A prefabricated steel tube truss reinforced node connection structure and installation method thereof

The node connection structure is strengthened through the prefabricated steel pipe truss, and components such as steel pipe columns, square pipe installation kits and compression angle steel are used to solve the problem of welding operations affecting the node strength of steel pipe truss, and the improvement of high strength, seismic resistance and safety performance is achieved. Simplifies the installation process and extends service life.

CN111424819BActive Publication Date: 2024-11-08CHINA THIRD METALLURGICAL GRP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202010284972.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-13
Publication Date
2024-11-08
Estimated Expiration
2040-04-13

AI Technical Summary

Technical Problem

The existing steel pipe truss node connection structure is easily affected by the proficiency of the welding personnel in welding operations, resulting in unstable structural strength and complex reinforcement methods, which cause cuts or weld damage to the main pipe, affecting aesthetics and safety.

Method used

The node connection structure is strengthened by prefabricated steel pipe trusses, through steel pipe columns, square pipe installation kits, installation angle steel, T-shaped steel, compression angle steel and other components, and the connection stability is enhanced by rubber sealing rings and cement mortar, and through oblique compression device and The locking bolts achieve a stable clamping state, reducing damage to the connecting angle steel and simplifying the installation process.

Benefits of technology

It improves the structural strength and seismic resistance of the steel pipe truss nodes, reduces the dependence on welding skills, enhances the stability and safety of the connection, and does not have residual welding stress, extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111424819B_ABST
    Figure CN111424819B_ABST
Patent Text Reader

Abstract

An assembled steel tube truss reinforced node connection structure and an installation method thereof, comprising a steel tube column, a square tube installation kit, an installation angle steel, a T-shaped steel, and a clamping angle steel, wherein a connection wing is fixed at the node installation position of the steel tube column, the square tube installation kit is fixed at the node installation position of the steel tube column and outside the connection wing, one side of the square tube installation kit is fixedly connected to the installation angle steel, the installation angle steel is movably connected to the T-shaped steel, the T-shaped steel is movably connected to the clamping angle steel, and the T-shaped steel and the clamping angle steel are clamped to connect the angle steel. The present invention provides an assembled steel tube truss reinforced node connection structure and an installation method thereof, which has the advantages of reducing damage to the main steel material and a relatively simple installation method, and solves the problem that the low proficiency of welding operators will affect the structural strength of the steel structure connection node.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building structure engineering, and in particular to an assembled steel pipe truss reinforced node connection structure and an installation method thereof. Background Art

[0002] In recent years, with the rapid development of large-span venues, ceilings, and platform structures, steel tube truss structures have been used more and more widely in engineering projects. For commonly used intersecting node trusses, since the radial stiffness of the node main pipe is much smaller than the axial stiffness of the branch pipe, and there is a large stress concentration and complex residual stress at the weld toe, the main pipe at the intersecting part is the most prone to damage. Following the principle of "strong node and weak rod", it is generally necessary to reinforce the main and branch pipe intersection parts of the truss node to improve the bearing performance of the pipe node. Commonly used reinforcement methods include built-in stiffening ring reinforcement, built-in plug-in reinforcement, local thickening reinforcement, pad reinforcement, ring plate reinforcement, and external stiffening rib reinforcement.

[0003] These reinforcement methods are relatively difficult to construct, and may cause cuts or weld damage to the main pipes, and affect the appearance of the structure. The steel structure connection nodes need to be connected to the steel columns and steel beams by means of weld connection, bolt connection, or a mixed connection of weld connection and bolt connection. In actual welding operations, the welding proficiency of the welding operators will affect the welding quality of the welds, and the welding quality of the welds will in turn affect the structural strength of the steel structure connection nodes. If the welding operators have low proficiency, it will affect the structural strength of the steel structure connection nodes. There is room for improvement in the existing technology. Summary of the invention

[0004] The present invention provides an assembled steel pipe truss reinforced node connection structure and an installation method thereof, which has the advantages of reducing damage to the main steel material and a relatively simple installation method, and solves the problem that the low operational proficiency of welding operators will affect the structural strength of the steel structure connection node.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] An assembled steel tube truss reinforced node connection structure includes a steel tube column, a square tube installation kit, an installation angle steel, a T-shaped steel, and a clamping angle steel. A connecting wing is fixed at the node installation position of the steel tube column. The square tube installation kit is fixed to the node installation position of the steel tube column and the outside of the connecting wing. One side of the square tube installation kit is fixedly connected to the installation angle steel. The installation angle steel is movably connected to the T-shaped steel. The T-shaped steel is movably connected to the clamping angle steel. The connecting angle steel is clamped between the T-shaped steel and the clamping angle steel.

