Converter primary flue gas full dry dust removal and energy recovery system

By using refuelerator and thermal balancer to burn and deoxygenate in the converter primary flue gas full-dry dust removal and energy recovery system, combined with the design of the rear airflow to promote the front airflow, the dust removal accuracy in the converter primary flue gas dust removal technology is solved. and safety issues, efficient smoke removal and energy recovery have been achieved, and the reliability and environmental benefits of the system have been improved.

CN113025776BActive Publication Date: 2024-11-15BEIJING RUIDA HONGXIN TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110212669.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-02-25
Publication Date
2024-11-15
Estimated Expiration
2041-02-25

AI Technical Summary

Technical Problem

The existing converter primary flue gas dry dust removal technology has problems such as low dust removal accuracy, large fluctuations, risk of electrostatic precipitator explosion, cathode line corrosion and disconnection, frequent faults, large maintenance workload, and poor purification effect of PM2.5. Affects the safety, stability and purification effect of the system.

Method used

A converter primary flue gas full-dry dust removal and energy recovery system was designed, including a cigarette hood, vaporization cooling flue, refueler, thermal balancer, boiler and dust removal device. The combustion is controlled by refuelerator to remove low CO content. Deoxygenation treats oxygen in the exhaust gas and gas phase condenses and treats it in the thermal balancer to significantly improve the removal effect of high-temperature smoke and dust. The rear airflow is used to promote the design of the front airflow to avoid mixing oxygen and gas, ensuring the safety and reliability of the system.

Benefits of technology

It realizes efficient high-temperature smoke removal, improves purification efficiency, reduces system failure rate and operating costs, realizes full recycling of energy, and does not require water to cool down, significantly reduces the emission of PM2.5 dust, and system safety and significantly improve reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_1
    Figure SMS_1
  • Figure SMS_2
    Figure SMS_2
  • Figure SMS_3
    Figure SMS_3
Patent Text Reader

Abstract

The present invention provides a full-dry dust removal and full energy recovery system for primary flue gas of a converter, which comprises a smoke hood, a vaporization cooling flue, an afterburner, a heat balancer, an explosion-proof special-purpose medium-temperature medium-pressure waste heat boiler and a dust removal device. The flue gas outlet of the converter is connected to the smoke hood, the vaporization cooling flue is connected to the afterburner, the afterburner is connected to the heat balancer, the outlet of the heat balancer is connected to the inlet of the explosion-proof special-purpose medium-temperature medium-pressure waste heat boiler, and the outlet of the explosion-proof special-purpose medium-temperature medium-pressure waste heat boiler is connected to the dust removal device; the system pre-afterburner provided in the present application controls combustion to remove low-content CO in the system during combustion, and deoxidizes oxygen in the waste gas during the non-smelting time of the converter. At the same time, gas phase condensation treatment is carried out in the heat balancer to cause tiny particles of dust to condense and grow, thereby significantly improving the removal effect of high-temperature smoke.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of dust removal, and in particular relates to a full dry dust removal and energy recovery system for primary flue gas of a converter. Background Art

[0002] The oxygen-blowing converter is a major smelting process equipment in steel production. my country has more than 850 converters of various sizes, and its annual output accounts for 70-80% of my country's crude steel output. During the converter blowing process, high-temperature flue gas containing a large amount of dust and combustible gas is generated, of which the CO content can reach more than 80%. After dust removal and purification, it is a very valuable converter gas for recycling, with a calorific value of up to 8000kJ / Nm 3 above.

[0003] Converter gas has the characteristics of high temperature, high dust concentration, high CO concentration, short smelting cycle, large component fluctuations, flammability, explosiveness and toxicity. So far, two purification and recovery technologies named OG and LT have been developed.

[0004] The OG converter gas purification and recovery technology is a wet process characterized by a two-stage venturi tube, which was jointly developed by Nippon Steel and Kawasaki Heavy Industries in Japan in the early 1960s. This technology was introduced in the 300t converter of the first phase of Baosteel in the 1980s, and has since been fully promoted and applied in my country. The main features of the OG method are mature technology, smooth process, stable system, simple operation, safe operation, and a gas recovery rate of 80-90Nm 3 / ts, waste heat recovery (steam) kg / ts. Its disadvantage is that the purification efficiency is limited (80mg / Nm 3 ), requires a set of complex sludge and sewage treatment facilities, which occupies a large area and has high operating energy consumption.

