Concrete pouring formwork system for overturned beam on raft foundation

By using combined sleeves and tie bolts to support the formwork on the main reinforcement of the upturned beam, the problems of formwork displacement and bulging of the upturned beam were solved, and the formwork was stably installed and disassembled, improving construction efficiency and forming quality.

CN112854277BActive Publication Date: 2024-11-08SHANXI NO 3 CONSTR ENG
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202110277892.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-15
Publication Date
2024-11-08
Estimated Expiration
2041-03-15

AI Technical Summary

Technical Problem

The existing formwork for upward-turning beams is prone to displacement and bulging, affecting the forming quality. At the same time, the method of fixing the formwork requires subsequent treatment and is prone to creating construction joints, which affects the foundation structure and waterproofing performance.

Method used

The system employs a modular sleeve assembly and a U-shaped fixing frame. The formwork on both sides is supported by sleeves and tie bolts on the main reinforcement of the upturned beam, and fixed with nuts to prevent formwork displacement and bulging, thus achieving stable assembly and disassembly of the formwork.

Benefits of technology

The formwork system is stable, avoiding deformation and displacement, improving construction efficiency, and ensuring the forming quality and construction progress of the reinforced concrete structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112854277B_ABST
    Figure CN112854277B_ABST
Patent Text Reader

Abstract

The present invention discloses a concrete pouring formwork system for an upper flip beam on a raft foundation, which solves the problem that the existing upper flip beam hanging formwork is prone to displacement and expansion. The support system of the concrete pouring formwork for the upper flip beam is constructed on the main reinforcement of the upper flip beam, and a combined sleeve assembly is used to construct a square-shaped fixed frame for supporting and clamping the formworks on both sides of the upper flip beam. The two formworks are clamped by fixing nuts at both ends of the upper and lower tension screws. The sleeves are welded on the main reinforcement of the upper flip beam, and the lower tension bolts are inserted into the two sleeves, and the tension bolts are used as supports for the formworks on both sides of the upper flip beam; that is, the displacement of the formwork of the side formwork during the integral casting of the raft and the upper flip beam is avoided, and the assembly and disassembly of the formwork system is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a flip beam on a raft foundation, in particular to a concrete pouring formwork system for the flip beam on a raft foundation and a method for erecting the formwork system. Background Art

[0002] The raft foundation and the upturned beam thereon are generally completed by an integral one-time pouring method. The concrete pouring formwork of the upturned beam can only be fixed by a hanging formwork method. Generally, a tie rod is used to support the lower part of the hanging formwork, and a steel wire is used to be inclined and fixed on the upper part of the hanging formwork. A tension bolt is arranged in the middle part of the hanging formwork according to the height of the formwork to achieve the purpose of fixing the concrete pouring formwork of the upturned beam. A wooden keel is used for reinforcement at the side formwork to prevent the deformation and expansion of the formwork. The formwork support method in which the upper part of the formwork is inclined with steel wire and the bottom tie rod is stressed has poor stability. When the raft and the upturned beam are poured with concrete as a whole, the hanging formwork is easily displaced and the expansion of the formwork occurs, which affects the forming quality of the upturned beam. In addition, this formwork fixing method will produce a large number of tension bolt penetration holes, which need to be processed later. In order to overcome this defect, there is also a construction method of first pouring the raft concrete and then making the upturned part formwork of the concrete upturned beam, but this method is easy to produce a large number of construction joints at the connection part between the raft foundation and the upturned beam, affecting the foundation structure and waterproof performance. Summary of the invention

[0003] The invention provides a concrete pouring formwork system for a flip beam on a raft foundation and a method for erecting the formwork, which solves the technical problems that the existing hanging formwork for the flip beam is prone to displacement and expansion.

[0004] The present invention solves the above technical problems through the following technical solutions:

[0005] The overall concept of the present invention is: constructing the support system of the concrete pouring formwork of the upper flip beam on the main reinforcement of the upper flip beam, using a combined sleeve assembly to construct a U-shaped fixed frame for supporting and clamping the formwork on both sides of the upper flip beam, and clamping the two formworks through the nuts at both ends of the upper and lower tension screws, and welding sleeves on the main reinforcement of the upper flip beam, passing the lower tension bolts through the two sleeves, and using the tension bolts as support for the formwork on both sides of the upper flip beam; that is, avoiding the displacement of the side formwork during the integrated casting of the raft slab and the upper flip beam, and facilitating the assembly and disassembly of the formwork system.

