A multi-disc permanent magnet eddy current speed regulating device for reducing axial load
Through the design of a multi-disk permanent magnet eddy current speed regulation device, the drive device and bearing support structure are optimized using spacer barrels, springs and synchronous gears, and the problem of excessive bearing load in the disc permanent magnet transmission equipment is solved, and the small size of the equipment is realized Improve stability and meet the needs of high-power transmission.
Patent Information
- Application Number
- CN202010883111.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-08-28
AI Technical Summary
Disc permanent magnet transmission equipment has high bearing load problems caused by axial force, which leads to heat, wear and lubrication problems of bearings. The equipment is large in size and low in reliability, especially when high-power transmission is too large, which affects installation and reliability. sex.
The multi-disk permanent magnet eddy current speed regulation device is adopted, and the conductor disk is connected through the spacer barrel, the spring and synchronous gear are set, the driving device and bearing support structure are optimized, and the axial load is reduced. The multi-disk series structure and simple-support beam structure are adopted. Improve device stability and synchronization consistency.
Effectively reduce the axial load of the equipment, optimize the bearing selection, extend the service life, reduce production costs, improve the stability and installation convenience of the equipment, and meet the needs of high-power transmission.
Smart Images

Figure CN112187011B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of transmission equipment, and in particular relates to a multi-disc permanent magnet eddy current speed regulating device that reduces axial load. Background Art
[0002] The permanent magnet eddy current transmission technology of the disc structure includes a conductor disc and a permanent magnetic disc. The magnetic force generated by the eddy current in the conductor disc interacts with the permanent magnetic disc to achieve energy transfer. The transfer state is related to the air gap between the conductor disc and the permanent magnetic disc. The air gap between the conductor disc and the permanent magnetic disc is adjusted by the adjustment device to achieve the change of the transmission torque and speed. Due to the characteristics of the magnetic steel, a large axial force will be generated between the conductor disc and the magnetic disc. This axial force will cause the drive bearing to bear a large axial load. During the speed regulation process of the equipment, the size and direction of the axial force will change with the speed difference and air gap.
[0003] For disc-type permanent magnet transmission equipment, the axial force generated between the conductor disc and the magnetic disc will act on the adjustment mechanism bearing and the output end bearing, which requires high requirements on bearing selection and bearing quality. In axial selection, problems such as limited maximum speed, insufficient load capacity, and short service life will be encountered. In actual application, problems such as bearing heating, wear, and lubrication often occur. At the same time, due to the large axial load, the specifications, volume, and weight of the selected actuator are all large.
[0004] In addition, as the disc-type transmission equipment needs to transmit greater torque, its diameter size is generally larger. Therefore, for high-power transmission equipment, when the motor power is too large, the use of the traditional single-disk structure will make the speed control equipment too large in size, affecting the installation of the equipment; in addition, it will also reduce the reliability of the equipment. Summary of the invention
[0005] The purpose of the present invention is to provide a multi-disk permanent magnet eddy current speed regulating device which reduces the axial load, so as to solve the technical problem.
[0006] The technical solution of the present invention to solve the above technical problems is as follows: a multi-disk permanent magnet eddy current speed regulation device for reducing axial load, comprising: an equipment housing, an input end, an output end, a disk synchronization device and a driving device; the input end comprises an input shaft, a first conductor disk assembly, a second conductor disk assembly and a connecting sleeve, the connecting sleeve is connected between the first conductor disk assembly and the second conductor disk assembly; the input shaft is connected to one side of the first conductor disk assembly; the first conductor disk assembly comprises a conductor disk 1 and a conductor disk 2 connected by a spacing cylinder, and the second conductor disk assembly comprises a conductor disk 3 and a conductor disk 4 connected by a spacing cylinder; the output end comprises an output shaft, a first disk assembly, and a second disk assembly; the first disk assembly and the second disk assembly are installed on the output shaft at intervals; the first disk assembly comprises a disk 1 and a disk 2, and the second disk assembly comprises a disk 3 and a disk 4; the first disk assembly is arranged between the conductor disk 1 and the conductor disk 2, and the disk 1 corresponds to Conductor disk one, disk two corresponds to conductor disk two; the second disk assembly is arranged between conductor disk three and conductor disk four, and disk three corresponds to conductor disk three, and disk four corresponds to conductor disk four; the disk is installed on the output shaft through a key connection; the disk synchronization device includes a center disk, a first synchronization rack, a second synchronization rack and a synchronization gear, the center disk is fixedly connected to the output shaft, the synchronization gear is installed on the center disk, one end of the first synchronization rack is connected to a disk in the disk assembly, and the other end is meshed with the synchronization gear, one end of the second synchronization rack is connected to another disk in the same disk assembly, and the other end is meshed with the synchronization gear; the driving device includes an actuator sleeve, a sleeve support bearing, a driving seat and a disk connecting rod, one end of the disk connecting rod is connected to disk two, and the other end is connected to disk four, one end of the actuator sleeve is connected to disk four and the other end is connected to the inner ring of the sleeve support bearing, and the outer ring of the sleeve support bearing is connected to the driving seat; it also includes a spring, and the spring is installed between disk two and disk three.
