A seismic-resistant steel structure factory building and construction technology
By using steel structure support plates and steel mesh connected by bolts and nuts in the steel structure workshop, combined with the detachable design of aluminum formwork and automated pouring equipment, the problem of easy cracking at steel structure connection nodes was solved, seismic performance was improved and construction waste was reduced, achieving an environmentally friendly and efficient construction process.
Patent Information
- Application Number
- CN202011181120.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-29
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-10-29
AI Technical Summary
Steel structure connection nodes are prone to cracking and damage in terms of seismic performance, and traditional construction techniques are not environmentally friendly.
The steel structure supports the steel mesh and connects them with screws and nuts. Combined with the construction method of detachable aluminum formwork, the connection nodes are covered with concrete to form an earthquake-resistant steel structure factory building. The construction efficiency is improved by using automated pouring equipment.
It enhances the seismic resistance of steel structure connection nodes, reduces construction waste, and achieves an environmentally friendly and efficient construction process.
Smart Images

Figure CN112502318B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of green building construction, and in particular to an earthquake-resistant steel structure factory building and a construction process. Background Art
[0002] Steel structure is a structure made of steel materials and is one of the main types of building structures. Steel structure is mainly composed of steel beams, steel columns, steel trusses and other components made of steel sections and steel plates. The components or parts are usually connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in large factories, venues, super high-rise buildings and other fields. Steel structure has many advantages, but it has shortcomings in terms of seismic performance. When an earthquake disaster occurs, the connection nodes in the steel structure are prone to cracking and damage.
[0003] In view of this, the inventor of this case conducted in-depth research on the above-mentioned issues, which led to the emergence of this case. Summary of the invention
[0004] One object of the present invention is to provide an earthquake-resistant steel structure factory building for protecting connection nodes.
[0005] A second object of the present invention is to provide a highly efficient and environmentally friendly construction process for an earthquake-resistant steel structure factory building.
[0006] In order to achieve the above object, the present invention adopts such technical solution:
[0007] An earthquake-resistant steel structure factory building comprises a foundation and a steel structure outer wall located on the foundation; the steel structure outer wall comprises a steel structure column arranged on the foundation and fixedly connected to the foundation, a steel structure rib plate vertically arranged and fixedly connected between two steel structure columns, two steel meshes located on both sides of the steel structure support rib plate and connected to the steel structure support rib plate, and concrete covering the steel structure column, the steel structure support rib plate and the steel mesh; the steel mesh is parallel to the steel structure support rib plate.
[0008] The steel structure supporting ribs are welded together with the steel structure columns.
[0009] The steel structure support rib plate and the steel mesh are connected together by a connecting device, which includes a screw connecting the steel structure support rib plate and the steel mesh, a first nut located on both sides of the steel structure support rib plate to lock the steel structure support rib plate, and a second nut located on both sides of the steel mesh to lock the steel mesh.
[0010] The steel structure support rib has a plurality of first mounting holes arranged in a vertical direction for mounting screws; the steel mesh has a plurality of second mounting holes arranged in a vertical direction for mounting screws; each of the first mounting holes is arranged in a one-to-one correspondence with each of the second mounting holes.
[0011] There is a gap between the steel structure supporting ribs and the steel mesh.
[0012] The steel structure supporting rib plate has a plurality of through holes for concrete to pass through.
[0013] The present invention also comprises aluminum templates arranged on both sides of the outer wall of the steel structure; the aluminum templates are detachably connected with the steel mesh through screws.
[0014] The aluminum template is provided with pouring holes for pouring concrete, and multiple groups of pouring holes are distributed on the aluminum template along the vertical direction; each group of pouring holes includes two pouring holes arranged laterally.
[0015] The aluminum template also has a gate plate arranged at each group of casting holes and slidingly opening and closing each group of casting holes along the horizontal direction, a sliding groove connected to the gate plate for sliding the gate plate, and a driving device for driving the gate plate to slide to open or close the casting holes; the gate plate is formed with corresponding holes corresponding to each group of casting holes.