[0006] A concrete casting formwork system for a flip beam on a raft foundation comprises a raft foundation steel frame, on which are arranged the main reinforcement of the flip beam and the stirrups of the flip beam, on which the stirrups of the flip beam at the connection between the precast valve plate and the precast flip beam are respectively welded along the left and right horizontal directions with a left inner connecting sleeve of a lower tension bolt and a right inner connecting sleeve of a lower tension bolt, the central axis of the left inner connecting sleeve of the lower tension bolt coincides with the central axis of the right inner connecting sleeve of the lower tension bolt, on the left end outer wall of the left inner connecting sleeve of the lower tension bolt, a lower limiting steel plate on the inner side of the left formwork is welded, and on the right end outer wall of the right inner connecting sleeve of the lower tension bolt, a lower limiting steel plate on the inner side of the right formwork is welded The lower limiting steel plate is penetrated with a lower tension bolt between the left inner connecting sleeve of the lower tension bolt and the right inner connecting sleeve of the lower tension bolt; a left template is arranged on the left side of the lower limiting steel plate inside the left template, and the bottom end of the left template is arranged on the lower tension bolt, and the left outer connecting sleeve of the lower tension bolt is penetrated on the lower tension bolt on the left side of the left inner connecting sleeve of the lower tension bolt, and the left template lower fixed vertical rod is welded to the outer side wall of the left outer connecting sleeve of the tension bolt, and the left vertical sleeve is sleeved on the lower fixed vertical rod of the left template, and the left template upper fixed vertical rod is sleeved on the upper port of the left vertical sleeve, and the left template upper fixed vertical rod is welded to the outer side wall of the left connecting sleeve of the upper tension bolt The left connecting sleeve of the upper tension bolt and the upper fixed vertical rod of the left formwork are arranged perpendicular to each other, and the upper limit steel plate on the inner side of the left formwork is welded on the left connecting sleeve of the upper tension bolt, and the upper limit steel plate on the inner side of the left formwork is arranged on the right side of the upper end of the left formwork; the right formwork is arranged on the right side of the lower limit steel plate inside the right formwork, and the bottom end of the right formwork is arranged on the lower tension bolt, and the right outer connecting sleeve of the lower tension bolt is connected on the lower tension bolt on the right side of the right inner connecting sleeve of the lower tension bolt, and the lower fixed vertical rod of the right formwork is welded on the outer side wall of the right outer connecting sleeve of the tension bolt, and the right vertical sleeve is sleeved on the lower fixed vertical rod of the right formwork, and the upper end of the right formwork is sleeved on the upper port of the right vertical sleeve. Fixed vertical rod, the upper fixed vertical rod of the right formwork is welded to the outer wall of the right through-sleeve of the upper tension bolt, the right through-sleeve of the upper tension bolt and the upper fixed vertical rod of the right formwork are vertically arranged to each other, and the upper limit steel plate on the inner side of the right formwork is welded to the right through-sleeve, and the upper limit steel plate on the inner side of the right formwork is arranged on the upper left side of the right formwork; the upper tension bolt is passed through between the left through-sleeve of the upper tension bolt and the right through-sleeve of the upper tension bolt, nuts are screwed on both ends of the upper tension bolt, and nuts are screwed on both ends of the lower tension bolt; left wooden slats are arranged at intervals between the left vertical sleeve and the left formwork, and right wooden slats are arranged at intervals between the right vertical sleeve and the right formwork.

[0007] A PVC sleeve is sleeved on the lower tension bolt between the left inner connecting sleeve of the lower tension bolt and the right inner connecting sleeve of the lower tension bolt; a left concrete pad is arranged between the left formwork and the upper flip beam stirrups, and a right concrete pad is arranged between the right formwork and the upper flip beam stirrups.

