A fully automatic rainwater separation and multi-stage utilization system for high-rise buildings

Through the fully automatic high-rise building rainwater separation and multi-stage utilization system, the problems of poor initial rainwater quality and easy damage of equipment are solved, the cleaning, storage and multi-functional utilization of rainwater are realized, the power generation efficiency is improved and the maintenance cost is reduced, which is suitable for Extensive promotion.

CN110894817BActive Publication Date: 2024-10-22EAST CHINA JIAOTONG UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010003150.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-02
Publication Date
2024-10-22
Estimated Expiration
2040-01-02

AI Technical Summary

Technical Problem

Existing rainwater utilization equipment has problems such as poor water quality, easy damage to equipment, high maintenance costs and low power generation efficiency when treating initial rainwater, and it fails to effectively utilize the potential energy of rainwater.

Method used

A fully automatic rainwater separation and multi-stage utilization system for high-rise buildings is designed, including roofs, drainage pipes, impeller waste devices, full-flow energy storage devices, hydroelectric generators, electricity storage devices and reservoirs. Through the filter screen Filtration, impeller waste flow device separation, full flow energy storage device to concentrate water flow, hydroelectric generator power generation and storage device storage realize the cleaning, storage and multi-functional utilization of rainwater.

Benefits of technology

It achieves the separation of roof rainwater, the storage and utilization of rain energy, improves power generation efficiency, extends equipment life, reduces maintenance costs, is suitable for large-scale promotion, and reduces the risk of urban waterlogging.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110894817B_ABST
    Figure CN110894817B_ABST
Patent Text Reader

Abstract

The present invention discloses a fully automatic high-rise building rainwater separation and multi-stage utilization system, which includes a roof, a drain pipe, an impeller flow abandonment device, a sewage pipe, a full-flow energy storage device, a hydro-turbine generator, an electrical storage device and a water storage tank. The filter screen is flush with the roof and is located directly above the drain pipe. The drain pipe is connected to the impeller flow abandonment device. The impeller flow abandonment device is provided with a flow abandonment pipe, which is connected to the sewage pipe. The full-flow energy storage device is installed on the drain pipe to ensure that the water flow that fills the pipe diameter impacts the hydro-turbine generator, and is stored in the electrical storage device after power generation. The rainwater flowing through the hydro-turbine generator is finally collected in the water storage tank. The present invention realizes multiple functions such as roof rainwater separation, rain energy accumulation, utilization, and rainwater storage, and achieves the purpose of obtaining clean rainwater, improving power generation efficiency, and extending the life of the power generation device. The device in the whole system is small in size, high in safety factor, simple in structure, low in cost, has high economic effect, and is suitable for large-scale promotion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of rainwater collection and utilization, and specifically relates to a fully automatic high-rise building rainwater separation and multi-stage utilization system. Background Art

[0002] my country is a country with very scarce water resources. According to incomplete statistics, more than 300 of the more than 600 cities in my country are short of water, and 108 of them are seriously short of water. With the progress of urbanization, more and more people are pouring into cities, and the water shortage problem will only become more and more serious. At present, water shortage has become an important factor restricting the development of cities and the improvement of people's living standards in my country. However, the contradiction is that my country's cities are full of high-rise buildings and have vast roofs, which can store a lot of rainwater, but most cities discharge rainwater from high-rise roofs directly to the ground. If this part of rainwater can be used, it can not only greatly alleviate the current situation of urban water shortage, but also provide electricity for the city.

[0003] The reason why rainwater from high-rise roofs is abandoned by most cities is mainly because the quality of its initial rainwater is poor. The initial rainwater dissolves most of the pollutants in the air, is highly corrosive, and contains other particles such as dust on the roof. At the same time, if rainwater containing initial rainwater is used for power generation, the particles in the initial rainwater will be adsorbed on the blades, and the acidic substances will corrode the power generation equipment, affecting the power generation efficiency and reducing the service life of the equipment.

[0004] The Chinese patent publication number is 205676967U, and the patent name is a document of a high-rise building rainwater recycling device. It discloses a device that sets a float valve to achieve rainwater diversion, but the device is easily damaged and fails, and the potential energy of rainwater is not utilized.

[0005] The Chinese patent publication number is 1206268008U, and the patent name is a document entitled "A system for comprehensive utilization of roof rainwater and rain energy". A system for comprehensive utilization of rainwater is disclosed through rain collection devices, power generation devices, purification devices, control devices and other mechanisms. However, the system contains too many electronic devices, such as a first liquid level detector, a second liquid level detector, etc. The operation of these devices consumes electricity, and the price of these devices is not low. At the same time, because these electronic devices are in contact with water for a long time, they are easy to be damaged, the subsequent maintenance cost is high, and the safety is low. At the same time, when the rain is light, the potential energy of the water flow is not concentrated, and the efficiency of the generator is low.