[0016] The driving device includes a threaded seat arranged on the gate plate, an adjusting screw matched with the threaded seat, and a driving motor driving the adjusting screw to rotate. The threaded seat includes an adjusting nut matched with the adjusting screw.
[0017] The casting hole is provided with a leak-proof part for sealing the casting hole; the leak-proof part includes a leak-proof hard tube; the leak-proof hard tube has an inlet and an outlet connected to the inlet; the leak-proof part also has a closing head arranged at the outlet and closing the outlet, and the closing head includes an elastic tube; the elastic tube has a closed inner hole, and one end of the inner hole is connected to the leak-proof hard tube; the leak-proof part also has a shell that is threaded with the casting hole; the leak-proof hard tube and the closing head are arranged in the shell; the leak-proof hard tube gradually becomes thinner from the inlet toward the outlet.
[0018] A construction method for an earthquake-resistant steel structure factory building comprises the following steps:
[0019] S1: Weld the steel structure support rib plate between two steel structure columns;
[0020] S2: Set the steel mesh on both sides of the steel structure support rib plate and connect them together through a connecting device; weld the edge of the steel mesh to the steel structure column
[0021] S3: Setting an aluminum formwork, connecting the aluminum formwork to the foundation, and forming a space for accommodating steel structure columns, steel structure supporting ribs, and steel mesh;
[0022] S4: pouring concrete into the accommodating space through a pouring pipe to form a wall surface;
[0023] S5: After the concrete solidifies, remove the aluminum formwork.
[0024] In step S4, the casting pipe used is provided with a casting head matching each group of casting holes.
[0025] The pouring head is installed on a support frame located outside the aluminum formwork; the support frame has a first guide rail connected to the pouring head and vertically arranged, a sliding seat supporting the first guide rail, and a base for installing the sliding seat; the base has a second guide rail connected to the sliding seat and extending toward the aluminum formwork; the support frame also includes a first cylinder for driving the pouring head to slide in the direction of the first guide rail and a second cylinder for driving the sliding seat to slide in the direction of the second guide rail.
[0026] The step of pouring concrete in step S4 includes:
[0027] S41: The driving device drives the gate at the bottom to slide and open the pouring hole, and the first cylinder drives the pouring head to rise along the first guide rail so that the pouring head is aligned with the pouring hole; the second cylinder drives the sliding seat to slide along the second guide rail so that the pouring head is inserted into the pouring hole;
[0028] S42: pouring concrete through the pouring pipe until the edge of the pouring hole is covered, and then the pouring is stopped. The second cylinder drives the sliding seat to slide along the second guide rail to move the pouring head out of the pouring hole. The driving device drives the gate to slide and close the pouring hole at the bottom.
[0029] S43: the first cylinder drives the pouring head to slide along the direction of the first guide rail, so that the pouring head rises to the position of another group of pouring holes; the driving device drives the gate to open another group of pouring holes;
[0030] S44: Repeat the action to complete the pouring of all pouring holes from bottom to top;
[0031] S45: The second cylinder drives the sliding seat to reset, and the first cylinder drives the pouring head to reset.
[0032] After adopting the above technical scheme, in the actual implementation process of an earthquake-resistant steel structure factory building of the present invention, the steel structure columns, steel structure supporting ribs and steel mesh fixed on the foundation are cast into one body through concrete to form a wall surface, and the connection nodes are covered in the wall by concrete to strengthen the connection between the steel structures. At the same time, when an earthquake disaster occurs, the concrete can protect the connection nodes, share the force acting on the connection nodes, avoid cracking and damage of the connection nodes, and thus improve the earthquake resistance of the steel structure factory building.
