A zinc ash treatment device for continuous hot-dip galvanizing furnace nose
By installing a plate-type zinc ash suctioner and a concentric pipeline structure in the nose of a continuous hot-dip galvanized furnace, combined with an external vibrator, the surface adhesion problem of strip steel caused by zinc ash agglomeration is solved, and the coating quality and product stability are improved. Reduced production costs.
Patent Information
- Application Number
- CN202011038292.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-28
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-09-28
AI Technical Summary
During the continuous hot-dip galvanizing production process, the accumulation and fall of zinc ash in the furnace nose leads to excessive adhesion of the strip steel surface, resulting in weak product plating, leakage, dezincification and other defects, affecting product quality and mold life. Technology is difficult to solve effectively.
Design a plate-type zinc ash suction device, combining a concentric pipeline structure with a gas suction pipe and an injection pipe, and installs it on the inner wall of the furnace nose through a trapezoidal zinc ash suction device, adsorbs and filters zinc ash, and uses the jet gas to maintain the belt The steel plate temperature ensures the atmosphere in the zinc pot is closed, and the zinc ash is thoroughly cleaned with an external vibrator.
It effectively solves the problem of surface adhesion of strip steel caused by zinc ash aggregation, improves the quality of the plating and product stability, reduces production costs, extends the service life of the mold, and ensures the corrosion resistance of the product in humid environments.
Smart Images

Figure CN112143998B_ABST
Abstract
Description
Technical Field
[0001] A zinc ash treatment device for a continuous hot-dip galvanizing furnace nose is used for environmentally friendly zinc ash treatment of a continuous hot-dip galvanizing high-speed unit and belongs to the technical field of manufacturing zinc ash treatment equipment for hot-dip galvanizing furnace noses. Background Art
[0002] The nose of the neutral annealing furnace in the continuous hot-dip galvanizing production is normally immersed in the liquid zinc in the zinc pot. The zinc vapor generated by the heated strip after being immersed in the zinc liquid meets the nitrogen in the nose to produce condensed zinc ash. The zinc ash is carried into the rapid cooling section of the annealing furnace through the nose along with the nitrogen or nitrogen-hydrogen mixed gas. The other part adheres to the inner wall of the nose. After accumulating too much, it will fall onto the strip and the zinc liquid surface in the nose, and adhere to the strip along the running direction to produce zinc ash defects.
[0003] After zinc ash gathers in large quantities inside the nose of the vertical furnace, it will vibrate abnormally with the operation of the production line and the flow of protective gas in the furnace will cause the zinc ash to fall onto the strip and the zinc liquid surface inside the nose. Since the zinc ash falls from top to bottom, most of the zinc ash falls on the upper surface of the strip and is brought out of the zinc pot with the running strip of the production line. A large amount of zinc ash will cause product plating leakage or poor adhesion of the coating. Riveted or stamped DDQ-grade home appliance panels will experience coating cracking, dezincification, and local plating leakage defects. The wear of the mold during customer processing will increase, which will reduce the service life of the mold, increase production costs, and product quality cannot be guaranteed. These partially dezincified products will be corroded prematurely when used in humid areas in the south or north.
[0004] People have found many methods to treat and suppress zinc ash, such as nitrogen humidification system, zinc ash filtration system, zinc pump and other equipment, but they cannot effectively solve the generation of zinc ash and its impact on product quality. The zinc ash adheres to the upper surface of the strip more than the lower surface of the strip, which is an unfavorable factor for the zinc pot sinking roller and rear stabilizing roller that contact the upper surface of the strip. The reason is that after the zinc ash adheres to the upper surface of the strip, it will cause friction after passing through the sinking roller and the rear stabilizing roller. The zinc ash is carried away by the sinking roller and the rear stabilizing roller, which will increase the amount of slag sticking to the sinking roller and the rear stabilizing roller, resulting in new defects, and having a very adverse effect on the equipment in the zinc pot. Utility Model Content
[0005] The purpose of the present invention is to address the shortcomings of the prior art. A plate-type zinc ash extractor is used in conjunction with a gas conveying concentric pipe in which the outer pipe is a gas suction pipe and the inner pipe is a gas injection pipe to design a zinc ash treatment device for a continuous hot-dip galvanizing furnace nose. The device solves the problem that the furnace nose of a vertical annealing furnace is immersed in liquid zinc in a zinc pot, and the zinc vapor generated after the heated strip steel is immersed in the zinc liquid encounters the nitrogen in the furnace nose to produce condensed zinc ash. The zinc ash is brought into the rapid cooling section of the annealing furnace along with the nitrogen or nitrogen-hydrogen mixed gas through the furnace nose, and adheres to the inner wall of the furnace nose. After accumulating too much, it will fall onto the strip steel and the zinc liquid surface in the furnace nose, and adhere to the strip steel along the running direction to produce zinc ash defects.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is as follows:
