Anti-settlement roadbed structure and construction method
By introducing waterproof concrete triangular blocks, anti-settlement plates, anti-settlement columns and high-strength steel strands into the roadbed structure, combined with drainage pipes and filters, the problem of roadbed settlement is solved and the stability and safety of the roadbed are improved. Extends the service life of the road.
Patent Information
- Application Number
- CN201911045964.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2039-10-30
AI Technical Summary
The roadbed is prone to swelling or loosening due to water erosion in the external environment, leading to instability of the roadbed, causing settlement problems, affecting the normal use of roads and railways, and it is difficult to effectively extend the life of roads with existing technology.
An anti-settlement roadbed structure is adopted, including a base body, slope modules, waterproof concrete triangular blocks, anti-settlement plates, anti-settlement columns and high-strength steel strands. Through the design of reinforced concrete and solid iron columns, it is combined with drainage pipes and filters. , ensure the firmness and waterproofness of the structure and prevent loose soil and water accumulation.
Effectively prevent roadbed settlement, extend the life of the road, ensure the stability and safety of the roadbed, reduce maintenance costs, and increase the service life.
Smart Images

Figure CN110644311B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of roadbed structures, and in particular to an anti-settlement roadbed structure and a construction method. Background Art
[0002] Roadbed refers to a strip structure built as the foundation of the road surface according to the route location and certain technical requirements. It is a linear structure built with soil or stone. When the roadbed is damaged by weather, hydrological conditions, human activities and geological movements, it will lose its firmness, stability and durability, resulting in the need for regular maintenance of the roadbed, which is time-consuming and labor-intensive, causing a waste of human resources, increasing the capital expenditure for roadbed maintenance, and hindering traffic and use. The stability of the roadbed is directly related to whether the highway and railway can be used normally.
[0003] With existing technologies, the roadbed is exposed to the external environment for a long time and is easily eroded by rainwater. The roadbed matrix is easily infiltrated by water and expands or loosens, resulting in roadbed instability. The road surface is prone to cracking and sinking, which is very detrimental to driving safety. According to the "Highway Engineering Technical Standards" published in 2014, highways are divided into five technical levels according to traffic volume. From the perspective of vehicle speed, they can be divided into expressways, expressways, and ordinary highways. According to administrative levels, they are divided into national highways, provincial highways, county roads, township roads, and village roads. However, highway subsidence has always been a problem, which greatly shortens the life of the highway, so we improve a highway structure that extends the life of the highway. Summary of the invention
[0004] In view of the problems existing in the prior art, the first object of the present invention is to provide a simple and practical anti-settlement roadbed structure.
[0005] The second object of the present invention is to provide a construction method for an anti-settling roadbed using the above structure, which method is easy to operate and use.
[0006] To achieve the above first purpose, the specific technical solution adopted by the present invention is as follows:
[0007] An anti-settlement roadbed structure comprises a base, slope modules are arranged on both sides of the base, waterproof concrete triangle blocks are arranged below the slope modules, and the base is composed of a crushed stone layer, a lime rammed earth layer and a sandy soil layer arranged in sequence from top to bottom;
[0008] Among them, an anti-settlement plate is horizontally arranged between the crushed stone layer and the lime soil rammed earth layer, an anti-settlement column is arranged at the middle position of the bottom end of the anti-settlement plate, and a high-strength steel strand is penetrated at the bottom of the anti-settlement column;
[0009] Wherein, a slope module joint is arranged at a middle position of one side of the slope module facing the anti-settling column, and steel strand connectors are arranged at both ends of the high-strength steel strand.
[0010] As an improvement, the anti-settling plate is cast by reinforced concrete, so that the structure of the anti-settling plate is more solid and the service life is longer. At the same time, because it is made of longitudinal and transverse steel bars, the anti-settling plate is subjected to more uniform force.
[0011] As an improvement, the anti-settlement column is a solid iron column, and the bottom end of the anti-settlement column is a cone structure, the bottom of the anti-settlement column is provided with an anti-settlement column hole, and the high-strength steel strand runs through the anti-settlement column hole. Since the lower end of the anti-settlement column is set to be conical, the pressure on the soil can be increased, making the high-strength steel strand easier to bear force. At the same time, the waterproof material applied on the surface of the anti-settlement column can prevent the anti-settlement column from rusting to extend its service life.
[0012] As an improvement, a drainage pipe is pre-buried at the bottom of the waterproof concrete triangle block. Since the inner pipe of the base is higher than the outer pipe of the base, it is convenient for water in the base to flow out to prevent the soil in the base from being damaged. At the same time, a filter net should be set at the drainage pipe opening on the inner side of the base to prevent sand from clogging the drainage pipe to prevent water accumulation in the base and cause soil settlement in the base.