[0006] The purpose of the technical solution of the present invention is to overcome the shortcomings of current rainwater utilization equipment and to design a simple, easy-to-maintain, fully automatic high-rise building rainwater separation and multi-stage utilization system. It is an extended research result based on the National Natural Science Foundation of China Youth Fund (No.51608198) and Jiangxi Natural Science Foundation (No. 20161BAB216138) projects. Summary of the invention

[0007] The purpose of the present invention is to overcome the shortcomings of current rainwater utilization equipment and to design a fully automatic high-rise building rainwater separation and multi-stage utilization system with simple structure, full automation, easy maintenance, rainwater collection and separation, rainwater potential energy accumulation, power generation, water storage and other functions.

[0008] The technical solution of the present invention is achieved in this way:

[0009] A fully automatic high-rise building rainwater separation and multi-stage utilization system, comprising a roof, a drain pipe, an impeller flow abandonment device, a sewage pipe, a full-flow energy storage device, a hydro-generator, an electricity storage device and a water tank, a filter screen is arranged on the roof downspout, the filter screen is flush with the roof and is located directly above the drain pipe, the drain pipe is connected to the impeller flow abandonment device, the impeller flow abandonment device is provided with a flow abandonment pipe, the diameter of the flow abandonment pipe is smaller than the diameter of the drain pipe, the flow abandonment pipe is connected to the sewage pipe, the full-flow energy storage device is installed on the drain pipe below the impeller flow abandonment device, to ensure that the water flow that fills the pipe diameter impacts the hydro-generator, the hydro-generator generates electricity through the water flow that fills the pipe diameter, and stores the electricity in the water storage device arranged in the water storage device. In the power storage device next to it, rainwater flowing through the hydro-generator is finally collected in the water reservoir. An overflow pipe is also provided on the water reservoir. The impeller flow abandonment device includes a shell, an impeller and a bearing part. One side of the bearing part is fixedly connected to the shell. The impeller is fixedly connected to the bearing part and can rotate in the shell. The impeller includes a wheel disc and S-shaped blades. Several of the blades are evenly arranged on the wheel disc surface in a circular shape around the axis of the wheel disc, and the length of the blades is less than the radius of the wheel disc. A circular space is formed at the axis of the wheel disc for placing the abandonment pipe. The distance between the blades and the axis of the wheel disc is greater than the radius of the abandonment pipe. The abandonment pipe is close to the impeller but independent of the impeller and does not interfere with each other.

[0010] In the fully automatic high-rise building rainwater separation and multi-stage utilization system of the present invention, the full-flow energy storage device includes a fixed ring 1, an outer sleeve, a fixed ring 2, an inverted frustum-conical funnel, an inner sleeve, a movable baffle, a spring, a support plate and a support rod. The fixed ring 1 and the fixed ring 2 are fixedly connected at both ends of the outer sleeve, the upper edge of the inverted frustum-conical funnel is fixedly connected to the inner surface of the upper edge of the outer sleeve, the movable baffle is arranged at the lower port of the inverted frustum-conical funnel and can cover the lower port, the inner side of the fixed ring 2 is provided with at least three radial reinforcing ribs, and the support The support rod is vertically fixed on the reinforcing rib connection point at the second center of the fixed ring, the upper end of the support rod is fixedly connected to the center of the support plate, and a spring is fixedly connected to the center of the upper surface of the support plate, and the upper end of the spring is fixedly connected to the center of the lower end surface of the movable baffle, and the spring presses the movable baffle tightly against the lower port of the inverted frustum-shaped funnel to cover the lower port, and the lower end of the inner sleeve is fixedly connected to the support plate, the inner diameter of the inner sleeve is consistent with the diameter of the movable baffle, and the distance between its upper end surface and the lower port of the frustum-shaped funnel is less than the thickness of the movable baffle.

[0011] In the fully automatic high-rise building rainwater separation and multi-stage utilization system of the present invention, the drainage pipe is vertically fixedly connected to the building wall through a horizontal pipe clamp, and the drainage pipe on the side close to the roof has an S-shaped pipe section.

[0012] In the fully automatic high-rise building rainwater separation and multi-stage utilization system of the present invention, the bearing part includes an outer ring, a roller and an inner shaft. The radius of the outer ring is half of the radius of the impeller. The inner shaft is a stepped shaft, including shaft segment one and shaft segment two. A raceway is provided on the side of shaft segment one to constitute the inner ring of the bearing. One side of the outer ring is fixed to the inner bottom surface of the shell, and the other end of the inner shaft is installed at the center position of the side of the impeller. An annular shielding part extends from the outer surface of the outer ring close to the impeller in the axial direction. The inner diameter of the shielding part is smaller than the diameter of shaft segment one and larger than the diameter of shaft segment two. The starting force of the bearing part is 34.64N.

[0013] In the fully automatic high-rise building rainwater separation and multi-stage utilization system of the present invention, the abandoned flow pipe is fixedly installed on the shell and tilted downward to form an angle of 15° with the horizontal plane. It includes an outer pipe section and an inner pipe section. The inner pipe section is semi-open with an opening upward. It is located in the circular space at the axis of the impeller and is close to the impeller but independent of the impeller and does not interfere with it.

[0014] In the fully automatic high-rise building rainwater separation and multi-stage utilization system of the present invention, the power storage device includes a rectifier, a battery and a plurality of wires, the battery is connected to the hydro-generator via the wires, and the rectifier is connected to the wires and is located between the hydro-generator and the battery.

