Prefabricated component production system and production process

By optimizing the arrangement and equipment design of component production units of the concrete prefabricated components production system, the problems of unreasonable process flow and high consumption in the existing technology are solved, efficient, energy-saving and safe production are achieved, and manufacturing costs and labor intensity are reduced.

CN112297209BActive Publication Date: 2025-01-03周兆弟
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910707868.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-01
Publication Date
2025-01-03
Estimated Expiration
2039-08-01

AI Technical Summary

Technical Problem

When the existing concrete prefabricated pile production system is processed in the factory, the process flow is unreasonable, resulting in high production efficiency and manufacturing costs, and the mold is not easy to deform, but consumes a large amount of steam, which is high cost.

Method used

Design a prefabricated component production system, including multiple component production units, each unit is equipped with main rib processing equipment, cage knitting machine, fixed mold table, steel cage delivery vehicle and concrete fabric truck. Through optimized layout and equipment design, steel bars are realized Efficient delivery and injection of cages and concrete materials, reducing waiting time and energy consumption.

Benefits of technology

It improves production efficiency, reduces workers' labor intensity and manufacturing costs, ensures product quality, and reduces steam consumption and energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112297209B_ABST
    Figure CN112297209B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated component production system and production process, the production system includes a plurality of component production units distributed in the transverse direction, each of the component production units is mainly composed of main reinforcement processing equipment, cage weaving machine, fixed mold platform, steel cage delivery vehicle, concrete distribution vehicle and other equipment, wherein the fixed mold platform is located at the rear side of the cage weaving machine in the longitudinal direction, including a first fixed mold platform and a second fixed mold platform arranged side by side in the transverse direction, and a running channel corresponding to the cage weaving machine in the longitudinal direction is formed between the first fixed mold platform and the second fixed mold platform; the steel cage delivery vehicle can reciprocate along the running channel between the receiving position and the delivery position, and the concrete distribution vehicle can reciprocate along the running channel and inject the carried concrete material into the component molds of the first fixed mold platform and the second fixed mold platform during the movement. The manufacturing system can operate efficiently, energy-saving, safely and time-saving, and can reduce the labor intensity and manufacturing cost of workers while ensuring product quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of precast concrete piles, and in particular to a production system for producing precast concrete components. The present invention also relates to a method for producing precast concrete piles. Background Art

[0002] Precast piles used in the construction field mainly include two types of precast concrete piles and steel piles. Precast concrete piles are concrete piles with steel cages inside that are prefabricated in factories. They are characterized by being able to withstand large loads, being strong and durable, and having a fast construction speed.

[0003] Precast concrete piles are mostly processed and manufactured in the ground work area of ​​the factory. The production process usually includes preparing concrete materials, preparing steel cages, placing steel cages into molds, tensioning, injecting concrete materials into molds, steam curing, demoulding, stacking, etc. Since the entire production process is carried out in a factory with limited area and space, it is particularly important to reasonably arrange and control each production process.

[0004] Moreover, once the manufacturing system is put into use, it will be very difficult and costly to change it. Therefore, the scientific and reasonable design of the concrete precast pile manufacturing system and manufacturing process is the key scientific research direction of each manufacturer when building or upgrading a factory and before formal production.

[0005] For example, CN109676783A discloses a fixed formwork prestressed concrete square pile production line and production process, which is equipped with a mixing area, a distribution area, a cage weaving area and a molding area. The mixing area is provided with a cementitious material silo and a mixing tower. The distribution area is provided with a secondary material distribution hopper, a distribution hopper and a distribution vehicle. The cage weaving area is provided with a cage weaving machine and a steel cage stacking area. The molding area is provided with a tensioning machine, a tensioning machine track and a fixed formwork. The fixed formwork is provided with a tensioning longitudinal beam and a tensioning cross beam. A plurality of steam pipes are evenly arranged at the bottom of the fixed formwork, and the steam pipes are connected to the steam main pipe.

[0006] The mold of this production line is not easy to deform, which solves the technical problems of large mold size, back and forth movement affecting product quality, large steam consumption and high cost when entering the steam curing tank for curing. However, since it uses a crane to lift the material hopper for material distribution, and the location design of each processing area is not very reasonable, it does not have a very obvious advantage in production efficiency and manufacturing cost. Summary of the invention

[0007] The object of the present invention is to provide a prefabricated component production system which can operate efficiently, energy-saving, safely and time-saving, and can reduce the labor intensity of workers and manufacturing costs while ensuring product quality.

