A foundation pit structure and construction method thereof

A phased foundation pit structure with multiple stages and supporting units addresses the challenge of controlling deformation in large-span pits near rail transit, reducing costs and time through controlled excavation and enhanced rigidity.

CN112411556BActive Publication Date: 2024-12-03CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011457434.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-11
Publication Date
2024-12-03
Estimated Expiration
2040-12-11

AI Technical Summary

Technical Problem

Large-span foundation pits adjacent to rail transit face challenges in controlling deformation due to insufficient support stiffness, leading to increased concrete use, high costs, and prolonged construction periods, while maintaining the integrity of the rail transit foundation.

Method used

A phased foundation pit structure with multiple stages (first-phase, second-phase, and third-phase pits) and supporting units, allowing for controlled excavation and construction, reducing the need for temporary supports and enhancing rigidity, thereby minimizing deformation and construction time.

Benefits of technology

The phased approach reduces construction costs and time by minimizing the impact on the rail transit foundation, allowing for efficient excavation and reduced concrete usage while maintaining structural integrity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112411556B_ABST
    Figure CN112411556B_ABST
Patent Text Reader

Abstract

The embodiment of the present application discloses a foundation pit structure and a construction method thereof, including a first-phase foundation pit, a second-phase foundation pit, a third-phase foundation pit, a support unit, a first-phase basement, a second-phase basement and a third-phase basement, the first-phase foundation pit is arranged at intervals from the rail transit, the support unit is arranged in the soil layer on one side of the rail transit close to the first-phase foundation pit, the second-phase foundation pit and the third-phase foundation pit are arranged side by side between the first-phase foundation pit and the support unit; the first-phase basement includes a plurality of support piers and a first-phase bottom plate, a first-phase middle plate and a first-phase top plate, and a plurality of support piers are respectively fixed on the first-phase middle plate and the first-phase top plate; the second-phase basement includes a second-phase bottom plate, a second-phase middle plate and a second-phase top plate; the third-phase basement includes a third-phase bottom plate, a third-phase middle plate and a third-phase top plate; the support piers and the support unit can be used as the two ends of temporary support respectively. The foundation pit structure and the construction method thereof of the embodiment of the present application have the advantage of low engineering cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to civil engineering, and in particular to a foundation pit structure and a construction method thereof. Background Art

[0002] With the popularity of rail transit (such as high-speed rail, trains, urban rail, etc.), the number of foundation pit projects adjacent to rail transit is increasing. Since rail transit has extremely strict requirements on displacement and settlement of the foundation, taking high-speed rail as an example, high-speed rail only allows millimeter-level deformation. Therefore, the foundation pit structure next to the high-speed rail generally adopts a support method of bored piles or underground continuous walls combined with multiple internal supports to prevent deformation of the high-speed rail foundation during the foundation pit construction. However, the foundation pit structure varies in size. For the large-span foundation pit next to rail transit, if horizontal temporary supports are directly set in the foundation pit, on the one hand, the deformation cannot be controlled due to the large span resulting in too small support stiffness; therefore, the density of temporary supports will be increased, resulting in a large amount of concrete, high cost, and difficulty in demolition; in addition, it is difficult to dig the soil under a large number of temporary supports, and the construction efficiency is very low, which ultimately leads to high project costs and long construction periods. Summary of the invention

[0003] In view of this, the embodiments of the present application hope to provide a foundation pit structure and a construction method thereof to solve the problem of high project cost.

[0004] To achieve the above purpose, the technical solution of the embodiment of the present application is implemented as follows:

[0005] A foundation pit structure is located on a lateral side of a rail transit, the foundation pit structure includes a first-phase foundation pit, a second-phase foundation pit, a third-phase foundation pit, a support unit, a first-phase basement arranged in the first-phase foundation pit, a second-phase basement arranged in the second-phase foundation pit, and a third-phase basement arranged in the third-phase foundation pit, the first-phase foundation pit is arranged at intervals from the rail transit, the support unit is arranged in a soil layer on one side of the rail transit close to the first-phase foundation pit, the second-phase foundation pit and the third-phase foundation pit are arranged side by side between the first-phase foundation pit and the basement. The first-phase basement includes a plurality of supporting piers and a first-phase bottom plate, a first-phase middle plate and a first-phase top plate which are horizontally arranged in sequence from bottom to top, and the plurality of supporting piers are respectively fixed on the first-phase middle plate and the first-phase top plate; the second-phase basement includes a second-phase bottom plate, a second-phase middle plate and a second-phase top plate which are horizontally arranged in sequence from bottom to top; the third-phase basement includes a third-phase bottom plate, a third-phase middle plate and a third-phase top plate which are horizontally arranged in sequence from bottom to top; the supporting piers and the supporting units can respectively serve as the two ends of temporary support.

[0006] Furthermore, the number of the three-phase foundation pits is two, and the second-phase foundation pit is arranged between the two three-phase foundation pits.

[0007] Furthermore, the depth of the first-phase foundation pit is H, and the distance between the first-phase foundation pit and the rail transit is 2H to 6H.

[0008] Furthermore, the second-phase basement includes a second-phase exterior wall panel vertically arranged on one side close to the support unit, and the second-phase gap between the pit wall of the second-phase foundation pit and the second-phase exterior wall panel is filled with concrete, and / or; the third-phase basement includes a third-phase exterior wall panel vertically arranged on one side close to the support unit, and the third-phase gap between the pit wall of the third-phase foundation pit and the third-phase exterior wall panel is filled with concrete.