[0007] The multi-disc permanent magnet eddy current speed regulation device for reducing axial load of the present invention as described above, further, the input end also includes a hollow flange shaft and a conductor disk support bearing, the hollow flange shaft is installed on one side of the second conductor disk assembly, the inner ring of the conductor disk support bearing is connected to the hollow flange shaft, and the outer ring of the conductor disk support bearing is connected to the equipment housing.
[0008] The multi-disc permanent magnet eddy current speed regulation device for reducing axial load of the present invention as described above, further, the input end also includes an input shaft support bearing, the inner ring of the input shaft support bearing is connected to the input shaft, and the outer ring of the input shaft support bearing is connected to the equipment housing.
[0009] The multi-disk permanent magnet eddy current speed regulating device for reducing axial load of the present invention as described above, further, a connecting rod through-hole is provided on the disk three, and the disk connecting rod passes through the connecting rod through-hole to connect the disk two and the disk four.
[0010] The multi-disc permanent magnet eddy current speed regulation device for reducing axial load of the present invention as described above, further, the output end also includes an output shaft support bearing, the inner ring of the output shaft support bearing is connected to the output shaft, and the outer ring of the output shaft support bearing is connected to the equipment housing.
[0011] The beneficial effects of the present invention are:
[0012] In situations where high-power transmission equipment is required for operating conditions, a multi-disc series structural arrangement is adopted. On the basis of meeting the transmission capacity requirements of the equipment, the space occupied by the equipment in the radial direction can also be reduced; in addition, the application of the improved device will change the force structure of the overall disc-type speed regulation equipment. The application of this technology will enable the driving mechanism of the speed regulation equipment to provide a very small driving force to meet the driving requirements of the entire equipment, and the driving structure of the original equipment technology will be optimized through this technology to become small, simple and easy to arrange; the application of this technology also optimizes the selection design of the original equipment for bearings, so that the selection of bearings at the output end and the drive end is not affected by the axial force of the equipment, which can effectively improve the problems of bearing heating, wear, lubrication, etc., making the selection of bearings for equipment easier and simpler; and the application of this technology will also greatly reduce the production and manufacturing cost of the equipment, so that the equipment application related to this technology can better meet the market demand. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The above and / or other advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings. These drawings are only exemplary and do not limit the present invention.
[0014] in:
[0015] Figure 1 Schematic diagram of a multi-disk permanent magnet eddy current speed control device at maximum air gap to reduce axial load;
[0016] Figure 2 Schematic diagram of a multi-disk permanent magnet eddy current speed control device in minimum air gap to reduce axial load;
[0017] Figure 3 A schematic diagram of a magnetic disk according to an embodiment of the present invention;
[0018] Figure 4 A schematic diagram of a gear rack according to an embodiment of the present invention;
[0019] Figure 5 This is a schematic diagram of the force analysis of a multi-disk permanent magnet eddy current speed control device;
[0020] Figure 6 This is a schematic diagram of the center disk force analysis.