[0008] Another object of the present invention is to provide a prefabricated component production process.

[0009] To achieve the above object, the present invention provides a prefabricated component production system, comprising a plurality of component production units distributed in a transverse direction, each of the component production units being provided with:

[0010] Main reinforcement processing equipment, including a main reinforcement straightening and cutting machine and a head-piercing machine, wherein the main reinforcement straightening and cutting machine is used to cut the disc-shaped main reinforcement into fixed-length main reinforcements, and the head-piercing machine is used to install sleeve nuts on both ends of the straight main reinforcement by means of upsetting after cutting;

[0011] A cage weaving machine, located beside the main reinforcement processing equipment, is used to weld the main reinforcement and spiral reinforcement into a steel cage with a square cross section;

[0012] A fixed die table is located at the rear side of the cage weaving machine in the longitudinal direction, and includes a first fixed die table and a second fixed die table arranged side by side in the transverse direction, wherein a running channel corresponding to the cage weaving machine in the longitudinal direction is formed between the first fixed die table and the second fixed die table;

[0013] A steel cage delivery vehicle is capable of reciprocating along the running channel between a receiving position and a delivery position, so as to receive the steel cage from the cage weaving machine at the receiving position, and to place the steel cage into the component molds of the first fixed mold platform and the second fixed mold platform at the delivery position;

[0014] The concrete placing vehicle can reciprocate along the running channel and inject the carried concrete material into the component molds of the first fixed mold platform and the second fixed mold platform during the movement.

[0015] Preferably, the steel cage delivery vehicle includes a vehicle body, a steel cage accommodating space arranged on the vehicle body, and retractable extension arms arranged on both sides of the vehicle body; in different extended states, the extension arms correspond to different component molds in the first fixed mold platform and the second fixed mold platform, so as to place the steel cage into the corresponding component mold along the extension arms.

[0016] Preferably, in the extended state, the extension arm has a downward tilt angle relative to the horizontal plane, so that the steel cage slides along the extension arm into the component molds of the first fixed mold platform and the second fixed mold platform.

[0017] Preferably, the steel cage accommodating space of the vehicle body is provided with a lifting platform and a lifting mechanism, wherein the lifting platform is located at the bottom of the steel cage accommodating space and is used to carry the steel cage; the lifting mechanism is arranged below the lifting platform and is used to drive the lifting platform to rise or fall so that the steel cage can be transferred to the extension arm.

[0018] Preferably, the concrete placing vehicle has a vehicle box for carrying concrete materials and a material delivery pipe located on both sides of the vehicle box and extending outward in a lateral direction, and the material delivery pipe is provided with a discharge port corresponding to the component molds of the first fixed mold platform and the second fixed mold platform.

[0019] Preferably, a steel cage passage extending front to back in the longitudinal direction is provided below the concrete placing vehicle, and the steel cage produced by the cage weaving machine passes through the steel cage passage and is transported to the steel cage placing vehicle.

[0020] Preferably, two groups of the first fixed mold platforms and the second fixed mold platforms are provided in the longitudinal direction, and a tensioning machine is provided between opposite ends of the two groups of the first fixed mold platforms and the second fixed mold platforms.

[0021] Preferably, a longitudinal pile-extracting channel and a pile-extracting transport vehicle capable of reciprocating along the pile-extracting channel are provided between two adjacent component production units.

[0022] Preferably, it further comprises a concrete mixing mechanism arranged on the concrete placing vehicle to supply materials to the concrete placing vehicle; the concrete mixing mechanism is provided with a transverse material conveying pipeline and a longitudinal material conveying pipeline connected to the transverse material conveying pipeline, and each of the longitudinal material conveying pipelines is respectively used to convey concrete materials to the corresponding concrete placing vehicle.