[0007] A zinc ash treatment device for a continuous hot-dip galvanizing furnace nose, comprising a plate-type zinc ash sucker located on the surface of a strip steel on the inner side wall of the furnace nose, the projection of the plate-type zinc ash sucker on a vertical plane in the furnace nose that is colinear with the length direction line of the strip steel is in a trapezoidal shape, and the longer bottom side of the trapezoidal shape is fixedly connected to the inner side wall of the furnace nose, the plate-type zinc ash sucker is sequentially provided with a first suction chamber, a second suction chamber, a third suction chamber, and a gas injection chamber from one end of the furnace nose close to the annealing furnace to the end of the furnace nose close to the zinc pot, the plate-type zinc ash sucker One end of the aspirator close to the inner wall of the furnace nose is connected to a gas delivery concentric pipe that runs through the side wall of the furnace nose, and the gas delivery concentric pipe includes a gas injection pipe and a gas suction pipe with concentric cross-sections. The gas injection pipe is located in the gas suction pipe, and the gas injection pipe is connected to the gas injection chamber in the furnace nose. One end of the gas suction pipe in the furnace nose is respectively connected to the first suction chamber, the second suction chamber, the third suction chamber, and the gas injection chamber, and the end of the gas suction pipe outside the furnace nose is connected to the zinc ash processing mechanism.
[0008] In the present invention, a plate-type zinc ash extractor is installed on the inner wall of the furnace nose of the galvanized annealing furnace. The plate-type zinc ash extractor is arranged on the surface of the steel strip and is placed in the width direction of the furnace nose. The furnace gas containing zinc ash in the furnace nose is extracted and filtered by the plate-type zinc ash extractor and then sent back into the furnace nose near the annealing furnace. The interior of the furnace nose is sealed at the end opening of the furnace nose by the zinc liquid in the zinc pot to prevent air from entering the interior of the furnace nose and affecting the atmosphere in the annealing furnace. After the steel strip is heated by the annealing furnace, it enters the zinc liquid. After the zinc liquid surface contacts the high-temperature steel strip, it will affect the generation of zinc ash in the furnace nose, and the steel strip bypasses the zinc pot and sinks. The roller passes through the rear stabilizing roller and the front stabilizing roller and then the zinc pot runs upward. The longest end of the plate zinc ash aspirator is installed inside the furnace nose. The whole is in a flat shape, and the two ends gradually shrink and fit tightly inside the furnace nose. The end closest to the strip is at the highest point of the trapezoid, and a gradual transition method is adopted. Even if the strip is scraped against the plate zinc ash aspirator, it will not cause the possibility of strip breakage. The gas delivery concentric pipeline is a combination of the suction pipelines of the first suction chamber, the second suction chamber and the third suction chamber and the air supply pipeline of the gas injection chamber. The gas is sucked and injected independently, and the gas injection pipeline is in the gas In order to prevent the temperature of the steel strip from being affected by the cooling gas inside the body suction pipe, the gas injection pipe heats the small flow of injection gas through the high-temperature gas suction pipe to transfer the heat generated to the pipe wall for heat transfer to achieve the purpose of heating, so that the temperature of the injection gas is close to the temperature of the steel strip, ensuring the precise control of the actual plate temperature of the steel strip entering the zinc pot, and improving the efficiency of the injection gas; solving the direction of the pipeline and the utilization of energy in a narrow space, reducing energy consumption, the gas suction pipe sucks out the zinc ash in the furnace nose, and the sucked zinc ash is processed by the zinc ash processing mechanism. The present invention adopts a plate-type zinc ash extractor in conjunction with an external pipeline. The gas suction pipe and the internal pipe are gas transport concentric pipes of the gas injection pipe. A zinc ash treatment device for a continuous hot-dip galvanizing furnace nose is designed to solve the problem that the furnace nose of the vertical annealing furnace is immersed in liquid zinc in the zinc pot. The zinc vapor generated after the heated strip is immersed in the zinc liquid encounters the nitrogen in the furnace nose to produce condensed zinc ash. The zinc ash is brought into the rapid cooling section of the annealing furnace through the furnace nose along with the nitrogen or nitrogen-hydrogen mixed gas, and adheres to the inner wall of the furnace nose. After accumulating too much, it will fall onto the strip and the zinc liquid surface in the furnace nose, and adhere to the strip along the running direction to produce zinc ash defects.