[0005] The LT converter gas purification and recovery technology is a dry treatment process characterized by cylindrical electrostatic precipitators, which was jointly developed by Lurgi and Thyssen in Germany in the late 1960s. This technology was introduced into the 250t converter of the Baosteel Phase III project in the 1990s, and secondary research and development and promotion were carried out in my country. So far, more than 40 sets of LT devices have been put into operation. The LT method uses evaporative coolers to enhance spray humidification and reduce the dust resistivity; a cylindrical electrostatic precipitator is used to replace the secondary venturi of the OG method to achieve dry dust removal; and a matching dust briquetting device is used to replace the huge sludge and sewage treatment facilities to achieve direct reuse of collected dust. Its main features: advanced technology, reasonable process, energy saving and environmental protection, and good comprehensive effect. It can save 40-50% of land, 50-60% of electricity, and 50-70% of water, and purify the dust concentration to ≤20mg / Nm 3 .

[0006] As the core technology of "three operations" and "three utilizations", LT has become a hot spot for energy conservation and environmental protection in my country's steel industry. LT seminars and promotion meetings have been held frequently, but the promotion effect is not ideal. The LT systems that have been put into operation always have problems of one kind or another. Some actual operating indicators are somewhat different from the design values, which also affects the scheme comparison and demonstration of new projects. Some users would rather choose the more reliable OG improved technology. LT technology covers steelmaking process, safe and stable production, energy conservation and environmental protection, involving many fields and high technical difficulty. my country's scientific and technological personnel have persisted in digesting and introducing technologies and tackling technical problems for more than ten years, and have achieved gratifying results, but they have not yet entered the state of "being at ease". The main problems exposed in the project:

[0007] ⑴ The dust removal accuracy is not high and the fluctuation is large. The designed dust concentration of clean gas is 20mg / Nm 3 However, many users can actually achieve ≤50mg / Nm 3 , affecting the normal operation of downstream process facilities and the recovery and use of clean coal gas;

[0008] (2) There is an explosion problem in the electrostatic precipitator. The explosion relief valve frequently operates, which is an unsafe factor in itself and easily causes deformation of the electrode plate and electrode line, thus reducing the dust removal efficiency.

[0009] ⑶ The cathode wire is corroded and broken, sometimes causing a short circuit, affecting the dust removal efficiency and safe operation;

[0010] (4) There are many failure factors and heavy maintenance workload, which makes LT operation and safety and stability a contradiction and mutually restrictive;

[0011] ⑸LT electrostatic precipitator has poor purification effect on PM2.5 and is difficult to solve the problem of fine dust control that has been put on the agenda in recent years. Summary of the invention

[0012] In order to solve the above technical problems, the present invention provides a converter primary flue gas full dry dust removal and energy recovery system, the converter primary flue gas full dry dust removal and energy recovery system includes a smoke hood, a vaporization cooling flue, a post-burner, a heat balancer, a boiler and a dust removal device, the flue gas outlet of the converter is connected to the smoke hood, the vaporization cooling flue is connected to the post-burner, the post-burner is connected to the heat balancer, the outlet of the heat balancer is connected to the inlet of the boiler, and the outlet of the boiler is connected to the dust removal device.

[0013] The primary smoke of the converter directly enters the heat pipe waste heat tube boiler, and a large amount of high-temperature smoke (molten state) adheres to the heat pipe and cannot be removed. The system pre-burner provided in the present application controls combustion to remove low-content CO before combustion, and deoxidizes the oxygen in the waste gas during the non-smelting time of the converter. At the same time, gas phase condensation treatment is carried out in the heat balancer to make tiny particles of dust condense and grow, which significantly improves the removal effect of high-temperature smoke. The design of the bucket of the heat pipe waste heat boiler and the gas transportation inevitably has dead zones, making it difficult to achieve the rear airflow pushing the front airflow forward. There is a mixture of oxygen and coal gas, and the probability of explosion increases. The system pre-burner has oxygen in the system that has been deoxidized, and the oxygen content in the waste gas is ≤ 2%, which meets the oxygen content requirement in the coal gas. The system is safe and reliable. At the same time, the design in the pre-system adopts the method of the rear airflow pushing the front airflow forward, and there is no dead angle throughout the process.

