Multi-source data monitoring method, device and electronic equipment

Through projection tracking method, a main database is established, which solves the problems of low efficiency and high storage pressure in multi-source data monitoring, and realizes efficient data supply and storage management.

CN112069364BActive Publication Date: 2024-11-22BEIJING GUODIANTONG NETWORK TECH CO LTD +5
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202010759952.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-31
Publication Date
2024-11-22
Estimated Expiration
2040-07-31

AI Technical Summary

Technical Problem

In the prior art, multi-source data monitoring has problems such as low data operation efficiency and excessive load on the monitoring hardware storage space. Users need to perform secondary screening of a large amount of secondary data and redundant data, resulting in reduced efficiency and increased storage pressure.

Method used

The projection tracking method is used to classify multi-source data, construct high-dimensional data and project it into low-dimensional subspace, determine the contribution rate and weight vector of multi-source data, establish the main database, provide supply data according to monitoring commands and user needs, and reduce the Saving and transfer of redundant data.

Benefits of technology

It effectively reduces the existence of redundant data in the process of filtering multi-source data, improves data operation efficiency, reduces the load on the monitoring hardware storage space, and provides a flexible data supply mode to improve user experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112069364B_ABST
    Figure CN112069364B_ABST
Patent Text Reader

Abstract

One or more embodiments of the present application provide a multi-source data monitoring method, device and electronic device, including: obtaining multi-source data; establishing a main database based on the projection tracking method and multi-source data; receiving a monitoring command, and determining the supply data based on the monitoring command, multi-source data and the main database; sending the supply data to the user end to monitor the supply data. The present invention effectively screens out the main data from the data to be monitored by establishing a main database, and eliminates a large amount of secondary data and redundant data with low relevance mixed in the monitored data, thereby improving the data operation efficiency, only saving the data in the main database, and avoiding the problem of excessive load on the monitoring hardware storage space caused by saving all multi-source data, reducing hardware costs, and improving the economic efficiency of operation and maintenance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] One or more embodiments of the present application relate to the field of data monitoring technology, and in particular, to a multi-source data monitoring method, device, and electronic device. Background Art

[0002] The existing technology for monitoring multi-source data is to monitor all multi-source data. A large amount of secondary data and data with low relevance are mixed in the monitored data, requiring users to perform secondary screening, which reduces data operation efficiency and creates a large load on the monitoring hardware storage space. Summary of the invention

[0003] In view of this, the purpose of one or more embodiments of the present application is to propose a multi-source data monitoring method, device and electronic device to solve the problems of low data operation efficiency and excessive load on monitoring hardware storage space in the prior art.

[0004] Based on the above objectives, one or more embodiments of the present application provide a multi-source data monitoring method, including:

[0005] Acquire data from multiple sources;

[0006] Establishing a main database based on the projection pursuit method and the multi-source data;

[0007] receiving a monitoring command, and determining supply data based on the monitoring command, multi-source data, and a main database;

[0008] The supply data is sent to a user end to monitor the supply data.

[0009] Optionally, the establishing of a main database based on the projection pursuit method and the multi-source data includes:

[0010] Constructing high-dimensional data {s(i,j...n)} using the multi-source data, where i,j...n represent different multi-source data;

[0011] Based on the projection pursuit method, the high-dimensional data {s(i,j...n)} is projected into a low-dimensional subspace {s(i)} to construct a projection index function f(s(i)) and an objective function library {f object}={f1,f2,...f n}, where f1,f2,...f n represents the alternate objective function;

[0012] The contribution rate of the multi-source data is obtained according to the global optimization algorithm, the projection index function and the target database Among them, s(m) represents the optimal projection value of the projection index function, a i Represents any multi-source data,

[0013] Determine the weight vector {η} of the multi-source data according to the contribution rate of the multi-source data s(m)}={η1,η2,...η n}, where η1,η2,...η n Represents n different multi-source data weights;

[0014] The multi-source data with the top five weights in the weight vector of the multi-source data are selected to determine the main data, and the main database is established according to the main data.

