Pile-raft composite foundation based on existing concrete pavement and its construction method

By using existing concrete pavement as the raft slab of the pile-raft composite foundation, combined with jet grouting piles and geogrids, the problems of high cost and uneven settlement of the pile-raft composite foundation were solved, thereby improving economic benefits and construction efficiency.

CN112962375BActive Publication Date: 2024-11-05YUNNAN DESIGN INST GRP CO LTD
View PDF 16 Cites 0 Cited by

Patent Information

Application Number
CN202110387504.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-10
Publication Date
2024-11-05
Estimated Expiration
2041-04-10

AI Technical Summary

Technical Problem

Existing pile-raft composite foundations are costly to construct, and when used temporarily in soft soil areas, the lack of deep foundation treatment leads to uneven settlement, affecting construction efficiency and economic benefits.

Method used

The existing concrete pavement is used as the raft slab of the pile-raft composite foundation. A composite foundation system is formed by combining jet grouting piles, geogrids and fine stone concrete to control foundation settlement and avoid uneven settlement.

Benefits of technology

It reduced the cost of foundation treatment, shortened the construction period, reduced the difficulty of construction, achieved economic and social benefits, and avoided uneven settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112962375B_ABST
    Figure CN112962375B_ABST
Patent Text Reader

Abstract

The present invention provides a pile-raft composite foundation based on an existing concrete pavement and a construction method thereof, the foundation comprising an existing concrete pavement and a foundation, the existing concrete pavement being located on the foundation, and a plurality of jet-jet piles being vertically arranged under the existing concrete pavement, the bottom free end of each jet-jet pile being vertically inserted into the foundation, backfill soil being arranged on the upper surface of the existing concrete pavement, bidirectional geogrids being equidistantly arranged horizontally in the backfill soil, fine stone concrete being arranged at the pile head of the jet-jet pile, a plurality of composite foundation piles being vertically arranged on one side of the jet-jet pile in the foundation, a sand and gravel cushion layer being arranged between a newly built reinforced concrete raft slab and the top of the composite foundation piles, a bidirectional geogrid being horizontally arranged in the sand and gravel cushion layer, and backfill soil being arranged on the top of the newly built reinforced concrete raft slab. The present invention not only avoids the increase in engineering cost caused by dismantling the existing concrete pavement and making a new raft slab, but also significantly reduces the construction difficulty, and has good economic and social benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of foundation treatment, and in particular relates to a pile-raft composite foundation based on an existing concrete pavement and a construction method thereof. Background Art

[0002] The pile-raft composite foundation is a composite foundation system composed of rigid piles, foundation soil, cushion layer and raft slab, which can coordinate the working characteristics of pile body-cushion layer-raft slab-foundation soil and jointly bear the upper load. The pile-raft composite foundation can maintain uniform settlement of the foundation due to the presence of the raft slab, and the presence of the crushed stone cushion layer can make up for the differential settlement of the pile and soil, fully mobilize the bearing potential of the soil between the piles, coordinate the load sharing of the pile and soil, and reduce uneven settlement.

[0003] Pile-raft composite foundation can solve problems that are difficult to solve with traditional composite foundations. It has broad application prospects in the field of foundation treatment, especially in projects with strict settlement control. However, pile-raft composite foundation has the disadvantage of relatively high cost, which limits its application scope to a certain extent.

[0004] At present, my country is in a period of rapid urban construction. Due to the time difference in land development, some soft foundation areas are used as temporary sites, temporary roads, etc. before formal development. Often, only hardening treatment is carried out, and the deep foundation is not treated. Subsequent development will carry out foundation treatment according to the requirements of the overlying structures. If the existing concrete pavement or concrete floor can be reasonably used as the raft of the pile raft composite foundation, it will avoid the engineering waste and construction period consumption caused by first breaking the concrete pavement or concrete floor and then carrying out foundation treatment, which will undoubtedly greatly reduce the cost of foundation treatment, shorten the construction period, and play a significant economic benefit. Summary of the invention