[0008] A method for erecting a concrete pouring formwork system for a flip beam on a raft foundation comprises the following steps:

[0009] The first step is to make the sleeve assembly as follows: weld the lower limit steel plate on the inner side of the left template on the outer wall of the left port of the left inner connecting sleeve of the lower tension bolt, so that the angle between the left inner connecting sleeve of the lower tension bolt and the lower limit steel plate on the inner side of the left template is 90 degrees, weld the lower limit steel plate on the inner side of the right template on the outer wall of the right port of the right inner connecting sleeve of the lower tension bolt, so that the angle between the right inner connecting sleeve of the lower tension bolt and the lower limit steel plate on the inner side of the right template is 90 degrees; weld the lower fixing vertical rod of the left template on the outer wall of the left outer connecting sleeve of the lower tension bolt, so that the left outer connecting sleeve of the lower tension bolt and the lower fixing vertical rod of the left template are arranged perpendicular to each other, weld the lower fixing vertical rod of the right template on the outer wall of the right outer connecting sleeve of the tension bolt, so that the right outer connecting sleeve of the tension bolt is fixed to the lower part of the right template The vertical rods are arranged perpendicular to each other; the left template upper fixed vertical rod is welded on the outer wall of the left port of the upper tension bolt left through-sleeve, so that the upper tension bolt left through-sleeve and the left template upper fixed vertical rod are arranged in a cross shape; the left template inner upper limit steel plate is welded below the outer wall of the right port of the upper tension bolt left through-sleeve, so that the upper tension bolt left through-sleeve and the left template inner upper limit steel plate are arranged in an L shape; the right template upper fixed vertical rod is welded on the outer wall of the right port of the upper tension bolt right through-sleeve, so that the upper tension bolt right through-sleeve and the right template upper fixed vertical rod are arranged in a cross shape; the right template inner upper limit steel plate is welded below the outer wall of the left port of the upper tension bolt right through-sleeve, so that the upper tension bolt right through-sleeve and the right template inner upper limit steel plate are arranged in an L shape;

[0010] The second step is to weld the left inner connecting sleeve of the lower tension bolt assembled in the first step to the left steel bar of the stirrup of the upper flip beam at the connection between the precast valve plate and the precast upper flip beam, and set the lower limit steel plate inside the left template vertically upward; weld the right inner connecting sleeve of the lower tension bolt assembled in the first step to the right steel bar of the stirrup of the upper flip beam at the connection between the precast valve plate and the precast upper flip beam, and set the lower limit steel plate inside the right template vertically upward;

[0011] The third step is to insert the lower tension bolt between the left inner connecting sleeve of the lower tension bolt and the right inner connecting sleeve of the lower tension bolt, place the left template on the lower tension bolt on the left side of the left inner connecting sleeve of the lower tension bolt, and make the lower end of the right side of the left template close to the lower limit steel plate inside the left template, sleeve the left outer connecting sleeve of the lower tension bolt assembled in the first step on the left end of the lower tension bolt, and arrange the lower fixed vertical rod of the left template vertically upward; sleeve the left vertical sleeve on the lower fixed vertical rod of the left template, arrange the left wooden slat at intervals between the left vertical sleeve and the left template, screw the nut on the left end of the lower tension bolt, and press the left vertical sleeve, the left wooden slat and the left template between the nut and the lower limit steel plate inside the left template by rotating the nut;

[0012] Step 4: Place the right template onto the lower tension bolt on the right side of the left inner connecting sleeve of the lower tension bolt, and make the lower end of the left side of the right template close to the lower limit steel plate inside the right template. Sleeve the right outer connecting sleeve of the lower tension bolt assembled in the first step onto the right end of the lower tension bolt, and arrange the lower fixed vertical rod of the right template vertically upward; sleeve the right vertical sleeve onto the lower fixed vertical rod of the right template, arrange the right wooden slat at intervals between the right vertical sleeve and the right template, screw the nut on the right end of the lower tension bolt, and press the right vertical sleeve, the right wooden slat and the right template between the nut and the lower limit steel plate inside the right template by rotating the nut;