[0013] As an improvement, the high-strength steel strand is a whole steel strand, and both ends of the high-strength steel strand are connected to the slope module joints respectively. Thus, the slope module joints are connected to the stressed steel bars in the slope module, thereby preventing the high-strength steel strand from falling off under stress. At the same time, the surface of the high-strength steel strand is coated with waterproof material to prevent rust and affect the strength, thereby ensuring the normal operation of the high-strength steel strand.
[0014] As an improvement, the slope module is provided with stress-bearing steel bars inside, and the slope module is formed by a frame composed of transverse and longitudinal steel bars and then poured with concrete. This makes the slope module stronger and can better withstand the tension of the high-strength steel strands, so that the slope modules on both sides compact the soil inward to prevent the soil from loosening. At the same time, the steel bar frame of the slope module is composed of transverse and longitudinal steel bars, which can evenly disperse and transmit the tension of the high-strength steel strands to the slope module, making the soil in the base more evenly stressed and avoiding warping and deformation.
[0015] To achieve the above second purpose, the specific technical solution adopted by the present invention is as follows:
[0016] A method for constructing an anti-settling roadbed, the method adopts the construction of the anti-settling roadbed structure, and the method comprises the following steps:
[0017] S1: Clean the roadbed base;
[0018] S2: After installing the formwork and the drainage pipe, pouring the waterproof concrete triangular block, after the concrete solidifies, applying waterproof material on the surface of the waterproof concrete triangular block;
[0019] S3: filling the base with sand and gravel, and compacting them to form the sand layer;
[0020] S4: Filling the sandy soil layer with lime soil and tamping it to form the lime soil rammed soil layer, and pre-burying the anti-settlement column, and reserving a working space for installing the high-strength steel strand at the position where the anti-settlement column is pre-buried;
[0021] S5: installing the template of the slope module on the lime-soil rammed earth layer, fixing the steel frame and welding the joints of the slope module to the steel frame, and then pouring concrete;
[0022] S6: After the slope module solidifies and reaches the strength requirement, the high-strength steel strand is passed through the anti-settlement column hole at the bottom of the anti-settlement column and connected to the slope module joint, and the soil is filled and compacted;
[0023] S7: installing a steel frame of the anti-settlement plate on the lime-soil rammed earth layer and pouring concrete;
[0024] S8: After the anti-settling plate is solidified, gravel filling is performed to form the gravel layer, so that the upper surface of the gravel layer is flush with the upper surface of the slope module.
[0025] As an improvement, the length of the high-strength steel strand in S6 should be calculated according to the height and width of the roadbed through a trigonometric formula, so that the length of the high-strength steel strand can be accurately calculated, which is convenient for construction workers to carry out construction, and can also save raw materials and reduce construction costs.
[0026] As an improvement, during construction in S7, it is necessary to ensure that the bottom surface of the anti-settlement plate is perpendicular to the axial direction of the anti-settlement column. Thus, when the anti-settlement column moves downward, the high-strength steel strand is evenly stressed, and the slope modules on both sides of the anti-settlement column exert the same pressure on the base, so as to prevent the anti-settlement plate from sliding sideways.
[0027] Compared with the prior art, the technical solution provided by the present invention has at least the following beneficial effects:
[0028] 1. Through the action of automobile load, gravel layer load and other loads, the vertical load transmitted from the anti-settlement plate to the soil, and the tension transmitted from the anti-settlement column to the slope module through the high-strength steel strand, the soil can be made more compact and the occurrence of subsidence can be effectively avoided.
[0029] 2. The pipes reserved at the bottom of the waterproof concrete triangle block can allow the water in the base to be discharged in time to prevent the soil in the base from being damaged.
[0030] 3. The lower end of the anti-settlement column is set to be conical, which can increase the pressure on the soil and make the high-strength steel strands more easily bear the force. At the same time, the surface of the anti-settlement column should be coated with waterproof material to prevent rust and extend its service life. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 is a structural schematic diagram of an anti-settlement roadbed structure of Example 1;
[0032] Figure 2 yes Figure 1 A partial enlarged view of the middle A;
[0033] Figure 3 This is a schematic structural diagram of a high-strength steel strand and a slope module joint of an anti-settlement roadbed structure in Example 1;
[0034] Figure 4 is a structural schematic diagram of a drainage pipe of an anti-settlement roadbed structure in Example 1;
[0035] Figure 5 It is a flow chart of an anti-subsidence roadbed construction method of Example 2.
[0036] In the figure, 1-gravel layer; 2-lime soil rammed earth layer; 3-sand soil layer; 4-waterproof concrete triangle block; 5-anti-settlement plate; 6-slope module; 601-slope module joint; 602-steel strand connector; 7-anti-settlement column; 8-high-strength steel strand; 801-anti-settlement column hole. DETAILED DESCRIPTION
[0037] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments and can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementations and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.
