Geothermal pipeline quick disassembly and assembly mechanism and construction method

By designing a rapid disassembly and assembly mechanism of geothermal pipelines, using the combination of pallets, brackets and pins, the problems of inconvenient disassembly and assembly of geothermal pipelines and falling parts in the prior art are solved, and an efficient and safe construction process is achieved.

CN113431956BActive Publication Date: 2024-12-03POWER CHINA HENAN ENG CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202110693867.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-22
Publication Date
2024-12-03
Estimated Expiration
2041-06-22

AI Technical Summary

Technical Problem

During the pipe release and pipe extraction process of geothermal pipes, it is difficult to disassemble and assemble quickly in the prior art, and parts are prone to fall, which affects construction efficiency and safety.

Method used

A rapid disassembly and assembly mechanism of geothermal pipes is designed, including base, cross plate and support hook. Through the combination of pallets, brackets and pin plates, stable support and rapid disassembly and assembly of the pipes are achieved to prevent parts from falling.

Benefits of technology

It improves construction efficiency, ensures construction quality and safety, simplifies the installation and dismantling process of pipelines, and avoids falling parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113431956B_ABST
    Figure CN113431956B_ABST
Patent Text Reader

Abstract

The present invention discloses a geothermal pipeline rapid disassembly and assembly mechanism and construction method, wherein the mechanism includes a base, a horizontal plate and a support hook, a horizontal plate is arranged at the bottom of the base, a support plate is arranged on both sides of the inner hole of the base, and a bracket is arranged on the support plate; a hoisting assembly is arranged above the base, and the hoisting assembly is composed of a support hook, a connecting plate, a pin plate and a limit plate, there are two support hooks, a connecting plate is arranged between the two support hooks, and a lifting ear is arranged at the upper end of the two support hooks; a square pin hole is arranged on the connecting plate, and a matching pin plate is arranged in the square pin hole, and the pin plate is clamped together with the pipeline. The present invention can support the pipeline flange by arranging a bracket on the support plate, which is convenient for the staff to install or remove bolts on the pipeline and avoid the situation of parts falling during construction; by clamping the pin plate and the pipeline together, the pipeline is prevented from falling from the support hook when hoisting the pipeline; the safety of construction is guaranteed, the installation time of bolts or nuts is reduced, and the disassembly and assembly are convenient, and it is easy to promote.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0002] The invention relates to an auxiliary device for taking out or placing a geothermal pipe and a construction method of the device, and in particular to a geothermal pipe quick disassembly and assembly mechanism and a construction method. Background technology:

[0004] The rise of geothermal energy, a new energy source, has led to a busy schedule for the installation and maintenance of heat network well pipelines. The length of heat network well pipelines is generally tens of meters to hundreds of meters, or even thousands of meters. However, when laying and removing the heat network well pipelines, it is very inconvenient to lift them. The existing technology is to use a steel wire rope to wrap around the pipeline flange and use a crane to lay and remove the pipes. Since each section of the pipeline is fixed with bolts, the pipelines need to be connected during the process of taking or laying the pipes. Since the pipeline is in a suspended state, it will be very difficult to penetrate the flange bolts during installation; when the flange is disassembled, it will be difficult to remove the bolts or nuts. If you are not careful, the bolts or nuts will fall into the heat network well. Summary of the invention:

[0006] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a geothermal pipeline rapid disassembly and assembly mechanism and a construction method, which can quickly lower or lift the pipeline and avoid the falling of parts during the disassembly and assembly process, thereby improving construction efficiency and ensuring construction quality.

[0007] The technical solution adopted by the present invention to solve the technical problem is:

[0008] A quick disassembly and assembly mechanism for geothermal pipes, comprising a base, a cross plate and a support hook, wherein there are two cross plates, which are respectively located at the two ends of the bottom of the base, the base is distributed in a U-shape, and the closed end of the base is fixedly connected to one of the cross plates by means of studs and matching nuts; support plates are respectively provided on both sides of the inner hole of the base, and the support plates are fixedly connected to the base by bolts; brackets are respectively provided on each of the support plates; a lifting assembly is provided above the bracket, and the lifting assembly consists of a support hook, a connecting plate, a pin plate and a limit plate, the two support hooks are symmetrically distributed, and a connecting plate is provided between the two support hooks, and lifting ears are provided at the upper ends of the two support hooks; a square pin hole is provided on the connecting plate, a matching pin plate is provided in the square pin hole, a limit plate is provided at the upper end of the pin plate, and a handle is provided at the upper end of the limit plate.