[0013] Step 4: Insert the upper fixed vertical rod of the left template assembled in the first step into the upper port of the left vertical sleeve, arrange the left connecting sleeve of the upper tension bolt horizontally to the right, and make the upper limit steel plate on the inner side of the left template abut against the upper end of the right side of the left template; insert the upper fixed vertical rod of the right template assembled in the first step into the upper port of the right vertical sleeve, arrange the right connecting sleeve of the upper tension bolt horizontally to the left, and make the upper limit steel plate on the inner side of the right template abut against the upper end of the left side of the right template;

[0014] The fifth step is to pass the upper tension bolt between the left connecting sleeve of the upper tension bolt and the right connecting sleeve of the upper tension bolt, screw a nut on the left end of the upper tension bolt, screw another nut on the right end of the upper tension bolt, and tighten the two nuts; complete the erection of the concrete pouring formwork system for the flip beam on the raft foundation.

[0015] The present invention adopts a combined sleeve to build a formwork support system, which saves labor costs and improves construction efficiency. The formwork system of the upturned beam is stable, and deformation, expansion and displacement will not occur during pouring concrete. The integrated pouring of the raft slab and the upturned beam is realized, effectively ensuring the molding effect and quality of the reinforced concrete structure and accelerating the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the present invention;

[0017] Figure 2 It is a structural schematic diagram of the fixing frame of the flip beam template of the present invention;

[0018] Figure 3 It is a structural schematic diagram of the left inner connecting sleeve 4 assembly of the lower tension bolt of the present invention;

[0019] Figure 4 It is a structural schematic diagram of the left outer connecting sleeve 9 assembly of the lower tension bolt of the present invention;

[0020] Figure 5 It is a structural schematic diagram of the upper tension bolt left connecting sleeve 14 assembly of the present invention. DETAILED DESCRIPTION

[0021] The present invention is described in detail below in conjunction with the accompanying drawings:

[0022] A concrete casting formwork system for a flip beam on a raft foundation comprises a raft foundation steel frame 1, on which are arranged the main reinforcement 2 of the flip beam and the stirrups 3 of the flip beam, on which the stirrups 3 of the flip beam at the connection between the precast valve plate and the precast flip beam are respectively welded along the left and right horizontal directions with a left inner connecting sleeve 4 of a lower tension bolt and a right inner connecting sleeve 5 of a lower tension bolt, the central axis of the left inner connecting sleeve 4 of the lower tension bolt and the central axis of the right inner connecting sleeve 5 of the lower tension bolt coincide with each other, on the left end outer wall of the left inner connecting sleeve 4 of the lower tension bolt, a lower limit steel plate 6 on the inner side of the left template is welded, and on the right end outer wall of the right inner connecting sleeve 5 of the lower tension bolt, a lower limit steel plate 6 on the inner side of the right template is welded Steel plate 7, between the left inner connecting sleeve 4 of the lower tension bolt and the right inner connecting sleeve 5 of the lower tension bolt, a lower tension bolt 20 is connected; a left template 23 is arranged on the left side of the lower limit steel plate 6 inside the left template, and the bottom end of the left template 23 is arranged on the lower tension bolt 20, and the lower tension bolt left outer connecting sleeve 9 is connected on the lower tension bolt 20 on the left side of the left inner connecting sleeve 4 of the lower tension bolt, and the left template lower fixed vertical rod 10 is welded on the outer side wall of the tension bolt left outer connecting sleeve 9, and the left vertical sleeve 13 is sleeved on the left template lower fixed vertical rod 10, and the left template upper fixed vertical rod 15 is sleeved on the upper port of the left vertical sleeve 13, and the left template upper fixed vertical rod 15 is welded on the left side of the upper tension bolt On the outer side wall of the connecting sleeve 14, the left connecting sleeve 14 of the upper tension bolt and the upper fixed vertical rod 15 of the left formwork are arranged perpendicular to each other, and the upper limit steel plate 21 of the inner side of the left formwork is welded on the left connecting sleeve 14 of the upper tension bolt, and the upper limit steel plate 21 of the inner side of the left formwork is arranged on the upper right side of the left formwork 23; a right formwork 26 is arranged on the right side of the lower limit steel plate 7 inside the right formwork, and the bottom end of the right formwork 26 is arranged on the lower tension bolt 20, and the right outer connecting sleeve 11 of the lower tension bolt is connected to the lower tension bolt 20 on the right side of the right inner connecting sleeve 5 of the lower tension bolt, and the right template lower fixed vertical rod 12 is welded on the outer side wall of the right outer connecting sleeve 11 of the tension bolt, and the right template lower fixed vertical rod 12 is sleeved on the right template lower fixed vertical rod 12 There is a right vertical sleeve 16, on the upper end of the right vertical sleeve 16, a right template upper fixed vertical rod 18 is sleeved, the right template upper fixed vertical rod 18 is welded to the outer wall of the upper tension bolt right through-connecting sleeve 17, the upper tension bolt right through-connecting sleeve 17 and the right template upper fixed vertical rod 18 are arranged vertically to each other, on the right through-connecting sleeve 17, a right template inner side upper limit steel plate 22 is welded, and the right template inner side upper limit steel plate 22 is arranged on the upper left side of the right template 26; between the upper tension bolt left through-connecting sleeve 14 and the upper tension bolt right through-connecting sleeve 17, an upper tension bolt 19 is penetrated, nuts are screwed on both ends of the upper tension bolt 19, and nuts are screwed on both ends of the lower tension bolt 20;A left wooden slat 24 is disposed between the left vertical sleeve 13 and the left template 23, and a right wooden slat 27 is disposed between the right vertical sleeve 16 and the right template 26. ;