[0038] The directions such as up, down, left or right involved in the present invention are directions on the drawings and are only for the convenience of expression.
[0039] Example 1, see Figure 1-4 , an anti-settlement roadbed structure, comprising a base, with slope modules 6 arranged on both sides of the base, waterproof concrete triangular blocks 4 arranged below the slope modules 6, and the base consisting of a crushed stone layer 1, a lime rammed earth layer 2 and a sandy soil layer 3 arranged in sequence from top to bottom;
[0040] Among them, an anti-settling plate 5 is horizontally arranged between the gravel layer 1 and the lime soil rammed earth layer 2, an anti-settling column 7 is arranged at the middle position of the bottom end of the anti-settling plate 5, and a high-strength steel strand 8 is penetrated at the bottom of the anti-settling column 7;
[0041] A slope module joint 601 is provided at the middle position of one side of the slope module 6 facing the anti-settling column 7 , and steel strand connectors 602 are provided at both ends of the high-strength steel strand 8 .
[0042] During specific implementation, the anti-settling plate 5 is cast by reinforced concrete.
[0043] In specific implementation, the anti-settling column 7 is a solid iron column, and the bottom end of the anti-settling column 7 is a cone structure. The bottom of the anti-settling column 7 is provided with an anti-settling column hole 801, and the high-strength steel strand 8 runs through the anti-settling column hole 801. The lower end of the anti-settling column 7 is set to a cone, which can increase the pressure on the soil and make the high-strength steel strand 8 more easily stressed. The surface of the anti-settling column 7 should be coated with waterproof material to prevent rust and extend its service life.
[0044] In specific implementation, a drainage pipe 401 is pre-buried at the bottom of the waterproof concrete triangular block 4. The drainage pipe 401 at the bottom of the waterproof concrete triangular block 4 is slightly inclined, and the inner pipe of the base is higher than the outer pipe of the base to facilitate the outflow of water in the base. A filter net should be set at the drainage pipe opening inside the base to prevent sand from blocking the drainage pipe 401. Discharge measures should also be taken on both sides of the roadbed to prevent external accumulated water from flowing back into the base.
[0045] In specific implementation, the high-strength steel strand 8 is a whole steel strand, and the two ends of the high-strength steel strand 8 are respectively connected to the slope module joint 601. The strength of the high-strength steel strand 8 must meet the requirements. The high-strength steel strand 8 and the slope module joint 601 are tied and connected by the steel strand connector 602. The slope module joint 601 should be connected to the stressed steel bars in the slope module 6 to prevent them from falling off under stress. The high-strength steel strand 8 should be coated with waterproof material to prevent rust and affect the strength.
[0046] In specific implementation, the slope module 6 is provided with stress-bearing steel bars inside, and the slope module 6 is formed by a frame composed of transverse and longitudinal steel bars and then poured with concrete. When the high-strength steel strand 8 is tensioned, the slope module 6 is brought closer to the base, thereby compacting the soil.
[0047] Example 2, see Figure 5A construction method for an anti-settlement roadbed adopts the construction of the anti-settlement roadbed structure in Example 1; the method comprises the following steps:
[0048] S1: Clean the roadbed base;
[0049] S2: After installing the formwork and the drainage pipe 401, pour the waterproof concrete triangular block 4, and after the concrete solidifies, apply waterproof material on the surface of the waterproof concrete triangular block 4;
[0050] S3: filling the base with sand and gravel, and compacting it to form the sand layer 3;
[0051] S4: Filling the sand layer 3 with lime soil and tamping it to form the lime soil rammed earth layer 2, and pre-burying the anti-settling column 7, and reserving a working space for installing the high-strength steel strand 8 at the position where the anti-settling column 7 is pre-buried;
[0052] S5: Install the template of the slope module 6 on the lime-soil rammed earth layer 2, fix the steel frame and weld the slope module joint 601 to the steel frame, and then pour concrete;
[0053] S6: After the slope module 6 solidifies and reaches the strength requirement, the high-strength steel strand 8 is passed through the anti-settlement column hole 801 at the bottom of the anti-settlement column 7 and connected to the slope module joint 601, and the soil is filled and compacted;
[0054] Specifically, the length of the high-strength steel strand 8 should be calculated using a trigonometric formula according to the height and width of the roadbed.
[0055] S7: installing the steel frame of the anti-settlement plate 5 on the lime-soil rammed earth layer 2 and pouring concrete;
[0056] Specifically, during construction, it is necessary to ensure that the bottom surface of the anti-settling plate 5 is perpendicular to the axial direction of the anti-settling column 7 .
[0057] S8: After the anti-settling plate 5 solidifies, gravel filling is performed to form the gravel layer 1 , so that the upper surface of the gravel layer 1 is flush with the upper surface of the slope module 6 .