[0033] The invention discloses a construction process for an earthquake-resistant steel structure factory building. In actual implementation, aluminum formwork is set on the outside of steel structure columns, steel structure supporting ribs, and steel mesh to cast concrete. Compared with the traditional casting mode, the aluminum formwork can be reused, which reduces the generation of construction waste and achieves the purpose of protecting the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1This is a schematic diagram of the assembly structure of the steel structure support rib plate, steel structure column, steel mesh and aluminum template of the present invention;
[0035] Figure 2 This is a schematic structural diagram of the aluminum formwork, the pouring head and the support frame of the present invention from the first perspective;
[0036] In the figure:
[0037] Steel structure column 1; steel structure supporting rib plate 2; steel mesh 3; aluminum template 4; pouring hole 41; gate plate 42; pouring head 5; support frame 6; sliding seat 61; base 62. DETAILED DESCRIPTION
[0038] In order to further explain the technical solution of the present invention, it is described in detail below through specific embodiments.
[0039] like Figure 1 and Figure 2 As shown, an earthquake-resistant steel structure factory building includes a foundation and a steel structure outer wall on the foundation; the steel structure outer wall includes a steel structure column 1 arranged on the foundation and fixedly connected to the foundation, a steel structure rib plate vertically arranged and fixedly connected between two steel structure columns 1, two steel meshes 3 located on both sides of the steel structure support rib plate 2 and connected to the steel structure support rib plate 2, and concrete covering the steel structure column 1, the steel structure support rib plate 2 and the steel mesh 3; the steel mesh 3 is parallel to the steel structure support rib plate 2. In the actual implementation process, the steel structure column 1, the steel structure support rib plate 2 and the steel mesh 3 fixed on the foundation are cast into one body to form a wall surface, and the connection nodes are covered in the wall by concrete to strengthen the connection between the steel structures. At the same time, when an earthquake disaster occurs, the concrete can protect the connection nodes, share the force acting on the connection nodes, and avoid cracking and damage of the connection nodes, thereby improving the earthquake resistance of the steel structure factory building.
[0040] Preferably, the steel structure support rib plate 2 is welded to the steel structure column 1. The welded structure has high rigidity and good integrity, and can effectively improve the connection strength of the connection node.
[0041] Preferably, the steel structure support rib plate 2 and the steel mesh 3 are connected together by a connecting device. The connecting device includes a screw connecting the steel structure support rib plate 2 and the steel mesh 3, a first nut located on both sides of the steel structure support rib plate 2 to lock the steel structure support rib plate 2, and a second nut located on both sides of the steel mesh 3 to lock the steel mesh 3. Through the cooperation of the first nut, the second nut and the screw, the position between the steel mesh 3 and the support rib plate can be quickly adjusted, and the fixing of the steel mesh 3 is convenient.
[0042] Preferably, the steel structure support rib has a plurality of first mounting holes arranged in a vertical direction for mounting screws; the steel mesh has a plurality of second mounting holes arranged in a vertical direction for mounting screws; each first mounting hole is arranged in a one-to-one correspondence with each second mounting hole, so as to facilitate the installation and connection of the screws and the steel mesh.
[0043] Preferably, there is a gap between the steel structure support rib plate 2 and the steel mesh 3. The gap is set so that both sides of the steel mesh 3 are filled with concrete, and the steel mesh 3 enhances the crack resistance of the concrete.
[0044] Preferably, the steel structure support rib plate 2 has a plurality of through holes for concrete to pass through. The concrete entering the through holes can effectively strengthen the connection between the steel structure support rib plate 2 and the concrete.
[0045] Preferably, the present invention further comprises an aluminum template 4 arranged outside the outer wall of the steel structure; the aluminum template 4 is detachably connected to the steel mesh 3 through a screw rod. The detachable connection makes it easy to load and unload the aluminum template 4 after the concrete solidifies.
[0046] Preferably, the aluminum template 4 is provided with multiple groups of pouring holes 41 for pouring concrete, and the multiple groups of pouring holes 41 are distributed on the aluminum template 4 along the vertical direction; each group of pouring holes 41 includes two laterally arranged pouring holes 41. The pouring efficiency can be effectively accelerated by the two laterally arranged pouring holes 41.
