A bolt ball node grid structure seismic support and hanger
By designing the bolt ball node grid anti-seismic supports and hangers in the grid structure, and using the combination of cross arms, upper chord balls, connecting supports and anti-seismic hinges, the problem that the grid structure cannot be installed with anti-seismic supports is solved, and the roof panel is realized The effective seismic resistance and load requirements are met, ensuring the stability and aesthetics of the structure.
Patent Information
- Application Number
- CN202010914141.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-02
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing grid structure cannot effectively install seismic brackets, resulting in insufficient thickness of the roof panels to withstand seismic loads, and increasing the load will cause excessive deflection of the rods, affecting the stability of the overall structure.
A bolt ball node grid structure seismic support and hanger is designed, including cross arms, upper string balls, connecting supports, anti-seismic hinges, steel wire ropes and buckles. The supports and ball nodes are connected through bolts and fixed by wire ropes and buckles. , ensuring the stability and aesthetics of the bracket while meeting the load requirements.
It is possible to provide seismic brackets for roof panels without affecting the overall stress and aesthetics, meet the load requirements of different electromechanical pipeline installation situations, effectively transmit seismic forces, reduce the inclination and deflection of the roof, and improve structural stability.
Smart Images

Figure CN112066084B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the installation of an anti-seismic support for electromechanical pipelines, and in particular to an anti-seismic support and hanger bracket of a bolt ball node grid structure. Background Art
[0002] Grid structures have emerged in large numbers in my country since the 1980s due to their novel structure, reasonable force, light weight, and low steel consumption. They are widely used in large stadiums, exhibition centers, theaters, shopping malls, etc. Grid roof panels are usually thin and cannot withstand seismic loads. At the same time, if additional loads are added to the grid rods, the deflection of the grid rods will be too large, affecting the overall structure of the grid. However, various electromechanical pipelines must be used during the use of the building, so a safe and reliable seismic support solution is needed. Summary of the invention
[0003] The purpose of the present invention is to overcome the defect that the existing grid structure cannot be installed with seismic brackets, and to provide a bolt ball node grid structure seismic support and hanger to solve the problem that the bolt ball node grid structure cannot effectively install seismic brackets.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0005] A bolt-ball node grid structure seismic support and hanger, comprising a cross arm and an upper chord ball, the top of the cross arm is provided with a plurality of upper chord balls, the bottom end of each of the upper chord balls is provided with a connecting support, the bottom end of the connecting support is provided with a second seismic hinge, both ends of the cross arm are provided with a first seismic hinge, the first seismic hinge is fixedly connected with a basket bolt, the end of the basket bolt away from the first seismic hinge is provided with a wire rope, both ends of the wire rope are fixedly connected with a plurality of wire rope buckles, the end of the wire rope close to the cross arm is fixedly connected with a basket bolt, the wire rope is inserted in the first seismic hinge, and the end of the wire rope buckle away from the basket bolt is inserted in the second seismic hinge, two connecting screw rods are symmetrically arranged on the cross arm, the two connecting screw rods both penetrate the cross arm, the two connecting screw rods are threadedly connected to the cross arm, and the top and bottom ends of each connecting screw rod are threadedly connected to a channel steel support plate.
[0006] Furthermore, a bolt hole is drilled at the bottom end of the upper chord ball, and a connecting bolt matching the bolt hole is provided at the bottom of the upper chord ball, and the connecting support and the upper chord ball are fixedly connected by the connecting bolt.
[0007] Furthermore, one end of the steel wire rope close to the upper chord ball is inserted into the second seismic hinge and fixedly connected by multiple steel wire rope buckles, and one end of the steel wire rope close to the cross arm is inserted into the first seismic hinge and fixedly connected by multiple steel wire rope buckles.
[0008] Furthermore, one end of the steel wire rope close to the cross arm is fixedly connected to the flower basket bolt.
[0009] Furthermore, the first anti-seismic hinge is fixedly connected to the cross arm, the second anti-seismic hinge is fixedly connected to the connecting support, and the first anti-seismic hinge and the cross arm, and the second anti-seismic hinge and the connecting support are all detachable connections.
[0010] Furthermore, two steel wire ropes are fixedly connected to both ends of the cross arm, and the two steel wire ropes are both arranged in a horizontal direction.
