A new type of high-efficiency carbon dioxide phase change fracturing device
By designing the shear blade in the energy leakage head to be parallel to the borehole wall and installing a sealing device and a turbine device on the outer wall of the liquid storage pipe, the problems of energy loss and "flying pipe" phenomenon during the detonation process of the carbon dioxide phase change cracker are solved. , improving energy utilization and safety.
Patent Information
- Application Number
- CN201911137340.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2039-11-19
AI Technical Summary
During the detonation process of existing carbon dioxide phase change crackers, the impact between the energy venting head and the bottom of the borehole causes energy loss, and the "flying pipe" phenomenon is prone to occur, affecting safety and efficiency.
The shear blade in the energy discharge head is designed to be parallel to the borehole wall, and a sealing device and a turbine device are installed on the outer wall of the liquid storage pipe to improve energy utilization and sealing effect, and avoid energy loss and "flying pipe" phenomenon.
It effectively improves the energy utilization rate during the phase change and cracking process of carbon dioxide, prolongs the action time of high-pressure gas, ensures rapid and complete detonation, and reduces safety hazards.
Smart Images

Figure CN110793403B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of exploration rock and soil construction, and in particular to a novel high-efficiency carbon dioxide phase change fracturing device. Background Art
[0002] In 1914, after the British Cardox Company invented the cardox tube system, the cardox tube system was used for coal seam fracturing, permeability enhancement and mining. It has good fracturing effect and high safety. Since the 1980s, developed countries such as Britain, the United States and France have begun to apply this technology to pipeline clearing and ice breaking. The main energy source of carbon dioxide phase change fracturing rock breaking technology for the rock medium to be broken is the phase energy difference between the supercritical state and the gaseous state of liquid carbon dioxide. Compared with the blasting of common explosives, it has the advantages of small seismic waves, less flying rocks and short throwing distance, small dust, easy control, good safety, stable peak pressure and long duration. At present, this technology is widely used in rock crushing, jade mining, underwater blasting, coal seam permeability enhancement and other aspects, and its industrial application prospects are broad. However, due to the short development time of carbon dioxide phase change fracturing technology, it is still in the primary development stage and the theory is still lagging behind the practice. The development of an efficient rock breaking equipment is a key link in promoting the rapid development of carbon dioxide phase change technology, and it is of great significance to improve the application level of supercritical carbon dioxide fracturing technology.
[0003] At present, the shear plates of carbon dioxide phase change fracturing devices are mostly set parallel to the bottom of the energy release head. After the high-energy carbon dioxide breaks through the shear plates, it first impacts the bottom of the energy release head and then sprays out from the energy release ports on both sides. The high-energy gas impacts the rock wall, causing the rock to be quickly destroyed. This setting of the shear plates of the fracturing device has too much impact on the energy release head, which is easily damaged, with huge energy loss, and the huge impact reaction force is easy to destroy the energy release head, causing the fracturing device to "fly the pipe", causing a major safety hazard. Summary of the invention
[0004] The purpose of the present invention is to provide a new type of high-efficiency carbon dioxide phase change fracturing device in view of the existing technical status. The shear piece in the energy release head is designed to be parallel to the borehole wall. During the detonation process of the carbon dioxide fracturing device, the energy loss caused by the impact between the energy release head and the bottom of the borehole can be avoided, thereby improving the energy utilization rate in the phase change process and effectively avoiding the "flying pipe" phenomenon during carbon dioxide phase change fracturing.
[0005] In order to achieve the above object, the present invention adopts the following technical scheme:
[0006] A novel high-efficiency carbon dioxide phase change fracturing device comprises a gland, a heating tube, a liquid storage tube and an energy discharge head. The two ends of the liquid storage tube are respectively connected to the gland and the energy discharge head so that the inner cavity of the liquid storage tube is in a closed state. The gland is provided with a wire through hole penetrating the upper and lower end surfaces thereof. The heating tube is fixed on the lower end surface of the gland. The gland is also provided with a liquid injection port, which is sealed by a sealing plug and communicated with the inner cavity of the liquid storage tube through a liquid injection channel. The energy discharge head comprises an end body and a shearing piece. The end body is a hollow column with a closed bottom end. The side wall of the end body is provided with an annular groove extending upward along the bottom surface of the end body and two energy discharge ports are symmetrically provided thereon. The shearing piece is an annular column with a disc at the bottom. The thickness of the shearing piece matches the groove width of the annular groove. The shearing piece is inserted into the annular groove so that the two energy discharge ports on the side wall of the end body are closed.
