A modular combined pressurized emergency plugging tool and method
Through the modular combined compressed emergency leak plugging tool, the leak plugging module, elevated components and hydraulic tension-locking mechanism are used to solve the problem of easy breakage of the rope and poor leak plugging effect, achieving efficient and stable leakage Blocking, simplifying operation.
Patent Information
- Application Number
- CN202010561311.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-18
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-06-18
AI Technical Summary
When used, the existing bundled leak plugging tool is prone to breaking, the leak plugging effect is poor, and the operation is inconvenient, especially under the injection pressure of the leak media, it is difficult to maintain the position of the leak plug block.
Modular combined compressed emergency leak plugging tool, including leak plugging module, lifting component, sealing component and hydraulic tension-locking mechanism, and the height and sealing force of the leak plugging block are increased by quickly combining the structure and hydraulic system. The rope is evenly distributed with tension force to avoid sliding, and the push rod is driven by the hydraulic pump to achieve a tight fit of the plugged block.
It effectively avoids breakage of rope, improves leakage plugging effect, simplifies operation process, shortens sealing time, enhances control of leakage points, and ensures the stability of leakage plugging block under medium pressure.
Smart Images

Figure CN111577897B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of leak plugging devices, and in particular to a modular combined pressurized emergency leak plugging tool and method. Background Art
[0002] Pressurized tank trucks are the main mode of road transportation for hazardous chemicals. Due to factors such as rollover, rear-end collision, scratches, medium corrosion, welding defects, and damage to sealing materials, tank trucks are very likely to be damaged, causing leakage, combustion, and explosion accidents of hazardous chemicals, causing uncontrollable losses to people's lives and property. The cylinder is the main part of the tank truck that is damaged. In case of cylinder leakage accidents of pressurized tank trucks, firefighters generally use bundled plugging tools for emergency plugging. The bundled plugging tool is mainly composed of a plugging block (or plugging module), a rope (wire rope, binding belt), a rope tensioner-locker, a power source and its accessories, and its usage method is: first, press the plugging block tightly on the leaking part; secondly, bundle the rope to the cylinder, wherein one end of the rope is placed in the groove on the outer side of the plugging piece, and the other end is installed on the rope tensioner-locker; secondly, connect the power source and its accessories to the rope tensioner-locker, and then drive the power source to tighten the rope until there is no more leakage; finally, operate the rope tensioner-locker to limit the rope position, and remove the power source and its accessories.
[0003] The rope tensioning-locking mechanism and the leak-plugging module are key components of the bundled leak-plugging tool. In the prior art, the rope tensioning-locking mechanism needs to use a clamping screw to lock the rope. Therefore, when performing leak-plugging operations, it is necessary to use tools such as wrenches to repeatedly tighten or loosen the clamping screw, which is not only time-consuming but also easily causes the rope to break.
[0004] Secondly, the existing plugging block 110 has a groove on the outer end surface that matches the rope 500, and a plugging glue 330 or a sealing pad 320 is pasted on the inner end surface. Although this type of plugging block 110 can achieve emergency plugging in some leakage scenarios, there are still many shortcomings: First, the required height of the plugging block 110 is not considered. When the bundled plugging tool is working, in order to convert the tension of the rope 500 into compression force as much as possible, the angle θ (such as Figure 2 To achieve the above goal, there should be a certain height difference between the contact position between the plugging block 110 and the rope 500 and the leakage. In addition, affected by the cylinder attachment 410, some leakage points, such as leakage point B (such as Figure 2As shown in the figure, the plugging block 110 also needs to have a certain height when plugging the leak, so as to ensure that the rope 500 is in contact with the plugging block 110. Second, the rope 500 installed in the groove will slip when tightened, causing the plugging module to slide. Third, due to the lack of operating accessories, it is difficult for the operator to press the plugging block 110 against the leaking part under the pressure of the leaking medium.
[0005] It can be seen that how to avoid the breakage of the rope caused by locking and improve the plugging effect is the problem to be solved by the present invention. Summary of the invention
[0006] Aiming at the problem that the rope of the existing bundled leak-plugging tool is easy to break and the leak-plugging effect is poor when in use, the present invention provides a bundled leak-plugging tool and a use method thereof, which well solves the problems existing in the prior art.
[0007] In order to achieve the above-mentioned purpose, the modular combined pressurized emergency leak plugging tool provided by the present invention mainly includes: a leak plugging module and a rope tightening-locking mechanism; the rope tightening-locking mechanism and the leak plugging module are connected by a rope; the leak plugging module is composed of a leak plugging component, a heightening component and a sealing component, and the heightening component, the leak plugging component and the sealing component are arranged in sequence; the sealing component can be pressed on the leaking part of the cylinder under the action of the heightening component and the leak plugging component, thereby forming a seal; the rope tightening-locking mechanism includes a locking block, a tensioner, a hydraulic hose and its accessories and a manual hydraulic pump, which are arranged in sequence; the locking block includes a slider and a clamp; the slider is installed in the grooves on both sides of the locking block; the center of the clamp is provided with a rope threading channel and is installed on the mounting holes on both sides of the upper end surface of the locking block, which is used to manually fix the rope.
