connected in an L shape. The first clamping portion 410 corresponds to the second clamping portion 510, and the movable arm connecting portion 520 is connected to the stationary arm connecting portion 420. When the control system 600 controls the movable arm connecting portion 520 to move relative to the stationary arm connecting portion 420, the distance between the first clamping portion 410 and the second clamping portion 510 changes accordingly.

[0101] The difference between this embodiment and the previous embodiment is that the second clamping portion 510 includes an upper baffle 511 and an adsorption mechanism 512 disposed on the upper baffle 511. The second clamping portion 510 fixes the upper buckle of the buckle component through the adsorption mechanism 512. Specifically, the adsorption mechanism 512 adsorbs and fixes the flat cable of the upper buckle.

[0102] Furthermore, in this embodiment, a limiting enclosure 513 is provided on the periphery of the adsorption mechanism 512 to limit the position of the adsorbed upper fastener and ensure that the upper and lower fasteners can be accurately aligned.

[0103] Similarly, in this embodiment, the first clamping portion 410 may be configured as an adjustable structure capable of changing the size of the opening, which will not be described in detail herein.

[0104] In summary, in an embodiment of the buckling operation method of the present invention, step 100 further includes: the flat cable portion of the upper buckle is fixed between the upper baffle and the lower clamping arm of the second clamping portion.

[0105] In one embodiment, step 100 further includes: the flat cable portion of the upper fastener is fixed on the second clamping portion by adsorption.

[0106] In one embodiment, step S100 further includes: adjusting the sizes of the first clamping portion and the second clamping portion to accommodate buckle components of different sizes.

[0107] In one embodiment, step S200 further includes: controlling the distance that the movable arm connection part moves relative to the stationary arm connection part by a control system.

[0108] In one embodiment, step S200 further includes: controlling the pressure applied by the upper fastener to the lower fastener through a control system.

[0109] In one embodiment, step S200 further includes: controlling the pressing time of the upper fastener and the lower fastener by a control system.

[0110] Of course, the present invention may have many other embodiments. Without departing from the spirit and essence of the present invention, those skilled in the art may make various corresponding changes and modifications based on the present invention, but these corresponding changes and modifications should all fall within the scope of protection of the claims attached to the present invention.

Claims

1. A buckle operation jig, characterized in that: It comprises a clamping static arm and a clamping movable arm connected to the clamping static arm, the clamping movable arm is electrically connected to a control system, the clamping static arm comprises a first clamping portion and a static arm connecting portion connected in an L-shape, the clamping movable arm comprises a second clamping portion and a movable arm connecting portion connected in an L-shape, wherein the second clamping portion corresponds to the first clamping portion, the movable arm connecting portion is connected to the static arm connecting portion, and when the control system controls the movable arm connecting portion to move relative to the static arm connecting portion, the distance between the first clamping portion and the second clamping portion changes accordingly; Among them, the second clamping part includes an upper baffle plate and a lower clamping arm arranged up and down, and there is a thickness distance between the upper baffle plate and the lower clamping arm; the lower clamping arm includes a fixed lower clamping arm and a movable lower clamping arm, and when the movable lower clamping arm moves relative to the fixed lower clamping arm, the distance between the fixed lower clamping arm and the movable lower clamping arm changes accordingly.

2. The buckle operation jig according to claim 1, characterized in that: The second clamping portion includes an upper baffle and an adsorption mechanism disposed on the upper baffle.

3. The buckle operation jig according to claim 2, characterized in that: The periphery of the adsorption mechanism is provided with a limited position enclosure.

4. The buckle operation jig according to any one of claims 1 to 3, characterized in that: The first clamping portion includes a fixed static clamping arm and a movable static clamping arm. When the movable static clamping arm moves relative to the fixed static clamping arm, the distance between the fixed static clamping arm and the movable static clamping arm changes accordingly.

5. The buckle operation jig according to claim 1, characterized in that: The stationary arm connection part comprises a stationary arm guide rail, and the movable arm connection part comprises a movable arm movement guide rod, and the movable arm movement guide rod can slide on the stationary arm guide rail.

6. The buckle operation jig according to claim 1, characterized in that: The control system includes a reciprocating motion control module for controlling the reciprocating motion of the movable arm connection part relative to the stationary arm connection part.

7. The buckle operation jig according to claim 6, characterized in that: The control system further comprises a pressure control module and a pressing time control module, wherein the pressure control module is connected to the reciprocating motion control module, and the pressing time control module is connected to the pressure control module.

8. A buckle operation method, characterized in that: A buckle operation jig according to any one of claims 1 to 7 is used to perform a buckle operation on a buckle component, the buckle component comprising a lower buckle part and an upper buckle part, and the method comprises the following steps: S100, the lower fastener is fixed by the first clamping part, the upper fastener is fixed by the second clamping part, and the upper fastener is positioned relative to the lower fastener; S200, controlling the movable arm connecting part to move relative to the stationary arm connecting part through the control system until the upper fastener is correspondingly engaged with the lower fastener.

9. The buckle operation method according to claim 8, characterized in that: The step S100 further includes: the flat cable of the upper clamping member is clamped and fixed between the upper baffle plate and the lower clamping arm of the second clamping portion.

10. The buckle operation method according to claim 9, characterized in that: The step S100 further includes: adjusting the sizes of the openings of the first clamping portion and the second clamping portion to accommodate buckle components of different sizes.

11. The buckle operation method according to claim 8, characterized in that: The step S100 further includes: the flat cable of the upper fastener is adsorbed and fixed on the second clamping portion.

12. The buckle operation method according to claim 8, characterized in that: The step S200 further includes: the control system controls the distance that the movable arm connection part moves relative to the stationary arm connection part.

13. The buckle operation method according to claim 8, characterized in that: The step S200 further includes: the control system controls the pressure applied by the upper buckle component to the lower buckle component.

14. The buckle operation method according to claim 8, characterized in that: The step S200 further includes: the control system controls the buckling pressing time of the upper buckle component and the lower buckle component.

Citation Information

Patent Citations

  • Buckling operation jig

    CN210806299U