[0005] In order to solve the above problems, the present invention provides a pile-raft composite foundation based on an existing concrete pavement and a construction method thereof, so as to achieve the purpose of controlling foundation settlement through the pile-raft composite foundation; and through reasonable overlapping structural measures with the surrounding non-utilized areas, it is possible to avoid the occurrence of differential settlement that does not meet the requirements.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0007] A pile-raft composite foundation based on an existing concrete pavement comprises an existing concrete pavement and a foundation, wherein the existing concrete pavement is located on the foundation, and a plurality of jet-jet piles are vertically arranged under the existing concrete pavement, the bottom free end of each of the jet-jet piles is vertically inserted into the foundation, backfill soil is arranged on the upper surface of the existing concrete pavement, and bidirectional geogrids are equidistantly arranged horizontally in the backfill soil, fine stone concrete is arranged at the pile head of each of the jet-jet piles, a plurality of composite foundation piles are vertically arranged on one side of the jet-jet piles in the foundation, a newly-built reinforced concrete raft is arranged above the composite foundation piles, a sand and gravel cushion layer is arranged between the newly-built reinforced concrete raft and the top of the composite foundation piles, and the bidirectional geogrid is horizontally arranged in the sand and gravel cushion layer, and the backfill soil is arranged on the top of the newly-built reinforced concrete raft.

[0008] Furthermore, the interval between adjacent bidirectional geogrids is 0.5 m.

[0009] Furthermore, the overlap width between the area formed by the newly built reinforced concrete raft slab and the area formed by the existing concrete pavement is at least 1 m.

[0010] Furthermore, the width of the use area of ​​the bidirectional geogrid exceeds the width of the use area of ​​the existing concrete pavement by at least 2m.

[0011] Furthermore, the fine stone concrete is C40 fine stone concrete.

[0012] The present invention also relates to a construction method of a pile raft composite foundation based on an existing concrete pavement, which is carried out as follows:

[0013] Drill holes on the existing concrete pavement to construct high-pressure jet grouting piles. After drilling holes through the existing pavement surface layer and base layer, construct according to the normal high-pressure jet grouting pile process;

[0014] After the strength of the jet grouting pile reaches 70%, the pile head within the existing concrete pavement surface layer and base layer is removed and filled with fine stone concrete;

[0015] The raft slab in the non-utilized area shall overlap with the existing concrete pavement area by at least 1m in the horizontal projection direction. A layer of bidirectional geogrid shall be set every 0.5m in thickness in the fill area above the existing concrete pavement, and the horizontal geogrid setting range shall exceed the existing concrete pavement by more than 2m.

[0016] Further, the following steps are included:

[0017] Step (1) Drilling: Determine the existing concrete surface layer, base material and thickness;

[0018] Step (2) assessing the availability of existing concrete;

[0019] Assess the availability of existing concrete. If it can be directly utilized, proceed to the next step. If it cannot be directly utilized, reinforce it locally before proceeding to the next step.

[0020] Step (3) Design the layout of jet grouting piles according to the settlement control standard, drill holes on the existing concrete pavement and construct high-pressure jet grouting piles; determine the jet grouting pile construction process and parameters according to soil conditions and reinforcement requirements;

[0021] Step (4) putting the equipment in place, inserting the jet pipe, jet grouting, pulling out the pipe, and flushing to complete the pile foundation construction within the scope of the foundation treatment;

[0022] Step (5) After the pile body strength reaches 70%, the pile head within the existing concrete pavement surface layer and base layer is removed and filled with C40 fine stone concrete;

[0023] Step (6) constructing a raft slab in the unused area, with the newly constructed raft slab overlapping the existing concrete pavement area by at least 1m in the horizontal projection direction;

[0024] Step (7) uses sandy materials for backfilling in layers, with a geogrid layer set every 0.5 m thick, and the horizontal setting range exceeds the existing concrete pavement by more than 2 m.

[0025] Furthermore, the existing concrete pavement is used as a raft slab of the piled raft composite foundation to avoid uneven settlement.

[0026] During use, holes are drilled through the existing concrete pavement surface and foundation to determine the thickness of the existing concrete pavement surface and foundation, evaluate the availability of the existing concrete pavement, and design the layout of the jet grouting piles according to the settlement control standard. Then, the jet grouting pile construction process and parameters are determined based on soil conditions and reinforcement requirements. Holes are drilled on the existing concrete pavement to carry out high-pressure jet grouting pile construction. At this time, the machine is in place, the injection pipe is inserted, grouting is sprayed, the pipe is pulled out, and flushing is carried out to complete the pile foundation construction within the foundation treatment range.

[0027] When the strength of the jet grouting pile reaches 70%, the pile head within the existing concrete pavement surface layer and foundation range is removed and filled with fine stone concrete. Preferably, the newly built reinforced concrete raft area and the existing concrete pavement area overlap by at least 1m in the horizontal projection direction, and a layer of bidirectional geogrid is set every 0.5m thickness in the fill area above the existing concrete pavement, and the horizontal geogrid setting range exceeds the existing concrete pavement by more than 2m.