[0008] Furthermore, the plugging assembly mainly includes a plugging block, and a plurality of bearings are also arranged on the upper end surface of the plugging block; the distribution of the plurality of bearings on the upper end surface of the plugging block makes the pressing force of the rope on the plugging block evenly distributed.
[0009] Furthermore, the heightening component includes a heightening plugging block, and the lower end surface of the heightening plugging block is provided with a quick assembly structure that cooperates with the plugging block; the upper end surface of the heightening plugging block is also provided with a plurality of bearings; the distribution of the plurality of bearings on the upper end surface of the heightening plugging block makes the pressing force of the rope on the heightening plugging block evenly distributed; the heightening component also includes a heightening pad block group, and the heightening pad block group is composed of a plurality of heightening pad blocks combined by a quick assembly structure.
[0010] Furthermore, the sealing assembly includes a cushion block, a sealing gasket and a leak-proof adhesive, wherein the sealing gasket is arranged on the lower end surface of the cushion block; and the leak-proof adhesive is arranged on the lower end surface of the sealing gasket.
[0011] Furthermore, the upper and lower end surfaces of the heightened plugging block, heightened cushion block, plugging block, cushion block and sealing gasket are all provided with mutually cooperating quick assembly structures, and a quick-plug and quick-pull structure can be formed between the heightened plugging block and the heightened cushion block, between the heightened cushion block and the plugging block, between the plugging block and the cushion block, and between the cushion block and the sealing gasket through the quick assembly structure.
[0012] Furthermore, grooves are provided on the front, back, left and right four surfaces of the plugging block and the heightened plugging block; and a handle is also provided on the plugging block.
[0013] Furthermore, the side of the sliding block close to the locking block is an arc-shaped side surface, which cooperates with the locking block groove to form a slowly increasing transition circular arc curve rope threading channel.
[0014] Furthermore, the tensioner includes a push rod, a hydraulic cylinder, a quick connector, and a clamp; the hydraulic cylinder is installed in a mounting hole in the middle of the lower end surface of the tensioner and is connected to the push rod; the quick connector is arranged on the hydraulic cylinder body for connecting the hydraulic hose; the clamp is arranged on the mounting holes on both sides of the upper end surface of the tensioner, and a rope threading channel is provided in the center of the clamp.
[0015] Furthermore, the outer diameter of the push rod is consistent with the diameter of the central groove on the upper end surface of the locking block.
[0016] Furthermore, the center lines of the rope passages on both sides of the locking block and the tensioner are on the same line, so that the ropes of the leak-proof module and the tensioning-locking mechanism can horizontally pass through the center of the rope passage in sequence to connect the leak-proof module with the tensioning-locking mechanism.
[0017] Furthermore, the hydraulic hose and its accessories include several quick connectors, several stop valves, three-way valves and several hydraulic hoses; the parallel valve ports at both ends of the three-way valve are connected to the stop valve, and the valve port at the other end is connected to the hydraulic hose; the valves of the two stop valves are connected to the hydraulic hose; the quick connector is installed at the hydraulic hose interface, and is used to connect the hydraulic cylinder body and the manual hydraulic pump. When the hydraulic pump is driven, the hydraulic cylinder can move through the hydraulic pressure transmitted by the hydraulic hose, thereby driving the push rod.
[0018] Furthermore, the plurality of stop valve ports are respectively provided with knobs for controlling the extension length of the hydraulic cylinder push rod.
[0019] In order to achieve the above object, the method for using the plugging tool provided by the present invention comprises the following steps:
[0020] (1) Assemble the sealing components;
[0021] Glue the sealing glue to the lower end of the gasket; press the gasket into the pad to ensure that the upper end of the gasket is in contact with the bottom of the pad;
[0022] (2) Installing the sealing assembly;
[0023] Place the sealing assembly assembled in step (1) onto the lower end surface of the plugging block, ensuring that the upper end surface of the gasket is in contact with the bottom surface of the plugging block.