[0023] A PVC sleeve 8 is sleeved on the lower tension bolt 20 between the left inner connecting sleeve 4 and the right inner connecting sleeve 5 of the lower tension bolt; a left concrete pad 25 is arranged between the left formwork 23 and the upper flip beam stirrup 3, and a right concrete pad 28 is arranged between the right formwork 26 and the upper flip beam stirrup 3.

[0024] A method for erecting a concrete pouring formwork system for a flip beam on a raft foundation comprises the following steps:

[0025] The first step is to make the sleeve assembly as follows: weld the lower limit steel plate 6 on the inner side of the left template on the outer wall of the left port of the left inner connecting sleeve 4 of the lower tension bolt, so that the angle between the left inner connecting sleeve 4 of the lower tension bolt and the lower limit steel plate 6 on the inner side of the left template is 90 degrees; weld the lower limit steel plate 7 on the inner side of the right template on the outer wall of the right port of the right inner connecting sleeve 5 of the lower tension bolt, so that the angle between the right inner connecting sleeve 5 of the lower tension bolt and the lower limit steel plate 7 on the inner side of the right template is 90 degrees; weld the lower fixed vertical rod 10 of the left template on the outer wall of the left outer connecting sleeve 9 of the lower tension bolt, so that the left outer connecting sleeve 9 of the lower tension bolt and the lower fixed vertical rod 10 of the left template are arranged perpendicular to each other, and weld the lower fixed vertical rod 12 of the right template on the outer wall of the right outer connecting sleeve 11 of the tension bolt, so that the right outer connecting sleeve 11 of the tension bolt and the lower fixed vertical rod 12 of the right template are perpendicular to each other. The upper fixing vertical rod 15 of the left template is welded on the outer wall of the left port of the left connecting sleeve 14 of the upper tension bolt, so that the left connecting sleeve 14 of the upper tension bolt and the upper fixing vertical rod 15 of the left template are arranged in a cross shape, and the upper limit steel plate 21 of the inner side of the left template is welded below the outer wall of the right port of the left connecting sleeve 14 of the upper tension bolt, so that the left connecting sleeve 14 of the upper tension bolt and the upper limit steel plate 21 of the inner side of the left template are arranged in an L shape, and the upper fixing vertical rod 18 of the right template is welded on the outer wall of the right port of the right connecting sleeve 17 of the upper tension bolt, so that the right connecting sleeve 17 of the upper tension bolt and the upper fixing vertical rod 18 of the right template are arranged in a cross shape, and the upper limit steel plate 22 of the inner side of the right template is welded below the outer wall of the left port of the right connecting sleeve 17 of the upper tension bolt, so that the right connecting sleeve 17 of the upper tension bolt and the upper limit steel plate 22 of the inner side of the right template are arranged in an L shape;