[0028] Compared with the prior art, the present invention has the following advantages and positive effects:

[0029] The present invention proposes a method for utilizing the existing concrete pavement as a composite foundation raft slab, as well as differential settlement control measures with surrounding non-utilized areas, which not only avoids the increase in engineering cost caused by demolishing the existing concrete pavement and making a new raft slab, but also significantly shortens the construction period and reduces the construction difficulty, with good economic and social benefits; and the present invention has the advantages of simple structure, convenient maintenance, low processing cost, etc. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the top view of the structure of the present invention;

[0031] Figure 2 The present invention Figure 1 AA cross-sectional structure schematic diagram;

[0032] Figure 3 The present invention Figure 1 Schematic diagram of BB cross-section structure;

[0033] Figure 4 is a flow chart of the method of the present invention.

[0034] The following are marked in the figure:

[0035] 1. New reinforced concrete raft 2. Bidirectional geogrid 3. Current concrete pavement 4. Sand and gravel cushion layer 5. Composite foundation pile foundation 6. Jet Grouting 7. Backfill 8. Foundation 9. Fine stone concrete DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] Unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present application should be understood by people with ordinary skills in the field. The words "first", "second" and similar words used in this embodiment do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Install", "connect", "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal connection of two elements. "Up", "down", "left", "right", "horizontal" and "vertical" are only used relative to the orientation of the components in the drawings. These directional terms are relative concepts. They are used for description and clarification relative to the components, and they can change accordingly according to the change of the orientation of the components in the drawings.

[0038] like Figure 1 , 2 As shown in Figures 3 and 4, the pile-raft composite foundation based on the existing concrete pavement of this embodiment comprises an existing concrete pavement 3 and a foundation 8. The existing concrete pavement 3 is located on the foundation 8, and a plurality of jet-jet piles 6 are vertically arranged under the existing concrete pavement 3. The bottom free end of each jet-jet pile 6 is vertically inserted into the foundation 8. Backfill soil 7 is arranged on the upper surface of the existing concrete pavement 3, and bidirectional geogrids 2 are equidistantly arranged horizontally in the backfill soil 7. Fine stone concrete 9 is arranged at the pile head of each jet-jet pile 6. A plurality of composite foundation piles 5 are vertically arranged on one side of the jet-jet pile 6 in the foundation 8. A newly built reinforced concrete raft 1 is arranged above the composite foundation piles 5. A gravel cushion layer 4 is arranged between the newly built reinforced concrete raft 1 and the top of the composite foundation piles 5, and a bidirectional geogrid 2 is horizontally arranged in the gravel cushion layer 4. Backfill soil 7 is arranged on the top of the newly built reinforced concrete raft 1. The interval between adjacent bidirectional geogrids 2 is 0.5m. The overlap width between the area formed by the newly built reinforced concrete raft 1 and the area formed by the existing concrete pavement 3 is at least 1m. The width of the use area of ​​the bidirectional geogrid 2 exceeds the width of the use area of ​​the existing concrete pavement 3 by at least 2m. The fine aggregate concrete 9 is C40 fine aggregate concrete.

[0039] like Figure 4 As shown, the construction method of this embodiment is carried out as follows:

[0040] During use, holes are drilled through the existing concrete pavement 3 surface layer and foundation 8 to determine the thickness of the existing concrete pavement 3 surface layer and foundation 8, and the usability of the existing concrete pavement 3 is evaluated. If it can be directly used, proceed to the next step. If it cannot be directly used, it is partially reinforced before proceeding to the next step.

[0041] In this embodiment, the existing concrete pavement is intact, without broken slabs or cracks, and can be directly used; the existing concrete pavement has a broken slab rate of less than 15% and the number of cracks per 100 square meters is less than 15, and can be used after repair; the existing concrete pavement has a broken slab rate of more than 15% and the number of cracks per 100 square meters is more than 15, and it is not recommended to use it.

[0042] The layout of the jet grouting piles 6 is designed according to the settlement control standard, and then the construction process and parameters of the jet grouting piles 6 are determined according to the soil conditions and reinforcement requirements. Holes are drilled on the existing concrete pavement 3 to construct the high-pressure jet grouting piles 6. At this time, the machinery is in place, the jet pipe is inserted, the grouting is sprayed, the pipe is pulled out, and the flushing is completed to complete the pile foundation construction within the foundation treatment range.

[0043] When the strength of the jet grouting pile 6 reaches 70%, the pile head within the existing concrete pavement 3 surface layer and foundation 8 is removed and filled with fine stone concrete 9. Preferably, the newly built reinforced concrete raft 1 area overlaps the existing concrete pavement 3 area by at least 1m in the horizontal projection direction, and a layer of bidirectional geogrid 2 is set every 0.5m thickness in the fill area above the existing concrete pavement 3, and the horizontal geogrid 2 is set over the existing concrete pavement 3 by more than 2m.