[0024] (3) Assemble the heightening components;
[0025] Insert the heightened plugging block into the two heightened pads and then into the plugging block, ensuring that the bottom surface of the heightened plugging block is in contact with the upper end surface of the plugging block;
[0026] (4) Leakage plugging;
[0027] Hold the handle of the plugging block tightly with both hands, align the plugging glue with the center of the leak, and press it to the leaking part;
[0028] (5) Rope setting;
[0029] Prepare two sets of locking blocks and tensioners, take a rope, wrap it around the cylinder, and install it on any bearing on both sides of the plugging block, then pass the head and tail of the rope through the rope passages on both sides of one set of locking blocks and tensioners respectively;
[0030] Place the locking block as close to the cylinder wall as possible, and then make the push rod end face of the tensioner contact the groove in the center of the upper end face of the locking block;
[0031] Tighten the jaws on both sides of the tensioner;
[0032] Take another rope, install it on the other side of the plugging block and wrap it around the cylinder, then pass the head and tail of the rope through the rope passages on both sides of another set of locking fasteners and tensioners;
[0033] Repeat steps (2) and (3);
[0034] (6) Manual hydraulic pump and its accessories;
[0035] Connect the hydraulic hose connected to the three-way valve to the quick plug on the manual hydraulic pump through the quick connector, and connect the other two hydraulic hoses connected to the stop valve to the quick connectors on the hydraulic cylinder bodies of the two sets of tensioners through the quick connectors; manually rotate the knob of the stop valve port according to the actual situation to adjust the extension length of the two hydraulic cylinder push rods;
[0036] (7) Locking operation;
[0037] Operate the handle of the manual hydraulic pump, and the hydraulic cylinder moves through the hydraulic pressure transmitted by the hydraulic hose, thereby driving the push rod to push the locking block to move toward the plugging block until the plugging block contacts the leaking part of the cylinder tank wall;
[0038] Continue to operate the handle of the manual hydraulic pump until the cylinder of the hydraulic cylinder is fully extended. At this time, the distance between the locking block and the tensioner reaches the maximum value, and the rope is also in a tightened state. At this time, the plugging glue on the plugging block is closely attached to the leaking part;
[0039] Tighten the clamping jaws on both sides of the locking block, and then remove the manual hydraulic pump;
[0040] (8) Repeated plugging;
[0041] If the leak has been sealed, unscrew the clamp on the tensioner, and then cut the rope at any position between the tensioner and the locking block to complete the entire leak blocking work;
[0042] If the leak is not completely blocked, unscrew the clamp on the tensioner and drive the manual hydraulic pump to reset the push rod of the hydraulic cylinder;
[0043] Repeat (7)-(8) to tighten and seal the leak until there is no more leakage.
[0044] The modular combined pressurized emergency plugging tool and method provided by the present invention avoids the problem of easy breakage of the rope and improves the plugging effect by arranging clamps on the rope tensioning-locking mechanism and increasing the height of the plugging block. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0046] Figure 1 This is a schematic diagram of the main structure of the leak-blocking module used in the emergency leak-blocking tool in this example;
[0047] Figure 2 This is a structural diagram of the emergency plugging tool in this example when the plugging module is working;
[0048] Figure 3 This is a schematic diagram of the main structure of the rope locking-tensioning module for the emergency plugging tool in this example;
[0049] Figure 4 It is a schematic diagram of the main structure of the hydraulic hose and its accessories in this example;
[0050] Figure 5 This is a schematic diagram of the main structure of the manual hydraulic pump in this example. DETAILED DESCRIPTION
[0051] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below with reference to specific diagrams.
[0052] In order to solve the technical problems existing in the existing bundled plugging tools, this example provides a modular combined pressurized emergency plugging tool, which includes a plugging module and a rope tensioning-locking mechanism. The rope tensioning-locking mechanism and the plugging module are arranged in coordination, and the plugging module is brought close to the leaking place. The plugging block is pressed against the leaking place of the cylinder through the push of the rope tensioning-locking mechanism, thereby forming a seal.
[0053] like Figure 1 As shown, the leak-plugging module for the emergency leak-plugging tool provided in this example mainly includes: a leak-plugging component 100, a heightening component 200 and a sealing component 300, wherein the heightening component 200 is arranged on the leak-plugging component 100, and is used to increase the height of the leak-plugging block 110 and reduce the angle between the rope and the leak-plugging block 110; the sealing component 300 is arranged on the lower end surface of the leak-plugging component 100, and is used to cooperate with the leak-plugging component 100 and the heightening component 200 to seal the leakage of the cylinder.
[0054] The leak-blocking assembly 100 is used to press and block the leaking part of the cylinder, and mainly includes a leak-blocking block 110 .
[0055] The plugging block 110 is used to press and plug the leaking part of the cylinder, and a plurality of evenly distributed bearings 111 are embedded in the upper end surface thereof, which are used to place the ropes and evenly arrange them on the upper end surface of the plugging block 110 .
[0056] With such arrangement, the tensioning force of the rope can be more effectively converted into a compressive force through the bearing 111, and the compressive force is always perpendicular to the plugging block; secondly, it can also effectively avoid the slippage of the plugging block 110 caused by the rope tensioning operation.
[0057] As an example, three pairs of bearings are selected as an example here, and a pair of bearings are respectively set in the middle and at both ends of the plugging block 110 to ensure that the force on the plugging block 110 is balanced and does not cause the rope to slide due to uneven force.
[0058] Since the three pairs of bearings have the same settings, one pair is selected here for detailed introduction, and the others are not described in detail.