[0014] The beneficial effects of the present invention are as follows: the system pre-afterburner provided in the present application controls combustion to remove low-content CO in the system during combustion, and deoxidizes the oxygen in the exhaust gas during the non-smelting time of the converter. At the same time, gas phase condensation treatment is carried out in the heat balancer to make tiny particles of dust condense and grow, which significantly improves the removal effect of high-temperature smoke; the system provided by the present invention fully utilizes the energy generated by converter smelting to achieve full energy recovery and utilization; the entire system does not use water for cooling, realizes a fully dry process, and has a good removal effect on high-temperature smoke. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is the result block diagram of the converter primary flue gas full dry dust removal and energy recovery process in the example;

[0016] Figure 2 This is a schematic diagram of the process flow of the converter primary flue gas full dry dust removal and energy recovery system in the example. DETAILED DESCRIPTION

[0017] The present invention will be further described in detail below in conjunction with the accompanying drawings and the following embodiments.

[0018] Example

[0019] like Figure 1 and Figure 2As shown, a result block diagram and a process flow diagram of the converter primary flue gas full dry dust removal and energy recovery process of the present invention are shown. The converter primary flue gas full dry dust removal and energy recovery system comprises a smoke hood 1, a vaporization cooling flue 2, an afterburner 3, a heat balancer 4, a boiler 5 and a dust removal device. The smoke hood 1 is connected to the flue gas outlet of the converter, the vaporization cooling flue 2 is connected to the afterburner 3, the afterburner 3 is connected to the heat balancer 4, and the heat balancer 4 The outlet of the boiler 5 is connected to the inlet of the boiler 5, and the outlet of the boiler 5 is connected to the dust removal device. The vaporization cooling flue 2 is provided with an oxygen content analyzer 7 and a gas content analyzer 8. The dust removal device includes an explosion-proof and wear-resistant variable frequency fan 9 connected to the boiler 5 and a switching station 10 connected to the explosion-proof and wear-resistant variable frequency fan 9. The switching station 10 is respectively connected to a gas high-temperature bag dust collector 11 and a waste gas high-temperature bag dust collector 12. The waste gas high-temperature bag dust collector 12 is respectively connected to a first fine ash conveying system 13 and a dispersing chimney 14. The gas high-temperature bag dust collector 11 are respectively connected to the second fine ash conveying system 15 and the gas cooler 16, the first fine ash conveying system 13 and the second fine ash conveying system 15 are both connected to the main ash storage bin 17, the gas cooler 16 is also connected to the converter gas tank 18, a muffler 19 is provided between the explosion-proof and wear-resistant variable frequency fan 9 and the switching station 10, an ash conveying device is provided at the bottom of the afterburner 3 and / or the boiler 5, a special high-temperature dust collector 20 is provided between the heat balancer 4 and the boiler 5, a first emergency ash discharge port 21 is provided at the bottom of the afterburner 3, and the special high-temperature dust collector 20 A second emergency ash unloading port 22 is provided at the bottom, the bottoms of the first emergency ash unloading port 21 and the second emergency ash unloading port 22 are both connected to the first ash bin 23, the bottoms of the afterburner 3 and the heat balancer 4 are also connected to the first ash storage bin 25 through the first ash conveying device 24, the bottom of the special high-temperature dust collector 20 is also connected to the first ash storage bin 25 through the second ash conveying device 26, the bottom of the first ash storage bin 25 is connected to the main emergency ash unloading port 27, the bottom of the boiler 5 is connected to the second ash storage bin 29 through the third ash conveying device 28, and the bottom of the second ash storage bin 29 is connected to the third emergency ash unloading port 30.

[0020] Among them, the new vaporization cooling flue cools the flue gas temperature from 1650℃ (maximum) -1500℃ (maximum) to 850-750℃, recovers 2.0-4.0MPa high-pressure steam (-175kg / ts), and maximizes the use of waste heat.

[0021] The afterburner burns and deoxidizes flue gas with high oxygen content, raises the temperature of low-temperature flue gas, and burns flue gas with low coal gas content, making full use of the energy in the flue gas and improving the utilization rate of the waste heat boiler.

[0022] The heat balancer balances the flue gas temperature to prevent excessive temperature fluctuations from affecting the system. The gas phase condenses and agglomerates tiny dust particles, making them larger and easier to capture and remove by the high-temperature dust collector.