[0007] It also includes an installation threaded rod, a right-angle steel clamp, and an oblique clamping device, wherein one end of the installation threaded rod is movably connected to the T-shaped steel, and the other end of the installation threaded rod is fixedly connected to the right-angle steel clamp. One end of the oblique clamping device is hinged to the right-angle steel clamp, and the other end of the oblique clamping device is hinged to the inner corner of the clamping angle steel.

[0008] Reinforcement plates are respectively fixed at the two ends of the inner angle of the clamping angle steel, a vertical plate is fixedly connected between the two reinforcement plates, and the vertical plate is hinged to the other end of the oblique clamping device.

[0009] One end of the oblique clamping device is hinged to one end of a mounting bolt through a rotating shaft, and the other end of the mounting bolt is movably connected to a right-angle steel clamp.

[0010] The right-angle steel clamp is provided with a connection and mounting hole with adjustable position, and the connection and mounting hole is used for connecting the mounting bolts.

[0011] The oblique pressing device comprises a supporting sleeve and a supporting rod. A pressing spring is fixedly connected inside the supporting sleeve, and one end of the pressing spring is fixedly connected to the supporting rod.

[0012] The installation angle steel is connected to the T-shaped steel through a connecting bolt; one end of the clamping angle steel is connected to the T-shaped steel through a connecting bolt, and the other end of the clamping angle steel is connected to the T-shaped steel through a locking bolt.

[0013] The square tube installation kit includes an installation square tube, an upper grouting pipe, a lower grouting hole, and a rubber sealing ring. The upper grouting pipe and the lower grouting hole are respectively arranged on two opposite sides of the installation square tube. The installation square tube is sleeved on the outside of the steel pipe column and the connecting wing. The rubber sealing ring is installed at the upper and lower ends of the installation square tube. Cement mortar is filled between the installation square tube and the steel pipe column and the connecting wing.

[0014] A method for installing an assembled steel tube truss reinforced node connection structure, comprising the following method:

[0015] 1) Put the installation square tube on the node installation position of the steel pipe column, press and install the rubber sealing ring on the upper and lower ends of the installation square tube, and inject the prepared cement mortar into the cavity between the steel pipe column and the installation square tube through the upper grouting pipe using a high-pressure grouting gun. When the slurry is discharged from the lower slurry outlet hole, use a rubber rod to block the lower slurry outlet hole;

[0016] 2) Assemble the installation angle steel and T-shaped steel through the connecting bolts, and then assemble the clamping angle steel to the T-shaped steel through the connecting bolts and locking bolts. Do not tighten the connecting bolts and locking bolts for the time being;

[0017] 3) Assemble the connecting right-angle steel clamp and the oblique clamping device, clamp the connecting angle steel between the T-shaped steel and the clamping angle steel, adjust the pre-clamping force of the oblique clamping device on the clamping angle steel through the connecting installation hole, and then adjust the installation position of the connecting angle steel, and then tighten the locking bolts and the connecting bolts to lock and fix the clamping angle steel, T-shaped steel and the installation angle steel;

[0018] 4) Adjust the position of the mounting bolts on the right-angle steel clamp so that the oblique clamping device can further apply clamping force to the clamping angle steel.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] 1) The assembled steel tube truss reinforced node connection structure is provided with a clamping angle steel, a T-steel and a connecting angle steel. The T-steel is locked with the clamping angle steel by a locking bolt. The right-angle steel clamp is clamped with the T-steel by installing a threaded rod. The clamping angle steel is locked with the right-angle steel clamp by an oblique clamping device, so that the connecting angle steel is firmly clamped between the clamping angle steel and the T-steel to form a stable clamping state, while reducing any damage to the connecting angle steel. The installation method is relatively simple and the installation is stable, which improves the durability of the connecting angle steel. The construction personnel do not need professional welding skills to carry out the installation of the steel tube column truss reinforced node, thereby improving the installation quality of the steel tube column truss reinforced node, and further achieving the purpose of improving the structural strength of the steel tube column truss reinforced node.