[0059] When the bearing 111 is specifically set, it can be set on the upper end surface of the plugging block 110 through the connecting bolt 113, and the connecting bolt 113 is set on the plugging block 110 through the fixing bolt 114.
[0060] The lower end surface of the plugging block 110 is provided with a quick assembly structure for forming a quick plug-in structure with the sealing assembly 300 .
[0061] The sealing assembly 300 specifically includes a gasket 310 , a sealing gasket 320 and a leak-proof adhesive 330 .
[0062] The spacer block 310 is used to increase the height of the leak-proof block 110, so as to better convert the tensioning force of the rope into a compressive force.
[0063] In the specific configuration, the cushion block 310 may adopt an inverted step structure, the purpose of which is to transfer the compression force borne by the plugging block 110 to the sealing gasket 320 in a more concentrated manner, thereby achieving more effective plugging.
[0064] The upper and lower end surfaces of the cushion block 310 are also provided with quick assembly structures respectively, and the quick assembly structure of the upper end surface is used to cooperate with the quick assembly structure of the lower end surface of the plugging block 110 to form a quick plug and pull structure setting.
[0065] In order to prevent the sealing glue 330 from overflowing during implementation, a sealing gasket 130 may be provided on the lower end surface of the cushion block 310 .
[0066] The upper and lower end surfaces of the sealing gasket 320 are respectively provided with quick assembly structures, and the quick assembly structure of the upper end surface is used to cooperate with the quick assembly structure of the lower end surface of the cushion block 310 to form a quick plug-in and quick pull-out structural setting.
[0067] The sealing glue 330 is arranged on the lower end surface of the sealing gasket 320. The sealing glue 330 here has extremely strong elastic deformation. Under the compression force transmitted by the sealing gasket 320, the sealing glue 330 will be in close contact with the leakage port, thereby achieving sealing.
[0068] It should be noted here that the shape of the leak-proof glue 330 can be set according to the different shapes of the leak points.
[0069] At the same time, the quick assembly structure of the sealing gasket 320 and the lower end surface of the cushion block 310 can also be matched and arranged according to the shape of the sealing glue 330.
[0070] Such a structure can enable the sealing assembly 300 to achieve a better sealing effect when performing leak plugging work.
[0071] At the same time, a plurality of slot structures are also provided on the cushion block 310, which can reduce the weight of the entire leak-proof module on the one hand, and facilitate grasping on the other hand.
[0072] Furthermore, handles 112 are provided at the left and right ends of the plugging block 110, respectively, so that under the injection pressure of the leaking medium, the operator can press the plugging block 110 against the leaking part to facilitate the subsequent tightening-locking operation.
[0073] As an example, the sealing assembly 300 here can be used in a selected combination according to actual needs in a specific application.
[0074] (1) The plugging glue 330 may be selected and set on the lower end surface of the plugging block 110;
[0075] (2) It is also possible to select a leak-proof glue to be set on the lower end surface of the cushion block 310, and the cushion block 310 and the leak-proof block 110 are connected and set by a quick assembly structure;
[0076] (3) The plugging glue 330 may also be set on the lower end surface of the sealing gasket 320, and the sealing gasket 320 and the plugging block 110 are connected and set by a quick assembly structure;
[0077] (4) Alternatively, the sealing glue 330 is disposed on the lower end surface of the sealing gasket 320, and the sealing gasket 320 and the cushion block 310, and the cushion block 310 and the sealing block 110 are all connected and disposed via a quick assembly structure.
[0078] In addition to the above structure, this example is further provided with a heightening component 200 for heightening the plugging block 110, so that the tension of the rope is more effectively converted into a compression force, reducing the angle between the rope and the plugging block 110, thereby achieving effective sealing.
[0079] The heightening component 200 here mainly includes a heightening plugging block 220. The structure of the heightening plugging block 220 may be the same as or different from the structure of the plugging block 110. The structure that is the same as the plugging block 110 will not be described in detail here.
[0080] In specific applications, the structure of the heightened plugging block 220 may also be different from the structural setting of the plugging block 110. Its specific width may be narrower than the plugging block 110, and its upper end surface may also be provided with the same bearing assembly as that on the plugging block 110. Such a setting can make the tensioning force of the rope be transmitted to the plugging block 110 more concentratedly.
[0081] At the same time, a heightening block 230 is also provided on the lower end surface of the heightening plugging block 220 for raising the height of the plugging block 110 so that the tensioning force of the rope can be transmitted to the plugging block 110 in a more concentrated manner.
[0082] In the specific setting, the heightening block 230 can be fixedly set on the lower end surface of the heightening plugging block 220; or the heightening block 230 can be connected to the heightening plugging block 220 through a quick combination structure to form a quick plug and pull structure.
[0083] Furthermore, the heightening block 230 and the leak-blocking block 110 also form a quick-insertion and quick-extraction structure through a quick assembly structure.