[0009] As a preferred embodiment, a plurality of suction holes with a spacing of 10-20 mm and a diameter of 8-12 mm are provided on the surface of the plate-type zinc ash extractor.
[0010] As a preferred embodiment, the surface of the plate-type zinc ash extractor is provided with a plurality of slit suction nozzles which are perpendicular to or staggered with the strip surface and inclined at 30-90 degrees, the spacing between the slit suction nozzles is 50-500mm, and the inner diameter of the slit suction nozzles is 8-10mm.
[0011] As a preferred embodiment, the zinc ash processing mechanism includes a suction filter, the input end of the suction filter is connected to the gas suction pipe through a filter suction pipe, and the output end of the suction filter is respectively provided with a filter exhaust pipe and a filter delivery pipe, the filter exhaust pipe is connected to the inside of the furnace nose near the annealing furnace at one end away from the suction filter at the furnace nose, and the filter delivery pipe is connected to the zinc ash hopper at one end away from the suction filter.
[0012] As a preferred embodiment, a plurality of plate-type zinc ash extractors are arranged in a staggered manner on the inner wall of the furnace nose on the upper and lower surfaces of the strip, and the distance from the plate-type zinc ash extractor located on the upper surface of the strip to the upper surface of the strip is equal to the distance from the plate-type zinc ash extractor located on the lower surface of the strip to the lower surface of the strip.
[0013] As a preferred embodiment, a suction balance chamber is provided in the middle of the first suction chamber, the second suction chamber and the third suction chamber, and a reinforcing rib penetrating the plate-type zinc ash sucker is provided on the suction balance chamber, and the reinforcing rib is perpendicular to the inner wall of the furnace nose.
[0014] As a preferred embodiment, the reinforcing ribs are two partitions, and the two partitions separate a transition zone parallel to the steel strip from the third suction cavity.
[0015] As a preferred embodiment, an external vibrator of the furnace nose is provided on the outer side wall of the furnace nose.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] (1) The present invention adopts a plate-type zinc ash aspirator in combination with a gas conveying concentric pipe in which the outer pipe is a gas suction pipe and the inner pipe is a gas injection pipe, and designs a zinc ash treatment device for a continuous hot-dip galvanizing furnace nose, which solves the problem that the furnace nose of a vertical annealing furnace is immersed in liquid zinc in a zinc pot, and the zinc vapor generated after the heated strip steel is immersed in the zinc liquid encounters the nitrogen in the furnace nose to produce condensed zinc ash, and the zinc ash is brought into the rapid cooling section of the annealing furnace through the furnace nose along with the nitrogen or nitrogen-hydrogen mixed gas, and adheres to the inner wall of the furnace nose. After accumulating too much, it will float onto the strip steel and the zinc liquid surface in the furnace nose, and adhere to the strip steel along the running direction to produce zinc ash defects.
[0018] (2) The present invention adopts a plate-type zinc ash extractor whose surface adopts a cavity formed by a porous zinc ash extraction isolation plate to absorb the zinc ash inside the furnace nose with the maximum area.
[0019] (3) The present invention adopts a plurality of slit-type suction nozzles which are perpendicular to or staggered with the surface of the steel strip and inclined at 30-90 degrees, and can absorb zinc ash inside the furnace nose 1 and on the surface of the steel strip over a large area.
[0020] (4) The gas delivery concentric pipe of the plate-type zinc ash extractor of the present invention is connected to the zinc ash filter suction pipe, the zinc ash suction filter is connected to the zinc ash filter suction pipe, the zinc ash filter exhaust pipe, the zinc ash filter delivery pipe, and the zinc ash filter delivery pipe is connected to the zinc ash collection cabin. The furnace gas containing zinc ash extracted by the plate-type zinc ash extractor is delivered to the zinc ash suction filter through the zinc ash filter suction pipe for filtration. The zinc ash suction filter also has the function of sucking and filtering zinc ash. The pressure provided by the zinc ash suction filter is used to deliver the clean gas after filtration through the zinc ash filter exhaust pipe to the upward section of the furnace nose for recycling again, thereby ensuring normal furnace pressure and reducing energy consumption. The zinc ash filtered by the zinc ash suction filter is delivered to the zinc ash collection tank through a pipeline for centralized treatment.
