A kind of assembled plastic permeable pavement structure
Through the prefabricated plastic permeable pavement with prefabricated standard segment structure, the problems of long construction cycle and poor permeability of traditional pavement are solved, rapid construction and high permeability are achieved, maintenance costs are reduced, and the ecology of pavement is improved through regeneration and utilization is improved. Environmental protection.
Patent Information
- Application Number
- CN201911052355.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-31
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2039-10-31
AI Technical Summary
Traditional pavement has a long construction cycle and is difficult to control the construction quality. It requires a lot of manpower and material resources to maintain it in the later stage. The road surface cannot be recycled after it is damaged, and the water permeability is poor, which affects driving safety.
Prefabricated plastic permeable pavement with prefabricated standard segment structure, including permeable plastic pavement layer and permeable pavement surface layer, bonded through asphalt bonding layer, hollow structure design is designed to facilitate drainage and pipeline laying, colored plastic curbs and electric thermal welding connection The cushion layer adopts a sand cushion layer or a gravel cushion layer to improve the flexibility and water permeability of the road surface.
Rapid construction has been achieved, construction quality and water permeability of the pavement have been improved, post-maintenance and repair costs have been reduced, the service life of the pavement has been extended, and environmental impact has been reduced through regeneration and utilization.
Smart Images

Figure CN110644315B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a pavement structure, in particular to an assembled plastic permeable pavement structure. Background Art
[0002] The current pavement systems mainly include masonry pavement, cement pavement, asphalt pavement, etc. Traditional masonry pavement is mainly artificial masonry, which is time-consuming and has poor bearing capacity. It is only suitable for pedestrian system pavement paving; traditional cement pavement adopts cast-in-place concrete technology. The cast-in-place process not only has a long construction period, but also has difficult to control the construction quality; traditional asphalt pavement uses hot paving technology for the surface layer and inorganic binder stabilized soil for the base layer. The base layer construction and maintenance period is long and the standards are high. More importantly, once the operation time of traditional pavement increases, a large number of disease problems often occur, and the management and maintenance units have to spend a lot of manpower and material resources for later maintenance. At the same time, masonry pavement and cement pavement cannot be recycled after damage. Although asphalt pavement can be recycled, the utilization rate is low. In addition, the water permeability of traditional pavement is poor, and water easily accumulates on the surface to form a water film, affecting driving safety. Summary of the invention
[0003] The technical problem to be solved by the present invention is that the traditional road construction period is long, the construction quality is difficult to control, and a large amount of manpower and material resources are required for maintenance in the later stage. The road surface cannot be recycled after being damaged. The purpose is to provide an assembled plastic permeable pavement structure, which adopts a prefabricated standard section structure, can quickly realize assembly construction, save construction time, and the plastic pavement can be recycled, which is convenient for the maintenance and repair of the road surface in the later stage.
[0004] The present invention is achieved through the following technical solutions:
[0005] The present invention discloses an assembled plastic permeable pavement structure, comprising a cushion layer arranged on a roadbed, a pavement layer arranged above the cushion layer, the pavement layer being formed by splicing a plurality of standard prefabricated segments along a length direction, the pavement layer comprising a permeable plastic pavement layer and a permeable pavement surface layer arranged in sequence from bottom to top, the permeable plastic pavement layer and the permeable pavement surface layer being bonded to each other by an asphalt bonding layer.
[0006] The assembled pavement structure of the present invention adopts a prefabricated standard section structure, which can quickly realize assembly construction and save construction time. In addition, the plastic pavement can be recycled, which is convenient for the maintenance and repair of the pavement in the later stage. The pavement structure of the present invention abandons the traditional construction structure and method, adopts the method of centrally prefabricating the pavement layer in the factory, transporting it to the site and then assembling it, which can quickly complete the construction of the pavement. At the same time, the prefabrication process also makes the construction quality easier to control. In addition, after the pavement is damaged in the later stage, the assembled pavement structure can quickly replace the damaged plates, shorten the maintenance time, and save the maintenance and management costs of the pavement in the later stage of operation. The pavement layer adopts a permeable plastic pavement layer and a permeable pavement surface layer, which has good permeability, improves safety, can reduce the problem of pavement diseases in the later stage, and reduce daily maintenance and costs. The permeable plastic pavement layer can also be recycled, saving repair costs and being environmentally friendly.