[0015] Optionally, the monitoring command includes: monitoring data type and supply mode; the monitoring data type includes at least: equipment basic data, equipment operation data and energy management data; the supply mode includes: default data supply mode, all data supply mode and custom data supply mode.

[0016] Optionally, the receiving the monitoring command and determining the supply data based on the monitoring command, multi-source data and a main database includes:

[0017] Receiving the monitoring command sent by the user terminal;

[0018] When the supply mode is the default data supply mode, the main database is called, and the supply data is determined through the main database according to the type of monitored data.

[0019] Optionally, also include:

[0020] When the supply mode is the full data supply mode, the main database is first called to obtain the main data, and then all data related to the monitoring data type except the main data is obtained according to the multi-source data to determine the supply data.

[0021] Optionally, also include:

[0022] When the supply mode is a user-defined data supply mode, the main database is first called to obtain the main data, and then the user-selected data is obtained from the multi-source data according to the monitoring data type to determine the supply data.

[0023] Optionally, also include:

[0024] The authenticity, accuracy and reliability of the supplied data are analyzed according to the multi-source data, and the supplied data is packaged.

[0025] Optionally, also include:

[0026] receiving feedback information from the user terminal according to the supplied data;

[0027] A secondary data analysis is provided based on the feedback information.

[0028] Based on the same inventive concept, one or more embodiments of the present application further propose a multi-source data monitoring device, including:

[0029] an acquisition module, configured to acquire multi-source data;

[0030] An establishing module configured to establish a main database based on a projection pursuit method and the multi-source data;

[0031] a determination module configured to receive a monitoring command and determine supply data based on the monitoring command, multi-source data and a main database;

[0032] The monitoring module is configured to send the supply data to a user terminal to monitor the supply data.

[0033] Based on the same inventive concept, one or more embodiments of this specification also propose an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that the processor implements any of the methods described above when executing the program.

[0034] From the above, it can be seen that one or more embodiments of the present application provide a multi-source data monitoring method, device and electronic device. First, multi-source data is obtained; then, a main database is established based on the projection pursuit method and the multi-source data, and the main data determined is the most important multiple data for the data type that the user needs to monitor, thereby avoiding the user's secondary screening of the multi-source data, and avoiding the redundant data that may appear in the process of the user screening the multi-source data. Only the main data is saved, which can effectively reduce the load on the monitoring hardware storage space; after receiving the monitoring command, the supply data is determined based on the monitoring command, the multi-source data and the main database, and a selection port is provided for users with different needs. The user can select a database of different modes to select the required monitoring data, thereby improving the data operation efficiency; finally, the supply data is sent to the user end to monitor the supply data. By determining the main data, the user's screening of multi-source data and the redundant data that may appear in the screening process are reduced, and only the determined main data is saved to establish a multi-mode database, thereby improving the data operation efficiency and reducing the load on the monitoring hardware storage space. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate one or more embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only one or more embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0036] Figure 1 A flowchart of a multi-source data monitoring method in one or more embodiments of the present application;

[0037] Figure 2 A schematic diagram of a process for establishing a main database based on a projection pursuit method in one or more embodiments of the present application;

[0038] Figure 3 A schematic diagram of a multi-source data monitoring device in one or more embodiments of the present application;

[0039] Figure 4 Schematic diagram of an electronic device in one or more embodiments of the present application. DETAILED DESCRIPTION

[0040] In order to make the objectives, technical solutions and advantages of the present disclosure more clearly understood, the present disclosure is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.

[0041] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in one or more embodiments of the present application should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in one or more embodiments of the present application do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "include" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0042] One or more embodiments of the present application provide a multi-source data monitoring method, device, and electronic device.