[0084] It should be noted here that the heightened plugging block 220 and the plugging block 110 can be used independently to plug the leaking parts with limited operating space.
[0085] In specific applications, a heightened pad block group 210 may be further provided between the heightened plugging block 220 and the plugging block 110 . The heightened pad block group 210 may transfer the compression force borne by the heightened plugging block 220 to the plugging block 110 more evenly.
[0086] Specifically, the heightening pad group 210 is composed of a plurality of heightening pads 211 connected in sequence, and each heightening pad 211 is provided with a quick assembly structure on the upper and lower end surfaces, which is used to cooperate between different heightening pads or with other heightening pads to form a quick plug-in and quick pull-out structure.
[0087] The quick assembly structure of the uppermost heightening block of the heightening block group 210 is used to cooperate with the quick assembly structure of the lower end surface of the heightening block 230 on the heightening plugging block 220 to form a quick plug-in and quick pull-out structure.
[0088] The quick assembly structure of the lowermost heightening block of the heightening block group 210 is used to cooperate with the quick assembly structure of the upper end surface of the plugging block 110 to form a quick plug-in and quick pull-out structure.
[0089] The number of heightening pads 211 can be set according to actual needs and is not specifically limited here.
[0090] Furthermore, when the plugging block 110 and the heightened plugging block 220 are specifically set, grooves can be provided on the four faces of the front, back, left and right sides. On the one hand, this reduces the overall weight of the plugging module, and on the other hand, it is convenient for operators to grasp, which is beneficial for operation and carrying.
[0091] Based on the above solution, this example also gives a specific implementation case:
[0092] Embodiment 1:
[0093] Various combinations of using the plugging block 110 and the sealing assembly 300 alone are suitable for a case where the diameter of the cylinder is small. Using the plugging block 110 alone can form a smaller angle between the rope and the plugging block 110, and the pressing force of the rope on the plugging block 110 is also greater.
[0094] Embodiment 2:
[0095] Various combinations of the heightened plugging block 220 and the sealing assembly 300 are used alone. This situation is suitable for a larger diameter of the cylinder. Using the heightened plugging block 220 alone can also form a smaller angle between the rope and the plugging block 110. At this time, the pressing force of the rope on the heightened plugging block 220 is also greater.
[0096] Embodiment three:
[0097] Various combinations of heightened plugging block 220, connection setting of plugging block 110 and sealing assembly 200 are suitable for cylinder with larger diameter. The combination of heightened plugging block 220 and connection setting of plugging block 110 can form a smaller angle between the rope and the plugging block 110. At this time, the rope can form a greater pressing force on the plugging block 110 by heightening the plugging block 220.
[0098] Embodiment 4:
[0099] Various combinations of heightened plugging block 220, heightened plugging pad 210, plugging block 110 connection settings and sealing assembly 200 are suitable for a cylinder with a large diameter. Only by using a combination of heightened plugging block 220, heightened plugging pad 210, plugging block 110 connection settings can a smaller angle be formed between the rope and the plugging block 110. At this time, the rope can form a greater pressing force on the plugging block 110 by heightening the plugging block 220.
[0100] The plugging module provided in this solution can be used to quickly combine the plugging block 110, the heightened cushion block group 210, the heightened plugging block 220, and the sealing assembly 300 according to actual needs, thereby increasing the height of the plugging module, which increases the clamping force on the one hand and expands the scope of application on the other.
[0101] The tensioning and locking mechanism includes a locking block 600 , a tensioner 700 , a hydraulic hose and its accessories 800 , and a manual hydraulic pump 900 .
[0102] For details, see Figure 3 The locking block 600 includes two sliders 601 and two clamps 602. Grooves are provided on both sides of the locking block 600, and the two sliders 601 are respectively installed in the grooves on both sides of the locking block 600 by fixing screws. In addition, the side of the slider 601 close to the groove is an arc-shaped side surface, which cooperates with the groove of the locking block 600 to form a circular arc curve rope threading channel 603, and the other side is also symmetrically matched with the rope threading channel 603 with the same structure, which effectively avoids stress concentration in the rope threading channel 603 when tightening, makes the rope tension more uniform, and avoids breakage. When the locking block 600 is plugging a leak, the lower end surface is in direct contact with the leaking part.
[0103] Furthermore, mounting holes are provided on both sides of the upper end surface of the locking block 600 for installing the clamp 602, and a rope passage 603 is provided in the center of the clamp 602. Preferably, the surfaces of the locking block 600 and the tensioner 700 are designed to be easy to grasp. For example, some grooves can be provided on the surface of the locking block 600 to increase the friction between the fingers and the locking block 600, while also further reducing its own weight.
[0104] The tensioner 700 includes a push rod 701 , a hydraulic cylinder 702 , a quick connector 703 , a clamping claw 704 and a rope threading channel center line 705 .