[0015] The fully automatic high-rise building rainwater separation and multi-stage utilization system of the present invention has the following beneficial effects:

[0016] 1. It realizes multiple functions such as roof rainwater separation, rain energy accumulation, rain energy utilization, and rainwater storage, and achieves the purpose of obtaining clean late rainwater, improving power generation efficiency, and extending the life of the power generation device. The impeller flow abandonment device, full flow energy storage device, power generation and power storage device in the whole system are small in size, and the water storage tank is located below the ground, which occupies a small space, has a high safety factor, a simple structure, and a low cost. It has high economic, social, and environmental effects and is suitable for large-scale promotion.

[0017] 2. The unique impeller flow abandonment device cleverly utilizes the difference in rainfall intensity at the beginning and end - rainfall duration, successfully separates rainwater, reduces the subsequent treatment process, and also avoids the problem that the initial rainwater passes through the turbine generator, acid rain corrodes the turbine blades, and the mixed particles are adsorbed on the turbine blades, resulting in a shortened service life of the turbine generator and reduced power generation efficiency of the turbine generator. The impeller blades are S-shaped, which can effectively eliminate part of the kinetic energy of rainwater, slow down the flow rate of rainwater, and facilitate the force on the impeller.

[0018] 3. The unique full-flow energy storage device ensures that the water flow that fills the pipe diameter impacts the turbine generator, concentrates the water flow potential energy, and improves the power generation efficiency of the turbine generator.

[0019] 4. This system divides rainwater into initial rain and subsequent rain, avoiding the adverse effects of the poor quality of initial rain on rainwater utilization, and reusing the subsequent rainwater in a refined manner to fully utilize its potential energy and water resources. The reservoir collects clean subsequent rainwater for flushing toilets, washing cars, greening, road spraying, etc., alleviating the pressure on the municipal pipe network. At the same time, during heavy rains, it reduces the area of ​​urban rainwater inflow and reduces the occurrence of urban waterlogging, which also meets the construction needs of sponge cities. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the fully automatic high-rise building rainwater separation and multi-stage utilization system of the present invention;

[0021] Figure 2 for Figure 1 Schematic diagram of the front of the middle impeller jet flow device;

[0022] Figure 3 for Figure 1 Schematic diagram of the back of the middle impeller jet flow device;

[0023] Figure 4 for Figure 2 Schematic diagram of the connection structure between the middle jet flow pipe and the impeller;

[0024] Figure 5 for Figure 4Schematic diagram of the impeller;

[0025] Figure 6 for Figure 4 Schematic diagram of the middle discard flow pipe;

[0026] Figure 7 for Figure 2 Structural diagram of the middle bearing part;

[0027] Figure 8 for Figure 7 Schematic diagram of the structure of the outer ring and the inner shaft;

[0028] Fig. 9 for Figure 7 Schematic diagram of the structure of the middle roller and the inner shaft;

[0029] Fig.10 for Figure 1 Schematic diagram of a mid-full flow energy storage device;

[0030] Fig.11 for Fig.10 Schematic diagram of the structure of the inner sleeve, the movable baffle and the inverted frustum cone funnel;

[0031] Fig.12 for Fig.10 Schematic diagram of the connection structure of the components.

[0032] The accompanying drawings are marked as follows: roof 1, drain pipe 2, impeller flow abandonment device 3, sewage pipe 4, full-flow energy storage device 5, hydro-generator 6, electricity storage device 7, water reservoir 8, filter screen 9, flow abandonment pipe 10, overflow pipe 11, casing 12, impeller 13, bearing part 14, wheel disc 15, blade 16, fixing ring 17, outer sleeve 18, fixing ring 2 19, inverted frustum cone funnel 20, inner sleeve 21, movable baffle 22, spring 23, support plate 24, support rod 25, reinforcement rib 26, horizontal pipe clamp 27, outer ring 28, roller 29, inner shaft 30, shaft section 1 31, shaft section 2 32, shielding part 33, outer pipe section 34, inner pipe section 35, rectifier 36, battery 37, and wire 38. DETAILED DESCRIPTION

[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0034] like Figure 1The fully automatic high-rise building rainwater separation and multi-stage utilization system of the present invention shown in the figure comprises a roof 1, a drain pipe 2, an impeller flow abandonment device 3, a sewage pipe 4, a full-flow energy storage device 5, a hydro-generator 6, an electric storage device 7 and a water storage tank 8. The filter screen 9 is flush with the roof 1 and is located directly above the drain pipe 2. The drain pipe 2 is connected to the impeller flow abandonment device 3. The impeller flow abandonment device 3 is provided with a flow abandonment pipe 10, which is connected to the sewage pipe 4. The full-flow energy storage device 5 is installed on the drain pipe 2 to ensure that the water flow that fills the pipe diameter impacts the hydro-generator 6. The hydro-generator 6 generates electricity through the water flow that fills the pipe diameter and stores it in the electric storage device 7 arranged next to it. The rainwater flowing through the hydro-generator 6 is finally collected in the water storage tank 8.