[0021] (5) The present invention installs two sets of corresponding plate-type zinc ash extractors inside the galvanizing annealing furnace nose 1, which are arranged on the upper and lower surfaces of the steel strip, respectively, and are placed in the width direction of the nose. The furnace gas containing zinc ash inside the nose is extracted and filtered by the plate-type zinc ash extractors, and then sent back to a section of the nose close to the annealing furnace. The nose 1 is inserted into the zinc liquid in the zinc pot, and the zinc liquid surface maintains a certain immersion distance with the end of the nose to prevent air from entering the nose. The lowest end of the plate-type zinc ash extractor close to the zinc pot is in contact with the zinc liquid. The steel strip passes through the retractable furnace nose and enters the zinc pot, bypasses the zinc pot sinking roller, and then turns vertically upward. The front and rear stabilizing rollers of the zinc pot stabilize the vibration of the steel strip during operation. The inside of the furnace nose is sealed with zinc liquid in the zinc pot at the end opening of the furnace nose to prevent air from entering the inside of the furnace nose and affecting the atmosphere in the annealing furnace. After being heated by the annealing furnace, the steel strip enters the zinc liquid. When the zinc liquid surface contacts the high-temperature steel strip, it will affect the generation of zinc ash inside the furnace nose. The strip passes by the zinc pot sinking roller, passes through the rear stabilizing roller and the front stabilizing roller, and then exits the zinc pot and moves upward; the upper surface of the strip inside the furnace nose corresponds to the plate-type zinc ash extractor. The amount of zinc ash on the upper surface of the strip is larger than that on the lower surface of the strip. After the zinc ash is produced, it will flow to other sections of the annealing furnace along with the protective gas in the furnace. A large amount of zinc ash will continue to gather on the shell inside the furnace nose as the production time increases, covering the surface. The zinc ash on the inner top and both sides of the furnace nose is vibrated and falls downward, part of which falls on the upper surface of the strip, and the other part falls in the gap between the edge of the strip and the side wall of the furnace nose and falls on the bottom of the furnace nose. The wider the width of the strip, the less zinc ash falls on the bottom of the furnace nose, and vice versa. A large amount of zinc ash falls on the upper surface of the strip, and part of it is adhered to the strip and taken away by the running of the strip, and the other part gathers on the surface of the zinc liquid inside the furnace nose; the amount of zinc ash processed by the plate-type zinc ash extractor corresponding to the upper surface of the strip is greater than that processed by the plate-type zinc ash extractor on the lower surface of the strip.
[0022] (6) The reinforcing ribs arranged inside the plate-type zinc ash aspirator of the present invention connect the gas delivery concentric pipeline, the first suction chamber, the second suction chamber, and the third suction chamber, and are welded on the suction balance chamber and penetrate through the chamber. The plate-type zinc ash aspirator adopts a stainless steel series, which has the ability to resist high temperature and corrosion by harmful gases. The plate-type zinc ash aspirator adopts an internal reinforcing rib structure design to prevent the chamber from being deformed or damaged due to serious scratches caused by poor plate shape.
[0023] (7) In the present invention, there is a transition zone parallel to the steel strip between the second suction chamber and the third suction chamber which are closer to the steel strip. The suction force of the transition zone is greater than that of other transition zones. The plate-type zinc ash sucker is installed inside the furnace nose at the end with the longest side length. The plate-type zinc ash sucker is in a flat shape as a whole, and the two ends gradually shrink and fit tightly inside the furnace nose. The end closest to the steel strip is at the highest point of the trapezoid. Through the gradual transition, even if the steel strip is scraped against the plate-type zinc ash sucker, there is no possibility of the steel strip breaking, thereby improving the pass rate of defective plate types.
[0024] (8) The present invention installs an external vibrator on the outside of the furnace nose, which can be driven by AC or DC, and has an adjustable vibration frequency. The vibration power must meet the requirement that the furnace nose can reduce the amount of zinc ash attached to the inside of the furnace nose under a certain amplitude. The vibrator is used to vibrate before thoroughly cleaning the zinc ash in the furnace nose. The zinc ash attached to the inside of the furnace nose that cannot be handled is separated from the attached object by vibration and falls under the furnace nose. The gas ejected from the gas injection chamber of the plate-type zinc ash extractor again removes the zinc ash that falls on the end of the furnace nose, thereby achieving the purpose of thoroughly cleaning the zinc ash. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a front view of the plate-type zinc ash extractor of the present invention;
[0026] Figure 2 It is a top view of the plate-type zinc ash extractor of the present invention;
[0027] Figure 3 It is a left side view of the plate type zinc ash extractor of the present invention;
[0028] Figure 4 It is a structural schematic diagram of the gas delivery concentric pipeline of the plate-type zinc ash aspirator in the present invention;
[0029] Figure 5 It is a practical application principle diagram of the present invention;
[0030] Figure 6 It is a schematic diagram of the gas flow of the plate type zinc ash aspirator;
[0031] Figure 7 It is a schematic diagram of zinc ash filtration using a plate-type zinc ash extractor.