[0026] The second step is to weld the left inner connecting sleeve 4 of the lower tension bolt assembled in the first step to the left steel bar of the upper flip beam stirrup 3 at the connection between the precast valve plate and the precast upper flip beam, and set the lower limit steel plate 6 on the inner side of the left template vertically upward; weld the right inner connecting sleeve 5 of the lower tension bolt assembled in the first step to the right steel bar of the upper flip beam stirrup 3 at the connection between the precast valve plate and the precast upper flip beam, and set the lower limit steel plate 7 on the inner side of the right template vertically upward;

[0027] The third step is to insert the lower tension bolt 20 between the left inner connecting sleeve 4 of the lower tension bolt and the right inner connecting sleeve 5 of the lower tension bolt, place the left template 23 on the lower tension bolt 20 on the left side of the left inner connecting sleeve 4 of the lower tension bolt, and make the lower end of the right side surface of the left template 23 abut against the lower limit steel plate 6 inside the left template, sleeve the left outer connecting sleeve 9 of the lower tension bolt assembled in the first step on the left end of the lower tension bolt 20, and arrange the lower fixed vertical rod 10 of the left template vertically upward; sleeve the left vertical sleeve 13 on the lower fixed vertical rod 10 of the left template, set the left wooden slat 24 at intervals between the left vertical sleeve 13 and the left template 23, screw the nut on the left end of the lower tension bolt 20, and by rotating the nut, the left vertical sleeve 13, the left wooden slat 24 and the left template 23 are pressed between the nut and the lower limit steel plate 6 inside the left template;

[0028] Step 4: Place the right template 26 onto the lower tension bolt 20 on the right side of the left inner connecting sleeve 4 of the lower tension bolt, and make the lower end of the left side of the right template 26 abut against the lower limit steel plate 7 inside the right template, sleeve the right outer connecting sleeve 11 of the lower tension bolt assembled in the first step onto the right end of the lower tension bolt 20, and arrange the lower fixed vertical rod 12 of the right template vertically upward; sleeve the right vertical sleeve 16 onto the lower fixed vertical rod 12 of the right template, arrange the right wooden slat 27 at intervals between the right vertical sleeve 16 and the right template 26, screw the nut on the right end of the lower tension bolt 20, and by rotating the nut, the right vertical sleeve 16, the right wooden slat 24 and the right template 26 are pressed between the nut and the lower limit steel plate 7 inside the right template;

[0029] Step 4: Insert the upper fixed vertical rod 15 of the left template assembled in the first step into the upper port of the left vertical sleeve 13, arrange the left connecting sleeve 14 of the upper tension bolt horizontally to the right, and make the upper limit steel plate 21 on the inner side of the left template abut against the upper end of the right side surface of the left template 23; insert the upper fixed vertical rod 18 of the right template assembled in the first step into the upper port of the right vertical sleeve 16, arrange the right connecting sleeve 17 of the upper tension bolt horizontally to the left, and make the upper limit steel plate 22 on the inner side of the right template abut against the upper end of the left side surface of the right template 26;

[0030] Step 5: Insert the upper tension bolt 19 between the left tension bolt connecting sleeve 14 and the right tension bolt connecting sleeve 17, screw a nut on the left end of the upper tension bolt 19, screw another nut on the right end of the upper tension bolt 19, and tighten the two nuts;

[0031] Step 6: Place concrete pads between the stirrups 3 of the upturned beam and the two formworks to ensure the thickness of the concrete protective layer;

[0032] Step 7. When removing the formwork, first remove the nuts at both ends of the upper tension bolt 19 and the nuts at both ends of the lower tension bolt 20, pull out the upper tension bolt 19 and the lower tension bolt 20, and each sleeve assembly unit can be reused.