[0043] The inventor has found through research that multi-source data monitoring is a commonly used data monitoring system in the prior art, but the multi-source data monitoring of the prior art has the characteristics of "large and complete". Although the prior art can fully grasp the multi-source data, it has objective problems such as low data operation efficiency, strict requirements for monitoring hardware storage space and high equipment cost. This has caused various problems in the user monitoring process, such as a large amount of secondary data and redundant data are mixed in the main data that the user needs to monitor, requiring the user to perform secondary screening, which reduces the data operation efficiency. When the user needs to monitor the working status of a transformer, the monitoring data that the user wants to obtain at this time is the location information, voltage, current and operating temperature of the transformer and other related information, while other redundant information such as the meteorological information of the location of the transformer does not need to be monitored, but the monitoring method of the prior art will monitor all multi-source data, without distinguishing the main data, which will cause the redundant data to be sent to the user end as the main data, so that the user end needs to screen the received data again, and because multiple data including redundant data are saved, the pressure on the monitoring hardware storage space is increased, so the monitoring method in the prior art has the problems of low data operation efficiency and excessive load on the monitoring hardware storage space.

[0044] refer to Figure 1 Therefore, one or more embodiments of the present application provide a multi-source data monitoring method, comprising the following steps:

[0045] S101 obtains multi-source data.

[0046] In this embodiment, according to the data that needs to be monitored in different fields and by different users, multi-source data with different data sources, different spatial data standards, and different data models are collected. As an optional embodiment, taking a transformer as an example, the multi-source data obtained includes at least: temperature information, voltage, current, load, rated capacity, no-load current, no-load loss, and location, etc.

[0047] S102 establishes a main database based on the projection pursuit method and the multi-source data.

[0048] In this embodiment, it is necessary to classify the data that the user may monitor, and use the projection pursuit method to classify the application of multi-source data. As an optional embodiment, taking the transformer as an example, when the user needs to monitor the safe operation of the transformer, information such as temperature information, voltage, current and load information should be the main data, while information such as rated capacity, no-load current, no-load loss and location should be relatively secondary data; when the user needs to monitor the layout status of the transformer, information such as rated capacity, no-load current, no-load loss and location should be the main data, while information such as temperature information, voltage, current and load information should be relatively secondary data.

[0049] As an optional embodiment, refer to Figure 2 According to the projection pursuit method, multi-source data and parameters are used to construct high-dimensional data and then classify the data that users need to monitor. Different multi-source data and parameters constitute different high-dimensional vectors. Multi-source data is obtained based on the data in the high-dimensional vector, and the high-dimensional vector is projected into a low-dimensional subspace. Different projection rules will obtain different low-dimensional point sets. By optimizing the index, the projection index function is maximized, and the projection direction that best reflects the high-dimensional set is obtained. Specifically, the following steps are included:

[0050] S201 constructs high-dimensional data using multi-source data.

[0051] Multi-source data are used to construct high-dimensional data {s(i,j...n)}, where i,j...n represent different multi-source data.

[0052] S202 projects the high-dimensional data into a low-dimensional subspace to construct a projection index function and an objective function library.

[0053] Based on the projection pursuit method, the high-dimensional data {s(i,j...n)} is projected into the low-dimensional subspace {s(i)} to construct the projection index function f(s(i)) and the target function library {f object}={f1,f2,...f n}, where f1,f2,...f n represents the backup objective function, each of which corresponds to a different optimization index. For example, f1 represents the fastest configuration speed, f2 represents the lowest configuration cost, and f n It indicates that the configuration has the best effect. According to the different data that users need to monitor, different backup objective functions are selected for optimization to achieve single-objective optimization of the data that users are most concerned about, so as to achieve the effect of selecting the best from the best. The process of constructing the projection index function is solved by using the existing projection pursuit method, which will not be repeated here.

[0054] According to the data that the user needs to monitor, select a suitable backup objective function as the optimization objective function.

[0055] S203 determines the contribution rate of the multi-source data according to the global optimization algorithm, the projection index function and the target database.

[0056] A variety of global optimization algorithms are uniformly evaluated to find the most suitable algorithm, including genetic algorithm, simulated annealing and harmony search. Different algorithms are then used to solve the optimal projection value of the projection function. The main evaluation functions include convergence speed, number of iterations and calculation result evaluation. The specific algorithm is determined according to the existing projection pursuit method. However, based on the projection pursuit method, it is necessary to select the backup objective function according to the different data that the user needs to monitor.