[0047] Preferably, the aluminum template 4 further comprises a gate plate 42 disposed at each group of casting holes for slidingly opening and closing each group of casting holes 41 in a horizontal direction, a sliding groove connected to the gate plate 42 for sliding the gate plate 42, and a driving device for driving the gate plate 42 to slide and open or close the casting holes 41; the gate plate 42 is formed with corresponding holes corresponding to each group of casting holes 41. By driving the gate plate 42 to slide in the sliding groove by the driving device, each group of casting holes 41 can be quickly opened or closed.
[0048] Preferably, the driving device includes a threaded seat arranged on the gate plate 42, an adjusting screw matched with the threaded seat, and a driving motor driving the adjusting screw to rotate, and the threaded seat includes an adjusting nut matched with the adjusting screw. The adjusting screw is driven by the driving motor. The driving motor drives the adjusting screw to rotate, and the gate plate 42 is driven to slide to open or close the casting hole 41 through the matching of the screw and the threaded seat.
[0049] Preferably, a leak-proof part for sealing the casting hole 41 is provided at the casting hole 41; the leak-proof part includes a leak-proof hard tube; the leak-proof hard tube has an inlet and an outlet connected to the inlet; the leak-proof part also has a closing head arranged at the outlet and closing the outlet; the closing head includes an elastic tube; the elastic tube has a closed inner hole, one end of the inner hole is connected to the leak-proof hard tube; the leak-proof part also has a shell matching the casting hole 41; the leak-proof hard tube and the closing head are arranged in the shell and connected together with the shell; the leak-proof hard tube gradually tapers from the inlet to the outlet. In actual implementation, the leak-proof part closes the inner hole through the side wall of the elastic tube. When the casting tube is connected to the casting hole, the casting tube extends into the inner hole through the leak-proof hard tube to squeeze the side wall to open the inner hole, and then open the casting hole for casting. When the casting tube is removed, the side wall of the elastic tube is restored to close the inner hole; the elastic tube is made of rubber material.
[0050] A construction method for an earthquake-resistant steel structure factory building comprises the following steps:
[0051] S1: Weld the steel structure support rib plate 2 between two steel structure columns 1;
[0052] S2: Set the steel mesh 3 on both sides of the steel structure support rib 2 and connect them together through a connecting device; weld the edge of the steel mesh 3 to the steel structure column 1
[0053] S3: Arrange an aluminum formwork 4, connect the aluminum formwork 4 to the foundation, and form a storage space for accommodating the steel structure column 1, the steel structure support rib plate 2, and the steel mesh 3;
[0054] S4: pouring concrete into the accommodating space through a pouring pipe to form a wall surface;
[0055] S5: After the concrete solidifies, the aluminum formwork 4 is removed.
[0056] In the actual implementation process, aluminum formwork 4 is set on the outside of steel structure column 1, steel structure supporting rib plate 2, and steel mesh 3 to cast concrete. Compared with the traditional casting mode, aluminum formwork 4 can be reused, which reduces the generation of construction waste and achieves the purpose of protecting the environment.
[0057] Preferably, in step S4, the casting pipe used is provided with a casting head 5 matching each group of casting holes 41. Through the matching of the casting holes 41 and the casting head 5, the connection between the casting pipe and the aluminum template 4 can be accelerated.
[0058] Preferably, the pouring head 5 is mounted on a support frame 6 located outside the aluminum formwork 4; the support frame 6 has a first guide rail connected to the pouring head 5 and vertically arranged, a sliding seat 61 that carries the first guide rail, and a base 62 on which the sliding seat 61 is installed; the base 62 has a second guide rail connected to the sliding seat 61 and extending toward the aluminum formwork 4; the support frame 6 also includes a first cylinder that drives the pouring head 5 to slide along the direction of the first guide rail and a second cylinder that drives the sliding seat 61 to slide along the direction of the second guide rail. The first cylinder drives the pouring head 5 to move along the direction of the first guide rail so that the pouring head 5 is aligned with the pouring hole 41; the second cylinder drives the sliding seat 61 to slide along the direction of the second guide rail so that the pouring head 5 is inserted into the pouring hole 41, and the connection between the pouring pipe and the pouring hole 41 is automatically completed, which reduces the dependence on personnel and effectively speeds up the connection efficiency.