[0035] The drain pipe 2 uses a 100mm diameter plastic downpipe, and the drain pipe 2 is vertically fixed to the building wall through a horizontal pipe clamp 27. The upper end of the drain pipe 2 passes through the downspout of the roof 1 and is flush with the roof 1, or the upper end of the drain pipe 2 is set in the downspout of the roof 1. A filter screen 9 is set on the downspout of the roof 1 to filter out some stones and other large particles of debris in the rainwater, which plays a good protective role for the subsequent rainwater separation device. The drain pipe 2 on the side close to the roof 1 has an S-shaped pipe section for buffering the flow rate of rainwater to achieve better initial and late rainwater separation effects.

[0036] The impeller discarding device 3 is installed at a position 1.2m below the roof 1, so that the rainwater flowing to the impeller discarding device 3 can obtain a certain speed, thereby increasing its alluvial force on the impeller. The impeller discarding device 3 is connected to the drain pipe 2, and the rainwater must pass through the impeller discarding device 3 before continuing to flow down in the drain pipe 2. The unique impeller discarding device 3 cleverly utilizes the difference in rainfall intensity at the initial and later stages - rainfall duration, successfully separates rainwater, reduces subsequent processing processes, and also avoids the problem of initial rainwater passing through the hydro-generator 6 and acidic water corroding the turbine blades; in addition, it also avoids the problem of mixed particles being adsorbed on the turbine blades, resulting in a shortened service life of the hydro-generator 6 and a reduced power generation efficiency of the hydro-generator 6. Figures 2 to 9As shown, the impeller flow abandonment device 3 includes a housing 12, an impeller 13, a flow abandonment pipe 10 and a bearing part 14. The housing 12 and the impeller 13 are made of stainless steel. The flow abandonment pipe 10 uses a 50mm diameter plastic downpipe. Because the initial flow abandonment rainwater is small, the flow abandonment pipe 10 is smaller than the drain pipe 2, saving pipe materials. The housing 12 is installed on the wall through a wall clamp (horizontal pipe clamp) or other commonly used fixings. The housing 12 is cylindrical, the bottom surface of the housing 12 is parallel to the wall, and the inner diameter of the housing 12 is slightly larger than the diameter of the impeller 13, so that the impeller 13 can rotate in the housing 12. The bearing part 14 includes an outer ring 28, a roller 29 and an inner shaft 30. The radius of the outer ring 28 is half of the radius of the impeller 13. The impeller 13 plays a blocking role on the rainwater entering the side of the bearing part 14, avoiding the rust and jamming of the bearing part 14, forming the first layer of protection. The length of the inner shaft 30 is greater than the width of the outer ring 28. A raceway is provided on the side surface of one end of the inner shaft 30, so the section of the inner shaft 30 with the raceway is equivalent to the inner ring. Preferably, the inner shaft 30 can also be set as a stepped shaft, including a shaft section 1 31 and a shaft section 2 32. A raceway is provided on the side surface of the shaft section 1 31 to form the inner ring of the bearing. The diameter of the shaft section 1 31 is greater than the diameter of the shaft section 2 32. When the outer ring 28, the roller 29 and the inner shaft 30 are installed, the bearing part 14 is formed, and the inner shaft 30 plays the role of both the shaft and the inner ring of the bearing. One side of the outer ring 28 is welded to the inner bottom surface of the housing 12, or the outer ring 28 is installed on the housing 12 by other commonly used fixed connection methods, and the other end of the inner shaft 30 is welded to the center position of the side surface of the impeller 13. Preferably, the outer surface of the outer ring 28 near the impeller 13 extends an annular shielding portion 33 in the axial direction, and the inner diameter of the shielding portion 33 is smaller than the diameter of the shaft section 1 31 and larger than the diameter of the shaft section 2 32. The shielding portion 33 protects the bearing rollers 29 and raceways, and can effectively prevent rainwater from entering the bearing, further preventing the bearing rollers 29 and raceways from rusting and jamming, and constitutes a second level of protection for the bearing. The bearing portion 14 has a certain starting critical force. With an initial rainfall thickness of 4 mm, a rainfall time of 10 min, and a catchment area of ​​200m for a single drainage pipe 2 2, the inner diameter of drain pipe 2 is 100mm, the inner diameter of waste pipe 10 is 50mm, and g is taken as 9.8N / kg as the basic condition; when the rainfall increases slowly, because the diameter of drain pipe 2 is larger than that of waste pipe 10, the drainage volume of waste pipe 10 is much smaller than that of drain pipe 2, so the rainwater slowly accumulates in drain pipe 2, so the critical condition for starting the bearing is that the rainwater accumulation height at drain pipe 2 is 1.2m. Because the rainwater flows in the water pipe, its center of gravity is its exact center, so its impact force on impeller 13 per second is half of its gravity, and because the rainwater can be regarded as uniformly distributed when it falls on impeller 13, so the effective force arm of the rainwater impact force on impeller 13 is half of the radius of impeller 13, and the force arm of the bearing starting force is the bearing radius, and the bearing radius is half of the radius of impeller 13, so the force arm of the bearing starting force is equal to the force arm of the rainwater impact force on impeller 13. According to the formula M=F·d and the critical condition M 冲 =M 启 , it is concluded that the bearing starting force is 34.64N, so only when the force accumulated by the water flow in the drain pipe 2 is greater than the starting force 34.64N required by the bearing, the impeller 13 can be driven to rotate, and then due to the centrifugal effect, the rainwater flows to the edge of the impeller 13 and finally gathers at the outlet of the drain pipe 2 below the impeller 13, and flows down along the drain pipe 2. The impeller 13 includes a wheel disc 15 and blades 16. A plurality of the blades 16 are evenly arranged on the surface of the wheel disc 15 in a circular shape around the axis of the wheel disc 15. The blades 16 can be welded to the wheel disc 15 or installed on the wheel disc 15 by other commonly used connection methods. The length of the blade 16 is less than the radius of the wheel disc 15, and the distance between one end and the outer edge of the wheel disc 15 is ≥0, and the distance between the other end and the axis of the wheel disc 15 is greater than the radius of the waste pipe 10. In actual operation, the distance between the blade 16 and the axis of the wheel disc 15 must be greater than the radius of the waste pipe 10 to prevent mutual interference. Since each blade 16 on the wheel disc 15 has a fixed distance from the axis of the wheel disc 15 , a circular space is formed at the axis of the wheel disc 15 for placing the waste flow pipe 10 .