[0009] Furthermore, the support unit is a bored pile or an underground continuous wall.

[0010] Furthermore, the support unit includes a crown beam arranged at the top, and the crown beam and the support pier fixed on the first-phase top plate can respectively serve as the two ends of the temporary support; and / or, the support unit includes a waist beam arranged at the waist, and the waist beam and the support pier fixed on the first-phase middle plate can respectively serve as the two ends of the temporary support.

[0011] Furthermore, the first-phase bottom plate, the second-phase bottom plate and the third-phase bottom plate are reinforced concrete structures; and / or, the first-phase middle plate, the second-phase middle plate and the third-phase middle plate are reinforced concrete structures; and / or, the first-phase top plate, the second-phase top plate and the third-phase top plate are reinforced concrete structures; and / or, the supporting pier is a reinforced concrete structure.

[0012] Furthermore, the thickness of the concrete layer in the area where the supporting pier is fixed on the first-phase middle plate and the first-phase top plate is thicker than that in other areas; the diameter of the steel bars in the area where the supporting pier is fixed on the first-phase middle plate and the first-phase top plate is larger than that in other areas.

[0013] A construction method for the above-mentioned foundation pit structure includes: driving the support unit into the soil layer; excavating the first-phase foundation pit; constructing the first-phase basement in the first-phase foundation pit; excavating the second-phase foundation pit and setting temporary supports between the support piers and the support unit; constructing the second-phase basement in the second-phase foundation pit; excavating the third-phase foundation pit and setting temporary supports between the support piers and the support unit; and constructing the third-phase basement in the third-phase foundation pit.

[0014] Furthermore, the step of excavating the second-phase foundation pit and setting a temporary support between the supporting pier and the supporting unit specifically includes: setting a first temporary support between the supporting unit and the supporting pier on the first-phase top plate; excavating the second-phase foundation pit downward to a depth corresponding to the first-phase middle plate; setting a second temporary support between the supporting unit and the supporting pier on the first-phase middle plate; and continuing to excavate the second-phase foundation pit downward to a preset depth.

[0015] Furthermore, the steps of constructing the second phase basement in the second phase foundation pit specifically include: constructing the second phase bottom plate and the second phase bottom plate replacement support in the second phase foundation pit, the second phase bottom plate is connected to the first phase bottom plate, and the second phase bottom plate replacement support is supported between the second phase bottom plate and the support unit; constructing the second phase middle plate and the second phase middle plate replacement support in the second phase foundation pit, the second phase middle plate is connected to the first phase middle plate, and the second phase middle plate replacement support is supported between the second phase middle plate and the support unit; removing the second temporary support; constructing the second phase top plate and the second phase top plate replacement support in the second phase foundation pit, the second phase top plate is connected to the first phase top plate, and the second phase top plate replacement support is supported between the second phase top plate and the support unit; removing the first temporary support.

[0016] Furthermore, the step of excavating the third-phase foundation pit and setting temporary supports between the supporting piers and the supporting units specifically includes: setting a third temporary support between the supporting unit and the supporting piers on the first-phase top plate; excavating the third-phase foundation pit downward to a depth corresponding to the first-phase middle plate; setting a fourth temporary support between the supporting unit and the supporting piers on the first-phase middle plate; and continuing to excavate the third-phase foundation pit downward to a preset depth.

[0017] Furthermore, the steps of constructing the third phase basement in the third phase foundation pit specifically include: constructing the third phase bottom plate and replacing the third phase bottom plate in the third phase foundation pit, the third phase bottom plate, the second phase bottom plate and the first phase bottom plate are connected to each other, and the third phase bottom plate replacement support is supported between the third phase bottom plate and the support unit; constructing the third phase middle plate and replacing the third phase middle plate in the third phase foundation pit, the third phase middle plate, the second phase middle plate and the first phase middle plate are connected to each other, and the third phase middle plate replacement support is supported between the third phase middle plate and the support unit; removing the fourth temporary support; constructing the third phase top plate and replacing the third phase top plate in the third phase foundation pit, the third phase top plate, the second phase top plate and the first phase top plate are connected to each other, and the third phase top plate replacement support is supported between the third phase top plate and the support unit; removing the third temporary support.

[0018] A foundation pit structure and construction method of an embodiment of the present application is provided with a first-phase foundation pit, a second-phase foundation pit, a third-phase foundation pit, a support unit, a first-phase basement a set in the first-phase foundation pit, a second-phase basement b set in the second-phase foundation pit, and a third-phase basement c set in the third-phase foundation pit, and the foundation pits originally excavated together are changed to be excavated three times and the corresponding basement structures are constructed in batches. The first-phase foundation pit is separated from the rail transit, and the interval is large in scale because the area of ​​the second-phase foundation pit and the third-phase foundation pit is reserved, so that the excavation of the first-phase foundation pit has very little impact on the foundation of the rail transit. Therefore, the first-phase foundation pit can be excavated without setting temporary support or with a small amount of temporary support, thereby speeding up the construction period and reducing construction costs.