[0007] Furthermore, a sealing device is provided in a ring sleeve on the outer wall of the liquid storage tube, and the sealing device is composed of two sealing pieces. The two sealing pieces can be spliced into a ring and the two are locked by a latch structure.
[0008] Furthermore, an outer convex groove is provided on the inner side of the sealing plate, and an inner concave groove matching the outer convex groove is provided on the outer wall of the liquid storage tube.
[0009] Furthermore, a thermal insulation coating is coated on the inner wall of the liquid storage tube.
[0010] Furthermore, a turbine device is provided in the inner cavity of the liquid storage tube, and the turbine device includes a turbine connecting rod and a turbine. The turbine connecting rod is an inverted L-shape, and the transverse part of the turbine connecting rod is fixed on the cavity wall of the liquid storage tube. The longitudinal part of the turbine connecting rod coincides with the central axis of the inner cavity of the liquid storage tube and a turbine is provided at its front end.
[0011] Furthermore, the wires of the turbine are arranged upward along the inner wall of the liquid storage tube, and the wires of the turbine and the heating tube are connected in series through external wires after passing through the wire through holes.
[0012] Furthermore, a sealing ring is provided at the fixed connection between the heating tube and the gland.
[0013] Furthermore, a sealing gasket is provided at the bottom of the annular groove.
[0014] The beneficial effects of the present invention are:
[0015] 1. Compared with the prior art, the technical solution of the present invention designs the shearing piece in the energy-draining head to be parallel to the borehole wall. During the detonation process of the carbon dioxide fracturing device, the energy loss caused by the impact between the energy-draining head and the bottom of the borehole can be avoided, thereby improving the energy utilization rate during the phase change process, and effectively avoiding the "flying pipe" phenomenon during the carbon dioxide phase change fracturing;
[0016] 2. A sealing device is provided on the outer wall of the liquid storage tube to ensure good sealing during the detonation process, effectively extending the action time of the high-pressure gas;
[0017] 3. A turbine device is provided in the inner cavity of the liquid storage tube. The wire of the turbine is connected in series with the wire of the heating tube. When the detonation current is connected, the heating tube and the turbine are started at the same time to ensure that the carbon dioxide is heated evenly and detonated quickly and thoroughly.
[0018] 4. The inner wall of the liquid storage tube is coated with a thermal insulation coating to improve the thermal insulation capacity of the liquid storage tube and prevent the detonation time from being too long due to excessive temperature difference. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Attached Figure 1 It is a structural schematic diagram of the carbon dioxide phase change fracturing device of the present invention;
[0020] Attached Figure 2 It is a schematic structural diagram of the energy dissipation head of the present invention.
[0021] Marking instructions: 1. Wire through hole, 2. Liquid injection channel, 3. Pressure cap, 4. Liquid injection port, 5. Heating tube, 6. Thermal insulation coating, 7. Sealing piece, 8. Turbine connecting rod, 9. Sealing gasket, 10. End body, 11. Turbine, 12. Shear piece, 13. Liquid storage tube. DETAILED DESCRIPTION
[0022] See also Figure 1-2 As shown, a novel high-efficiency carbon dioxide phase change fracturing device includes a gland 3, a heating tube 5, a liquid storage tube 13 and an energy release head. The liquid storage tube 13 is used to inject and store carbon dioxide. The two ends of the liquid storage tube 13 are respectively connected to the gland 3 and the energy release head by threaded connection, so that the inner cavity of the liquid storage tube 13 is in a closed state.
[0023] The gland 3 is provided with a wire through hole 1 penetrating the upper and lower end surfaces thereof, and the heating tube 5 is fixed on the lower end surface of the gland 3. Preferably, a sealing ring is provided at the fixed connection between the heating tube 5 and the gland 3 to ensure that the liquid carbon dioxide is well sealed in the liquid storage tube 13. The gland 3 is also provided with a liquid injection port 4, which is sealed by a sealing plug and communicated with the inner cavity of the liquid storage tube 13 through the liquid injection channel 2. After the liquid carbon dioxide is injected into the liquid storage tube 13 from the liquid injection port 4, the liquid injection port 4 is sealed with a sealing plug.