[0021] 2) The assembled steel tube truss reinforced node connection structure has a connection wing fixedly connected to the outer surface of the steel tube column through the arrangement of the steel tube column and the installation square tube. The connection wing and the space between the steel tube column and the installation square tube are filled with cement mortar. The connection wing increases the friction between the steel tube column and the installation square tube, ensuring the stability of the connection. The prepared cement mortar is injected into the cavity between the steel tube column and the installation square tube through the upper grouting pipe using a high-pressure grouting gun. When the slurry comes out of the lower slurry hole, the lower slurry hole is blocked with a rubber rod, thereby improving the filling efficiency of the cement mortar and enhancing the stability of the cement mortar after filling, so that the connection between the steel tube column and the installation square tube has good stability, high bearing capacity and good seismic performance. At the same time, there is no welding residual stress, thereby enhancing the overall safety performance of the steel tube truss node connection structure and extending its service life. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a schematic diagram of the installation structure of an assembled steel tube truss reinforced node connection structure of the present invention (without the oblique clamping device installed);

[0023] Figure 2 It is a structural schematic diagram of a prefabricated steel tube truss reinforced node connection structure of the present invention (without an oblique clamping device);

[0024] Figure 3 It is a side view of a prefabricated steel tube truss reinforced node connection structure of the present invention (with an oblique clamping device installed);

[0025] Figure 4 It is a structural schematic diagram of an oblique clamping device in a prefabricated steel tube truss reinforced node connection structure of the present invention;

[0026] Figure 5 It is a structural schematic diagram of a square tube installation kit in an assembled steel tube truss reinforced node connection structure of the present invention.

[0027] In the figure: 1. Steel pipe column; 2. Clamping angle steel; 3. Installing square pipe; 4. Installing angle steel; 5. Connecting bolts; 6. T-shaped steel; 7. Connecting angle steel; 8. Reinforcement plate; 9. Vertical plate; 10. Articulated shaft; 11. Oblique clamping device; 12. Installing bolts; 13. Right-angle steel clamp; 14. Locking bolt; 15. Installing threaded rod; 16. Connecting installation hole; 17. Rubber sealing ring; 18. Upper grouting pipe; 19. Lower grouting hole; 20. Connecting wing. DETAILED DESCRIPTION

[0028] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:

[0029] See Figure 1-Figure 5 A prefabricated steel tube truss reinforced node connection structure includes a steel tube column 1, a square tube installation kit, a mounting angle steel 4, a T-shaped steel 6, and a clamping angle steel 2. A connecting wing 20 is fixed at the node installation position of the steel tube column 1. The square tube installation kit is fixed to the node installation position of the steel tube column 1 and the outside of the connecting wing 20. One side of the square tube installation kit is fixedly connected to the mounting angle steel 4. The mounting angle steel 4 is movably connected to the T-shaped steel 6. The T-shaped steel 6 is movably connected to the clamping angle steel 2. A connecting angle steel 7 is clamped between the T-shaped steel 6 and the clamping angle steel 2.

[0030] It also includes an installation threaded rod 15, a right-angle steel clamp 13, and an oblique clamping device 11. One end of the installation threaded rod 15 is movably connected to the T-shaped steel 6, and the other end of the installation threaded rod 15 is fixedly connected to the right-angle steel clamp 13. One end of the oblique clamping device 11 is hinged to the right-angle steel clamp 13, and the other end of the oblique clamping device 11 is hinged to the inner corner of the clamping angle steel 2.

[0031] The installation threaded rod 15 passes through the T-shaped steel 6 and the installation angle steel 4 in sequence and is locked and fixed by nuts.

[0032] The two ends of the inner angle of the clamping angle steel 2 are respectively fixed with reinforcing plates 8, and a vertical plate 9 is fixedly connected between the two reinforcing plates 8. The vertical plate 9 is hinged to the other end of the oblique clamping device 11. A hinge shaft 10 is provided in the middle position of the vertical plate 9, and a hinge hole is provided at the other end of the oblique clamping device 11.

[0033] One end of the oblique clamping device 11 is hinged to one end of a mounting bolt 12 via a rotating shaft, and the other end of the mounting bolt 12 is movably connected to a right-angle steel clamp 13 .

[0034] The right-angle steel clip 13 is provided with an adjustable connection and installation hole 16, and the connection and installation hole 16 is used to connect the installation bolt 12. The connection and installation hole 16 can be an elongated hole or a plurality of through holes of different heights.