[0019] In addition, the span of the second and third phase foundation pits is small, which makes the rigidity of the temporary support large and the setting density can be reduced accordingly, saving concrete pouring and facilitating dismantling in the later stage, reducing construction costs and labor costs. On the other hand, the longitudinal length of the second and third phase foundation pits is shorter than that of the first phase foundation pit, the excavation area is small, the excavation operation is fast, and the impact on the soil layer is small, ensuring that the second and third phase foundation pits will not cause the foundation of the rail transit to deform during the construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of the relative positions of a foundation pit structure and rail transit according to an embodiment of the present application;

[0021] Figure 2 for Figure 1 CC section view;

[0022] Figure 3 for Figure 1 DD cross-sectional view;

[0023] Figure 4 for Figure 2 A top view of

[0024] Figure 5 A schematic diagram of the connection relationship of the support piers of an embodiment of the present application;

[0025] Figure 6 The first step is to illustrate the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0026] Figure 7 This is a schematic diagram of process 2 of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0027] Figure 8 This is a schematic diagram of process three of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0028] Fig. 9This is a schematic diagram of process 4 of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0029] Fig.10 This is a schematic diagram of process 5 of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0030] Fig.11 Process 6 is a schematic diagram of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0031] Fig.12 This is a schematic diagram of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0032] Fig.13 Process 8 is a schematic diagram of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0033] Fig.14 Process nine is a schematic diagram of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0034] Fig.15 Process 10 is a schematic diagram of the construction process of the second phase foundation pit and the second phase basement of the embodiment of the present application;

[0035] Fig.16 A flowchart of a construction method according to an embodiment of the present application;

[0036] Fig.17 for Fig.16 Specific flow chart of step S40 in FIG.

[0037] Fig.18 for Fig.16 Specific flow chart of step S50 in FIG.

[0038] Fig.19 for Fig.16 Specific flow chart of step S60 in FIG.

[0039] Fig. 20 for Fig.16 Specific flow chart of step S70 in FIG. DETAILED DESCRIPTION

[0040] It should be noted that, in the absence of conflict, the embodiments and technical features in the embodiments of the present application can be combined with each other, and the detailed descriptions in the specific implementation methods should be understood as explanations of the present application and should not be regarded as improper limitations on the present application.

[0041] In the description of the embodiments of the present application, the directions or positional relationships of "up", "down", "left", "right", "front", and "rear" are based on the attached Figure 1Regarding the orientation or positional relationship shown, it should be understood that these orientation terms are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0042] Rail transit 9 can be a high-speed rail, train, light rail or tram. In the prior art, the bottom of rail transit 9 has a foundation, and tracks are laid on the foundation for passage, so rail transit 9 has high requirements for foundation deformation. When it is necessary to construct buildings near both sides of rail transit 9, the part of the foundation of rail transit 9 adjacent to the foundation pit of the building is exposed to the air, and its own gravity and the gravity of the passing vehicles are converted into horizontal forces, causing the foundation to be easily deformed. Therefore, during the construction process, in addition to supporting piles and other structures to maintain the stability of the soil body exposed to the air, temporary supports are also required to be set on the pit wall of the foundation pit to prevent the foundation of rail transit 9 from deforming. However, when the span of the foundation pit is too large, the supporting capacity of the temporary support is limited, which easily leads to too small support stiffness and inability to control deformation. If the density of the temporary support is increased, it will lead to a large amount of concrete, difficult removal and high cost; in addition, it is difficult to dig the lower part of a large number of temporary supports, and the construction efficiency is very low, which ultimately leads to high project cost and long construction period.

[0043] In the embodiment of the present application, without affecting the expression of the technical solution and without specific explanation, the basement refers to the first phase basement 4a, the second phase basement 4b and the third phase basement 4c, the bottom plate refers to the first phase bottom plate 41a, the second phase bottom plate 41b and the third phase bottom plate 41c, the middle plate refers to the first phase middle plate 42a, the second phase middle plate 42b and the third phase middle plate 42c. The top plate refers to the first phase top plate 3a, the second phase top plate 43b and the third phase top plate 43c.

[0044] In the present application embodiment, Figures 1 to 18 As shown, a foundation pit structure is located on one lateral side of the rail transit 9. That is, the foundation pit structure is located on any lateral side of the rail 9. The foundation pit structure includes a first-phase foundation pit 1, a second-phase foundation pit 2, a third-phase foundation pit 3, a support unit 5, a first-phase basement 4a arranged in the first-phase foundation pit 1, a second-phase basement 4b arranged in the second-phase foundation pit 2, and a third-phase basement 4c arranged in the third-phase foundation pit 3.

[0045] The support unit 5 is vertically arranged in the soil layer on one side of the rail transit 9 close to the first phase foundation pit 1 to maintain the stability of the soil body in the air, and the second phase foundation pit 2 and the third phase foundation pit 3 are arranged side by side between the first phase foundation pit 1 and the support unit 5; so that the support unit 5 can be used as a temporary support 8 to provide protection for the second phase foundation pit 2 and the third phase foundation pit 3. According to the site conditions and construction needs, the support unit 5 can be a bored pile or an underground continuous wall.

[0046] The first-stage basement 4a includes a plurality of supporting piers 47 and a first-stage bottom plate 41a, a first-stage middle plate 42a and a first-stage top plate 43a which are arranged horizontally from bottom to top. The plurality of supporting piers 47 are fixedly mounted on the first-stage middle plate 42a and the first-stage top plate 43a. Of course, a plurality of supporting columns (not shown) are arranged between the first-stage bottom plate 41a, the first-stage middle plate 42a and the first-stage top plate 43a to connect them into a rigid whole. The supporting columns can be arranged specifically according to the specific environment of the site.