[0007] The permeable plastic pavement layer has an internal hollow structure, and a plurality of middle partitions are vertically arranged along the width direction inside the hollow structure of the permeable plastic pavement layer. The middle partitions divide the interior of the permeable plastic pavement layer into a drainage bin on one side and a pipeline bin on the other side. Manholes are provided on the two side plates of the permeable plastic pavement layer and the partition plates in the pipeline bin. The middle partitions are integrally formed with the permeable plastic pavement layer. The permeable plastic pavement layer adopts a multi-grid hollow type. The pipeline bin on one side can be used for laying pipelines, and the drainage bin on the other side can be used for drainage.
[0008] Colored plastic curbstones are laid along the length direction on both sides of the permeable pavement surface layer above the permeable plastic pavement layer. A lane dividing line is set in the middle of the surface of the permeable pavement surface layer. The lane dividing line uses colored aluminum marking blocks. The colored aluminum marking blocks are embedded in the surface of the permeable pavement surface layer and leave a gap with the permeable pavement surface layer. A liquid asphalt layer is hot-filled in the gap. This part of the work is also prefabricated in the factory.
[0009] The cushion layer is made of sand cushion layer, crushed stone cushion layer, pebble gravel cushion layer or grid crushed stone cushion layer, and the cushion layer thickness is 15-30cm. The flexible combination of permeable plastic pavement layer and cushion layer can effectively control the occurrence of pavement diseases in later operation.
[0010] A groove is provided on the surface of the permeable plastic pavement layer below the colored plastic curbstone, and the lower end of the colored plastic curbstone is embedded in the groove. The colored plastic curbstone and the edge of the groove are hot-melt connected by an electric hot-melt joint to improve the connectivity between the two.
[0011] It also includes pipeline plastic inspection wells added on the outside of the pipeline bin at regular intervals along the road surface and drainage plastic inspection wells added on the outside of the drainage bin to facilitate the work of maintenance personnel.
[0012] The permeable pavement surface layer can be made of permeable asphalt pavement, permeable concrete bricks, breathable / permeable plastic pavement or perforated plastic pavement according to needs. Permeable asphalt pavement should be used for light-loaded low-grade highways, municipal slow-moving systems, internal roads of residential communities, scenic area roads, etc.; breathable (water) permeable plastic pavement or perforated plastic pavement should be used in outdoor sports venues; permeable concrete bricks should be used for sidewalks, pedestrian streets and greenways.
[0013] The permeable plastic pavement layer is made of waste plastic bottles and other waste plastic parts with raw materials such as SAN, AS, PET, PE or PP through hot melt molding, turning waste into treasure and being more environmentally friendly.
[0014] Drainage holes are evenly distributed on the top surface of the permeable plastic pavement layer corresponding to the drainage bin. Water on the road surface can easily flow into the drainage bin along the drainage holes and finally into the drainage system, further improving the permeability of the road surface. A cap head arranged in a rectangular or plum blossom shape is also provided on the top surface of the permeable plastic pavement layer.
[0015] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0016] 1. The present invention provides an assembled plastic permeable pavement structure, which adopts a prefabricated standard section structure, can quickly realize assembly construction, save construction time, and the plastic pavement can be recycled, which is convenient for later maintenance and repair of the pavement;
[0017] 2. The present invention provides an assembled plastic permeable pavement structure, in which the pavement layer adopts a permeable plastic pavement layer and a permeable pavement surface layer, has good permeability, improves safety, can reduce the problem of road diseases in the later stage, reduces daily maintenance and costs, and the permeable plastic pavement layer can be recycled, saving repair costs and being environmentally friendly;
[0018] 3. The present invention provides an assembled plastic permeable pavement structure, and drainage holes are evenly distributed on the top surface of the permeable plastic pavement layer corresponding to the drainage bin. Water on the pavement can easily flow into the drainage bin along the drainage holes and finally into the drainage system, thereby further improving the permeability of the pavement. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0020] Figure 1 It is a schematic diagram of the structure of the present invention;
[0021] Figure 2 This is a schematic diagram of the electric heat-melting joint of the present invention;
[0022] Figure 3 It is a schematic diagram of lane dividing line of the present invention.