[0032] Among them, 1. furnace nose; 101. plate-type zinc ash extractor; 1010. inner wall of furnace nose; 1011. external vibrator of furnace nose; 1012. gas delivery concentric pipeline; 10121. gas suction pipeline; 10122. gas injection pipeline; 1013. suction balance chamber; 1014. gas injection chamber; 1015. first suction chamber; 1016. second suction chamber; 1017. reinforcement rib; 1018 , the third suction chamber; 1019, the suction hole; 102, the zinc ash collecting chamber; 1021, the filter exhaust pipe; 1022, the suction filter; 1023, the filter delivery pipe; 1024, the filter suction pipe; 1025, the zinc ash hopper; 1026, the transition zone; 103, the injection pipe; 2, the strip steel; 3, the zinc pot; 4, the zinc liquid; 5, the zinc pot sinking roller; 6, the rear stabilizing roller; 7, the front stabilizing roller; 8, the zinc liquid surface. DETAILED DESCRIPTION
[0033] Embodiment 1:
[0034] See also Figure 1-7 A zinc ash treatment device for a continuous hot-dip galvanizing furnace nose comprises a plate-type zinc ash extractor 101 located on the surface of a steel strip 2 on an inner side wall 1010 of the furnace nose, wherein the projection of the plate-type zinc ash extractor 101 on a vertical plane in the furnace nose 1 that is colinear with a length direction line of the steel strip 2 is in a trapezoidal shape, and a longer bottom side of the trapezoidal shape is fixedly connected to the inner side wall of the furnace nose 1, wherein the plate-type zinc ash extractor 101 is provided with a first suction chamber 1015, a second suction chamber 1016, a third suction chamber 1018, and a gas injection chamber 1014 in sequence from one end of the furnace nose 1 close to the annealing furnace to the end of the furnace nose 1 close to the zinc pot 3, wherein the plate-type zinc ash extractor 101 is provided with a first suction chamber 1015, a second suction chamber 1016, a third suction chamber 1018, and a gas injection chamber 1014 in sequence from one end of the furnace nose 1 close to the inner side wall of the furnace nose 1 A gas delivery concentric pipe 1012 is connected and passes through the side wall of the furnace nose 1. The gas delivery concentric pipe 1012 includes a gas injection pipe 10122 and a gas suction pipe 10121 with concentric cross-sections. The gas injection pipe 10122 is located in the gas suction pipe 10121. The gas injection pipe 10122 is connected to the gas injection chamber 1014 in the furnace nose 1. The gas suction pipe 10121 is connected to the first suction chamber 1015, the second suction chamber 1016, the third suction chamber 1018, and the gas injection chamber 1014 at one end in the furnace nose 1. The gas suction pipe 10121 is connected to a zinc ash processing mechanism at its end outside the furnace nose 1.
[0035] Furthermore, the surface of the plate-type zinc ash extractor 101 is provided with a plurality of slit-type suction nozzles which are perpendicular to or staggered with the surface of the strip steel 2 and inclined at 30-90 degrees, the spacing between the slit suction nozzles is 50-500mm, and the inner diameter of the slit suction nozzles is 8-10mm, which is sufficient to absorb the zinc ash inside the furnace nose 1 and the surface of the strip steel over a large area.