[0047] The foundation pit that was originally excavated together is changed to be excavated three times and the corresponding basement structure is built in batches. The first-phase foundation pit 1 is set apart from the rail transit 9. The interval is large in scale because the area of ​​the second-phase foundation pit 2 and the third-phase foundation pit 3 is reserved, so the excavation of the first-phase foundation pit 1 has very little impact on the foundation of the rail transit 9. Therefore, the first-phase foundation pit 1 can be excavated without setting temporary supports 8 (mentioned below) or with a small amount of temporary supports 8, thereby speeding up the construction period and reducing construction costs.

[0048] The second phase basement 4b includes a second phase bottom plate 41b, a second phase middle plate 42b and a second phase top plate 43b which are arranged horizontally from bottom to top. Similarly, a plurality of supporting columns (not shown) are arranged between the second phase bottom plate 41b, the second phase middle plate 42b and the second phase top plate 43b to connect them into a rigid whole, and the supporting columns can be specifically arranged according to the specific environment of the site.

[0049] The third-phase basement 4c includes a third-phase bottom plate 41c, a third-phase middle plate 42c and a third-phase top plate 43c which are horizontally arranged in sequence from bottom to top; similarly, a plurality of supporting columns (not marked) are arranged between the third-phase bottom plate 41c, the third-phase middle plate 42c and the third-phase top plate 43c to connect them into a rigid whole, and the supporting columns can be specifically arranged according to the specific environment on site.

[0050] It is understandable that the plan shapes of the first phase foundation pit 1 and the first phase basement 4a, the second phase foundation pit 2 and the second phase basement 4b, and the third phase foundation pit 3 and the third phase basement 4c should be basically the same. The sum of the longitudinal lengths of the second phase basement 4b and the third phase basement 4c should be equal to the first phase basement 4a. The longitudinal length here refers to the length in the direction of the rail transit 9. The corresponding basement is built in the corresponding foundation pit, and the main building is further built on the basement.

[0051] The support pier 47 and the support unit 5 can serve as two ends of the temporary support. Specifically, after the construction of the first phase basement 4a is completed, the second phase foundation pit 2 and the third phase foundation pit 3 close to the rail transit 9 can be supported by the temporary support 8 (mentioned below) on the support pier 47 and the support unit 5 to form a horizontal support, and cooperate with the protection of the support unit 5 to prevent the second phase foundation pit 2 or the third phase foundation pit 3 from causing deformation of the foundation of the rail transit 9 during the construction process.

[0052] The first phase foundation pit 1, the first phase basement 4a, the second phase foundation pit 2, the second phase basement 4b, the third phase foundation pit 3 and the third phase basement 4c are constructed in sequence.

[0053] Specifically, after the construction of the first phase foundation pit 1 and the first phase basement 4a is completed, the second phase foundation pit 2 is excavated. After the excavation is completed, the second phase basement 4b is constructed in the second phase foundation pit 2. During the excavation of the second phase foundation pit 2, the first phase basement 4a can be considered as a fixed soil layer and can provide corresponding support functions. The temporary support 8 is supported between the support pier 47 and the support unit 5. On the one hand, the span of the second phase foundation pit 2 is small. Relatively speaking, the rigidity of the temporary support 8 is large, and the setting density can be reduced accordingly, saving concrete pouring, and it is also convenient to dismantle in the later stage, reducing construction costs and labor costs. On the other hand, the longitudinal length of the second phase foundation pit 2 is shorter than that of the first phase foundation pit 1, the excavation area is small, the excavation operation is fast, and the impact on the soil layer is small, ensuring that the second phase foundation pit 2 will not cause the foundation of the rail transit 9 to deform during the construction process.

[0054] In addition, after the construction of the first phase foundation pit 1 and the first phase basement 4a, the second phase foundation pit 2 and the second phase basement 4b is completed, the third phase foundation pit 3 is excavated, and after the excavation is completed, the third phase basement 4c is built in the third phase foundation pit 3. During the excavation of the third phase foundation pit 3, the first phase basement 4a and the second phase basement 4b can be considered as fixed soil layers and can provide corresponding support functions. Similarly, the third phase foundation pit 3 will not cause the foundation of the rail transit 9 to deform during the construction process, which will not be repeated here.

[0055] The completed first-phase basement 4a, second-phase basement 4b, and third-phase basement 4c should be connected as one. Taking the reinforced concrete structure as an example, the first-phase bottom plate 41a, the first-phase middle plate 42a, and the first-phase top plate 43a of the first-phase basement 4a should reserve steel bar joints (not marked); when the second-phase bottom plate 41b, the second-phase middle plate 42b, and the second-phase top plate 43b of the second-phase basement 4b are constructed, they should be tied and welded with the corresponding reserved steel bar joints of the first-phase basement 4a before concrete pouring; of course, the second-phase bottom plate 41b, the second-phase middle plate 42b, and the second-phase top plate 43b should also reserve steel bar joints (not marked); when the third-phase bottom plate 41c, the third-phase middle plate 42c, and the third-phase top plate 43c of the third-phase basement 4c are constructed, they should be tied and welded with the corresponding reserved steel bar joints of the first-phase basement 4a and the second-phase basement 4b before concrete pouring. Thus, the first phase bottom plate 41a, the second phase bottom plate 41b and the third phase bottom plate 41c are connected to each other and supported on the support unit 5; the first phase middle plate 42a, the second phase middle plate 42b and the third phase middle plate 42c are connected to each other and supported on the support unit 5; the first phase top plate 43a, the second phase top plate 43b and the third phase top plate 43c are connected to each other and supported on the support unit 5. Thus, the first phase basement 4a, the second phase basement 4b and the third phase basement 4c are connected as a whole, and can effectively support the support unit 5 to prevent the foundation of the rail transit 9 from deforming.