[0058] The working principle of the present invention is: the load of vehicles passing through the road, the deadweight load of the soil and other loads are loaded onto the anti-settling plate 5, and the anti-settling plate 5 has a compacting effect on the soil below. At the same time, the anti-settling plate 5 transfers the load to the anti-settling column 7 connected below, and the anti-settling column 7 moves downward to transfer the force to the high-strength steel strand 8, so that the high-strength steel strand 8 is tightened by force. The tensioning force is transmitted along the high-strength steel strand 8 to the slope modules 6 on both sides of the base, so that the slope modules 6 are moved closer to the base, thereby compacting the soil. When it rains, the drainage pipe 401 reserved at the bottom of the waterproof concrete triangle block 4 can allow the water in the base to be discharged in time to prevent the soil in the base from being damaged.
[0059] To sum up, with the help of the above technical scheme of the present invention, different from other roadbed structures which are integral concrete buildings, the present invention is to set anti-settlement plates, anti-settlement columns, steel strands and slope modules. When the steel strands are tightened, the slope modules are moved closer to the matrix, thereby compacting the soil. The roadbed soil can be made more compact, and it has good anti-settlement and lateral displacement effect of the soil.
[0060] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for anti-settlement roadbed construction, characterized in that: Used for the construction of the following anti-settlement roadbed structures: The anti-settlement roadbed structure comprises a base, with slope modules (6) respectively arranged on both sides of the base, and waterproof concrete triangle blocks (4) arranged below the slope modules (6), and the base is composed of a crushed stone layer (1), a lime soil rammed earth layer (2) and a sandy soil layer (3) arranged in sequence from top to bottom; An anti-settling plate (5) is horizontally arranged between the crushed stone layer (1) and the rammed earth layer (2), an anti-settling column (7) is arranged at the middle position of the bottom end of the anti-settling plate (5), and a high-strength steel strand (8) is arranged through the bottom of the anti-settling column (7); Wherein, a slope module joint (601) is provided at a middle position of a side of the slope module (6) facing the anti-settling column (7), and steel strand connectors (602) are provided at both ends of the high-strength steel strand (8); The anti-settling column (7) is a solid iron column, and the bottom end of the anti-settling column (7) is a cone structure. An anti-settling column hole (801) is provided at the bottom of the anti-settling column (7), and the high-strength steel strand (8) passes through the anti-settling column hole (801); The high-strength steel strand (8) is a whole steel strand, and both ends of the high-strength steel strand (8) are respectively connected to the slope module joint (601); The anti-settlement roadbed construction method includes the following steps: S1: Clean the roadbed base; S2: After installing the formwork and the drainage pipe (401), the waterproof concrete triangular block (4) is cast. After the concrete solidifies, a waterproof material is applied to the surface of the waterproof concrete triangular block (4); the waterproof material uses a water-based asphalt waterproof coating; S3: filling the base with sand and gravel, and compacting the sand and soil layer (3); S4: filling the sandy soil layer (3) with lime soil and tamping it to form the lime soil rammed soil layer (2), and pre-burying the anti-settlement column (7), and reserving an operating space for installing the high-strength steel strand (8) at the position where the anti-settlement column (7) is pre-buried; S5: installing the template of the slope module (6) on the rammed earth layer (2), fixing the steel frame and welding the slope module joint (601) to the steel frame, and then pouring concrete; the angle of the slope module is consistent with the slope of the roadbed slope; S6: After the slope module (6) solidifies and reaches the required strength, the high-strength steel strand (8) is passed through the anti-settlement column hole (801) at the bottom of the anti-settlement column (7) and connected to the slope module joint (601), and the steel strand is tensioned by the gravity of the anti-settlement plate and the anti-settlement column, and the soil is filled and compacted; S7: installing a steel frame of the anti-settlement plate (5) on the lime-soil rammed earth layer (2) and pouring concrete; S8: After the anti-settling plate (5) solidifies, gravel filling is performed to form the gravel layer (1), so that the upper surface of the gravel layer (1) is flush with the upper surface of the slope module (6).
2. The anti-settlement roadbed construction method according to claim 1, characterized in that: A drainage pipe (401) is pre-buried at the bottom of the waterproof concrete triangular block (4).
3. The anti-settlement roadbed construction method according to claim 1, characterized in that: The slope module (6) is provided with stress-bearing steel bars inside, and the slope module (6) is formed by pouring concrete with a frame formed by transverse steel bars and longitudinal steel bars.
4. The anti-settlement roadbed construction method according to claim 1, characterized in that: The length of the high-strength steel strand (8) in S6 should be calculated using a trigonometric formula based on the height and width of the roadbed.
5. The anti-settlement roadbed construction method according to claim 1, characterized in that: During the construction of S7, it is necessary to ensure that the bottom surface of the anti-settling plate (5) is perpendicular to the axial direction of the anti-settling column (7).