[0057] The contribution rate of multi-source data is obtained based on the global optimization algorithm, projection index function and target database Among them, s(m) represents the optimal projection value of the projection index function, a i Represents any multi-source data, The optimal projection value of the projection index function is solved using the existing projection pursuit method.

[0058] S204 determines the top five multi-source data in the weight vector of the multi-source data according to the contribution rate of the multi-source data to determine the main data.

[0059] Determine the weight vector {η} of multi-source data according to the contribution rate of multi-source data s(m)}={η1,η2,...η n}, where η1,η2,...η n Represents n different multi-source data weights;

[0060] The weights of different multi-source data are sorted from high to low, and the multi-source data with the top five weights in the weight vector of the multi-source data are selected to determine the main data.

[0061] S205: Establish a main database according to the main data.

[0062] As an optional embodiment, according to the different data that the user needs to monitor, the objective function that the user is most concerned about is selected from multiple backup objective functions. At the same time, multiple backup objective functions are not selected as objective functions, because multi-objective optimization cannot completely ensure convergence. Therefore, the backup objective function that the user is most concerned about is selected as the objective function for single-objective optimization, and other backup objective functions need to be taken into account as constraints. For the configuration projected to the low-dimensional subspace, a projection index function is used to describe the possibility of the projection exposing the classification and sorting structure of the original system, and the projection value that makes the projection index function reach the optimal value is found, that is, the projection value that reflects the structure or characteristics of the high-dimensional data as accurately as possible, and then the existing technology is used to analyze the classification structure characteristics of the high-dimensional data according to the projection value, such as the projection pursuit clustering evaluation model, or the scatter plot between the projection value and the actual output value of the research system is used to construct an appropriate mathematical model to simulate the system output, such as the projection pursuit grade evaluation model.

[0063] As an optional embodiment, confirm the data that the user needs to monitor, such as the operation safety of the transformer, then obtain all multi-source data on the operation safety of the transformer, solve the weight of each multi-source data through the above steps, sort the weights of all the multi-source data on the operation safety of the transformer from large to small, select the multi-source data with the top five weights, and determine these five multi-source data on the operation safety of the transformer as the main data on the operation safety of the transformer. According to the above steps, the main data of different user needs are obtained, and the main data of each type of needs are obtained. Save, so as to establish a main database including all the main data of various needs, such as the main database of service, monitoring, statistics and coordination.

[0064] S103 receives a monitoring command, and determines supply data based on the monitoring command, multi-source data, and a main database.

[0065] In this embodiment, the monitoring command includes: monitoring data type and supply mode; wherein the monitoring data type includes at least: equipment basic data, equipment operation data and energy management data; supply mode includes: default data supply mode, all data supply mode and custom data supply mode. After receiving the monitoring command, the supply data is determined based on the monitoring command, multi-source data and main database, specifically including the following steps:

[0066] Receive monitoring commands sent by the user end;

[0067] When the supply mode is the default data supply mode, the main database is directly called, and the supply data is determined through the main database according to the type of monitoring data. After analyzing the authenticity, accuracy and reliability of the supply data according to the source of multi-source data, the supply data is packaged;

[0068] When the supply mode is the full data supply mode, the main database is called first to obtain the main data. If the user specifies that the data to be monitored is not limited to the main data, all data related to the monitored data type except the main data is obtained from the multi-source data according to the monitored data type, and the secondary acquisition is completed to determine the supply data. After analyzing the authenticity, accuracy and reliability of the supply data according to the source of the multi-source data, the supply data is packaged;

[0069] When the supply mode is the custom data supply mode, the main database is called first to obtain the main data, and the user independently selects the data to be monitored from the main data. If the user specifies that the data to be monitored is not limited to the main data, the user-selected data is obtained from the multi-source data according to the monitoring data type, and the supply data is determined. After the authenticity, accuracy and reliability of the supply data are analyzed according to the source of the multi-source data, the packaging of the supply data is completed.