[0023] Special high-temperature dust collector initially removes dust from high-temperature flue gas to reduce it to 200mg / Nm 3 Below, the special high temperature dust collector has an operating temperature of over 950°C.

[0024] The boiler adopts a special explosion-proof medium-temperature and medium-pressure waste heat boiler. The boiler reduces the gas temperature from 850℃ to 150℃. The cooled gas enters the gas cooling system. The waste heat boiler has the functions of heat exchange and fire extinguishing. The high-temperature flue gas contacts the boiler heat exchange tube bundle. While generating steam, the flue gas temperature gradually decreases.

[0025] ID fan is the main power equipment of the system. It adopts wear-resistant fan and variable frequency speed regulation to adapt to the changes in flue gas volume and furnace mouth pressure control requirements during a smelting cycle.

[0026] The switching station consists of two sets of bell valves and glasses valves, which are hydraulically driven and quickly switched to meet the switching requirements of recovery and release during a smelting period.

[0027] Two sets of bag filters are the final purification equipment of this system, which can ensure that the dust concentration of clean coal gas is ≤5mg / Nm 3 ; Dust concentration in discharged exhaust gas ≤5mg / Nm 3 .

[0028] The ash conveying equipment adopts a combination of mechanical and pneumatic ash conveying, which directly reuses the dry dust briquettes or centrally sends them to sintering for unified mixing. Pneumatic ash conveying, also known as air flow conveying, uses the energy of air flow to convey granular materials in a closed pipeline along the direction of air flow, which is a specific application of fluidization technology. The principle of mechanical ash conveying is the rotation of the internal parts of the equipment to promote the continuous overall flow of materials. There is only one conveying process, no auxiliary facilities are required, the system is simple, the equipment is small, the intermediate links are small, the floor space is small, the investment cost is low, and the indirect operation and maintenance cost is low. Therefore, a simple system is an important way to reduce the investment in ash conveying.

[0029] The existing converter primary smoke directly enters the heat pipe waste heat pipe boiler, and a large amount of high-temperature smoke (molten state) adheres to the heat pipe and cannot be removed. The system pre-burner provided in the present application controls combustion to remove the low-content CO in the system during combustion, and deoxidizes the oxygen in the waste gas during the non-smelting time of the converter. At the same time, gas phase condensation treatment is carried out in the heat balancer to make tiny particles of dust condense and grow, which significantly improves the removal effect of high-temperature smoke. The design of the tube heat waste heat boiler bucket and gas transportation inevitably has dead zones, making it difficult to achieve the rear airflow pushing the front airflow forward. There is a mixture of oxygen and coal gas, and the probability of explosion increases. The system has a pre-burner, and the oxygen in the system has been deoxidized. The oxygen content in the waste gas is ≤2%, which meets the oxygen content requirement in the coal gas. The system is safe and reliable. At the same time, the design in the pre-system adopts the method of the rear airflow pushing the front airflow forward, and there is no dead angle throughout the process.

[0030] Our company's processing system places the fan and switching station in front of the high-temperature bag dust collector, and uses two sets of high-temperature bag dust collectors, one for treating coal gas and the other for treating waste gas, to avoid the situation where one set of dust collectors treats both coal gas and waste gas at the same time, thereby avoiding the mixing of coal gas and waste gas and the possibility of explosion. The system is safe and reliable.

[0031] The system provided by the present invention fully considers the properties of the primary flue gas of the converter and develops various special equipment for full dry recovery of the primary flue gas of the converter, thereby solving the problem of safe recovery and utilization of thermal energy and chemical energy of the primary flue gas of the converter.

[0032] System Features

[0033] This system has the following features:

[0034] A. Make full use of the energy generated by converter smelting to achieve full energy recycling. The whole system does not use water for cooling, realizing a fully dry process;

[0035] B. Control combustion through afterburner to reduce oxygen content and gas content in system exhaust gas, the system is safe and reliable, the oxygen content and gas content in system exhaust gas are low, and the safety is good;

[0036] C. High dust removal and purification efficiency, the gas dust concentration is reduced to 5mg / Nm through the bag filter 3 Below, the gas quality is greatly improved. The emission concentration reaches 5mg / Nm 3 Below, and very stable.