[0059] Preferably, the step of pouring concrete in step S4 includes:
[0060] S41: The driving device drives the gate plate 42 at the bottom to slide and open the pouring hole 41, and the first cylinder drives the pouring head 5 to rise along the first guide rail so that the pouring head 5 is aligned with the pouring hole 41; the second cylinder drives the sliding seat 61 to slide along the second guide rail so that the pouring head 5 is inserted into the pouring hole 41;
[0061] S42: concrete is poured through the pouring pipe until the edge of the pouring hole 41 is covered, and the pouring is stopped. The second cylinder drives the sliding seat 61 to slide along the second guide rail to move the pouring head 5 out of the pouring hole 41; the driving device drives the gate plate 42 to slide and close the pouring hole 41 at the bottom;
[0062] S43: The first cylinder drives the pouring head 5 to slide along the direction of the first guide rail, so that the pouring head 5 rises to the position of another group of pouring holes 41; the driving device drives the gate 42 to open another group of pouring holes 41;
[0063] S44: Repeat the action to complete the pouring of all the pouring holes 41 from bottom to top;
[0064] S45: The second cylinder drives the sliding seat to reset, and the first cylinder drives the pouring head to reset.
[0065] When pouring concrete, pouring from bottom to top can avoid the formation of bubbles due to excessive pouring from the pouring port at the top, which makes the quality of the cast wall poor. At the same time, the corresponding pouring holes 41 can be opened according to the plane of the concrete during pouring, so as to avoid the pressure required to be output by the pouring head 5 being increased due to the pouring hole 41 being below the plane of the concrete, thereby reducing the pouring efficiency.
[0066] The product form of the present invention is not limited to the illustrations and embodiments of this case. Any appropriate changes or modifications made by anyone with similar ideas should be deemed to be within the patent scope of the present invention.
Claims
1. An earthquake-resistant steel structure factory building, characterized by: It includes a foundation and a steel structure outer wall on the foundation; the steel structure outer wall includes a steel structure column arranged on the foundation and fixedly connected to the foundation, a steel structure support rib plate vertically arranged and fixedly connected between two steel structure columns, two steel meshes located on both sides of the steel structure support rib plate and connected to the steel structure support rib plate, and concrete covering the steel structure column, the steel structure support rib plate and the steel mesh; the steel mesh is parallel to the steel structure support rib plate; The steel structure support rib plate and the steel mesh are connected together by a connecting device; the connecting device includes a screw connecting the steel structure support rib plate and the steel mesh, a first nut located on both sides of the steel structure support rib plate to lock the steel structure support rib plate, and a second nut located on both sides of the steel mesh to lock the steel mesh; the steel structure support rib plate has a plurality of first mounting holes arranged in a vertical direction for mounting the screws, and the steel mesh has a plurality of second mounting holes arranged in a vertical direction for mounting the screws, and each of the first mounting holes is arranged in a one-to-one correspondence with each of the second mounting holes; there is a gap between the steel structure support rib plate and the steel mesh; It also includes aluminum templates arranged on both sides of the steel structure outer wall, and the aluminum templates are detachably connected to the steel mesh through screws.
2. The earthquake-resistant steel structure factory building according to claim 1 is characterized by: The steel structure supporting ribs are welded together with the steel structure columns.
3. The earthquake-resistant steel structure factory building according to claim 2 is characterized by: The steel structure supporting rib plate has a plurality of through holes for concrete to pass through.