[0070] S104 sends the supplied data to a user end to monitor the supplied data.

[0071] In this embodiment, the supply data that has been packaged after the first analysis is sent to the user end to realize the monitoring of the supply data. Multi-source data other than the main data will not be saved in the main database. Multi-source data other than the main data is only placed in the main database when the user selects the data to be monitored. After the supply data is sent to the user end, the main database deletes the multi-source data other than the main data in the database. After receiving the feedback information sent by the user end according to the supply data, if the user end needs to replace, add or delete the data to be monitored, the data to be monitored by the user is selected again according to step S104 and a secondary data analysis is performed. At the same time, the main database is retrieved again for the user end to view and select, and the real, accurate and reliable supply data is sent to the user end again.

[0072] As an optional embodiment, multi-source data is first acquired, and main data is determined based on the multi-source data based on the projection pursuit method, and a main database is established based on the main data. After the main database is established, in response to different data supply modes selected by the user, the supply mode selected by the user is judged. If the supply mode is the default data supply mode, main data related to the data that the user needs to monitor is selected according to the main database, and the selected main data is the supply data. After analyzing the authenticity, accuracy and reliability of the supply data according to the source of the multi-source data, the supply data is packaged and sent to the user end; if the supply mode is the full data supply mode, the main database is called first to obtain the main data. If the user specifies that the data to be monitored is not limited to the main data, Then, according to the monitoring data type, all data related to the monitoring data type except the main data is obtained from the multi-source data, the secondary acquisition is completed, the supply data is determined, and the authenticity, accuracy and reliability of the supply data are analyzed according to the source of the multi-source data, and then the supply data is packaged and sent to the user end; if the supply mode is a custom data supply mode, the main database is called first to obtain the main data, and the user selects the data to be monitored from the main data. If the user specifies that the data to be monitored is not limited to the main data, then the user's self-selected data is obtained from the multi-source data according to the monitoring data type, and the supply data is determined. After analyzing the authenticity, accuracy and reliability of the supply data according to the source of the multi-source data, the supply data is packaged and sent to the user end. The supply data packaged after the first analysis is sent to the user end to realize the monitoring of the supply data. After receiving the feedback information sent by the user end according to the supply data, if the user end needs to replace, add or delete the data to be monitored, the above steps are repeated to select the data to be monitored by the user again and perform secondary data analysis, and at the same time, the main database is called again for the user end to view and select, and the real, accurate and reliable supply data is sent to the user end again.

[0073] From the above description, it can be seen that one or more embodiments of the present application provide a multi-source data monitoring method, device and electronic device. First, multi-source data is acquired; then, a main database is established based on the projection pursuit method and the multi-source data, and the main data determined are the most important multiple data for the type of data that the user needs to monitor, thereby avoiding the user's secondary screening of the multi-source data and avoiding redundant data that may appear in the process of the user screening the multi-source data. Only the main data is saved, which can effectively reduce the load on the monitoring hardware storage space; after receiving the monitoring command, the supply data is determined based on the monitoring command, the multi-source data and the main database, and a selection port is provided for users with different needs. The user can select databases of different modes to select the required monitoring data, thereby improving data operation efficiency; finally, the supply data is sent to the user end to monitor the supply data. By determining the main data, the user's screening of multi-source data and the redundant data that may appear in the screening process are reduced. Only the determined main data is saved to establish a multi-mode database, thereby improving data operation efficiency and reducing the load on the monitoring hardware storage space. By determining different backup objective functions, dynamic matching is performed according to the data that the user needs to monitor, and the data that needs to be monitored is provided, which realizes on-demand provision, coordinated optimization and linkage, and improves the internal operation and maintenance level of the monitoring system.

[0074] The above describes specific embodiments of the present application. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0075] Based on the same inventive concept, one or more embodiments in the present application also provide a resource allocation device based on supply chain big data, including: an acquisition module, an establishment module, a determination module and a monitoring module.