[0105] A mounting hole is provided in the middle of the lower end surface of the tensioner 700, and the hydraulic cylinder 702 is mounted on the lower end surface of the tensioner 700 by means of fixing bolts. A quick connector 703 is provided on the cylinder body of the hydraulic cylinder 702. A push rod 701 is provided at one end of the hydraulic cylinder 702 facing the locking block 600, and the outer diameter of the push rod 701 is consistent with the diameter of the central groove on the upper end surface of the locking block 600. Mounting holes are provided on both sides of the upper end surface of the tensioner 700 for mounting the clamping jaws 704, and a rope threading channel 705 is provided in the center of the clamping jaws 704.
[0106] The center lines of the rope passages on both sides of the locking block 600 and the tensioner 700 are on the same line, ensuring that the rope can pass through the center of the rope passage horizontally in sequence; secondly, the clamping claw can be manually unscrewed or tightened to achieve the loosening and locking of the rope, which is convenient for the operator to use, and the rope can be used repeatedly without breaking.
[0107] See also Figure 4 The hydraulic hose and its accessories 800 include three quick connectors 801, two knobs 803, two stop valves 802, a three-way valve 804 and three hydraulic hoses. The valve ports at both ends of the three-way valve 804 are respectively connected to a stop valve 802, the other valve port of the three-way valve 804 is connected to a hydraulic hose 805, and the valves of the two stop valves are respectively connected to a hydraulic hose 806 and a hydraulic hose 807.
[0108] Furthermore, the ports of the two stop valves 802 are respectively provided with knobs 803, and the extension lengths of the two-way hydraulic cylinder push rods 701 can be controlled by manually rotating the knobs 303, thereby indirectly adjusting the tensioning force applied to the rope.
[0109] See also Figure 5 The manual hydraulic pump 900 is composed of a quick connector 901 and a handle 902. The hydraulic hose 305 is installed in the quick connector 901 of the manual hydraulic pump 900 through the quick connector. The other two hydraulic hoses in the hydraulic hose and its accessories 800 are connected to the quick connectors 703 on the cylinder bodies of the hydraulic cylinders 702 of the two sets of tensioners through the quick connectors 801. The mechanism can drive the two tensioners 700 to work synchronously with only one manual hydraulic pump 900 through the hydraulic hose and its accessories 800, solving the problem of plugging failure caused by the slippage of the plugging block due to tightening one rope first.
[0110] In view of the setting scheme of the bundled plugging tool given above, a method for using the plugging tool is further provided here, and its specific operation includes the following steps:
[0111] (1) Assemble the sealing components;
[0112] Stick the sealing glue to the lower end surface of the sealing gasket; press the sealing gasket into the cushion block to ensure that the upper end surface of the sealing gasket is in contact with the bottom surface of the cushion block.
[0113] (2) Installing the sealing assembly;
[0114] Place the sealing assembly assembled in step (1) onto the lower end surface of the plugging block, ensuring that the upper end surface of the gasket is in contact with the bottom surface of the plugging block.
[0115] (3) Assemble the heightening components;
[0116] Insert the heightened plugging block into the two heightened pads respectively, and then insert it into the plugging block, ensuring that the bottom surface of the heightened plugging block is in contact with the upper end surface of the plugging block.
[0117] (4) Leakage plugging;
[0118] Hold the handle on the plugging block tightly with both hands, align the plugging glue with the center of the leak, and press it to the leaking part.
[0119] (5) Rope setting;
[0120] Prepare two sets of locking blocks and tensioners, take a rope, wrap it around the cylinder, and install it on any bearing on both sides of the plugging block, then pass the head and tail of the rope through the rope passages on both sides of one set of locking blocks and tensioners respectively;
[0121] Place the locking block as close to the cylinder wall as possible, and then make the push rod end face of the tensioner contact the groove in the center of the upper end face of the locking block;
[0122] Tighten the jaws on both sides of the tensioner;
[0123] Take another rope, install it on the other side of the plugging block and wrap it around the cylinder, then pass the head and tail of the rope through the rope passages on both sides of another set of locking fasteners and tensioners;
[0124] Repeat steps (2) and (3).
[0125] (6) Manual hydraulic pump and its accessories;
[0126] Connect the hydraulic hose connected to the three-way valve to the quick plug on the manual hydraulic pump through a quick connector. Connect the other two hydraulic hoses connected to the stop valve to the quick connectors on the hydraulic cylinder bodies of the two sets of tensioners through quick connectors. According to the actual situation, manually rotate the knob of the stop valve port to adjust the extension length of the two hydraulic cylinder push rods.
[0127] (7) Locking operation;
[0128] Operate the handle of the manual hydraulic pump, and the hydraulic cylinder moves through the hydraulic pressure transmitted by the hydraulic hose, thereby driving the push rod to push the locking block to move toward the plugging block until the plugging block contacts the leaking part of the cylinder tank wall;
[0129] Continue to operate the handle of the manual hydraulic pump until the cylinder of the hydraulic cylinder is fully extended. At this time, the distance between the locking block and the tensioner reaches the maximum value, and the rope is also in a tightened state. At this time, the plugging glue on the plugging block is closely attached to the leaking part to seal it;
[0130] Tighten the clamping jaws on both sides of the locking block and remove the hand hydraulic pump.