[0044] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A pile raft composite foundation based on an existing concrete pavement, characterized in that: The invention comprises an existing concrete pavement (3) and a foundation (8), wherein the existing concrete pavement (3) is located on the foundation (8), and a plurality of jet grouting piles (6) are vertically arranged below the existing concrete pavement (3), and the bottom free end of each of the jet grouting piles (6) is vertically inserted into the foundation (8), and backfill soil (7) is arranged on the upper surface of the existing concrete pavement (3), and bidirectional geogrids (2) are equidistantly arranged horizontally in the backfill soil (7), and a fine stone concrete is arranged at the pile head of each of the jet grouting piles (6). Concrete (9), a plurality of composite foundation piles (5) are vertically arranged in the foundation (8) on one side of the jet grouting piles (6), a newly built reinforced concrete raft (1) is arranged above the composite foundation piles (5), a gravel cushion layer (4) is arranged between the newly built reinforced concrete raft (1) and the top of the composite foundation piles (5), and the bidirectional geogrid (2) is horizontally arranged in the gravel cushion layer (4), and the backfill soil (7) is arranged on the top of the newly built reinforced concrete raft (1).

2. The pile-raft composite foundation based on an existing concrete pavement according to claim 1, characterized in that: The interval between adjacent bidirectional geogrids (2) is 0.5 m.

3. The pile-raft composite foundation based on an existing concrete pavement according to claim 1, characterized in that: The overlap width between the area formed by the newly built reinforced concrete raft (1) and the area formed by the existing concrete pavement (3) is at least 1 m.

4. The piled raft composite foundation based on an existing concrete pavement according to claim 1 is characterized in that: The width of the use area of ​​the bidirectional geogrid (2) exceeds the width of the use area of ​​the existing concrete pavement (3) by at least 2 m.

5. The piled raft composite foundation based on an existing concrete pavement according to claim 1, characterized in that: The fine stone concrete (9) is C40 fine stone concrete.

6. A construction method for a piled raft composite foundation based on an existing concrete pavement, characterized in that: Proceed as follows: Drill holes on the existing concrete pavement to construct high-pressure jet grouting piles. After drilling holes through the existing pavement surface layer and base layer, construct according to the normal high-pressure jet grouting pile process; After the strength of the jet grouting pile reaches 70%, the pile head within the existing concrete pavement surface layer and base layer is removed and filled with fine stone concrete; The raft slab in the non-utilized area shall overlap with the existing concrete pavement area by at least 1m in the horizontal projection direction. A layer of bidirectional geogrid shall be set every 0.5m in thickness in the fill area above the existing concrete pavement, and the horizontal geogrid setting range shall exceed the existing concrete pavement by more than 2m.

7. The construction method according to claim 6, characterized in that: The steps include: Step (1) Drilling: Determine the existing concrete surface layer, base material and thickness; Step (2) assessing the availability of existing concrete; Assess the availability of existing concrete. If it can be directly utilized, proceed to the next step. If it cannot be directly utilized, reinforce it locally before proceeding to the next step. Step (3) Design the layout of jet grouting piles according to the settlement control standard, drill holes on the existing concrete pavement and construct high-pressure jet grouting piles; determine the jet grouting pile construction process and parameters according to soil conditions and reinforcement requirements; Step (4) putting the equipment in place, inserting the jet pipe, jet grouting, pulling out the pipe, and flushing to complete the pile foundation construction within the scope of the foundation treatment; Step (5) After the pile body strength reaches 70%, the pile head within the existing concrete pavement surface layer and base layer is removed and filled with C40 fine stone concrete; Step (6) constructing a raft slab in the unused area, with the newly constructed raft slab overlapping the existing concrete pavement area by at least 1m in the horizontal projection direction; Step (7) uses sandy materials for backfilling in layers, with a geogrid layer set every 0.5 m thick, and the horizontal setting range exceeds the existing concrete pavement by more than 2 m.

8. The construction method according to claim 6, characterized in that: The existing concrete pavement is used as the raft slab of the piled raft composite foundation to avoid uneven settlement.

Citation Information

Patent Citations

  • Method for reinforcing masonry structure building base

    CN101250886A

  • Basement reconstruction structure with raft foundation building

    CN106285032A

  • Non-slitting construction structure of concrete super-flat terrace

    CN110158394A

  • Construction method used for underground space below existing road

    CN111364509A

  • Novel soft soil foundation structure

    CN202830952U