[0036] In this embodiment, a plate-type zinc ash extractor 101 is installed on the inner side wall 1010 of the furnace nose of the galvanized annealing furnace. The plate-type zinc ash extractor 101 is correspondingly arranged on the surface of the steel strip 2 and is placed in the width direction of the furnace nose 1. The furnace gas containing zinc ash in the furnace nose 1 is extracted and filtered by the plate-type zinc ash extractor 101 and then sent back into the furnace nose 1 near the annealing furnace. The interior of the furnace nose 1 is sealed at the end opening of the furnace nose 1 by the zinc liquid in the zinc pot 3 to prevent air from entering the interior of the furnace nose 1 and affecting the atmosphere in the annealing furnace. The steel strip 2 is heated by the annealing furnace and enters the zinc liquid 4. After the zinc liquid surface contacts the high-temperature steel strip 2, it will affect the generation of zinc ash in the furnace nose 1. The steel strip 2 bypasses the zinc pot sinking roller 5, which After passing the rear stabilizing roller 6 and the front stabilizing roller 7, the zinc pot 3 moves upward, and the longest end of the plate zinc ash sucker 101 is installed on the inner wall 1010 of the furnace nose. The plate zinc ash sucker 101 is in a flat shape as a whole, and the two ends gradually shrink and fit closely between the two ends of the furnace nose 1. The closest end to the strip steel 2 is at the highest point of the trapezoid, and a gradual transition method is adopted. Even if the strip steel 2 scrapes the plate zinc ash sucker 101, it will not cause the possibility of the strip steel 2 breaking. The gas conveying concentric pipe 1012 is a combination of the air supply pipe of the gas suction pipe 10121 and the gas injection pipe 10122, which independently suck gas and inject gas. The gas injection pipe 10122 is in Inside the gas suction pipe 10121, in order not to affect the plate temperature of the steel strip 2 by the influence of the cooling gas, the gas injection pipe 10122 heats the small flow of injection gas through the high-temperature gas suction pipe 10121 to transfer the heat generated to the pipe wall for heat transfer to achieve the purpose of heating, so that the temperature of the injection gas is close to the plate temperature of the steel strip 2, ensuring the precise control of the actual plate temperature of the steel strip 2 entering the zinc pot 3, and improving the efficiency of the injection gas; solving the direction of the pipeline and the utilization of energy in a small space, reducing energy consumption, the gas suction pipe 10121 sucks out the zinc ash in the furnace nose 1, and the sucked zinc ash is processed by the zinc ash processing mechanism. The present invention adopts a plate-type zinc ash extractor 101 in conjunction with an external pipeline A continuous hot-dip galvanizing furnace nose zinc ash processing device is designed in the form of a gas suction pipe 10121 and a gas injection pipe 10122 as the internal pipe. The furnace nose 1 of the vertical annealing furnace is immersed in liquid zinc in the zinc pot 3. The zinc vapor generated by the heated strip 2 after being immersed in the zinc liquid 4 meets the nitrogen in the furnace nose 1 to produce condensed zinc ash. The zinc ash is brought into the rapid cooling section of the annealing furnace through the furnace nose 1 with the nitrogen or nitrogen-hydrogen mixed gas, and adheres to the inner wall 1010 of the furnace nose. After accumulating too much, it will fall on the strip 2 and the zinc liquid surface in the furnace nose 1, and adhere to the strip 2 along the running direction to produce zinc ash defects.
[0037] Embodiment 2:
[0038] See also Figure 1-7 A zinc ash treatment device for a continuous hot-dip galvanizing furnace nose comprises a plate-type zinc ash extractor 101 located on the surface of a steel strip 2 on an inner side wall 1010 of the furnace nose, wherein the projection of the plate-type zinc ash extractor 101 on a vertical plane in the furnace nose 1 that is colinear with a length direction line of the steel strip 2 is in a trapezoidal shape, and a longer bottom side of the trapezoidal shape is fixedly connected to the inner side wall of the furnace nose 1, wherein the plate-type zinc ash extractor 101 is provided with a first suction chamber 1015, a second suction chamber 1016, a third suction chamber 1018, and a gas injection chamber 1014 in sequence from one end of the furnace nose 1 close to the annealing furnace to the end of the furnace nose 1 close to the zinc pot 3, wherein the plate-type zinc ash extractor 101 is provided with a first suction chamber 1015, a second suction chamber 1016, a third suction chamber 1018, and a gas injection chamber 1014 in sequence from one end of the furnace nose 1 close to the inner side wall of the furnace nose 1 A gas delivery concentric pipe 1012 is connected and passes through the side wall of the furnace nose 1. The gas delivery concentric pipe 1012 includes a gas injection pipe 10122 and a gas suction pipe 10121 with concentric cross-sections. The gas injection pipe 10122 is located in the gas suction pipe 10121. The gas injection pipe 10122 is connected to the gas injection chamber 1014 in the furnace nose 1. The gas suction pipe 10121 is connected to the first suction chamber 1015, the second suction chamber 1016, the third suction chamber 1018, and the gas injection chamber 1014 at one end in the furnace nose 1. The gas suction pipe 10121 is connected to a zinc ash processing mechanism at its end outside the furnace nose 1.
[0039] Furthermore, the surface of the plate-type zinc ash extractor 101 is provided with a plurality of suction holes 1019 with a spacing of 10-20 mm and a diameter of 8-12 mm. The surface of the plate-type zinc ash extractor 101 adopts a cavity formed by a porous zinc ash suction isolation plate to absorb the zinc ash inside the furnace nose 1 with the maximum area.