[0021] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0022] 1. Input end, 11. Input shaft, 12. First conductor disk assembly, 121. Conductor disk one, 122. Conductor disk two, 123. Spacer tube, 13. Second conductor disk assembly, 14. Connecting sleeve, 15. Hollow flange shaft, 16. Conductor disk support bearing, 17. Input shaft support bearing, 2. Output end, 21. Output shaft, 22. First disk assembly, 221. Disk one, 222. Disk two, 23. Second disk assembly, 231. Disk three, 232. Disk four, 233. Connecting rod perforation, 24. Output shaft support bearing, 3. Equipment housing, 4. driving device, 41. actuator sleeve, 42. sleeve support bearing, 43. driving seat, 44. disk connecting rod, 5. center disk, 6. spring, 71. first magnetic attraction force, 72. second magnetic attraction force, 73. third magnetic attraction force, 74. fourth magnetic attraction force, 75. first elastic force, 76. second elastic force, 77. driving force, 78. shaft balancing force. DETAILED DESCRIPTION
[0023] Hereinafter, embodiments of a multi-disk permanent magnet eddy current speed regulating device for reducing axial load of the present invention will be described with reference to the accompanying drawings.
[0024] The embodiments described herein are specific embodiments of the present invention, which are used to illustrate the concept of the present invention, are illustrative and exemplary, and should not be construed as limiting the embodiments of the present invention and the scope of the present invention. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the claims and the contents disclosed in the specification of this application, including technical solutions that adopt any obvious replacement and modification of the embodiments described herein.
[0025] The drawings of this specification are schematic diagrams, which assist in explaining the concept of the present invention and schematically show the shapes of various parts and their mutual relationships. Please note that in order to clearly show the structures of various components of the embodiments of the present invention, the drawings are not drawn according to the same scale. The same reference numerals are used to represent the same parts.
[0026] Figure 1-6 A multi-disk permanent magnet eddy current speed regulating device for reducing axial load according to an embodiment of the present invention is shown, which comprises: a device housing 3, an input end 1, an output end 2, a disk synchronization device and a driving device 4;
[0027] The input end 1 includes an input shaft 11, a first conductor disc assembly 12, a second conductor disc assembly 13 and a connecting sleeve 14, wherein the connecting sleeve 14 is connected between the first conductor disc assembly 12 and the second conductor disc assembly 13; the input shaft 11 is connected to one side of the first conductor disc assembly 12; the first conductor disc assembly 12 includes a conductor disc 121 and a conductor disc 2 122 connected by a spacer cylinder 123, and the second conductor disc assembly 13 includes a conductor disc 3 and a conductor disc 4 connected by a spacer cylinder 123;
[0028] The output end 2 includes an output shaft 21, a first disk assembly 22, and a second disk assembly 23; the first disk assembly 22 and the second disk assembly 23 are installed on the output shaft 21 at intervals; the first disk assembly 22 includes a disk 1 221 and a disk 2 222, and the second disk assembly 23 includes a disk 3 231 and a disk 4 232; the first disk assembly 22 is arranged between the conductor disk 1 121 and the conductor disk 2 122, and the disk 1 221 corresponds to the conductor disk 1 121, and the disk 2 222 corresponds to the conductor disk 2 122; the second disk assembly 23 is arranged between the conductor disk 3 and the conductor disk 4, and the disk 3 231 corresponds to the conductor disk 3, and the disk 4 232 corresponds to the conductor disk 4; the disks are installed on the output shaft 21 through key connection;
[0029] The disk synchronization device includes a center disk 5, a first synchronization rack, a second synchronization rack and a synchronization gear. The center disk 5 is fixedly connected to the output shaft 21. The synchronization gear is installed on the center disk 5. One end of the first synchronization rack is connected to a disk in the disk assembly, and the other end is meshed with the synchronization gear. One end of the second synchronization rack is connected to another disk in the same disk assembly, and the other end is meshed with the synchronization gear.
[0030] The driving device 4 includes an actuator sleeve 41, a sleeve support bearing 42, a driving seat 43 and a disk connecting rod 44, one end of the disk connecting rod 44 is connected to the disk 222, and the other end is connected to the disk 4 232, one end of the actuator sleeve 41 is connected to the disk 4 232 and the other end is connected to the inner ring of the sleeve support bearing, and the outer ring of the sleeve support bearing 42 is connected to the driving seat 43;
[0031] It also includes a spring 6 which is installed between the second disk 222 and the third disk 231 .