[0023] To achieve the above another object, the present invention provides a precast component production process, which uses any of the above precast component production systems to produce concrete precast components, including:

[0024] Mixing and preparing concrete materials according to the formula, and supplying the prepared concrete materials to each of the concrete placing vehicles;

[0025] The main reinforcement processing equipment and the cage weaving machine are used to make a reinforcement cage, and the made reinforcement cage is placed on the reinforcement cage delivery vehicle;

[0026] Controlling the reinforcement cage delivery vehicle to run to the delivery position in the running channel, and placing the reinforcement cage into the component molds of the first fixed mold platform and the second fixed mold platform;

[0027] Connect the two ends of the steel cage to the tensioning mechanism respectively, and tension the steel cage along the length direction of the steel cage by the tensioning machine to make the steel cage prestressed;

[0028] Controlling the concrete placing vehicle to run along the length direction of the first fixed formwork platform and the second fixed formwork platform in the running channel, and injecting concrete material into the component molds of the first fixed formwork platform and the second fixed formwork platform during the running process;

[0029] After the curing, steam is introduced into the first fixed die table and the second fixed die table for steam curing;

[0030] The precast concrete components in the component mold are lifted by a crane for demoulding;

[0031] The precast concrete components are transported from the pile exit channel to outside the site.

[0032] The prefabricated component production system provided by the present invention is provided with a plurality of component production units, each of which is mainly composed of main reinforcement processing equipment, a cage weaving machine, a fixed formwork platform, a steel cage delivery vehicle, a concrete distribution vehicle and other equipment, and the cage weaving machine corresponds to the operation channel between the first fixed formwork platform and the second fixed formwork platform, the steel cage produced by the cage weaving machine can be directly transported to the steel cage delivery vehicle along the longitudinal direction, both the steel cage delivery vehicle and the concrete distribution vehicle can be operated in the operation channel, and two functions can be realized at the same time, the steel cage delivery vehicle can deliver the steel cage to the first fixed formwork platform on one side, and can also deliver the steel cage to the second fixed formwork platform on the other side, the concrete distribution vehicle can simultaneously inject concrete materials into the first fixed formwork platform and the second fixed formwork platform on both sides thereof, in each component production unit, concrete prefabricated components can be produced relatively independently at the same time, and its steel cage delivery vehicle, concrete distribution vehicle and other equipment can operate relatively independently without affecting each other, thus reducing waiting time, each production unit is reasonably arranged, the process is smooth, and the production efficiency can be significantly improved while saving area and space.

[0033] In addition, the present invention adopts a concrete placing vehicle for placing materials, and does not need to adopt a crane to lift the placing vehicle for placing materials, which reduces the operating frequency and distance of the crane, is beneficial to reducing energy consumption, and avoids the potential safety hazards caused by too frequent lifting operations. The time required for the concrete placing vehicle from receiving materials to completing the placing is relatively short, and the transportation distance and transportation time of the steel cage, tensioning parts and precast concrete components are also relatively short, which can speed up the production rhythm, improve production capacity, and reduce the labor intensity and manufacturing costs of workers while ensuring product quality.

[0034] The prefabricated component production process provided by the present invention applies the above-mentioned prefabricated component production system to produce concrete prefabricated components. Since the prefabricated component production system has the above-mentioned technical effects, the prefabricated component production process should also have corresponding technical effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 A schematic diagram of the structure of a prefabricated component production system disclosed in an embodiment of the present invention;

[0036] Figure 2 for Figure 1 A top view of the precast component production system shown;

[0037] Figure 3 for Figure 1 The structural schematic diagram of the prefabricated component production system shown in another perspective;

[0038] Figure 4 A schematic diagram of a steel cage delivery vehicle delivering a steel cage;

[0039] Figure 5 It is a structural schematic diagram of another steel cage delivery vehicle;

[0040] Figure 6 It is a structural schematic diagram of another steel cage delivery vehicle.

[0041] In the figure:

[0042] 1. Cage weaving machine 2. Rebar cage delivery vehicle 3. Concrete placing vehicle 4. Main reinforcement straightening and cutting machine 5. Pier head machine 6. First fixed mold platform 7. Second fixed mold platform 8. Running channel 9. Track 10. Rebar cage channel 11. Feed pipe 12. Tensioning machine 13. Concrete mixing mechanism 14. Horizontal feed pipe 15. Longitudinal feed pipe 16. Pile channel 17. Pile transport vehicle 18. Vehicle body 19. Rebar cage accommodation space 20. Extension arm 21. Lifting platform 22. Lifting mechanism 23. Hydraulic cylinder 24. Grate plate 25. Roller 26. Rebar cage DETAILED DESCRIPTION

[0043] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0044] In this article, the terms "upper, lower, inside, outside" and the like are established based on the positional relationships shown in the drawings. The corresponding positional relationships may also change depending on the drawings, and therefore cannot be understood as absolute limitations on the scope of protection; moreover, relational terms such as "first" and "second" and the like are merely used to distinguish one component from another with the same name, and do not necessarily require or imply any actual relationship or order between these components.