[0037] Preferably, the waste flow pipe 10 includes an outer pipe section 34 and an inner pipe section 35. The waste flow pipe 10 is fixedly mounted on the housing 12. The inner pipe section 35 is located inside the housing 12, and the outer pipe section 34 is located outside the housing 12. Preferably, the inner pipe section 35 is semi-open, with an opening facing upward. It is located in the circular space at the axis of the impeller 13, and is close to the impeller 13 but independent of the impeller 13. It will not interfere with the impeller 13, and will not rotate with the rotation of the impeller 13. Such a design ensures that the initial rainwater flows smoothly into the waste flow pipe 10 along the blades 16 of the impeller 13, that is, the semi-open inner pipe section 35 can better collect rainwater. The outer pipe section 34 extending out of the shell 12 is a closed water pipe, which is connected to the sewage pipe 4. The entire waste flow pipe 10 is slightly tilted downward to form an angle of 15° with the horizontal plane, which allows rainwater entering the waste flow pipe 10 to flow smoothly in the waste flow pipe 10 under the action of its own gravity, thereby facilitating the introduction of initial rainwater into the sewage pipe 4.

[0038] Preferably, the blades 16 of the impeller 13 are S-shaped, which can eliminate part of the kinetic energy of rainwater, slow down the flow rate of rainwater, and facilitate the force on the impeller 13. When the blades 16 are straight, rainwater falls on the blades 16, which can be regarded as point contact, and the blades 16 are parallel to or at an angle to the falling direction of rainwater, so that the blades 16 are not subjected to force, or the force is much smaller than the impact force of rainwater, and the impeller 13 cannot be started well, resulting in excessive amount of abandoned rainwater, and it is impossible to separate and drain rainwater well. When an S-shaped blade 16 is used, the blade 16 has an arc segment. Regardless of whether the rainwater falls on the arch surface or the concave surface of the arc segment, the falling direction of the rainwater is almost perpendicular to the blade 16, and the contact area between the rainwater and the blade 16 is much larger than the contact area with the straight blade 16, which can slow down the flow rate of rainwater, reduce the kinetic energy of rainwater, and better bear force, so that the impeller 13 can be started well. When the impeller 13 is started, the design of the S-shaped blades 16 makes it easier for rainwater to gather at the edge of the impeller 13 under the action of centrifugal force, which can minimize the drainage of rainwater to the waste flow pipe 10 and improve the collection efficiency of rainwater in the drainage pipe 2.