[0131] (8) Repeated plugging;
[0132] If the leak has been sealed, unscrew the clamp on the tensioner, and then cut the rope at any position between the tensioner and the locking block to complete the entire leak blocking work;
[0133] If the leak is not completely blocked, unscrew the clamp on the tensioner and drive the manual hydraulic pump to reset the push rod of the hydraulic cylinder;
[0134] Repeat (7)-(8) to tighten and seal the leak until there is no more leakage.
[0135] The present invention provides a modular combined pressurized emergency plugging tool and method, which has the following advantages:
[0136] (1) The plugging tool increases the height of the plugging module by quickly combining the plugging component, the heightening component and the sealing component, and more effectively converts the tensioning force of the rope into a compression force and transmits it to the plugging glue, thereby achieving effective plugging.
[0137] (2) The plugging tool embeds a bearing on the upper end surface of the plugging module, so that the tensioning force of the rope is more effectively converted into a compression force, and the compression force is always perpendicular to the plugging block, and can also effectively prevent the plugging block from sliding when the rope is tightened.
[0138] (3) The plugging tool is provided with a handle on the plugging block, so that the operation is more convenient. Under the pressure of the leaking medium, the operator can press the plugging block on the leaking part, which is convenient for the subsequent tightening-locking operation.
[0139] (4) The rope threading channel of the plugging tool is a slowly increasing transition arc curve, which can avoid stress concentration when the rope is tightened and make the rope tension more uniform.
[0140] (5) The leak plugging tool does not require a wrench, and the clamp can be manually locked and released on the rope. The operation is simple, effectively shortening the plugging time of the leak and preventing the rope from breaking.
[0141] (6) The plugging tool can drive two tensioners to work simultaneously with only one manual hydraulic pump, thus solving the problem of plugging failure caused by slipping of the plugging block due to tightening one rope first.
[0142] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A modular combined pressurized emergency plugging tool, comprising: A leak-plugging module and a rope tensioning-locking mechanism; the rope tensioning-locking mechanism and the leak-plugging module are connected by a rope; it is characterized in that the leak-plugging module comprises a leak-plugging component, a heightening component and a sealing component, and the heightening component, the leak-plugging component and the sealing component are arranged in sequence; the sealing component can be pressed against the leaking part of the cylinder under the action of the heightening component and the leak-plugging component, thereby forming a seal; the rope tensioning-locking mechanism comprises a locking block, a tensioner, a hydraulic hose and its accessories and a manual hydraulic pump, which are arranged in sequence; The locking block comprises a slider and a clamping claw; the slider is installed in the grooves on both sides of the locking block; a rope threading channel is provided in the center of the clamping claw and is installed on the mounting holes on both sides of the upper end surface of the locking block for manually fixing the rope; the tensioner comprises a push rod, a hydraulic cylinder, a quick connector and a clamping claw; the hydraulic cylinder is installed in the mounting hole in the middle of the lower end surface of the tensioner and connected to the push rod; the quick connector is arranged on the hydraulic cylinder body for connecting the hydraulic hose; the clamping claw is arranged on the mounting holes on both sides of the upper end surface of the tensioner, and a rope threading channel is provided in the center of the clamping claw; The plugging assembly mainly includes a plugging block, and a plurality of bearings are also arranged on the upper end surface of the plugging block; the distribution of the plurality of bearings on the upper end surface of the plugging block makes the pressing force of the rope on the plugging block evenly distributed; The heightening component includes a heightening plugging block, and the lower end surface of the heightening plugging block is provided with a quick assembly structure that cooperates with the plugging block; the upper end surface of the heightening plugging block is also provided with a plurality of bearings; the distribution of the plurality of bearings on the upper end surface of the heightening plugging block makes the pressing force of the rope on the heightening plugging block evenly distributed; the heightening component also includes a heightening pad block group, and the heightening pad block group is composed of a plurality of heightening pad blocks combined by a quick assembly structure.
2. A modular combined pressurized emergency plugging tool according to claim 1, characterized in that: The sealing assembly comprises a cushion block, a sealing pad and a leak-proof adhesive. The sealing pad is arranged on the lower end surface of the cushion block; and the leak-proof adhesive is arranged on the lower end surface of the sealing pad.
3. A modular combined pressurized emergency plugging tool according to claim 2, characterized in that: The upper and lower end surfaces of the heightened plugging block, heightened cushion block, plugging block, cushion block and sealing gasket are all provided with mutually cooperating quick assembly structures, and a quick plug and pull structure can be formed between the heightened plugging block and the heightened cushion block, between the heightened cushion block and the plugging block, between the plugging block and the cushion block, and between the cushion block and the sealing gasket through the quick assembly structure.