[0011] The present invention connects the connecting support with the bolt ball node by bolts, which will not affect the stress of the overall grid, solves the problem that the roof of the existing bolt ball node grid structure cannot be installed with seismic brackets, and at the same time does not cause damage to the structure of the roof of the bolt ball node grid, thereby ensuring the aesthetics of the overall grid and meeting the load requirements of the roof of the bolt ball node grid. Through the installation method of the connecting bolts at the lower end of the bolt ball, the seismic bracket can meet the different conditions of various electromechanical pipeline installations. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0013] Figure 1 It is a front view schematic diagram of the present invention;
[0014] Figure 2 is a top view of the present invention;
[0015] Figure 3 It is an expanded diagram of the present invention;
[0016] Figure 4 It is a detailed diagram of the bolt-ball connection in the present invention;
[0017] Figure 5 This is a detailed diagram of the cross arm connection in the present invention. DETAILED DESCRIPTION
[0018] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0019] The reference numerals in the figure drawings in the specification include: connecting support 1, connecting bolt 2, first seismic hinge 3, wire rope 4, wire rope buckle 5, basket bolt 6, channel steel support plate 7, connecting screw rod 8, cross arm 9, upper chord ball 10, lower chord ball 11, second seismic hinge 12.
[0020] like Figure 1-5As shown, a bolt ball node grid structure seismic support and hanger comprises a cross arm 9 and an upper chord ball 10. A plurality of upper chord balls 10 are arranged on the top of the cross arm 9. A connecting support 1 is arranged at the bottom end of each upper chord ball 10. A second seismic hinge 12 is arranged at the bottom end of the connecting support 1. A first seismic hinge 3 is arranged at both ends of the cross arm 9. A flower basket bolt 6 is fixedly connected to the first seismic hinge 3. A steel wire rope 4 is arranged at one end of the flower basket bolt 6 away from the first seismic hinge 3. Both ends of the steel wire rope 4 are There are multiple wire rope buckles 5 fixedly connected, one end of the wire rope 4 close to the cross arm 9 is fixedly connected with a basket bolt 6, the wire rope 4 is inserted in the first seismic hinge 3, and the end of the wire rope buckle 5 away from the basket bolt 6 is inserted in the second seismic hinge 12, and two connecting screw rods 8 are symmetrically arranged on the cross arm 9, the two connecting screw rods 8 both pass through the cross arm 9, and the two connecting screw rods 8 are both threadedly connected to the cross arm 9, and the top and bottom ends of each connecting screw rod 8 are threadedly connected to a channel steel support plate 7.
[0021] A bolt hole is drilled at the bottom end of the upper chord ball 10, and a connecting bolt 2 matching the bolt hole is provided at the bottom of the upper chord ball 10. The connecting support 1 and the upper chord ball 10 are fixedly connected by the connecting bolt 2. The end of the wire rope 4 close to the upper chord ball 10 is inserted into the second seismic hinge 12 and fixedly connected by multiple wire rope buckles 5. The end of the wire rope 4 close to the crossarm 9 is inserted into the first seismic hinge 3 and fixedly connected by multiple wire rope buckles 5. The end of the wire rope 4 close to the crossarm 9 is fixedly connected to the basket bolt 6. The first seismic hinge 3 is fixedly connected to the crossarm 9, and the second seismic hinge 12 is fixedly connected to the connecting support 1. The first seismic hinge 3 and the crossarm 9, the second seismic hinge 12 and the connecting support 1 are all detachable connections. Two wire ropes 4 are fixedly connected to both ends of the crossarm 9, and the two wire ropes 4 are 90 degrees in the horizontal direction.