[0039] Preferably, a full-flow energy storage device 5 is provided in the drainage pipe 2 at 8 m below the roof 1. The full-flow energy storage device 5 is fusedly connected to the drainage pipe 2, or other commonly used connection methods can be used. It is located below the impeller flow abandonment device 3, such as Figures 10 to 12As shown, the full-flow energy storage device 5 includes a fixing ring 17, an outer sleeve 18, a fixing ring 2 19, an inverted truncated cone funnel 20, an inner sleeve 21, a movable baffle 22, a spring 23, a support plate 24 and a support rod 25. The diameter of the inner sleeve 21 is smaller than the diameter of the outer sleeve 18, generally about one-half. The fixing ring 17 and the fixing ring 2 19 are fixedly connected at both ends of the outer sleeve 18. The fixing ring 1 17 and the fixing ring 2 19 can enhance the structural strength, so that the full-flow energy storage device 5 can work smoothly and prevent the high water column from causing a huge load on the full-flow energy storage device 5 and causing damage. The upper edge of the inverted truncated cone funnel 20 is fixedly connected to the inner surface of the upper edge of the outer sleeve 18, and the movable baffle 22 is arranged at the lower port of the inverted truncated cone funnel 20 and can cover the lower port. At least three radial reinforcing ribs 26 are arranged on the inner side of the fixing ring 19, and one end of all the reinforcing ribs 26 converge at the center of the fixing ring 19 to form a connection point. The overall structure of the fixing ring 19 and the reinforcing ribs 26 is similar to a steering wheel. The support rod 25 is vertically fixedly arranged at the connection point, which can also be understood as the support rod 25 and the reinforcing ribs 26 being an integrally formed vertical structure. The upper end of the support rod 25 is fixedly connected to the center of the support plate 24, and a spring 23 is fixedly connected to the center of the upper surface of the support plate 24. The upper end of the spring 23 is fixedly connected to the center of the lower end surface of the movable baffle 22. When the spring 23 is not subjected to force or is subjected to light force, it will press the movable baffle 22 tightly against the lower port of the inverted truncated cone funnel 20 to cover the lower port. The lower end of the inner sleeve 21 is fixedly connected to the support plate 24, which is equivalent to the lower bottom of the inner sleeve 21. The support plate 24 can be a filter plate structure (equivalent to evenly setting a number of filter holes on the support plate 24, not shown in the figure), and the inner sleeve 21 can adopt a grid structure (not shown in the figure). The filter plate structure of the support plate 24 and the grid structure of the inner sleeve 21 can be set separately or together. The inner diameter of the inner sleeve 21 is consistent with the diameter of the movable baffle 22, and the distance between its upper end surface and the lower port of the truncated cone funnel is less than the thickness of the movable baffle 22. In fact, the distance is generally half of the thickness of the movable baffle 22. The inner sleeve 21 is equivalent to a sliding sleeve, and the movable baffle 22 can only move up and down in the inner sleeve 21. The inner sleeve 21 is used to limit the horizontal displacement of the movable baffle 22 when the spring 23 is bent under force, which can ensure that the movable baffle 22 accurately covers the lower port of the inverted truncated cone funnel 20 when the spring 23 is reset. In actual operation, when the full-flow energy storage device 5 works normally, the spring 23 is in a compressed state, and according to the design, only when the rainwater height in the drain pipe 2 accumulates to 5 m relative to the movable baffle 22, the spring 23 will continue to be compressed, the movable baffle 22 moves down, and the rainwater flows out of the lower port of the inverted frustum-shaped funnel 20, passes through the fixed ring 2 19 and continues to flow downward in the drain pipe 2 until it impacts the hydro-generator 6, so that the hydro-generator 6 can generate electricity at full flow, thereby improving the power generation efficiency.In actual operation, the diameter of the movable baffle 22 is generally slightly smaller than the inner diameter of the inner sleeve 21. Therefore, rainwater will fall into the inner sleeve 21 along the edge of the movable baffle 22. If the rainwater is not drained, it will corrode the spring 23 over time and damage the full-flow energy storage device 5. In order to solve this problem, the support plate 24 is designed as a filter plate structure or the inner sleeve 21 is designed as a grid-like structure, so that the rainwater in the inner sleeve 21 can be drained and the spring 23 is protected. The full-flow energy storage device 5 in this solution uses a spring 23 baffle structure to block the funnel mouth. Only when the water column height in the drain pipe 2 is greater than 5 m, can rainwater pass through the full-flow energy storage device 5 and go down. Once the water column is less than 5 m, the funnel mouth is immediately blocked; and because the distance between the funnel mouth and the inner sleeve 21 is always consistent, the amount of rainwater that continues to flow down through the full-flow energy storage device 5 is always consistent, so as to ensure that the hydro-generator 6 can perform full-load power generation under the impact of uniform water flow and reduce the loss of the hydro-generator 6. Even if the inner sleeve 21 is set as a grid-like structure, the amount of rainwater that continues to flow down through the full-flow energy storage device 5 can always remain consistent.

[0040] Preferably, the power storage device 7 includes a rectifier 36, a battery 37 and a plurality of wires 38, the battery 37 is connected to the hydro-generator 6 via the wires 38, and the rectifier 36 is connected to the wires 38 and is located between the hydro-generator 6 and the battery 37. The connection circuit between the hydro-generator 6, the rectifier 36 and the battery 37 is a commonly used simple circuit, and the applicant has not made any improvements.

[0041] Preferably, the water reservoir 8 is arranged on the ground or under the ground, and an overflow pipe 11 is also arranged on the water reservoir 8 to prevent the water reservoir 8 from being oversaturated and blocking the drainage pipe 2. The existence of the water reservoir 8 can collect clean late rainwater for flushing toilets, washing cars, greening, road spraying, etc., reducing the pressure on the municipal pipe network, and at the same time, reducing the area of ​​urban rainwater inflow during heavy rains, reducing the occurrence of urban waterlogging, which also meets the construction requirements of sponge cities.