[0045] Please refer to Figure 1 , Figure 2 , Figure 3 , Figure 1 A schematic diagram of the structure of a prefabricated component production system disclosed in an embodiment of the present invention; Figure 2 for Figure 1 A top view of the precast component production system shown; Figure 3 for Figure 1 The structural schematic diagram of the prefabricated component production system shown in another perspective.

[0046] In a specific embodiment, the prefabricated component production system provided by the present invention is mainly composed of a crane and a ground work area located in a production workshop. The entire production workshop is roughly rectangular in a top view, with a certain length and width, and the size can be determined according to the specific plan. Inside the production workshop, a crane for performing various lifting operations is erected in a cross-sectional manner in the overhead area, and the work area based on the ground is divided into multiple work areas. A component production unit is set up in each work area, and all component production units operate in an overall coordinated manner according to the set process to achieve orderly production of prefabricated concrete components.

[0047] Since the entire production system is composed of multiple component production units, in order to save space, the following mainly introduces one of the component production units in detail. The other component production units are generally the same in structure. There may be slight differences between the component production units, for example, the length and number of fixed mold tables may be inconsistent, etc. Such differences should not constitute an obstacle to an accurate understanding of the present invention.

[0048] As shown in the figure, each component production unit is mainly composed of main reinforcement processing equipment, cage weaving machine 1, fixed formwork platform, reinforcement cage delivery vehicle 2, concrete placing vehicle 3 and other parts.

[0049] The main reinforcement processing equipment is mainly composed of a main reinforcement straightening and cutting machine 4 and a head piercing machine 5, wherein the main reinforcement straightening and cutting machine 4 is used to cut the disc-shaped main reinforcement into fixed-length main reinforcements, and the head piercing machine 5 is used to install sleeve nuts on both ends of the straight main reinforcement by roughening after cutting.

[0050] The cage weaving machine 1 is located beside the main reinforcement processing equipment and is used to weld the main reinforcement and spiral reinforcement into a reinforcement cage with a square cross section.

[0051] The steel cage is mainly composed of main bars distributed in a rectangular array and spiral bars wrapped and welded on the periphery of the main bars. Both ends of the main bars are usually provided with piers and sleeve nuts that are reversely locked with the piers. In the process of making the steel cage, the main bars distributed in the array pass through the cage weaving machine under the action of traction, and in the process of passing through the cage weaving machine, the cage weaving machine wraps and welds the spiral bars on the periphery of the main bars.

[0052] The fixed mold platform is located at the rear side of the cage weaving machine in the longitudinal direction, and is divided into a first fixed mold platform 6 and a second fixed mold platform 7 arranged side by side in the transverse direction. An operating channel 8 corresponding to the cage weaving machine 1 in the longitudinal direction is formed between the first fixed mold platform 6 and the second fixed mold platform 7.

[0053] The first fixed mold platform 6 and the second fixed mold platform 7 are respectively provided with a tensioning longitudinal beam, a tensioning cross beam, and a component mold located inside. The tensioning cross beams at both ends are respectively provided with a tensioning mechanism including a tensioning wire rod. When the steel cage is tensioned, the tensioning longitudinal beam and the tensioning cross beam bear the tensioning force, and the component mold does not bear the tensioning force. Therefore, the component mold can be made of thinner steel. The component mold is mainly composed of a bottom mold and a plurality of U-shaped mold cavities with openings upward located above the bottom mold, and multiple components can be produced at one time. The tensioning longitudinal beam and the tensioning cross beam form a long strip space closed in the circumferential direction, and a steam pipe is provided at the bottom thereof. The steam pipe is connected to the steam main pipe, and steam can be introduced into the fixed mold platform through the steam pipe for steam curing. When steam curing is performed, a steaming cover can be set on the top of the fixed mold platform or covered with canvas to prevent steam leakage and ensure the steaming effect.

[0054] A track 9 is provided in the running channel 8 between the first fixed formwork platform 6 and the second fixed formwork platform 7. The steel cage delivery vehicle 2 can reciprocate between the receiving position and the delivery position along the track 9. A steel cage channel 10 that runs through the front and back along the longitudinal direction is provided below the concrete placing vehicle 3, so that the steel cage delivery vehicle 2 can receive the steel cage from the cage weaving machine 1 at the receiving position. The steel cage produced by the cage weaving machine 1 passes through the steel cage channel 10 and is transported to the steel cage delivery vehicle 2. After receiving the steel cage, the steel cage delivery vehicle 2 runs along the track 9 in the running channel 8 to the delivery position to further place the steel cage into the component mold of the first fixed formwork platform 6 and the second fixed formwork platform 7.