[0076] refer to Figure 3 , the device comprises:

[0077] an acquisition module, configured to acquire multi-source data;

[0078] An establishing module configured to establish a main database based on a projection pursuit method and the multi-source data;

[0079] a determination module configured to receive a monitoring command and determine supply data based on the monitoring command, multi-source data and a main database;

[0080] The monitoring module is configured to send the supply data to a user terminal to monitor the supply data.

[0081] For the convenience of description, the above devices are described in terms of functions divided into various modules. Of course, when implementing one or more embodiments of the present invention, the functions of each module can be implemented in the same or multiple software and / or hardware.

[0082] The apparatus of the above-mentioned embodiment is used to implement the corresponding method in the above-mentioned embodiment, and has the beneficial effects of the corresponding method embodiment, which will not be described in detail here.

[0083] Based on the same inventive concept, one or more embodiments in the present application also provide an electronic device, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method described in any one of the above embodiments is implemented.

[0084] Figure 4 A more specific schematic diagram of the hardware structure of an electronic device provided in this embodiment is shown, and the device may include: a processor 401, a memory 402, an input / output interface 403, a communication interface 404, and a bus 405. The processor 401, the memory 402, the input / output interface 403, and the communication interface 404 are connected to each other in communication within the device through the bus 405.

[0085] The processor 401 can be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application.

[0086] The memory 402 may be implemented in the form of ROM (Read Only Memory), RAM (Random Access Memory), static storage device, dynamic storage device, etc. The memory 402 may store an operating system and other application programs. When the technical solution provided by the embodiment of the present invention is implemented by software or firmware, the relevant program code is stored in the memory 402 and is called and executed by the processor 401.

[0087] The input / output interface 403 is used to connect the input / output module to realize information input and output. The input / output module can be configured in the device as a component (not shown in the figure), or it can be externally connected to the device to provide corresponding functions. The input device may include a keyboard, a mouse, a touch screen, a microphone, various sensors, etc., and the output device may include a display, a speaker, a vibrator, an indicator light, etc.

[0088] The communication interface 404 is used to connect a communication module (not shown) to realize communication interaction between the device and other devices. The communication module can realize communication through a wired mode (such as USB, network cable, etc.) or a wireless mode (such as mobile network, WIFI, Bluetooth, etc.).

[0089] The bus 405 comprises a pathway for transmitting information between the various components of the device (eg, the processor 401 , the memory 402 , the input / output interface 403 , and the communication interface 404 ).

[0090] It should be noted that, although the above device only shows the processor 401, the memory 402, the input / output interface 403, the communication interface 404 and the bus 405, in the specific implementation process, the device may also include other components necessary for normal operation. In addition, it can be understood by those skilled in the art that the above device may also only include the components necessary for implementing the embodiment of the present invention, and does not necessarily include all the components shown in the figure.

[0091] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present disclosure (including the claims) is limited to these examples. Based on the concept of the present disclosure, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of different aspects of one or more embodiments of the present application as described above, which are not provided in detail for the sake of simplicity.

[0092] One or more embodiments in this application are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of one or more embodiments in this application should be included in the scope of protection of this disclosure.

Claims

1. A multi-source data monitoring method, characterized in that: include: Obtain data from multiple sources; A main database is established based on the projection pursuit method and the multi-source data, and the multi-source data other than the main data is deleted; wherein the main data in the main database is different under different monitoring requirements for the same multi-source data; receiving a monitoring command, and determining supply data based on the monitoring command, multi-source data, and a main database; sending the supply data to a user terminal to monitor the supply data; The method of establishing a main database based on the projection pursuit method and the multi-source data includes: Constructing high-dimensional data {s(i,j...n)} using the multi-source data, wherein i,j...n represent different multi-source data; Based on the projection pursuit method, the high-dimensional data {s(i,j...n)} is projected into a low-dimensional subspace {s(i)} to construct a projection index function f(s(i)) and an objective function library {f object }={f1,f2,...f n }, where f1,f2,...f n represents the alternate objective function; The contribution rate of the multi-source data is obtained according to the global optimization algorithm, the projection index function and the target database Among them, s(m) represents the optimal projection value of the projection index function, a i Represents any multiple source data, Determine the weight vector {η} of the multi-source data according to the contribution rate of the multi-source data s(m) }={η1,η2,...η n }, where η1,η2,...η n Represents the weights of n different multi-source data; Selecting the top five multi-source data in the weight vector of the multi-source data to determine the main data, and establishing the main database according to the main data; The monitoring command includes: monitoring data type and supply mode; the monitoring data type includes at least: equipment basic data, equipment operation data and energy management data; the supply mode includes: default data supply mode, all data supply mode and custom data supply mode; The receiving of the monitoring command and determining the supply data based on the monitoring command, multi-source data and a main database include: Receiving the monitoring command sent by the user terminal; In response to a user selecting a different data supply mode, determining the supply mode selected by the user; When the supply mode is the default data supply mode, the main database is called, and the supply data is determined through the main database according to the type of monitoring data.