[0042] The working principle of this device is as follows: the impeller flow abandonment device 3 is located under the roof of the high-rise building and is connected to the roof 1 through the drainage pipe 2. The drainage pipe 2 introduces rainwater into the impeller flow abandonment device 3. Under normal circumstances, the rainfall is small in the early stage of rain, that is, the initial rain. The gravity of this part of rainwater is less than the force required to drive the impeller bearing to rotate. The impeller 13 does not move, and the rainwater flows into the flow abandonment pipe 10 in the center of the blade along the blade 16. After the initial rain, the rainfall becomes larger, that is, the later rain. The gravity of the rainwater is greater than the force required for the impeller 13 to rotate. The impeller 13 rotates. Due to the centrifugal effect, the rainwater is thrown onto the inner wall of the impeller flow abandonment device 3, and finally gathered together and flows into the next-level drainage pipe 2. The full-flow energy storage device 5 is located in the next-level drainage pipe 2 and is 8 m away from the roof. When the rainwater in the next-level drainage pipe 2 accumulates to a height of 5 m from the full-flow energy storage device, the rainwater will be released and flow into the power generation device to achieve full-flow power generation. The rainwater passing through the power generation device is finally stored in the reservoir 8.

[0043] Embodiment 1:

[0044] Take a residential area in a southern city as an example. The residential area has 30 floors and the water collection area on the roof of each building is about 400 m 2 , height H = 90 m, the full-flow energy storage device is located 8 m away from the roof, then the stop water level H1 = 82 m, that is, the power generation water level is 82 m. When the water level in the pipeline reaches the power generation water level, the full-flow energy storage device is turned on, the turbine generator starts to generate electricity, and the water level drops to the stop water level.

[0045] Theoretical economic benefits:

[0046] The height of each building is H=30*3=90 m;

[0047] The rooftop water collection area is approximately 400 m 2 ;

[0048] The annual rainfall in the region is 2067 mm;

[0049] One building can collect m = 2067*10-3*400*1000 = 826800 kg of water per year;

[0050] Among them, 20% of the flow was abandoned;

[0051] The final amount of rainwater collected and utilized in one year is 826800*(1-0.2)=661440 kg.

[0052] The full-flow energy storage device is set at a distance of 8 m from the roof, and the power generation water level H1 = 82 m;

[0053] Then the gravitational potential energy of rainwater that can be used in a year is E1=m·g·h=661440*9.8*82=531533184J;

[0054] The efficiency of the hydraulic generator converting mechanical energy into electrical energy is η=0.8;

[0055] The rainwater collected in a year can generate E2 = η·E1 = 531533184*0.8 = 425226547J;

[0056] That is 425226547J / (3600*1000)=118 kwh of electricity.

[0057] 661440 kg = 661.44 t of rainwater can be collected and utilized in one year;

[0058] Calculated based on the electricity fee of 0.6 yuan per kilowatt-hour;

[0059] A building can save 118*0.6=70.8 yuan in electricity bills per year;

[0060] Calculated at 3 yuan per ton of water;

[0061] A building can save 661.44*3=1984.3 yuan in water bills per year;

[0062] A building saves 70.8+1984.3=2055.1 yuan in water and electricity bills per year.

[0063] Theoretical cost:

[0064] A roof area of ​​400 m 2 , two sets of impeller flow rejection devices, two sets of full-flow energy storage devices, one set of power generation device and battery, and rectifier are set.

[0065] The cost of re-pipeline is 1.13*8*54.6*2=987 yuan;

[0066] Output wire 215*1=215 yuan;

[0067] Impeller flow rejection device 1500*2=3000 yuan;

[0068] Hydro-turbine generator 800*1=800 yuan;

[0069] Full flow energy storage device 300*2=600 yuan;

[0070] Battery 600*1=600 yuan;

[0071] Rectifier 198*1=198 yuan;

[0072] Installation fee is 70%, which is (987+215+3000+800+600+600+198)*0.7=4480 yuan;

[0073] The test fee is 10%, which is (987+215+3000+800+600+600+198)*0.1=640 yuan;

[0074] The initial installation costs (987+215+3000+800+600+600+198)*(1+0.7+0.1)=11520 yuan;

[0075] The life of the pipeline is 10 years, the life of the output wire is 10 years, the life of the impeller flow abandonment device is 10 years, the life of the turbine generator is 10 years, the life of the full-flow energy storage device is 5 years, the life of the battery is 2 years, and the life of the rectifier is 2 years;

[0076] That is, every 10 years, the pipeline network should be renovated once, the electric wires once, the impeller flow abandonment device once, the turbine generator once, the full-flow energy storage device twice, the batteries five times, and the rectifier five times.

[0077] Theoretical profit calculation:

[0078] (987*1+215*1+3000*1+800*1+600*2+600*5+198*5)*(1+0.7+0.1)= 18345.6 yuan;

[0079] The economic benefits a building can obtain in 10 years are 10*2055.1-18345.6=2205.4 yuan;

[0080] Assuming there are 10 buildings in a community, a community has 4000 m 2 Catchment area;

[0081] With 2hm 2 Calculation of catchment area;

[0082] That is, by utilizing 20000 / 4000=5 communities and 50 buildings, the direct economic benefit can be 50*2205.4=110270 yuan in 10 years.