[0055] The concrete placing vehicle 3 has a vehicle box for carrying concrete materials and a feed pipe 11 located on both sides of the vehicle box and extending outward in the lateral direction. The length of the feed pipe 11 is substantially equivalent to the width of the first fixed mold platform 6 and the second fixed mold platform 7. The feed pipe 11 is provided with discharge ports corresponding to the component molds of the first fixed mold platform 6 and the second fixed mold platform 7 so as to inject the carried concrete materials into the component molds of the first fixed mold platform 6 and the second fixed mold platform 7 during the movement along the running channel.

[0056] In order to prevent the concrete material from being blocked in the delivery pipe 11, a screw conveyor may be installed in the delivery pipe 11 to deliver the concrete material by mechanical propulsion, or a concrete pump may be installed in the vehicle to deliver the concrete material by pressurization.

[0057] Furthermore, two groups of first fixed mold platforms 6 and second fixed mold platforms 7 can be arranged in the longitudinal direction, and a tensioning machine 12 is provided between the opposite ends of the two groups of first fixed mold platforms 6 and second fixed mold platforms 7. The ends of each mold cavity of the two groups of first fixed mold platforms 6 and second fixed mold platforms 7 are provided with a tensioning mechanism including a tensioning screw, so that the steel cage placed in the fixed mold platform can be tensioned by the tensioning machine 12, so that the steel cage has prestress.

[0058] In this embodiment, a total of four component production units are provided. In order to reduce the transportation distance of concrete as much as possible, a concrete mixing mechanism 13 (such as a concrete mixing plant) can be set in the middle position of one end of the four component production units. The concrete mixing mechanism 13 is provided with a transverse material conveying pipeline 14 extending to the left and right respectively, and a longitudinal material conveying pipeline 15 is connected to the transverse material conveying pipeline 14. Each longitudinal material conveying pipeline 15 is used to convey concrete materials to the corresponding concrete placing vehicle 3.

[0059] A longitudinal pile-exiting channel 16 and a pile-exiting transport vehicle 17 that can reciprocate along the pile-exiting channel 16 are provided between two adjacent component production units. The produced prefabricated concrete components are hoisted onto the pile-exiting transport vehicle 17 by a crane and transported out of the workshop along the pile-exiting channel 16 by the pile-exiting transport vehicle 17 .

[0060] Two cranes can be set up, and their operating areas cover four component production units to meet the needs of actual production. For example, one of the cranes is used to perform the task of lifting precast concrete components from the two component production units on the left for demoulding, and the other crane is used to perform the task of lifting precast concrete components from the two component production units on the right for demoulding.

[0061] Since the cage weaving machine 1, the garbage spreading machine 12, the concrete mixing mechanism 13, the crane and other equipment can be realized by using existing technologies, these equipments will not be described in detail in this article.

[0062] Please refer to Figure 4 , Figure 4 The present invention is a schematic diagram of the delivery process of a steel cage delivery vehicle when delivering a steel cage.

[0063] As shown in the figure, the steel cage delivery vehicle 2 includes a vehicle body 18, a steel cage accommodating space 19 arranged on the vehicle body, and retractable extension arms 20 arranged on both sides of the vehicle body; the extension arms 20 are multi-section telescopic structures. In different extended states, the extension arms 20 have different lengths, corresponding to different component molds in the first fixed mold platform 6 and the second fixed mold platform 7, so as to place the steel cage 26 into the corresponding component mold along the extension arms 20.

[0064] In at least one embodiment, the extension arm 20 has a downward tilt angle relative to the horizontal plane when in the extended state, so that the steel cage 26 slides along the extension arm 20 into the component molds of the first fixed mold platform 6 and the second fixed mold platform 7.

[0065] In order to transfer the steel cage 26 to the extension arm 20, a lifting platform 21 and a lifting mechanism 22 can be set in the steel cage accommodating space 19 of the vehicle body 18, wherein the lifting platform 21 is located at the bottom of the steel cage accommodating space 19 and is used to carry the steel cage 26, and the lifting mechanism 22 is arranged below the lifting platform 21 and is used to drive the lifting platform 21 to rise or fall.