[0022] Working principle:
[0023] Firstly, since the crossarm 9 and the first seismic hinge 3, the second seismic hinge 12 and the connecting support 1 are connected by bolts, they can be adjusted according to the on-site conditions. It is also convenient to add connection nodes and repair and replace various components. The two ends of the crossarm 9 are connected to the upper chord ball 10 by wire ropes 4. Four wire ropes 4 fix the four directions of the crossarm 9 respectively. During installation, the wire ropes 4 are first fixed by wire rope buckles 5, and then the force on the four sides is fine-tuned by anti-loosening and tightening the basket bolts 6 to ensure that the crossarm 9 is level, so that the four sides of the crossarm 9 can be evenly stressed, and it is not easy for the crossarm 9 to tilt to one side, thereby affecting the stability of the overall structure. The crossarm 9 and the electromechanical pipelines are fixedly connected by various connectors, such as P-type clamps, bridge frame adapters, etc., so that the earthquake force can be transferred from The seismic force is transmitted to the crossarm 9 on the electromechanical pipeline. At this time, the seismic force can be transmitted to the upper chord ball 10 through the steel wire ropes 4 on the four sides of the crossarm 9. Since the transmitted seismic force is mainly achieved by applying tension to the crossarm 9 through the steel wire ropes 4 in the opposite direction of the seismic force, the displacement of the crossarm 9 is prevented, and the seismic force can be transferred, thereby achieving the shock absorption effect. In different electromechanical installation situations, crossarms 9 of different specifications can be selected. Since the first seismic hinge 3 and the crossarm 9, the second seismic hinge 12 and the connecting support 1 are all detachable connections, they can be adjusted according to the on-site conditions. At the same time, it is also convenient to add connection nodes and repair and replace various components. By installing multiple spaced seismic brackets on the electromechanical pipeline through the above structure, the seismic force generated by the electromechanical pipeline can be effectively transmitted.
[0024] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A bolt ball node grid structure seismic support and hanger, Features: The invention comprises a cross arm (9) and an upper chord ball (10), wherein a plurality of upper chord balls (10) are arranged on the top of the cross arm (9), a connecting support (1) is arranged at the bottom end of each upper chord ball (10), a second anti-seismic hinge (12) is arranged at the bottom end of the connecting support (1), a first anti-seismic hinge (3) is arranged at both ends of the cross arm (9), a basket bolt (6) is fixedly connected to the first anti-seismic hinge (3), a steel wire rope (4) is arranged at one end of the basket bolt (6) away from the first anti-seismic hinge (3), and a plurality of steel wire ropes are fixedly connected to both ends of the steel wire rope (4). The buckle (5) is fixedly connected to the end of the steel wire rope (4) close to the cross arm (9) with a basket bolt (6), the steel wire rope (4) is inserted into the first anti-seismic hinge (3), and the end of the steel wire rope buckle (5) away from the basket bolt (6) is inserted into the second anti-seismic hinge (12), and two connecting screw rods (8) are symmetrically arranged on the cross arm (9), and the two connecting screw rods (8) both penetrate the cross arm (9), and the two connecting screw rods (8) are both threadedly connected to the cross arm (9), and the top and bottom ends of each connecting screw rod (8) are threadedly connected to a channel steel support plate (7); A bolt hole is drilled at the bottom end of the upper chord ball (10), and a connecting bolt (2) matching the bolt hole is provided at the bottom of the upper chord ball (10), and the connecting support (1) and the upper chord ball (10) are fixedly connected by the connecting bolt (2); One end of the steel wire rope (4) close to the upper ball (10) is inserted into the second anti-seismic hinge (12) and is fixedly connected via a plurality of steel wire rope buckles (5); and one end of the steel wire rope (4) close to the cross arm (9) is inserted into the first anti-seismic hinge (3) and is fixedly connected via a plurality of steel wire rope buckles (5); The first anti-seismic hinge (3) is fixedly connected to the cross arm (9), and the second anti-seismic hinge (12) is fixedly connected to the connecting support (1); the first anti-seismic hinge (3) and the cross arm (9), and the second anti-seismic hinge (12) and the connecting support (1) are all detachable connections.
2. The bolt ball node grid structure seismic support and hanger according to claim 1, Features: One end of the steel wire rope (4) close to the cross arm (9) is fixedly connected to the turnbuckle bolt (6).
3. The bolt ball node grid structure seismic support and hanger according to claim 1, Features: Two steel wire ropes (4) are fixedly connected to both ends of the cross arm (9), and the two steel wire ropes (4) are arranged at 90 degrees in the horizontal direction.
Citation Information
Patent Citations
Anti-seismic support hanger of bolt-sphere joint net rack structure
CN212775915U