[0035] The oblique pressing device 11 includes a supporting sleeve and a supporting rod. A pressing spring is fixedly connected inside the supporting sleeve, and one end of the pressing spring is fixedly connected to the supporting rod.

[0036] The mounting angle steel 4 is connected to the T-shaped steel 6 via a connecting bolt 5 ; one end of the clamping angle steel 2 is connected to the T-shaped steel 6 via a connecting bolt 5 , and the other end of the clamping angle steel 2 is connected to the T-shaped steel 6 via a locking bolt 14 .

[0037] The square tube installation kit includes an installation square tube 3, an upper grouting pipe 18, a lower grouting hole 19, and a rubber sealing ring 17. The upper grouting pipe 18 and the lower grouting hole 19 are respectively arranged on two opposite sides of the installation square tube 3. The installation square tube 3 is sleeved on the outside of the steel pipe column 1 and the connecting wing 20. The rubber sealing ring 17 is installed at the upper and lower ends of the installation square tube 3. Cement mortar is filled between the installation square tube 3 and the steel pipe column 1 and the connecting wing 20.

[0038] There are four connecting bolts 5, two of which are close to the connecting angle steel 7 and penetrate the clamping angle steel 2, T-shaped steel 6 and the installation angle steel 4 in sequence, and the other two connecting bolts 5 are away from the connecting angle steel 7 and penetrate the T-shaped steel 6 and the installation angle steel 4 in sequence.

[0039] The right-angle steel clamp 13 is locked and fixed with the T-shaped steel 6 by installing the threaded rod 15 and the nut, and the pressing angle steel 2 is pressed with the right-angle steel clamp 13 by the oblique pressing device 11, so that the connecting angle steel 7 is firmly clamped between the pressing angle steel 2 and the T-shaped steel 6, forming a stable clamping state, while reducing any damage to the connecting angle steel 7. The installation method of the present invention is relatively simple and the installation is stable.

[0040] A method for installing an assembled steel tube truss reinforced node connection structure, comprising the following method:

[0041] 1) The installation square tube 3 is mounted on the node installation position of the steel pipe column 1, and the rubber sealing ring 17 is pressed and installed on the upper and lower ends of the installation square tube 3. The prepared cement mortar is injected into the cavity between the steel pipe column 1 and the installation square tube 3 through the upper grouting pipe 18 using a high-pressure grouting gun. When the lower grouting hole 19 is grouting, the lower grouting hole 19 is blocked with a rubber rod, thereby improving the filling efficiency of the mortar and enhancing the stability of the mortar after filling;

[0042] At the same time, the connecting wing 20 increases the friction between the steel pipe column 1 and the installation square pipe 3, ensuring the stability of the connection;

[0043] 2) Assemble the installation angle steel 4 and the T-shaped steel 6 through the connecting bolts 5, and then assemble the clamping angle steel 2 to the T-shaped steel 6 through the connecting bolts 5 and the locking bolts 14. Do not tighten the connecting bolts 5 and the locking bolts 14 for the time being;

[0044] 3) Assemble the connecting right-angle steel clamp 13 and the oblique clamping device 11, clamp the connecting angle steel 7 between the T-shaped steel 6 and the clamping angle steel 2, adjust the pre-clamping force of the oblique clamping device 11 on the clamping angle steel 2 through the connecting installation hole 16, and then adjust the installation position of the connecting angle steel 7, and then lock the locking bolt 14 and the connecting bolt 5, and lock and fix the clamping angle steel 2, the T-shaped steel 6 and the installation angle steel 4;

[0045] When installing the connecting angle steel 7, the connecting angle steel 7 can be temporarily clamped and positioned before being fixed by the pre-compression force of the oblique pressing device 11;

[0046] 4) Adjust the position of the mounting bolt 12 on the right-angle steel clamp 13 so that the oblique clamping device 11 can further apply clamping force to the clamping angle steel 2.