[0032] Combination Figure 5Force analysis, when the device is in the maximum air gap, the spring is in a free state; when the device is in the minimum air gap, the spring is in a compressed state; take the conductor disk as the force analysis object, and the force analysis schematic diagram is shown as the arrow in the figure; suppose the suction of a single disk is F (single disk suction), the elastic force of the spring is T (spring elastic force), and the driving force is F (driving force). After force analysis, it can be known that the spring has a force on both conductor disk No. 2 and conductor disk No. 3, and the magnitude is equal and the direction is opposite, and both are overcoming the suction of the two disks; and the driving force F (driving force) provided by the actuator sleeve directly acts on disks No. 3 and No. 4, and also overcomes the suction of the disks; therefore, the force analysis equation given is: 4×F (single disk suction) = 2×T (spring elastic force) + F (driving force); (Here the spring elastic force is the force on a spring, acting on two conductor disks respectively, which is a pair of interaction forces, so it must be multiplied by a coefficient of 2). It can be seen from the force analysis and equations that the greater the elastic force provided by the spring, the smaller the required driving force; at this time, the design of the spring makes the elastic force of the spring close to 2 times F (the suction force of the minimum air gap of a single disc) at the maximum compression amount. At this time, only a small driving force is needed to drive the entire series disc speed regulation system; the above device can reduce the thrust of the driving device, so it can select a wider range of equipment and miniaturization. At the same time, due to the reduction of driving force, the requirements for the performance of the driving bearing are also reduced, so that it can be selected in a wider range. Through the above improvements, the service life of the driving bearing can be increased.
[0033] In the disc-type permanent magnet eddy current transmission equipment of the prior art, its input shaft is connected to the conductor disc, and the support method mostly adopts a cantilever beam structure arrangement supported by two deep groove ball bearings or a combination of multiple bearings. When the conductor disc is too large and too heavy, it is easy to cause a "top-heavy" situation. This arrangement is not conducive to the stability of the system operation, and it is easy to aggravate the vibration generated during the operation of the equipment, affecting the stable operation of the equipment.
[0034] The above-mentioned multi-disc permanent magnet eddy current speed regulation device for reducing axial load is further improved, and the input end 1 also includes a hollow flange shaft 15 and a conductor disk support bearing 16, the hollow flange shaft 15 is installed on one side of the second conductor disk assembly 13, the inner ring of the conductor disk support bearing 16 is connected to the hollow flange shaft 15, and the outer ring of the conductor disk support bearing 16 is connected to the equipment housing 3.
[0035] The advantage of the speed regulating device of the above embodiment is that, in the case where high-power transmission equipment is required, a multi-disc series structural arrangement is adopted, which can reduce the space occupied by the equipment radially on the basis of meeting the transmission capacity requirements of the equipment; the advantage of the present invention is that the arrangement of the input shaft and the conductor disk connection adopts a simply supported beam structure arrangement, which solves the problem of "top-heavy" of the existing equipment, and can effectively improve the heating, wear, lubrication and other problems of the bearing. This arrangement structure effectively improves the stability of the product to a certain extent, and also reduces the vibration generated during the operation of the equipment. It should be noted that the current products in the field of permanent magnet transmission are all transmission products suitable for motors with lower power and smaller transmission torque. For such products, the existing equipment does not have obvious problems such as heating, wear, and lubrication of the bearing due to "top-heavy". Moreover, the heating and damage of the bearing is also related to other factors. The technical personnel in this field have not found the problems existing in the arrangement of the conductor disk connection, and lack the motivation to make technical improvements to this part of the structure.
[0036] In a further preferred embodiment of a multi-disc permanent magnet eddy current speed regulation device for reducing axial load, the input end 1 also includes an input shaft support bearing 17, the inner ring of the input shaft support bearing 17 is connected to the input shaft 11, and the outer ring of the input shaft support bearing 17 is connected to the equipment housing 3.
[0037] In a further preferred embodiment of a multi-disk permanent magnet eddy current speed regulating device for reducing axial load, a connecting rod through hole 233 is provided on the disk 3 231, and the disk connecting rod 44 passes through the connecting rod through hole 233 to connect the disk 222 and the disk 4 232. The above structure can realize the synchronous movement of the four disks through only one set of driving devices, thereby achieving the simplification of the structure and the consistency of synchronization. The applicant has not found any technology in the prior art that requires synchronization of the four disks, and those skilled in the art lack the motivation to apply the above synchronization structure.