4. The earthquake-resistant steel structure factory building according to claim 3 is characterized by: The aluminum template is provided with pouring holes for pouring concrete, and multiple groups of pouring holes are distributed on the aluminum template along the vertical direction; each group of pouring holes includes two pouring holes arranged laterally.
5. The earthquake-resistant steel structure factory building according to claim 4 is characterized by: The aluminum template also has a gate plate arranged at each group of casting holes and slidingly opening and closing each group of casting holes along the horizontal direction, a sliding groove connected to the gate plate for sliding the gate plate, and a driving device for driving the gate plate to slide to open or close the casting holes; the gate plate is formed with corresponding holes corresponding to each group of casting holes.
6. The earthquake-resistant steel structure factory building according to claim 5, characterized in that: The driving device includes a threaded seat arranged on the gate plate, an adjusting screw matched with the threaded seat, and a driving motor driving the adjusting screw to rotate. The threaded seat includes an adjusting nut matched with the adjusting screw.
7. The earthquake-resistant steel structure factory building according to claim 3 is characterized by: A leak-proof part for sealing the casting hole is arranged at the casting hole; the leak-proof part includes a leak-proof hard tube; the leak-proof hard tube has an inlet and an outlet connected to the inlet; the leak-proof part also has a closing head arranged at the outlet and closing the outlet, and the closing head includes an elastic tube; the elastic tube has a closed inner hole, and one end of the inner hole is connected to the leak-proof hard tube; the leak-proof part also has a shell that is threaded with the casting hole; the leak-proof hard tube and the closing head are arranged in the shell; the leak-proof hard tube gradually becomes thinner from the inlet toward the outlet.
8. A construction method for an earthquake-resistant steel structure factory building according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1: Weld the steel structure support rib plate between two steel structure columns; S2: Set the steel mesh on both sides of the steel structure support rib plate and connect them together through a connecting device; weld the edge of the steel mesh to the steel structure column S3: Setting an aluminum formwork, connecting the aluminum formwork to the foundation, and forming a space for accommodating steel structure columns, steel structure supporting ribs, and steel mesh; S4: pouring concrete into the accommodating space through a pouring pipe to form a wall surface; S5: After the concrete solidifies, remove the aluminum formwork.
9. The construction method of an earthquake-resistant steel structure factory building according to claim 8, characterized in that: In step S4, the casting pipe used is provided with a casting head matching each group of casting holes.
10. The construction method of an earthquake-resistant steel structure factory building according to claim 9, characterized in that: The pouring head is installed on a support frame located outside the aluminum formwork; the support frame has a first guide rail connected to the pouring head and vertically arranged, a sliding seat supporting the first guide rail, and a base for installing the sliding seat; the base has a second guide rail connected to the sliding seat and extending toward the aluminum formwork; the support frame also includes a first cylinder for driving the pouring head to slide in the direction of the first guide rail and a second cylinder for driving the sliding seat to slide in the direction of the second guide rail.
11. The construction method of an earthquake-resistant steel structure factory building according to claim 8, characterized in that: The step of pouring concrete in step S4 includes: S41: The driving device drives the gate at the bottom to slide and open the pouring hole, and the first cylinder drives the pouring head to rise along the first guide rail so that the pouring head is aligned with the pouring hole; the second cylinder drives the sliding seat to slide along the second guide rail so that the pouring head is inserted into the pouring hole; S42: pouring concrete through the pouring pipe until the edge of the pouring hole is covered, and then the pouring is stopped. The second cylinder drives the sliding seat to slide along the second guide rail to move the pouring head out of the pouring hole. The driving device drives the gate to slide and close the pouring hole at the bottom. S43: the first cylinder drives the pouring head to slide along the direction of the first guide rail, so that the pouring head rises to the position of another group of pouring holes; the driving device drives the gate to open another group of pouring holes; S44: Repeat the action to complete the pouring of all pouring holes from bottom to top; S45: The second cylinder drives the sliding seat to reset, and the first cylinder drives the pouring head to reset.