[0037] D. Use special high-temperature dust collectors for rough dust removal to prevent wear of boilers and fans;

[0038] E. The removal rate of PM2.5 can reach 99.95% through high-temperature gas bag filter and high-temperature waste gas bag filter, thereby effectively reducing the emission of PM2.5 dust;

[0039] F. The system adopts full dry treatment, there is no secondary pollution and sewage treatment, and the water-saving effect is significant;

[0040] G. This system has low resistance loss, can save energy and electricity consumption, and has high calorific value of coal gas. The recovered dust can be directly used. This system is a fully dry system and does not use water (OG method or LT method needs to spray a large amount of water or steam into the flue gas to increase the flue gas flow rate, increase the system resistance, and at the same time, the coal gas contains a large amount of water (saturated water) to reduce the calorific value of the coal gas), thereby reducing the system resistance and increasing the calorific value of the coal gas;

[0041] H. Adopt new high-efficiency vaporization cooling flue to fully utilize the heat energy of flue gas;

[0042] J. The system is simplified, occupies a small area, and is easy to manage and maintain;

[0043] K. Compared with the OG method and the LT method, the system is simple and the process is simplified. There are fewer parts and the control is simple, which effectively reduces the failure rate of the system and improves the reliability of the system. The system has a low failure rate and high reliability.

[0044] L. Through the DCS control system, the converter operation is automatically linked with the system, which does not have any impact on the converter operation and reduces the operation requirements. Through the three-way switching valve (10), the recovered gas (CO) content is adjusted to adjust the calorific value of the gas; the converter operation requirements are low, and the recovered gas content can be adjusted, thereby adjusting the calorific value of the gas;

[0045] M. The recovered gas does not contain water and has a high calorific value.

[0046] Analysis of economic and social benefits

[0047] The following is a benefit analysis using the 150 converter as an example

[0048] 1) Basic parameters

[0049]

[0050] 2) Waste heat boiler system

[0051] Main design parameters of waste heat boiler:

[0052]

[0053] 3) Investment estimate:

[0054] Equipment investment: 23.5 million yuan

[0055] Construction and installation: 12 million yuan

[0056] Design: 2 million yuan

[0057] Total project cost: 37.5 million yuan

[0058] 4) The economic value of technological transformation:

[0059] (1) Recovering the heat of coal gas from 850℃ to 150℃;

[0060] (2) Eliminates the water consumption of the evaporative cooler of the OG system or LT system;

[0061] (3) The gas does not contain water, so the calorific value is increased, which is conducive to the utilization of the gas;

[0062] (4) The resistance of the dust removal system is reduced, and the power consumption of the primary fan is reduced;

[0063] (5) Other economic benefits;

[0064] (6) Environmental benefits.

[0065] A. The heat of coal gas from 850℃ to 150℃ is recovered, as shown in Table 1;

[0066] Table 1. Environmental protection income statement

[0067] Serial number project unit quantity Annual Recycling Remark 1 Saturated steam t / h 30.2 ~240,000 tons 2 Power generation kwh 4314 34.51 million KWH 7kg steam / kwh 3 Power generation income Yuan 18.98 million yuan 0.55 yuan / kwh

[0068] Description: The flue gas supplementary combustion system is used to maintain the residual heat 0 stable operation during the period when the converter is not blowing oxygen, and recover and release part of the chemical latent heat of the coal gas, which has more obvious economic benefits. The power generation reaches ~6000KWh, and the annual power generation can reach ~48 million kWh, generating ~26.4 million yuan of economic benefits.

[0069] B. The water consumption of the evaporative cooler of the OG system or LT system was eliminated. The results are shown in Table 2;

[0070] Table 2. Water consumption table

[0071]

[0072]

[0073] The annual savings are 2.8455 million yuan or 1.79175 million yuan.

[0074] C. The gas does not contain water, and the calorific value is increased, which is conducive to the use of gas. Whether it is OG method or LT method, the gas contains a lot of water (OG method is saturated water, LT method is unsaturated water), which reduces the calorific value of the gas and consumes a lot of heat when it is used.

[0075] D. The resistance of the dust removal system is reduced, and the power consumption of the primary fan is reduced. The results are shown in Table 3.

[0076] Table 3. Power consumption table generated by each method.

[0077]

[0078] E. Other economic benefits

[0079] The operating cost of the electrostatic precipitator after the gas tank is eliminated is about 200,000 yuan per year. The gas system is water-free, which reduces corrosion of equipment pipelines and extends service life.