[0083] The whole system includes three parts: first rain disposal, rain energy utilization and post-rainfall storage. First rain disposal distinguishes rainwater quality, reduces the pressure on sewage treatment plants, saves rainwater treatment costs and protects the water environment. Rain energy utilization generates electricity, reduces the burning of fossil fuels, saves energy and protects the environment. The rainwater collected in the reservoir is clean post-rainwater, which can be used for flushing toilets, washing cars, landscaping, road spraying, etc., saving water and reducing water bills. At the same time, during heavy rains, the reservoir's strong water storage capacity can effectively solve rainwater on the spot, reduce the area of ​​urban rainwater inflow, reduce the occurrence of urban waterlogging, and protect the lives and property of residents.

[0084] So far, the purpose of the present invention has been achieved.

[0085] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A fully automatic high-rise building rainwater separation and multi-stage utilization system, characterized in that: The invention comprises a roof, a drain pipe, an impeller flow abandonment device, a sewage pipe, a full-flow energy storage device, a hydro-generator, an electric storage device and a water reservoir. A filter screen is arranged on the roof drain outlet, the filter screen is flush with the roof and is located directly above the drain pipe. The drain pipe is connected to the impeller flow abandonment device. The impeller flow abandonment device is provided with a flow abandonment pipe, the diameter of the flow abandonment pipe is smaller than the diameter of the drain pipe, the flow abandonment pipe is connected to the sewage pipe, the full-flow energy storage device is installed on the drain pipe below the impeller flow abandonment device to ensure that the water flow that fills the pipe diameter impacts the hydro-generator. The hydro-generator generates electricity through the water flow that fills the pipe diameter and stores it in the electric storage device arranged next to it. The water flows through the water. The rainwater of the turbine generator is finally collected in the reservoir. The reservoir is also provided with an overflow pipe. The impeller flow abandonment device includes a housing, an impeller and a bearing part. One side of the bearing part is fixedly connected to the housing. The impeller is fixedly connected to the bearing part and can rotate in the housing. The impeller includes a wheel disc and S-shaped blades. A plurality of blades are evenly arranged on the wheel disc surface in a circular shape around the axis of the wheel disc, and the length of the blades is less than the radius of the wheel disc. A circular space is formed at the axis of the wheel disc for placing the flow abandonment pipe. The distance between the blades and the axis of the wheel disc is greater than the radius of the flow abandonment pipe. The flow abandonment pipe is close to the impeller but is independent of the impeller and does not interfere with each other. The full-flow energy storage device includes a fixing ring 1, an outer sleeve, a fixing ring 2, an inverted frustum cone funnel, an inner sleeve, a movable baffle, a spring, a support plate and a support rod. The fixing ring 1 and the fixing ring 2 are fixedly connected at both ends of the outer sleeve. The upper edge of the inverted frustum cone funnel is fixedly connected to the inner surface of the upper edge of the outer sleeve. The movable baffle is arranged at the lower port of the inverted frustum cone funnel and can cover the lower port. At least three radial reinforcing ribs are arranged on the inner side of the fixing ring 2. The support rod is vertically fixedly arranged on the fixing ring 2. At the connection point of the reinforcing rib at the center of the circle, the upper end of the support rod is fixedly connected to the center of the support plate, a spring is fixedly connected to the center of the upper surface of the support plate, the upper end of the spring is fixedly connected to the center of the lower end surface of the movable baffle, the spring presses the movable baffle tightly against the lower port of the inverted truncated cone funnel, covers the lower port, the lower end of the inner sleeve is fixedly connected to the support plate, the inner diameter of the inner sleeve is consistent with the diameter of the movable baffle, and the distance between its upper end surface and the lower port of the truncated cone funnel is less than the thickness of the movable baffle; The drainage pipe is vertically fixedly connected to the building wall through a horizontal pipe clamp, and the drainage pipe on the side close to the roof has an S-shaped pipe section.

2. The fully automatic high-rise building rainwater separation and multi-stage utilization system according to claim 1 is characterized in that: The bearing part includes an outer ring, a roller and an inner shaft. The radius of the outer ring is half of the radius of the impeller. The inner shaft is a stepped shaft, including shaft segment one and shaft segment two. A raceway is provided on the side of shaft segment one to constitute the inner ring of the bearing. One side of the outer ring is fixed to the inner bottom surface of the shell, and the other end of the inner shaft is installed at the center position of the side of the impeller. An annular shielding part is extended in the axial direction from the outer surface of the outer ring close to the impeller. The inner diameter of the shielding part is smaller than the diameter of shaft segment one and larger than the diameter of shaft segment two. The starting force of the bearing part is 34.64N.

3. The fully automatic high-rise building rainwater separation and multi-stage utilization system according to claim 1 is characterized in that: The jettison pipe is fixedly mounted on the shell and tilted downward to form an angle of 15° with the horizontal plane. It includes an outer pipe section and an inner pipe section. The inner pipe section is semi-open with an opening facing upward. It is located in a circular space at the axis of the impeller and is close to the impeller but independent of the impeller without interfering with it.

4. The fully automatic high-rise building rainwater separation and multi-stage utilization system according to claim 1 is characterized in that: The power storage device comprises a rectifier, a storage battery and a plurality of wires. The storage battery is connected to the hydro-generator through the wires. The rectifier is connected to the wires and is located between the hydro-generator and the storage battery.