2. The method according to claim 1, characterized in that Also includes: When the supply mode is the full data supply mode, the main database is first called to obtain the main data, and then all data related to the monitoring data type except the main data is obtained according to the multi-source data to determine the supply data.

3. The method according to claim 1, characterized in that Also includes: When the supply mode is a user-defined data supply mode, the main database is first called to obtain the main data, and then the user-selected data is obtained from the multi-source data according to the monitoring data type to determine the supply data.

4. The method according to claim 1, characterized in that Also includes: The authenticity, accuracy and reliability of the supplied data are analyzed according to the multi-source data, and the supplied data is packaged.

5. The method according to claim 1, characterized in that Also includes: receiving feedback information from the user terminal according to the supplied data; A secondary data analysis is provided based on the feedback information.

6. A multi-source data monitoring device, characterized in that: include: An acquisition module, configured to acquire multi-source data; An establishing module is configured to establish a main database based on the projection pursuit method and the multi-source data; wherein the main data in the main database is different under different monitoring requirements for the same multi-source data; a determination module configured to receive a monitoring command and determine supply data based on the monitoring command, multi-source data and a main database; A monitoring module, configured to send the supply data to a user terminal to monitor the supply data; The method of establishing a main database based on the projection pursuit method and the multi-source data includes: Constructing high-dimensional data {s(i,j...n)} using the multi-source data, wherein i,j...n represent different multi-source data; Based on the projection pursuit method, the high-dimensional data {s(i,j...n)} is projected into a low-dimensional subspace {s(i)} to construct a projection index function f(s(i)) and an objective function library {f object }={f1,f2,...f n }, where f1,f2,...f n represents the alternate objective function; The contribution rate of the multi-source data is obtained according to the global optimization algorithm, the projection index function and the target database Among them, s(m) represents the optimal projection value of the projection index function, a i Represents any multiple source data, Determine the weight vector {η} of the multi-source data according to the contribution rate of the multi-source data s(m) }={η1,η2,...η n }, where η1,η2,...η n Represents the weights of n different multi-source data; Selecting the top five multi-source data in the weight vector of the multi-source data to determine the main data, and establishing the main database according to the main data; The monitoring command includes: monitoring data type and supply mode; the monitoring data type includes at least: equipment basic data, equipment operation data and energy management data; the supply mode includes: default data supply mode, all data supply mode and custom data supply mode; The receiving of the monitoring command and determining the supply data based on the monitoring command, multi-source data and a main database include: Receiving the monitoring command sent by the user terminal; In response to a user selecting a different data supply mode, determining the supply mode selected by the user; When the supply mode is the default data supply mode, the main database is called, and the supply data is determined through the main database according to the type of monitoring data.

7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Electricity quality evaluation system and method

    CN101726678A

  • Electricity quality monitoring and managing method based on genetic projection pursuit evaluation

    CN102982406A

  • System practical monitoring method based on specialized requirements

    CN107239894A

  • Intelligent driving vehicle monitoring method and device and computer equipment

    CN110942635A

  • Seawater pump fault monitoring device and diagnosis method based on multi-source information fusion

    CN111259990A