[0056] A possible embodiment is as follows Figure 1 As shown, there are two phase III foundation pits 3, and the phase II foundation pit 2 is arranged between the two phase III foundation pits 3. On the one hand, the longitudinal length of the phase III foundation pit 3 and the phase II foundation pit 2 is small, accounting for only 33% of the longitudinal length of the phase I foundation pit 1, the excavation area is small, the excavation operation is fast, and the impact on the soil layer is small; in addition, when the phase II foundation pit 2 is excavated, the soil layers corresponding to the two phase III foundation pits 3 are respectively located on both sides of the phase II foundation pit 2, and the fixed support of the phase I basement 4a is cooperated to ensure that the phase II foundation pit 2 will not cause the foundation of the rail transit 9 to deform during the construction process.

[0057] A possible embodiment is as follows Figures 1 to 5As shown, the depth B of the first phase foundation pit 1, the second phase foundation pit 2 and the third phase foundation pit 3 is H, then the distance A between the first phase foundation pit 1 and the rail transit 9 can be selected as 2H to 6H according to the nature of the soil layer. For non-soft soil layers, the distance A is preferably 3H; within this range, it is used as the excavation area of ​​the second phase foundation pit 2 and the third phase foundation pit 3, which will be implemented later; for soft soil layer foundation pits, the distance A is preferably 5H, and within this range, it is used as the excavation area of ​​the second phase foundation pit 2 and the third phase foundation pit 3, which will be implemented later. It can be understood that the distance E of the second phase foundation pit 2 and the third phase foundation pit 3 close to the rail transit 9 should comply with national regulations to meet the requirements of foundation strength, noise, etc. According to Article 10 of the current "Regulations on Railway Transportation Safety Protection", in urban areas, the distance E is not less than 8 meters; in suburban residential areas, the distance E is not less than 10 meters; in rural residential areas, the distance E is not less than 12 meters; in other areas, the distance E is not less than 15 meters.

[0058] A possible embodiment is as follows Figures 1 to 3 As shown, the first-phase basement 4a includes a first-phase exterior wall panel 45a arranged vertically. The first-phase exterior wall panel 45a, the supporting column, the first-phase bottom plate 41a, the first-phase middle plate 42a and the first-phase top plate 43a are connected to form the rigid body of the first-phase basement 4a. The second-phase basement 4b includes a second-phase exterior wall panel 45b arranged vertically, and the second-phase exterior wall panel 45b, the supporting column, the second-phase bottom plate 41b, the second-phase middle plate 42b and the second-phase top plate 43b are connected to form the rigid body of the second-phase basement 4b. The third-phase basement 4c includes a third-phase exterior wall panel 45c arranged vertically, and the third-phase exterior wall panel 45c, the supporting column, the third-phase bottom plate 41c, the third-phase middle plate 42c and the third-phase top plate 43c are connected to form the rigid body of the third-phase basement 4c.

[0059] Among them, the fertilizer trough (not marked) between the first-phase exterior wall panel 45a and the pit wall of the first-phase foundation pit 1, the fertilizer trough between the second-phase exterior wall panel 45b and the pit wall of the second-phase foundation pit 2, and the fertilizer trough between the third-phase exterior wall panel 45c and the pit wall of the third-phase foundation pit 3 should be backfilled with soil or concrete. The gravity of the rail transit 9 itself and the gravity of the passing vehicles are converted into horizontal force and transmitted to the pit wall of the foundation pit, and then further transmitted to the rigid basement structure through the fertilizer trough, and finally transmitted to the soil layer on the other side, effectively completing the force transmission and preventing the high-speed rail from deforming after the completion of the main structure in the later stage.

[0060] Among them, as the main direction of force, the fat groove between the second-phase outer wall panel 45b vertically arranged near the side of the support unit 5 and the second-phase foundation pit 2, that is, the second-phase gap 48b, should be filled with concrete. The fat groove between the third-phase outer wall panel 45c vertically arranged near the side of the support unit 5 and the pit wall of the third-phase foundation pit 3, that is, the third-phase gap 48c, should be filled with concrete. Prevent the basement structure from being affected by the replacement of the support and the backfill from being loose, and avoid deformation of the high-speed rail after the main structure is completed in the later stage.

[0061] A possible embodiment is as follows Figures 1 to 3 As shown, the basement may include a waterproof layer 46. The waterproof layer 46 covers the bottom plate, middle plate, top plate and outer wall plate of the basement to prevent water accumulation in the soil layer from leaking.

[0062] A possible embodiment is as follows Figures 1 to 3 As shown, the support unit 5 includes a crown beam 51 arranged at the top. The crown beam 51 usually extends along the direction of travel of the rail transit 9; the crown beam 51 and the support pier 47 fixedly installed on the first-phase top plate 43a can respectively serve as the two ends of the temporary support 8. In addition, the support unit 5 may also include a waist beam 52 arranged at the waist. The waist beam 52 usually extends along the direction of travel of the rail transit 9; the waist beam 52 and the support pier 47 fixedly installed on the first-phase middle plate 42a can respectively serve as the two ends of the temporary support 8.