[0024] The energy release head includes a terminal body 10 and a shearing piece 12. The terminal body 10 is a hollow column with a closed bottom. The side wall of the terminal body 10 is provided with an annular groove extending upward along the bottom surface of the terminal body 10 and two energy release ports are symmetrically provided thereon. A sealing gasket 9 is provided at the bottom of the annular groove. The shearing piece 12 is an annular column with a disc at the bottom. The thickness of the shearing piece 12 matches the groove width of the annular groove. The shearing piece 12 is inserted and arranged in the annular groove to close the two energy release ports on the side wall of the terminal body 10. The thickness of the shearing piece 12 is related to the pressure of carbon dioxide breaking through the shearing piece 12. Shearing pieces 12 of different specifications correspond to different peak pressures and have different impacts on rocks. Therefore, energy release heads of different specifications can be replaced to achieve different fracturing effects.
[0025] The above technical solution designs the shear piece 12 in the energy release head to be parallel to the borehole wall. During the detonation of the carbon dioxide fracturing device, the energy loss caused by the impact between the energy release head and the bottom of the borehole can be avoided, thereby improving the energy utilization rate during the phase change process.
[0026] A sealing device is provided in a ring sleeve on the outer wall of the liquid storage tube 13. The sealing device is composed of two sealing pieces 7. The sealing pieces 7 are made of fine steel. The two sealing pieces 7 can be spliced into a ring and locked by a latch structure. An outer convex groove is provided on the inner side of the sealing piece 7, and an inner concave groove matching the outer convex groove is provided on the outer wall of the liquid storage tube 13. The sealing device is limited by the cooperation of the outer convex groove and the inner concave groove.
[0027] For boreholes of different diameters, the sealing sheets 7 of different thicknesses can be replaced to match the sealing device with the borehole. When using a carbon dioxide phase change fracturing device, the thickness of the sealing device is first determined according to the borehole diameter, and then assembled. After the assembly is completed, the carbon dioxide phase change fracturing device is inserted into the borehole, and then clay cannon mud and other materials are filled into the borehole for plugging. The sealing technology of the carbon dioxide fracturing device is currently in the primary stage, and clay cannon mud and other materials are mostly used for plugging. The sealing effect is general and time-consuming and labor-intensive, which restricts the development of the carbon dioxide phase change fracturing technology to a certain extent. The sealing device effectively avoids the overflow of high-pressure gas along the pores of clay cannon mud, ensures that there is sufficient high-pressure gas between the outer wall of the liquid storage pipe 13 between the bottom of the carbon dioxide phase change fracturing device and the sealing device and the borehole wall after detonation, prolongs the static pressure time of the high-pressure gas on the borehole wall, and greatly improves the fracturing effect.
[0028] Conventional carbon dioxide phase change crackers are cast from 42CrMo that has been quenched and tempered. The heat energy required to stimulate the phase change of carbon dioxide before detonation will be lost through the wall of the liquid storage tube 13, resulting in high energy consumption and prolonged detonation time, which affects the efficiency of phase change cracking. The above situation is particularly evident in cold region engineering applications. Preferably, the inner wall of the liquid storage tube 13 is coated with a thermal insulation coating 6, thereby improving the thermal insulation capacity of the liquid storage tube 13 and preventing the detonation time from being too long due to excessive temperature difference.
[0029] A turbine device is provided in the inner cavity of the liquid storage tube 13, and the turbine device includes a turbine connecting rod 8 and a turbine 11. The turbine connecting rod 8 is an inverted L-shape, and the transverse portion of the turbine connecting rod 8 is fixed to the inner cavity wall of the liquid storage tube 13. The longitudinal portion of the turbine connecting rod 8 coincides with the central axis of the inner cavity of the liquid storage tube 13, and the turbine 11 is provided at its front end. When the turbine 11 is working, the turbine 11 rotates with the end point of the longitudinal portion of the turbine connecting rod 8 as the center of the circle, so that the liquid carbon dioxide flows evenly in the inner cavity of the liquid storage tube 13, fully contacts with the heating tube 5, and is evenly heated, so that the detonation is rapid and thorough.