Claims

1. A concrete pouring formwork system for an upturned beam on a raft foundation, comprising a raft foundation steel frame (1), on which are arranged upturned beam main reinforcement (2) and upturned beam stirrups (3), characterized in that: On the stirrups (3) of the upper overturned beam at the connection between the precast valve plate and the precast upper overturned beam, a left inner connecting sleeve (4) of the lower tension bolt and a right inner connecting sleeve (5) of the lower tension bolt are respectively welded in the left and right horizontal directions. The central axis of the left inner connecting sleeve (4) of the lower tension bolt and the central axis of the right inner connecting sleeve (5) of the lower tension bolt coincide with each other. On the left end outer wall of the left inner connecting sleeve (4) of the lower tension bolt, a lower limit steel plate (6) on the inner side of the left template is welded and connected. On the right end outer wall of the right inner connecting sleeve (5) of the lower tension bolt, a lower limit steel plate (7) on the inner side of the right template is welded and connected. A lower tension bolt (20) is inserted between the two ends of the left template; a left template (23) is arranged on the left side of the lower limit steel plate (6) inside the left template; the bottom end of the left template (23) is arranged on the lower tension bolt (20); a left outer connecting sleeve (9) of the lower tension bolt is inserted on the lower tension bolt (20) on the left side of the left inner connecting sleeve (4) of the lower tension bolt; a left template lower fixed vertical rod (10) is welded to the outer side wall of the left outer connecting sleeve (9); a left vertical sleeve (13) is sleeved on the left template lower fixed vertical rod (10); a left template upper fixed vertical rod (15) is sleeved on the upper end of the left vertical sleeve (13); the left template upper fixed vertical rod (15) is welded to the left template upper fixed vertical rod (15); The left upper tie bolt connecting sleeve (14) is connected to the outer wall of the upper tie bolt, the left upper tie bolt connecting sleeve (14) and the upper fixed vertical rod (15) of the left template are arranged perpendicular to each other, and a left template inner side upper limit steel plate (21) is welded to the left upper tie bolt connecting sleeve (14), and the left template inner side upper limit steel plate (21) is arranged on the right side of the upper end of the left template (23); a right template (26) is arranged on the right side of the lower limit steel plate (7) inside the right template, and the bottom end of the right template (26) is arranged on the lower tie bolt (20), and a lower tie bolt right outer connecting sleeve (11) is connected to the lower tie bolt (20) on the right side of the right inner connecting sleeve (5) of the lower tie bolt, and a lower tie bolt right outer connecting sleeve (11) is arranged on the right outer connecting sleeve (5) of the tie bolt. A right template lower fixed vertical rod (12) is welded to the outer wall of the through-connecting sleeve (11), a right vertical sleeve (16) is sleeved on the right template lower fixed vertical rod (12), a right template upper fixed vertical rod (18) is sleeved on the upper end of the right vertical sleeve (16), the right template upper fixed vertical rod (18) is welded to the outer wall of the upper tension bolt right through-connecting sleeve (17), the upper tension bolt right through-connecting sleeve (17) and the right template upper fixed vertical rod (18) are arranged perpendicular to each other, a right template inner side upper limit steel plate (22) is welded to the right through-connecting sleeve (17), and the right template inner side upper limit steel plate (22) is arranged on the upper left side of the right template (26);An upper tension bolt (19) is inserted between the upper tension bolt left insertion sleeve (14) and the upper tension bolt right insertion sleeve (17), nuts are screwed on both ends of the upper tension bolt (19), and nuts are screwed on both ends of the lower tension bolt (20); a left wooden slat (24) is arranged at intervals between the left vertical sleeve (13) and the left template (23), and a right wooden slat (27) is arranged at intervals between the right vertical sleeve (16) and the right template (26). ; 2. A concrete pouring formwork system for a flip beam on a raft foundation according to claim 1, characterized in that: A PVC sleeve (8) is sleeved on the lower tension bolt (20) between the left inner connecting sleeve (4) of the lower tension bolt and the right inner connecting sleeve (5) of the lower tension bolt; a left concrete pad (25) is provided between the left template (23) and the upper flip beam stirrup (3); and a right concrete pad (28) is provided between the right template (26) and the upper flip beam stirrup (3).

Citation Information

Patent Citations

  • Upturned beam and cast-in-place slab overall pouring construction method

    CN103883052A

  • Ring beam construction method based on tool type shaping concrete ring beam formwork structure

    CN110017023A

  • Bottom plate of cast-in-place concrete pool and construction method thereof

    CN111561041A

  • Hanging template

    CN201891260U

  • Beam slab formula raft type foundation formwork bearing structure

    CN206438529U