[0063] The horizontal force from the soil layer borne by the support unit 5 is transmitted to the temporary support 8 through the crown beam 51 and the waist beam 52, and then transmitted to the support pier 47, and then transmitted to the top plate and the middle plate of the basement; and then transmitted to the soil layer through the rigid basement structure, completing the force transmission and effectively preventing the foundation deformation of the rail transit 9.

[0064] In a possible embodiment, the first-stage bottom plate 41a, the first-stage middle plate 42a, the first-stage top plate 43a and the supporting pier 47 can be reinforced concrete structures. The second-stage bottom plate 41b, the second-stage middle plate 42b and the second-stage top plate 43b can be reinforced concrete structures. The third-stage bottom plate 41c, the third-stage middle plate 42c and the third-stage top plate 43c can be reinforced concrete structures. The connection between them is made by steel bar binding and welding and then concrete pouring, which has low construction cost and good connection strength.

[0065] like Figure 5 As shown, the steel bars 471 in the supporting pier 47 are arranged alternately horizontally and vertically, and are respectively tied and welded with the steel bars in the first-phase top plate 43a (first-phase middle plate 42a) and the steel bars in the temporary support 8, and then concrete is poured, thereby connecting the three into a whole, effectively transmitting force, with low construction cost and good connection strength.

[0066] It can be understood that since the temporary support 8 must bear a greater force, the concrete layer thickness in the area of ​​the fixed support pier 47 of the first-phase middle plate 42a and the first-phase top plate 43a is thicker than the concrete layer thickness in other areas; the steel bar diameter in the area of ​​the fixed support pier 47 of the first-phase middle plate 42a and the first-phase top plate 43a is larger than the steel bar diameter in other areas, so that the overall structure of the basement can meet the use requirements.

[0067] A construction method for the above foundation pit structure, as Figures 16 to 18 As shown, including:

[0068] S10, driving the support unit 5 into the soil layer. The support unit 5 should be driven into the soil layer on the side of the rail transit 9 close to the first phase foundation pit 1.

[0069] S20. Excavation of the first phase foundation pit 1.

[0070] S30, construct the first phase basement 4a in the first phase foundation pit 1. Figure 6 As shown, after the construction of the first phase basement 4a is completed, there is a soil layer between the basement 4a and the support unit 5.

[0071] S40, digging the second phase foundation pit 2, and setting a temporary support 8 between the supporting pier 47 and the supporting unit 5.

[0072] S50, constructing the second phase basement 4b in the second phase foundation pit 2.

[0073] S60, digging the third phase foundation pit 3, and setting a temporary support 8 between the support pier 47 and the supporting unit 5.

[0074] S70. Construct the third phase basement 4c in the third phase foundation pit 3.

[0075] Among them, Figures 7 to 10 ,as well as Fig.17 As shown, step S40 specifically includes:

[0076] S41, such as Figure 7 As shown, a first temporary support 8 is provided between the support unit 5 and the support pier 47 on the first-stage top plate 43a.

[0077] S42, such as Figure 8 As shown, the second phase foundation pit 2 is excavated downward to the depth corresponding to the first phase middle plate 42a.

[0078] S43, such as Fig. 9 As shown, a second temporary support 8 is provided between the support unit 5 and the support pier 47 on the first-stage intermediate plate 42a.

[0079] S44, such as Fig.10 As shown, continue to excavate the second phase foundation pit 2 downward to a preset depth.

[0080] Among them, Figures 11 to 15 ,as well as Fig.18 As shown, step S50 specifically includes:

[0081] S51, such as Fig.11 As shown, the second-phase bottom plate 41b and the second-phase bottom plate replacement support 71b are constructed in the second-phase foundation pit 2. The second-phase bottom plate 41b is connected to the first-phase bottom plate 41a, and the second-phase bottom plate replacement support 71b is supported between the second-phase bottom plate 41b and the support unit 5.

[0082] S52, such as Fig.12As shown, the second-phase middle plate 42b and the second-phase middle plate replacement support 72b are constructed in the second-phase foundation pit 2. The second-phase middle plate 42b is connected to the first-phase middle plate 42a, and the second-phase middle plate replacement support 72b is supported between the second-phase middle plate 42b and the support unit 5.

[0083] S53, such as Fig.13 As shown, the second temporary support 8 is removed.

[0084] S54, such as Fig.14 As shown, a second-phase top plate 43b and a second-phase top plate replacement support 73b are constructed in the second-phase foundation pit 2. The second-phase top plate 43b is connected to the first-phase top plate 43a, and the second-phase top plate replacement support 73b is supported between the second-phase top plate 43b and the support unit 5.

[0085] S55, such as Fig.15 As shown, the first temporary support 8 is removed.

[0086] Among them, Fig.19 As shown, step S60 specifically includes:

[0087] S61. Set a third temporary support 8 between the support unit 5 and the support pier 47 on the first-stage top plate 43a.

[0088] S62, excavating the third-phase foundation pit 3 downward to the depth corresponding to the first-phase middle plate 42a.

[0089] S63. Set a fourth temporary support 8 between the support unit 5 and the support pier 47 on the first-stage intermediate plate 42a.

[0090] S64. Continue to excavate the third phase foundation pit 3 downward to a preset depth.

[0091] It can be understood that the structure of the third phase basement 4c is similar to that of the second phase basement 4b. Figures 7 to 10 The relevant structure of the second phase basement 4b is changed to the corresponding structure of the third phase basement 4c, which can be used as a reference for steps S61-S64.