[0080] F. Environmental Benefits

[0081] The dust concentration of coal gas is reduced to 5mg / Nm through bag filter 3 Below, the gas quality is greatly improved. The emission concentration reaches 5mg / Nm 3 The following reduces pollutant emissions and achieves ultra-low emissions.

[0082] The above preliminary analysis shows that the initial investment of the converter primary flue gas energy recovery system (~37.5 million yuan) is comparable to the initial investment of the LT dry dust removal system (~40 million yuan). However, since the converter primary flue gas energy recovery system has many advantages, such as full heat recovery, no water, small footprint, low operating cost, and fast investment recovery, the investment can be recovered in less than one year (7-8 months). It has a good development prospect.

[0083] The connection relationship between the devices in the drawings of the present invention is to clearly explain the needs of their information interaction and control process, and therefore should be regarded as a logical connection relationship, and should not be limited to physical connection; the present invention is not limited to the above-mentioned optimal implementation mode, and anyone can derive other various forms of products under the inspiration of the present invention, but no matter what changes are made in their shape or structure, all technical solutions that are the same or similar to those of the present application fall within the protection scope of the present invention.

Claims

1. Converter primary flue gas full dry dust removal and energy recovery system, It is characterized in that The converter primary flue gas full dry dust removal and energy recovery system comprises a smoke hood (1), a vaporization cooling flue (2), an afterburner (3), a heat balancer (4), a boiler (5) and a dust removal device, wherein the smoke hood (1) is connected to the flue gas outlet of the converter, the vaporization cooling flue (2) is connected to the afterburner (3), the afterburner (3) is connected to the heat balancer (4), the outlet of the heat balancer (4) is connected to the inlet of the boiler (5), and the outlet of the boiler (5) is connected to the dust removal device; A special high-temperature dust collector (20) is provided between the heat balancer (4) and the boiler (5); The afterburner (3) and / or the boiler (5) are provided with ash conveying equipment; The bottom of the afterburner (3) is provided with a first emergency ash discharge port (21), the bottom of the special high-temperature dust collector (20) is provided with a second emergency ash discharge port (22), the bottoms of the first emergency ash discharge port (21) and the second emergency ash discharge port (22) are both connected to a first ash bin (23), the bottoms of the afterburner (3) and the heat balancer (4) are also connected to a first ash storage bin (25) via a first ash conveying device (24), the bottom of the special high-temperature dust collector (20) is also connected to the first ash storage bin (25) via a second ash conveying device (26), and the bottom of the first ash storage bin (25) is connected to a general emergency ash discharge port (27); The afterburner (3) controls combustion to remove low-content CO in the system during combustion, and deoxidizes oxygen in the waste gas during non-smelting time of the converter; The heat balancer (4) performs gas phase condensation processing to make the tiny dust particles condense and grow; the rear airflow is used to push the front airflow to move forward.

2. The converter primary flue gas full dry dust removal and energy recovery system as claimed in claim 1, It is characterized in that The vaporization cooling flue (2) is provided with an oxygen content analyzer (7) and a coal gas content analyzer (8).

3. The converter primary flue gas full dry dust removal and energy recovery system as claimed in claim 1, It is characterized in that The dust removal device comprises an explosion-proof and wear-resistant variable frequency fan (9) connected to the boiler (5) and a switching station (10) connected to the explosion-proof and wear-resistant variable frequency fan (9); the switching station (10) is respectively connected to a coal gas high-temperature bag dust collector (11) and a waste gas high-temperature bag dust collector (12); the waste gas high-temperature bag dust collector (12) is respectively connected to a first fine ash conveying system (13) and a discharge chimney (14); the coal gas high-temperature bag dust collector (11) is respectively connected to a second fine ash conveying system (15) and a coal gas cooler (16); the first fine ash conveying system (13) and the second fine ash conveying system (15) are both connected to a general ash storage bin (17); the coal gas cooler (16) is also connected to a converter gas tank (18).

4. The converter primary flue gas full dry dust removal and energy recovery system as claimed in claim 3, It is characterized in that A muffler (19) is provided between the explosion-proof and wear-resistant variable frequency fan (9) and the switching station (10).

5. The converter primary flue gas full dry dust removal and energy recovery system as claimed in claim 1, It is characterized in that The bottom of the boiler (5) is connected to a second ash storage bin (29) via a third ash conveying device (28), and the bottom of the second ash storage bin (29) is connected to a third emergency ash discharge port (30).