[0030] Preferably, the wires of the turbine 11 are arranged upward along the inner wall of the liquid storage tube 13, and the wires of the turbine 11 and the heating tube 5 are passed through the wire through hole 1 and connected in series through an external wire. When the detonation current is connected, the heating tube 5 and the turbine 11 can be started at the same time.
[0031] Specifically, before the carbon dioxide phase change fracturing device is used, liquid carbon dioxide is injected into the inner cavity of the liquid storage tube 13 through the liquid injection port 4 along the liquid injection channel 2 using a professional filling machine. After the fracturing hole is drilled on the working surface, the thickness of the sealing device is matched according to the aperture of the fracturing hole, the carbon dioxide phase change fracturing device is assembled, and the carbon dioxide phase change fracturing devices are inserted into the fracturing holes one by one, and then the wires of each carbon dioxide phase change fracturing device are led out and connected in series. After the detonation current is introduced, the heating tube 5 heats up rapidly, and the turbine 11 starts to rotate at the same time, so that the liquid carbon dioxide is quickly and evenly heated. After reaching the supercritical state, the volume of carbon dioxide rapidly expands more than 600 times within 40ms, and the pressure in the inner cavity of the liquid storage tube 13 can reach more than 200 MPa. When the pressure reaches the limit pressure that the shear piece 12 can withstand, the shear pieces 12 at the two energy release ports are broken at the same time, generating a strong impact force to impact the borehole wall and crack the rock mass. After the impact process is completed, the static pressure generated by the high-pressure gas causes tiny cracks to develop in the rock mass. At the same time, the high-pressure gas causes the tips of the rock cracks to crack, causing the cracks to expand.
[0032] Of course, the above are only preferred embodiments of the present invention, and are not intended to limit the scope of use of the present invention. Therefore, any equivalent changes made to the principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A carbon dioxide phase change fracturing device, comprising a gland, a heating tube, a liquid storage tube and an energy-draining head, wherein both ends of the liquid storage tube are respectively connected to the gland and the energy-draining head, so that the inner cavity of the liquid storage tube is in a closed state, characterized in that: The gland is provided with a wire through hole penetrating the upper and lower end surfaces thereof, the heating tube is fixed on the lower end surface of the gland, the gland is also provided with a liquid injection port, the liquid injection port is sealed by a sealing plug and communicates with the inner cavity of the liquid storage tube through the liquid injection channel, the energy-draining head comprises an end body and a shearing piece, the end body is a hollow column with a closed bottom end, the side wall of the end body extends upward along the bottom surface of the end body to be provided with an annular groove and two energy-draining ports are symmetrically provided thereon, the shearing piece is an annular column with a disc at the bottom, the thickness of the shearing piece matches the groove width of the annular groove, the shearing piece is inserted into the annular groove to seal the two energy-draining ports on the side wall of the end body; A sealing device is provided in a ring sleeve on the outer wall of the liquid storage tube, and the sealing device is composed of two sealing pieces, which can be spliced into a ring and locked by a latch structure; The inner side of the sealing sheet is provided with an outer convex groove, and the outer wall of the liquid storage tube is provided with an inner concave groove matching the outer convex groove; The inner cavity wall of the liquid storage tube is coated with a heat-insulating coating.
2. A carbon dioxide phase change fracturing device according to claim 1, characterized in that: A turbine device is provided in the inner cavity of the liquid storage tube, and the turbine device includes a turbine connecting rod and a turbine. The turbine connecting rod is an inverted L-shape, and the transverse part of the turbine connecting rod is fixed on the cavity wall of the liquid storage tube. The longitudinal part of the turbine connecting rod coincides with the central axis of the inner cavity of the liquid storage tube and a turbine is provided at its front end.
3. A carbon dioxide phase change fracturing device according to claim 2, characterized in that: The wire of the turbine is arranged upward along the inner wall of the liquid storage tube, and the wire of the turbine and the wire of the heating tube are connected in series through an external wire after passing through the wire through hole.
4. A carbon dioxide phase change fracturing device according to any one of claims 1 to 3, characterized in that: A sealing ring is provided at the fixed connection between the heating tube and the gland.
5. A carbon dioxide phase change fracturing device according to any one of claims 1 to 3, characterized in that: A sealing gasket is provided at the bottom of the annular groove.