[0092] Among them, Fig. 20 As shown, step S70 specifically includes:

[0093] S71, constructing the third-phase bottom plate 41c and the third-phase bottom plate replacement support 71c in the third-phase foundation pit 3, the third-phase bottom plate 41c, the second-phase bottom plate 41b and the first-phase bottom plate 41a are connected to each other, and the third-phase bottom plate replacement support 71c is supported between the third-phase bottom plate 41c and the supporting unit 5;

[0094] S72, construct the third-phase middle plate 42c and the third-phase middle plate replacement support 72c in the third-phase foundation pit 3, the third-phase middle plate 42c, the second-phase middle plate 42b and the first-phase middle plate 42a are connected to each other, and the third-phase middle plate replacement support 72c is supported between the third-phase middle plate 42c and the supporting unit 5.

[0095] S73. Remove the fourth temporary support 8.

[0096] S74, construct the third-phase top plate 43c and the third-phase top plate replacement support 73c in the third-phase foundation pit 3, the third-phase top plate 43c, the second-phase top plate 43b and the first-phase top plate 43a are connected to each other, and the third-phase top plate replacement support 73c is supported between the third-phase top plate 43c and the supporting unit 5.

[0097] S75. Remove the third temporary support 8.

[0098] It can be understood that the structure of the third phase basement 4c is similar to that of the second phase basement 4b. Figures 11 to 15 The relevant structure of the second phase basement 4b is changed to the corresponding structure of the third phase basement 4c, which can be used as a construction reference for steps S71-S75.

[0099] In addition, after step S30, the following may be included: S30a, waterproofing the first phase basement 4a.

[0100] After step S50, the following may be included: S50a, waterproofing the second phase basement 4b.

[0101] After step S70, the following steps may be included: S70a, waterproofing the third phase basement 4c.

[0102] The various embodiments / implementations provided in this application can be combined with each other without causing any contradiction.

[0103] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A foundation pit structure located on the lateral side of a rail transit (9), characterized in that: The foundation pit structure comprises a first-phase foundation pit (1), a second-phase foundation pit (2), a third-phase foundation pit (3), a support unit (5), a first-phase basement (4a) arranged in the first-phase foundation pit (1), a second-phase basement (4b) arranged in the second-phase foundation pit (2), and a third-phase basement (4c) arranged in the third-phase foundation pit (3), wherein the first-phase foundation pit (1) is arranged at a distance from the rail transit (9), the support unit (5) is arranged in a soil layer on one side of the rail transit (9) close to the first-phase foundation pit (1), and the second-phase foundation pit (2) and the third-phase foundation pit (3) are arranged side by side between the first-phase foundation pit (1) and the support unit (5); The first-stage basement (4a) comprises a plurality of supporting piers (47) and a first-stage bottom plate (41a), a first-stage middle plate (42a) and a first-stage top plate (43a) which are horizontally arranged in sequence from bottom to top, and the plurality of supporting piers (47) are respectively fixed on the first-stage middle plate (42a) and the first-stage top plate (43a); The second-stage basement (4b) comprises a second-stage bottom plate (41b), a second-stage middle plate (42b) and a second-stage top plate (43b) which are horizontally arranged in sequence from bottom to top; The three-stage basement (4c) comprises a three-stage bottom plate (41c), a three-stage middle plate (42c) and a three-stage top plate (43c) which are arranged horizontally in sequence from bottom to top; The supporting pier (47) and the supporting unit (5) can respectively serve as two ends of a temporary support; After the construction of the first-phase basement (4a) is completed, there is a soil layer between the basement and the support unit (5); The first-phase foundation pit (1) has a depth of H. For non-soft soil layers, the distance between the first-phase foundation pit (1) and the rail transit (9) is 3H, and the excavation area of ​​the second-phase foundation pit (2) and the third-phase foundation pit (3) is within the range of the distance. For soft soil layers, the distance between the first-phase foundation pit (1) and the rail transit (9) is 5H, and the excavation area of ​​the second-phase foundation pit (2) and the third-phase foundation pit (3) is within the range of the distance. The steel bars (471) in the supporting pier (47) are arranged alternately horizontally and vertically, and are tied and welded with the steel bars in the first-stage top plate (43a) and / or the first-stage middle plate (42a) before concrete pouring; The rail transit (9) is a high-speed rail.

2. The foundation pit structure according to claim 1, characterized in that: The number of the three-phase foundation pits (3) is two, and the second-phase foundation pit (2) is arranged between the two three-phase foundation pits (3).

3. The foundation pit structure according to claim 1, characterized in that: The second-phase basement (4b) comprises a second-phase external wall panel (45b) vertically arranged on one side close to the supporting unit (5), a second-phase gap (48b) between the pit wall of the second-phase foundation pit (2) and the second-phase external wall panel (45b) is filled with concrete, and / or; The third-phase basement (4c) comprises a third-phase external wall panel (45c) vertically arranged on one side close to the supporting unit (5), and the third-phase gap (48c) between the pit wall of the third-phase foundation pit (3) and the third-phase external wall panel (45c) is filled with concrete.

4. The foundation pit structure according to any one of claims 1 to 3, characterized in that: The support unit (5) is a bored pile or an underground continuous wall.