[0040] Furthermore, the zinc ash processing mechanism includes a suction filter 1022, the input end of the suction filter 1022 is connected to the gas suction pipe 10121 through a filter suction pipe 1024, and the output end of the suction filter 1022 is respectively provided with a filter exhaust pipe 1021 and a filter delivery pipe 1023, the filter exhaust pipe 1021 is connected to the inside of the furnace nose 1 near the furnace nose 1 near the annealing furnace at one end away from the suction filter 1022, and the filter delivery pipe 1023 is connected to a zinc ash hopper 1025 at one end away from the suction filter 1022.
[0041] Furthermore, a plurality of plate-type zinc ash extractors 101 are arranged in a staggered manner on the upper and lower surfaces of the steel strip 2 on the inner side wall 1010 of the furnace nose, and the distance from the plate-type zinc ash extractors 101 located on the upper surface of the steel strip 2 to the upper surface of the steel strip 2 is equal to the distance from the plate-type zinc ash extractors 101 located on the lower surface of the steel strip 2 to the lower surface of the steel strip 2.
[0042] Furthermore, a suction balance chamber 1013 is provided between the first suction chamber 1015, the second suction chamber 1016, and the third suction chamber 1018. The suction balance chamber 1013 is provided with a reinforcing rib (1017) penetrating the plate type zinc ash extractor 101. The reinforcing rib 1017 is perpendicular to the inner wall 1010 of the furnace nose. The plate type zinc ash extractor 101 adopts a reinforcing rib 1017 structural design to prevent the cavity from being deformed or damaged due to severe scratches caused by poor plate shape.
[0043] Furthermore, the reinforcing ribs 1017 are two partitions, and the two partitions separate a transition zone 1026 parallel to the steel strip 2 from the third suction cavity 1018 .
[0044] Furthermore, a furnace nose external vibrator 1011 is provided on the outer side wall of the furnace nose 1. The furnace nose external vibrator 1011 can be driven by AC or DC, and the vibration frequency is adjustable. The vibration power must satisfy that the furnace nose 1 can reduce the amount of zinc ash attached to the inside of the furnace nose 1 under a certain amplitude. The furnace nose external vibrator 1011 is used to vibrate before thoroughly cleaning the zinc ash in the furnace nose. The zinc ash attached to the inside of the furnace nose 1 that cannot be handled is vibrated away from the attached object and falls under the furnace nose 1. The gas ejected from the gas injection chamber 1014 of the plate-type zinc ash extractor 101 again removes the zinc ash that falls on the end of the furnace nose 1, thereby achieving the purpose of thoroughly cleaning the zinc ash.
[0045] The method of using the zinc ash treatment device for the continuous hot-dip galvanizing furnace nose in this embodiment includes a method of using it for short-term fault shutdown and a method of using it for planned cleaning of zinc ash during normal production.
[0046] Method for handling short-term fault shutdown: After shutdown, first open the external vibrator 1011 of the furnace nose to vibrate the zinc ash inside the furnace nose 1 to vibrate the furnace nose 1 as a whole, and then turn on the suction function and gas injection function of the plate-type zinc ash extractor 101, so that the first suction chamber 1015, the second suction chamber 1016 and the third suction chamber 1018 suck out the furnace gas containing zinc ash for filtering treatment, and the gas injection pipe 10122 injects gas to blow the zinc ash attached to the surface of the strip 2 to the lower part of the furnace nose 1, and it is picked out together with the zinc slag manually or by robot for centralized treatment. After the zinc ash is processed, the external vibrator 1011 of the furnace nose stops, the furnace nose 1 is lowered to return to the normal online position, and other functions of the plate-type zinc ash extractor 101 are stopped.
[0047] The method for cleaning zinc ash in the furnace nose during normal production is as follows: first, activate the zinc pump for extracting zinc liquid level in the furnace nose to process the zinc ash, then start the external vibrator 1011 of the furnace nose to vibrate the zinc ash inside the furnace nose 1 to vibrate the furnace nose 1 to make the zinc ash attached to the inside of the furnace nose 1 fall off, and then turn on the suction function and the injection gas function of the plate-type zinc ash extractor 101, so that the first suction chamber 1015, the second suction chamber 1016 and the third suction chamber 1018 suck the furnace gas containing zinc ash outward for filtering treatment, and the gas injection pipe 10122 injects gas to blow the zinc ash attached to the downward section of the strip 2 away. It falls to the bottom of the furnace nose 1 and is pumped to the outside of the furnace nose 1 for treatment through the zinc pump; the external vibrator 1011 of the furnace nose should be used with caution under normal production conditions, because vibrating the furnace nose 1 during use will cause a large amount of zinc ash to fall, and the plate-type zinc ash suction device 101 cannot handle it in time and adheres to the surface of the strip 2, resulting in a large amount of degraded products; the plate-type zinc ash suction device zinc ash filtration system should be put into normal use during the production process, and the zinc ash should be continuously sucked, sprayed, filtered, and collected to form a complete cycle, to ensure normal furnace pressure, reduce the impact of zinc ash on the product, and improve the surface quality and product performance of the product. The suction capacity and injection pressure involved in the present invention are specifically adjusted according to the type of product produced, and the stability of the zinc liquid level should also be considered. For the production line speed, the aluminum content in the zinc pot composition, the plate temperature of the annealing furnace entering the zinc pot, the thickness and width of the strip, the strip type, and safe use, etc., different parameters can be set under different production conditions to suit the actual needs and requirements of the site.