[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An assembled steel tube truss reinforced node connection structure, characterized in that: It comprises a steel pipe column (1), a square pipe installation kit, an installation angle steel (4), a T-shaped steel (6), and a clamping angle steel (2); a connecting wing (20) is fixed at the node installation position of the steel pipe column (1); the square pipe installation kit is fixed at the node installation position of the steel pipe column (1) and outside the connecting wing (20); one side of the square pipe installation kit is fixedly connected to the installation angle steel (4); the installation angle steel (4) is movably connected to the T-shaped steel (6); the T-shaped steel (6) is movably connected to the clamping angle steel (2); and a connecting angle steel (7) is clamped between the T-shaped steel (6) and the clamping angle steel (2); It also includes an installation threaded rod (15), a right-angle steel clamp (13), and an oblique clamping device (11), wherein one end of the installation threaded rod (15) is movably connected to the T-shaped steel (6), and the other end of the installation threaded rod (15) is fixedly connected to the right-angle steel clamp (13), one end of the oblique clamping device (11) is hinged to the right-angle steel clamp (13), and the other end of the oblique clamping device (11) is hinged to the inner corner of the clamping angle steel (2); One end of the oblique clamping device (11) is hinged to one end of a mounting bolt (12) via a rotating shaft, and the other end of the mounting bolt (12) is movably connected to a right-angle steel clamp (13); The square tube installation kit comprises an installation square tube (3), an upper grouting tube (18), a lower grouting hole (19), and a rubber sealing ring (17); the upper grouting tube (18) and the lower grouting hole (19) are respectively arranged on two opposite sides of the installation square tube (3); the installation square tube (3) is sleeved on the outside of the steel tube column (1) and the connecting wing (20); the rubber sealing ring (17) is installed at the upper and lower ends of the installation square tube (3); cement mortar is filled between the installation square tube (3) and the steel tube column (1) and the connecting wing (20).

2. The assembled steel tube truss reinforced node connection structure according to claim 1, characterized in that: Reinforcement plates (8) are fixed to the two ends of the inner corners of the clamping angle steel (2), a vertical plate (9) is fixedly connected between the two reinforcement plates (8), and the vertical plate (9) is hinged to the other end of the oblique clamping device (11).

3. The assembled steel tube truss reinforced node connection structure according to claim 1, characterized in that: The right-angle steel clamp (13) is provided with a connection and installation hole (16) with an adjustable position, and the connection and installation hole (16) is used for connecting the installation bolt (12).

4. An assembled steel tube truss reinforced node connection structure according to any one of claims 1 to 3, characterized in that: The oblique pressing device (11) comprises a supporting sleeve and a supporting rod; a pressing spring is fixedly connected inside the supporting sleeve; one end of the pressing spring is fixedly connected to the supporting rod.

5. The assembled steel tube truss reinforced node connection structure according to claim 1, characterized in that: The installation angle steel (4) is connected to the T-shaped steel (6) via a connecting bolt (5); one end of the clamping angle steel (2) is connected to the T-shaped steel (6) via a connecting bolt (5), and the other end of the clamping angle steel (2) is connected to the T-shaped steel (6) via a locking bolt (14).

6. A method for installing a prefabricated steel tube truss reinforced node connection structure according to any one of claims 1 to 5, characterized in that: The following methods are included: 1) The installation square tube (3) is mounted on the node installation position of the steel pipe column (1), and the rubber sealing ring (17) is pressed and installed on the upper and lower ends of the installation square tube (3). The prepared cement mortar is injected into the cavity between the steel pipe column (1) and the installation square tube (3) through the upper grouting pipe (18) using a high-pressure grouting gun. When the grout is discharged from the lower grouting hole (19), the lower grouting hole (19) is blocked with a rubber rod; 2) Assemble the installation angle steel (4) and the T-shaped steel (6) by means of the connecting bolts (5), and then assemble the clamping angle steel (2) to the T-shaped steel (6) by means of the connecting bolts (5) and the locking bolts (14). Do not tighten the connecting bolts (5) and the locking bolts (14) for the time being; 3) Assemble the connecting right-angle steel clamp (13) and the oblique clamping device (11), clamp the connecting angle steel (7) between the T-shaped steel (6) and the clamping angle steel (2), adjust the pre-clamping force of the oblique clamping device (11) on the clamping angle steel (2) through the connecting installation hole (16), then adjust the installation position of the connecting angle steel (7), and then tighten the locking bolt (14) and the connecting bolt (5), and lock and fix the clamping angle steel (2), the T-shaped steel (6) and the installation angle steel (4); 4) Adjust the position of the mounting bolt (12) on the right-angle steel clamp (13) so that the oblique clamping device (11) can further apply clamping force to the clamping angle steel (2).

Citation Information

Cited By

  • Key node structure of extra-large-span vertical turning steel truss

    CN223343428U