5. The foundation pit structure according to any one of claims 1 to 3, characterized in that: The support unit (5) comprises a crown beam (51) arranged at the top, and the crown beam (51) and the support pier (47) fixed to the first-stage top plate (43a) can respectively serve as two ends of a temporary support; and / or, The support unit (5) comprises a waist beam (52) arranged at the waist, and the waist beam (52) and the support pier (47) fixed to the first-stage middle plate (42a) can respectively serve as two ends of a temporary support.

6. The foundation pit structure according to any one of claims 1 to 3, characterized in that: The first-stage bottom plate (41a), the second-stage bottom plate (41b) and the third-stage bottom plate (41c) are reinforced concrete structures; and / or, The first-stage middle plate (42a), the second-stage middle plate (42b) and the third-stage middle plate (42c) are reinforced concrete structures; and / or, The first-stage top plate (43a), the second-stage top plate (43b) and the third-stage top plate (43c) are reinforced concrete structures; and / or, The supporting pier (47) is a reinforced concrete structure.

7. The foundation pit structure according to claim 6, characterized in that: The thickness of the concrete layer in the area of ​​the first-stage middle plate (42a) and the first-stage top plate (43a) where the support pier (47) is fixed is thicker than the thickness of the concrete layer in other areas; The diameter of the steel bars in the area of ​​the first-stage middle plate (42a) and the first-stage top plate (43a) where the support pier (47) is fixed is greater than the diameter of the steel bars in other areas.

8. A construction method for a foundation pit structure according to any one of claims 1 to 7, characterized in that: include: Driving the support unit (5) into the soil layer; Excavating the first phase foundation pit (1); constructing the first-stage basement (4a) in the first-stage foundation pit (1); Excavating the second-phase foundation pit (2), and setting a temporary support (8) between the support pier (47) and the support unit (5); constructing the second phase basement (4b) in the second phase foundation pit (2); Excavating the third-phase foundation pit (3), and setting a temporary support (8) between the support pier (47) and the support unit (5); The third-phase basement (4c) is constructed in the third-phase foundation pit (3).

9. The construction method according to claim 8, characterized in that: The step of excavating the second-phase foundation pit (2) and providing a temporary support (8) between the support pier (47) and the support unit (5) specifically comprises: A first temporary support (8) is provided between the support unit (5) and the support pier (47) on the first-stage top plate (43a); Excavating the second-phase foundation pit (2) downwards to a depth corresponding to the first-phase middle plate (42a); A second temporary support (8) is provided between the support unit (5) and the support pier (47) on the first-stage intermediate plate (42a); Continue to excavate the second phase foundation pit (2) downward to a preset depth.

10. The construction method according to claim 9, characterized in that: The steps of constructing the second phase basement (4b) in the second phase foundation pit (2) specifically include: The second-phase bottom plate (41b) and the second-phase bottom plate replacement support (71b) are constructed in the second-phase foundation pit (2), the second-phase bottom plate (41b) is connected to the first-phase bottom plate (41a), and the second-phase bottom plate replacement support (71b) is supported between the second-phase bottom plate (41b) and the support unit (5); The second-phase middle plate (42b) and the second-phase middle plate replacement support (72b) are constructed in the second-phase foundation pit (2), the second-phase middle plate (42b) is connected to the first-phase middle plate (42a), and the second-phase middle plate replacement support (72b) is supported between the second-phase middle plate (42b) and the support unit (5); Remove the second temporary support (8); The second-phase top plate (43b) and the second-phase top plate replacement support (73b) are constructed in the second-phase foundation pit (2), the second-phase top plate (43b) is connected to the first-phase top plate (43a), and the second-phase top plate replacement support (73b) is supported between the second-phase top plate (43b) and the support unit (5); Remove the first temporary support (8).

11. The construction method according to any one of claims 8 to 10, characterized in that: The step of excavating the third-phase foundation pit (3) and setting a temporary support (8) between the support pier (47) and the support unit (5) specifically comprises: A third temporary support (8) is provided between the support unit (5) and the support pier (47) on the first-stage top plate (43a); Excavating the third-phase foundation pit (3) downwards to a depth corresponding to the first-phase middle plate (42a); A fourth temporary support (8) is provided between the support unit (5) and the support pier (47) on the first-stage intermediate plate (42a); Continue to excavate the third phase foundation pit (3) downward to a preset depth.

12. The construction method according to claim 11, characterized in that: The steps of constructing the third-phase basement (4c) in the third-phase foundation pit (3) specifically include: The third-phase bottom plate (41c) and the third-phase bottom plate replacement support (71c) are constructed in the third-phase foundation pit (3), the third-phase bottom plate (41c), the second-phase bottom plate (41b) and the first-phase bottom plate (41a) are connected to each other, and the third-phase bottom plate replacement support (71c) is supported between the third-phase bottom plate (41c) and the support unit (5); The third-phase middle plate (42c) and the third-phase middle plate replacement support (72c) are constructed in the third-phase foundation pit (3), the third-phase middle plate (42c), the second-phase middle plate (42b) and the first-phase middle plate (42a) are connected to each other, and the third-phase middle plate replacement support (72c) is supported between the third-phase middle plate (42c) and the support unit (5); Remove the fourth temporary support (8); The third-phase top plate (43c) and the third-phase top plate replacement support (73c) are constructed in the third-phase foundation pit (3), the third-phase top plate (43c), the second-phase top plate (43b) and the first-phase top plate (43a) are connected to each other, and the third-phase top plate replacement support (73c) is supported between the third-phase top plate (43c) and the support unit (5); Remove the third temporary support (8).