Claims
1. A continuous hot-dip galvanizing furnace nose zinc ash treatment device, characterized in that: The invention comprises a plate-type zinc ash extractor (101) located on the surface of the steel strip (2) on the inner side wall (1010) of the furnace nose, wherein the projection of the plate-type zinc ash extractor (101) on a vertical plane in the furnace nose (1) that is colinear with the length direction line of the steel strip (2) is in a trapezoidal shape, and the longer bottom side of the trapezoidal shape is fixedly connected to the inner side wall of the furnace nose (1), and the plate-type zinc ash extractor (101) is sequentially provided with a first suction chamber (1015), a second suction chamber (1016), a third suction chamber (1018), and a gas injection chamber (1014) from one end of the furnace nose (1) close to the annealing furnace to one end of the furnace nose (1) close to the zinc pot (3), and the plate-type zinc ash extractor (101) is connected to a through-hole at one end of the furnace nose (1) close to the inner side wall of the furnace nose (1). A gas delivery concentric pipe (1012) passing through the side wall of the furnace nose (1), the gas delivery concentric pipe (1012) comprising a gas injection pipe (10122) and a gas suction pipe (10121) having concentric cross-sections, the gas injection pipe (10122) being located inside the gas suction pipe (10121), the gas injection pipe (10122) being connected to a gas injection chamber (1014) inside the furnace nose (1), one end of the gas suction pipe (10121) inside the furnace nose (1) being connected to a first suction chamber (1015), a second suction chamber (1016), and a third suction chamber (1018), respectively, and the end of the gas suction pipe (10121 outside the furnace nose (1) being connected to a zinc ash processing mechanism; A plurality of plate-type zinc ash extractors (101) are arranged in a staggered manner on the inner side wall (1010) of the furnace nose, located on the upper and lower surfaces of the steel strip (2), and the distance between the plate-type zinc ash extractors (101) located on the upper surface of the steel strip (2) and the upper surface of the steel strip (2) is equal to the distance between the plate-type zinc ash extractors (101) located on the lower surface of the steel strip (2) and the lower surface of the steel strip (2); A suction balance chamber (1013) is provided in the middle of the first suction chamber (1015), the second suction chamber (1016), and the third suction chamber (1018); a reinforcing rib (1017) penetrating the plate-type zinc ash extractor (101) is provided on the suction balance chamber (1013); the reinforcing rib (1017) is perpendicular to the inner side wall (1010) of the furnace nose; The reinforcing ribs (1017) are two partitions, which separate a transition zone (1026) parallel to the steel strip (2) in the middle of the third suction chamber (1018).
2. A continuous hot-dip galvanizing furnace nose zinc ash treatment device according to claim 1, characterized in that: The surface of the plate-type zinc ash extractor (101) is provided with a plurality of suction holes (1019) with a spacing of 10-20 mm and a diameter of 8-12 mm.
3. The continuous hot-dip galvanizing furnace nose zinc ash treatment device according to claim 1, characterized in that: The zinc ash processing mechanism comprises a suction filter (1022), the input end of the suction filter (1022) is connected to the gas suction pipe (10121) via a filter suction pipe (1024), and the output end of the suction filter (1022) is respectively provided with a filter exhaust pipe (1021) and a filter delivery pipe (1023), the end of the filter exhaust pipe (1021) away from the suction filter (1022) is connected to the inside of the furnace nose (1) near the annealing furnace at the furnace nose (1), and the end of the filter delivery pipe (1023) away from the suction filter (1022) is connected to the zinc ash hopper (1025).
4. A continuous hot-dip galvanizing furnace nose zinc ash treatment device according to claim 1, characterized in that: A furnace nose external vibrator (1011) is provided on the outer side wall of the furnace nose (1).