[0023] Marks and corresponding parts names in the attached drawings:
[0024] 1-roadbed, 2-cushion, 3-permeable plastic pavement layer, 4-permeable pavement surface layer, 5-asphalt bonding layer, 6-middle partition, 7-drainage bin, 8-pipeline bin, 9-manhole, 11-colored plastic curbstone, 12-grooving, 13-electric hot-melt joint, 14-pipeline plastic inspection well, 15-drainage plastic inspection well, 16-lane dividing line, 17-liquid asphalt layer. DETAILED DESCRIPTION
[0025] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0026] Example 1
[0027] like Figure 1 As shown, the present invention is an assembled plastic permeable pavement structure, including a cushion layer 2 arranged on a roadbed 1, a pavement layer is arranged above the cushion layer, and the pavement layer is formed by splicing a plurality of standard prefabricated segments along the length direction. The pavement layer includes a permeable plastic pavement layer 3 and a permeable pavement surface layer 4 arranged in sequence from bottom to top, and the permeable plastic pavement layer and the permeable pavement surface layer are bonded by an asphalt bonding layer 5.
[0028] The assembled pavement structure of the present invention adopts a prefabricated standard section structure, which can quickly realize assembly construction and save construction time. In addition, the plastic pavement can be recycled, which is convenient for the maintenance and repair of the pavement in the later stage. The pavement structure of the present invention abandons the traditional construction structure and method, adopts the method of centrally prefabricating the pavement layer in the factory, transporting it to the site and then assembling it, which can quickly complete the construction of the pavement. At the same time, the prefabrication process also makes the construction quality easier to control. In addition, after the pavement is damaged in the later stage, the assembled pavement structure can quickly replace the damaged plates, shorten the maintenance time, and save the maintenance and management costs of the pavement in the later stage of operation. The pavement layer adopts a permeable plastic pavement layer and a permeable pavement surface layer, which has good permeability, improves safety, can reduce the problem of pavement diseases in the later stage, and reduce daily maintenance and costs. The permeable plastic pavement layer can also be recycled, saving repair costs and being environmentally friendly.
[0029] Preferably, the water-permeable plastic pavement layer has an internal hollow structure, and a plurality of middle partitions 6 are vertically arranged along the width direction inside the hollow structure of the water-permeable plastic pavement layer. The middle partitions divide the interior of the water-permeable plastic pavement layer into a drainage bin 7 on one side and a pipeline bin 8 on the other side. Manholes 9 are provided on both side plates and the partition plates of the water-permeable plastic pavement layer. The middle partitions and the water-permeable plastic pavement layer are integrally formed. The water-permeable plastic pavement layer adopts a multi-compartment hollow type. The pipeline bin on one side can be used for laying pipelines, and the drainage bin on the other side can be used for drainage.
[0030] Preferably, Figure 3 As shown, strip-shaped colored plastic curbstones 11 are laid along the length direction on both sides of the permeable pavement surface layer above the permeable plastic pavement layer, and a lane dividing line 16 is provided in the middle of the surface of the permeable pavement surface layer. The lane dividing line adopts a colored aluminum marking block, and the colored aluminum marking block is embedded in the surface of the permeable pavement surface layer and leaves a gap with the permeable pavement surface layer. A liquid asphalt layer 17 is hot-filled in the gap, and this part of the work is also prefabricated in the factory.
[0031] Preferably, the cushion layer is a sand cushion layer, a crushed stone cushion layer, a gravel cushion layer or a grid crushed stone cushion layer, and the cushion layer thickness is 15-30cm. The flexible combination of the permeable plastic pavement layer and the cushion layer can effectively control the occurrence of pavement diseases in later operation.
[0032] Preferably, Figure 2 As shown, a groove 12 is provided on the surface of the permeable plastic pavement layer below the colored plastic curbstone, and the lower end of the colored plastic curbstone is embedded in the groove. The colored plastic curbstone and the edge of the groove are hot-melt connected by an electric hot-melt joint 13 to improve the connectivity between the two.
[0033] Preferably, Figure 1 As shown, it also includes pipeline plastic inspection wells 14 added on the outside of the pipeline bin and drainage plastic inspection wells 15 added on the outside of the drainage bin at regular intervals along the road surface to facilitate the work of maintenance personnel.
[0034] Preferably, the permeable pavement surface layer can be made of permeable asphalt pavement, permeable concrete bricks, breathable / permeable plastic pavement or perforated plastic pavement as needed. Permeable asphalt pavement should be used for light-loaded low-grade highways, municipal slow-moving systems, internal roads of residential areas, scenic area roads, etc.; breathable (water) permeable plastic pavement or perforated plastic pavement should be used in outdoor sports venues; permeable concrete bricks should be used for sidewalks, pedestrian streets, and greenways.