[0038] In a further preferred embodiment of a multi-disk permanent magnet eddy current speed regulating device for reducing axial load, the output end 2 further includes an output shaft support bearing 24, the inner ring of the output shaft support bearing 24 is connected to the output shaft 21, and the outer ring of the output shaft support bearing 24 is connected to the device housing 3. The arrangement of the output shaft support bearing can further improve the stability of the output shaft during rotation and avoid vibration.
[0039] The technical features disclosed above are not limited to the disclosed combinations with other features. Those skilled in the art may also make other combinations between the technical features according to the purpose of the invention to achieve the purpose of the invention.
Claims
1. A multi-disc permanent magnet eddy current speed regulating device for reducing axial load, characterized in that: include: The device comprises a housing (3), an input end (1), an output end (2), a disk synchronization device and a drive device (4); the input end (1) comprises an input shaft (11), a first conductor disk assembly (12), a second conductor disk assembly (13) and a connecting sleeve (14); the connecting sleeve (14) is connected between the first conductor disk assembly (12) and the second conductor disk assembly (13); the input shaft (11) is connected to one side of the first conductor disk assembly (12); the first conductor disk assembly (12) comprises a first conductor disk (121) and a second conductor disk (122) connected via a spacer cylinder (123); the second conductor disk assembly (13) comprises a first conductor disk (121) and a second conductor disk (122) connected via a spacer cylinder (123); The output end (2) comprises an output shaft (21), a first magnetic disk assembly (22), and a second magnetic disk assembly (23); the first magnetic disk assembly (22) and the second magnetic disk assembly (23) are installed on the output shaft (21) at intervals; the first magnetic disk assembly (22) comprises a magnetic disk 1 (221) and a magnetic disk 2 (222), and the second magnetic disk assembly (23) comprises a magnetic disk 3 (231) and a magnetic disk 4 (232); the first magnetic disk assembly (22) is arranged between the conductor disk 1 (121) and the conductor disk 2 (122), and the magnetic disk 1 (221) corresponds to the conductor disk 4 The first body disk (121) and the second disk (222) correspond to the second conductor disk (122); the second disk assembly (23) is arranged between the third conductor disk and the fourth conductor disk, and the third disk (231) corresponds to the third conductor disk, and the fourth disk (232) corresponds to the fourth conductor disk; the disks are mounted on the output shaft (21) through a key connection; the disk synchronization device comprises a center disk (5), a first synchronization rack, a second synchronization rack and a synchronization gear, the center disk (5) is fixedly connected to the output shaft (21), the synchronization gear is mounted on the center disk (5), one end of the first synchronization rack is connected to a disk in the disk assembly, and the other end is meshed with the synchronization gear, and the second synchronization gear is meshed with the synchronization gear. One end of the rod is connected to another disk in the same disk assembly, and the other end is meshed with the synchronous gear; the driving device (4) comprises an actuator sleeve (41), a sleeve support bearing (42), a drive seat (43) and a disk connecting rod (44), one end of the disk connecting rod (44) is connected to disk two (222), and the other end is connected to disk four (232), one end of the actuator sleeve (41) is connected to disk four (232) and the other end is connected to the inner ring of the sleeve support bearing, and the outer ring of the sleeve support bearing (42) is connected to the drive seat (43); it also includes a spring (6), and the spring (6) is installed between disk two (222) and disk three (231); The input end (1) further comprises a hollow flange shaft (15) and a conductor disc support bearing (16), wherein the hollow flange shaft (15) is mounted on one side of the second conductor disc assembly (13), the inner ring of the conductor disc support bearing (16) is connected to the hollow flange shaft (15), and the outer ring of the conductor disc support bearing (16) is connected to the device housing (3); The input end (1) further comprises an input shaft support bearing (17), the inner ring of the input shaft support bearing (17) being connected to the input shaft (11), and the outer ring of the input shaft support bearing (17) being connected to the device housing (3).
2. The multi-disc permanent magnet eddy current speed regulating device for reducing axial load according to claim 1, characterized in that: The disk three (231) is provided with a connecting rod through hole (233), and the disk connecting rod (44) passes through the connecting rod through hole (233) to connect the disk two (222) and the disk four (232).
3. The multi-disc permanent magnet eddy current speed regulating device for reducing axial load according to claim 1, characterized in that: The output end (2) further comprises an output shaft support bearing (24), the inner ring of the output shaft support bearing (24) being connected to the output shaft (21), and the outer ring of the output shaft support bearing (24) being connected to the device housing (3).