[0066] A tilting mechanism is provided between the lifting platform 21 and the lifting mechanism 22. The tilting mechanism is composed of two hydraulic cylinders 23 (or cylinders) arranged symmetrically on the left and right. The lifting platform 21 is rotatably connected to the lifting mechanism 22 and can swing left and right. The two hydraulic cylinders 23 are arranged in a V shape, one end of which is hinged to the lifting platform 21, and the other end is hinged to the lifting mechanism 22. The lifting platform 21 can be driven to tilt left or right by the hydraulic cylinders 23, so that after the steel cage 26 is lifted to a certain height, the steel cage 26 can slide to the extension arm 20 under the action of its own gravity, and then slide along the extension arm 20 into the component mold of the fixed mold platform.

[0067] Of course, the steel cage can also be transferred to the extension arm 20 by other mechanisms. For example, in other embodiments, a grate plate 24 that can be lifted to the left and to the right can be installed on the lifting platform 21, and the steel cage 26 can be pushed to the extension arm 20 by the grate plate 24 (see Figure 5 ), or, rollers 25 or belts are installed on the lifting platform 21, and the rollers 25 or belts drive the steel cage 26 to move left or right respectively, thereby transferring it to the extension arm 20 (see Figure 6 ),etc.

[0068] The above embodiments are only preferred solutions of the present invention, and are not limited thereto. On this basis, targeted adjustments can be made according to actual needs to obtain different implementation methods. For example, the concrete mixing mechanism 13 is set at a position biased to one side; or the steel cage delivery vehicle 2 and the concrete placing vehicle 3 share the same set of tracks; or a common pile outlet channel 16 is set at the central position of the entire system, etc. Since there are many possible implementation methods, they will not be explained one by one here.

[0069] In addition, the technical solutions between the embodiments can be combined with each other, but it should be based on the fact that ordinary technicians in the field can implement it. If the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0070] In addition to the above-mentioned prefabricated component production system, the present invention also provides a prefabricated component production process, which uses the above-mentioned prefabricated component production system to produce concrete prefabricated components, including:

[0071] Mix and prepare concrete materials according to the formula, and supply the prepared concrete materials to each concrete placing vehicle 3;

[0072] The main reinforcement processing equipment and the cage weaving machine 1 are used to make the reinforcement cage, and the made reinforcement cage is placed on the reinforcement cage delivery vehicle 2;

[0073] Control the reinforcement cage delivery vehicle 2 to run to the delivery position in the running channel 8, and put the reinforcement cage into the component mold of the first fixed mold platform 6 and the second fixed mold platform 7;

[0074] Connect the two ends of the steel cage to the tensioning mechanism respectively, and tension the steel cage along the length direction of the steel cage by the tensioning machine 12, so that the steel cage has prestress;

[0075] Control the concrete placing vehicle 3 to run in the running channel 8 along the length direction of the first fixed mold platform 6 and the second fixed mold platform 7 in the fixed mold platform, and inject concrete material into the component molds of the first fixed mold platform 6 and the second fixed mold platform 7 during the running process;

[0076] After the curing, steam is introduced into the first fixed die table 6 and the second fixed die table 7 for steam curing;

[0077] The precast concrete components in the component mold are lifted by a crane for demoulding;

[0078] The precast concrete components are transported 16 out of the pile channel to the outside of the site.

[0079] The prefabricated components described in the present invention include but are not limited to prefabricated square piles, prefabricated beams, prefabricated columns, and prefabricated panels.

[0080] The above is a detailed introduction to the prefabricated component production system and production process provided by the present invention. This article uses specific examples to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the core idea of ​​the present invention. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present invention, the present invention can also be improved and modified in a number of ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims

1. Prefabricated component production system, characterized in that: It comprises a plurality of component production units distributed in the transverse direction, each of the component production units is provided with: Main reinforcement processing equipment, including a main reinforcement straightening and cutting machine and a head-piercing machine, wherein the main reinforcement straightening and cutting machine is used to cut the disc-shaped main reinforcement into fixed-length main reinforcements, and the head-piercing machine is used to install sleeve nuts on both ends of the straight main reinforcement by means of upsetting after cutting; A cage weaving machine, located beside the main reinforcement processing equipment, is used to weld the main reinforcement and spiral reinforcement into a steel cage with a square cross section; A fixed die table is located at the rear side of the cage weaving machine in the longitudinal direction, and includes a first fixed die table and a second fixed die table arranged side by side in the transverse direction, wherein a running channel corresponding to the cage weaving machine in the longitudinal direction is formed between the first fixed die table and the second fixed die table; A steel cage delivery vehicle is capable of reciprocating along the running channel between a receiving position and a delivery position, so as to receive the steel cage from the cage weaving machine at the receiving position, and to place the steel cage into the component molds of the first fixed mold platform and the second fixed mold platform at the delivery position; The concrete placing vehicle can reciprocate along the running channel and inject the carried concrete material into the component molds of the first fixed mold platform and the second fixed mold platform during the movement.

2. The prefabricated component production system according to claim 1, characterized in that: The steel cage delivery vehicle includes a vehicle body, a steel cage accommodating space arranged on the vehicle body, and retractable extension arms arranged on both sides of the vehicle body; in different extended states, the extension arms correspond to different component molds in the first fixed mold platform and the second fixed mold platform, so as to place the steel cage into the corresponding component mold along the extension arms.

3. The prefabricated component production system according to claim 2, characterized in that: In the extended state, the extension arm has a downward tilt angle relative to the horizontal plane, so that the steel cage slides along the extension arm into the component molds of the first fixed mold platform and the second fixed mold platform.

4. The prefabricated component production system according to claim 3, characterized in that: The steel cage accommodating space of the vehicle body is provided with a lifting platform and a lifting mechanism. The lifting platform is located at the bottom of the steel cage accommodating space and is used to carry the steel cage; the lifting mechanism is arranged below the lifting platform and is used to drive the lifting platform to rise or fall so that the steel cage can be transferred to the extension arm.

5. The prefabricated component production system according to claim 1, characterized in that: The concrete placing vehicle comprises a vehicle box for carrying concrete materials and a material delivery pipe located at both sides of the vehicle box and extending outward in a lateral direction, wherein the material delivery pipe is provided with a material discharge port corresponding to the component molds of the first fixed mold platform and the second fixed mold platform.

6. The prefabricated component production system according to claim 1, characterized in that: A steel cage passage that runs through the concrete placing vehicle in the longitudinal direction is provided below the concrete placing vehicle. The steel cage produced by the cage weaving machine passes through the steel cage passage and is transported to the steel cage placing vehicle.

7. The prefabricated component production system according to claim 1, characterized in that: Two groups of the first fixed mold platforms and the second fixed mold platforms are arranged in the longitudinal direction, and a tensioning machine is arranged between opposite ends of the two groups of the first fixed mold platforms and the second fixed mold platforms.

8. The prefabricated component production system according to claim 1, characterized in that: A longitudinal pile-exiting channel and a pile-exiting transport vehicle capable of reciprocating along the pile-exiting channel are provided between two adjacent component production units.

9. The prefabricated component production system according to claim 1, characterized in that: It further comprises a concrete mixing mechanism arranged on the concrete distribution vehicle to supply materials to the concrete distribution vehicle; the concrete mixing mechanism is provided with a transverse material delivery pipeline and a longitudinal material delivery pipeline connected to the transverse material delivery pipeline, and each of the longitudinal material delivery pipelines is respectively used to transport concrete materials to the corresponding concrete distribution vehicle.

10. A precast component production process, using the precast component production system according to any one of claims 1 to 9 to produce precast concrete components, comprising: Mixing and preparing concrete materials according to the formula, and supplying the prepared concrete materials to each of the concrete placing vehicles; The main reinforcement processing equipment and the cage weaving machine are used to make a reinforcement cage, and the made reinforcement cage is placed on the reinforcement cage delivery vehicle; Controlling the reinforcement cage delivery vehicle to run to the delivery position in the running channel, and placing the reinforcement cage into the component mold of the fixed mold platform; Connect the two ends of the steel cage to the tensioning mechanism respectively, and tension the steel cage along the length direction of the steel cage by the tensioning machine to make the steel cage prestressed; Controlling the concrete placing vehicle to run along the length direction of the fixed formwork platform in the running channel, and injecting concrete material into the component mold of the fixed formwork platform during the running process; After the static curing, steam is introduced into the fixed mold platform for steam curing; The precast concrete components in the component mold are lifted by the lifting equipment to demould; The precast concrete components are transported from the pile exit channel to outside the site.