[0035] Preferably, the permeable plastic pavement layer is made of waste plastic bottles and other waste plastic parts whose raw materials are SAN, AS, PET, PE or PP through hot melt molding, turning waste into treasure and being more environmentally friendly.
[0036] Preferably, drainage holes are evenly distributed on the top surface of the permeable plastic pavement layer corresponding to the drainage bin, so that water on the road surface can easily flow into the drainage bin along the drainage holes and finally into the drainage system, further improving the permeability of the road surface. A cap head arranged in a rectangular or plum blossom shape is also provided on the top surface of the permeable plastic pavement layer.
[0037] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. An assembled plastic permeable pavement structure, characterized in that: The invention comprises a cushion layer (2) arranged on a roadbed (1), a pavement layer being arranged above the cushion layer (2), the pavement layer being formed by splicing a plurality of standard prefabricated segments along a length direction, the pavement layer comprising a permeable plastic pavement layer (3) and a permeable pavement surface layer (4) being arranged in sequence from bottom to top, the permeable plastic pavement layer (3) and the permeable pavement surface layer (4) being bonded together by an asphalt bonding layer (5); the permeable plastic pavement layer (3) presents an internal hollow structure, a plurality of middle partitions (6) being vertically arranged inside the hollow structure of the permeable plastic pavement layer (3) along a width direction, the middle partitions (6) dividing the inside of the permeable plastic pavement layer (3) into a drainage bin (7) on one side and a pipeline bin (8) on the other side, and manholes (9) being provided on both side plates of the permeable plastic pavement layer (3) and the partition plates in the pipeline bin; strip-shaped colored plastic curbstones (11) are laid along the length direction on both sides of the permeable pavement surface layer (4) above the permeable plastic pavement layer (3).
2. The assembled plastic permeable pavement structure according to claim 1, characterized in that: The cushion layer (2) is a sand cushion layer, a crushed stone cushion layer, a pebble gravel cushion layer or a grid crushed stone cushion layer, and the thickness of the cushion layer is 15-30 cm.
3. The assembled plastic permeable pavement structure according to claim 1, characterized in that: A groove (12) is provided on the surface of the permeable plastic pavement layer (3) below the colored plastic curb (11), the lower end of the colored plastic curb (11) is embedded in the groove (12), and the colored plastic curb (11) and the edge of the groove (12) are hot-melt connected by an electric hot-melt joint (13).
4. The assembled plastic permeable pavement structure according to claim 1, characterized in that: It also includes pipeline plastic inspection wells (14) added outside the pipeline bin (8) at intervals along the road surface and drainage plastic inspection wells (15) added outside the drainage bin (7).
5. The assembled plastic permeable pavement structure according to claim 1, characterized in that: A lane marking (16) is provided in the middle of the surface of the permeable pavement surface layer (4). The lane marking (16) is made of a colored aluminum marking block. The colored aluminum marking block is embedded in the surface of the permeable pavement surface layer (4) and has a gap with the permeable pavement surface layer (4). A liquid asphalt layer (17) is hot-filled in the gap.
6. The assembled plastic permeable pavement structure according to claim 1, characterized in that: The permeable pavement surface layer (4) is made of permeable asphalt pavement, permeable concrete bricks, air-permeable / permeable plastic pavement or perforated plastic pavement.
7. The assembled plastic permeable pavement structure according to claim 1, characterized in that: The permeable plastic pavement layer (3) is made of waste plastic bottles, whose raw materials are SAN, AS, PET, PE or PP, or waste plastic parts through hot-melt molding.
8. The assembled plastic permeable pavement structure according to claim 1, characterized in that: Drain holes are evenly distributed on the top surface of the water-permeable plastic pavement layer (3) corresponding to the drainage bin (7), and caps arranged in a rectangular or plum blossom shape are also provided on the top surface of the water-permeable plastic pavement layer (3).
Citation Information
Patent Citations
Plantsurface structure and modules and method for forming the same
CN109618719A
Fabricated macroporous permeable asphalt pavement
CN208815366U
Assembly type plastic permeable pavement structure
CN211036600U
Paved road, sand retaining structure for construction of paved road, paved road surface stabilizing method, and road paving method
JP2004052472A
Water-retentive pavement structure and water-retentive block for pavement
JP2007270487A