4. A modular combined pressurized emergency plugging tool according to claim 1, characterized in that: The plugging block and the heightened plugging block are also provided with grooves on the four surfaces of front, back, left, and right; and the plugging block is also provided with a handle.
5. The modular combined pressurized emergency plugging tool according to claim 1 is characterized in that: The slider Close One side of the locking block is an arc-shaped side surface, which cooperates with the locking block groove to form a slowly increasing transition arc curve rope threading channel.
6. The modular combined pressurized emergency plugging tool according to claim 1, characterized in that: The outer diameter of the push rod is consistent with the diameter of the central groove on the upper end surface of the locking block.
7. The modular combined pressurized emergency plugging tool according to claim 1, characterized in that: The locking block and the center lines of the rope passages on both sides of the tensioner are on the same line, so that the ropes of the leak-proof module and the tensioning-locking mechanism can horizontally pass through the center of the rope passage in sequence to connect the leak-proof module with the tensioning-locking mechanism.
8. The modular combined pressurized emergency plugging tool according to claim 1, characterized in that: The hydraulic hose and its accessories include several quick connectors, several stop valves, three-way valves and several hydraulic hoses; the parallel valve ports at both ends of the three-way valve are connected to the stop valve, and the valve port at the other end is connected to the hydraulic hose; the valves of the two stop valves are connected to the hydraulic hose; the quick connector is installed at the hydraulic hose interface, and is used to connect the hydraulic cylinder body and the manual hydraulic pump. When the hydraulic pump is driven, the hydraulic cylinder can move through the hydraulic pressure transmitted by the hydraulic hose, thereby driving the push rod.
9. A modular combined pressurized emergency plugging tool according to claim 8, characterized in that: The ports of the plurality of stop valves are respectively provided with knobs for controlling the extension length of the hydraulic cylinder push rod.
10. A method for using the modular combined pressurized emergency plugging tool according to any one of claims 1 to 9, characterized in that: The method for using the plugging tool comprises the following steps: (1) Assemble the sealing components; Glue the sealing glue to the lower end of the gasket; press the gasket into the pad to ensure that the upper end of the gasket is in contact with the bottom of the pad; (2) Install the sealing assembly; Place the sealing assembly assembled in step (1) on the lower end surface of the plugging block, ensuring that the upper end surface of the gasket is in contact with the bottom surface of the plugging block; (3) Assemble the heightening components; Insert the heightened plugging block into the two heightened pads and then into the plugging block, ensuring that the bottom surface of the heightened plugging block is in contact with the upper end surface of the plugging block; (4) Leakage plugging; Hold the handle of the plugging block tightly with both hands, align the plugging glue with the center of the leak, and press it to the leaking part; (5) Rope setting; Prepare two sets of locking blocks and tensioners, take a rope, wrap it around the cylinder, and install it on any bearing on both sides of the plugging block, then pass the head and tail of the rope through the rope passages on both sides of one set of locking blocks and tensioners respectively; Place the locking block as close to the cylinder wall as possible, and then make the push rod end face of the tensioner contact the groove in the center of the upper end face of the locking block; Tighten the jaws on both sides of the tensioner; Take another rope, install it on the other side of the plugging block and wrap it around the cylinder, then pass the head and tail of the rope through the rope passages on both sides of another set of locking fasteners and tensioners; Repeat steps (2) and (3); (6) Manual hydraulic pump and its accessories; Connect the hydraulic hose connected to the three-way valve to the quick plug on the manual hydraulic pump through the quick connector, and connect the other two hydraulic hoses connected to the stop valve to the quick connectors on the hydraulic cylinder bodies of the two sets of tensioners through the quick connectors; manually rotate the knob of the stop valve port according to the actual situation to adjust the extension length of the two hydraulic cylinder push rods; (7) Locking operation; Operate the handle of the manual hydraulic pump, and the hydraulic cylinder moves through the hydraulic pressure transmitted by the hydraulic hose, thereby driving the push rod to push the locking block to move toward the plugging block until the plugging block contacts the leaking part of the cylinder tank wall; Continue to operate the handle of the manual hydraulic pump until the push rod on the hydraulic cylinder is fully extended. At this time, the distance between the locking block and the tensioner reaches the maximum value, and the rope is also in a tightened state. At this time, the plugging glue on the plugging block is tightly attached to the leaking part; Tighten the clamping jaws on both sides of the locking block, and then remove the manual hydraulic pump; (8) Repeated plugging; If the leak has been sealed, unscrew the clamp on the tensioner, and then cut the rope at any position between the tensioner and the locking block to complete the entire leak blocking work; If the leak is not completely blocked, unscrew the clamp on the tensioner and drive the manual hydraulic pump to reset the push rod of the hydraulic cylinder; Repeat (7)-(8) to tighten and seal the pipe until there is no leakage.