[0009] The side surfaces of the brackets are distributed in a right-angle trapezoidal shape, and the brackets located on both sides of the inner hole are distributed symmetrically.

[0010] The lower end of the pin plate is distributed in a cone shape, and the size of the front end of the pin plate is smaller than the inner diameter of the pipeline, and the size of the rear end of the pin plate is larger than the inner diameter of the pipeline, and the pin plate is clamped together with the pipeline.

[0011] The distance between the inner walls of the lower ends of the two support hooks is greater than the outer diameter of the pipeline and smaller than the outer diameter of the flange at the upper end of the pipeline. The outer diameter of the flange at the upper end of the pipeline is smaller than the width of the connecting plate.

[0012] The size of the inner hole of the base matches the outer diameter of the pipeline, and the horizontal plate is located above the geothermal wellhead.

[0013] A through hole is arranged at the closed end of the base, and a stud is arranged at a position of the through hole corresponding to one of the horizontal plates. The right end of the base is sleeved on the stud and fixed by a matching nut.

[0014] The construction method of the heating network pipeline quick disassembly and assembly mechanism comprises the following steps:

[0015] A. Construction preparation:

[0016] ①. Determine the length of the horizontal plate according to the size of the geothermal wellhead;

[0017] ②. Determine the size of the bottom plate inner hole according to the size of the geothermal pipe;

[0018] ③. Sleeve the through hole on the right end of the base on one of the horizontal plates and fix it with the matching nuts. Place the other horizontal plate under the left end of the base, and place the two horizontal plates on the upper ends of the geothermal wellheads respectively;

[0019] B. Lowering of geothermal pipes:

[0020] ① Place a pipe A on the inner hole of the bottom plate, and place the flange of the upper port of the pipe A on the upper end of the bracket, so that the pipe A is fixed;

[0021] ②. Hang the lifting lug on the hook of the crane, place the flange of the upper end of the other pipe B above the bend at the bottom of the support hook, then insert the pin plate into the square pin hole, and gently hit it with a hammer to clamp the pin plate and the upper end of the pipe B together; use the crane to place the lower end of pipe B above pipe A, and finally the staff will fix the two pipes together with bolts;

[0022] ③. After the pipeline is fixed, remove the bottom plate, cross plate and support hooks.

[0023] The two pipes are lowered until the upper end of pipe B is 0.5 m away from the geothermal wellhead below, and the horizontal plate with the bottom plate fixed is placed at the wellhead. At the same time, the inner hole of the bottom plate is moved toward pipe B, and another horizontal plate is placed below the left end of the bottom plate.

[0024] ④. Continue to lower pipe B until the flange at the upper end of pipe B is placed on the bracket, remove the pin plate from pipe B, and remove the support hook;

[0025] ⑤. Repeat the above operation, lowering and fixing at the same time, until the pipe is lowered to the required length;

[0026] C. Dismantling of geothermal pipelines:

[0027] ①. Place the flange at the upper end of pipe A on the support hook and fix it to pipe A through the pin plate. Hang the lifting lug on the crane and pull the pipe upward until the upper end of pipe B moves to 0.5m above the wellhead. Place the bottom plate with a horizontal plate on the wellhead and move the left end of the inner hole of the bottom plate toward pipe B until pipe B is located in the inner hole. Then place another horizontal plate below the left end of the bottom plate.

[0028] ② Place the upper port of pipe B on the bracket. At this time, the upper end of pipe B is connected to the lower end of pipe A by bolts. Place the flange at the upper end of pipe B on the bracket. The staff quickly removes the bolts between the two pipes, removes pipe A, and then separates the support hook from pipe A.

[0029] ③. Place the flange of the upper port of pipeline B above the bottom of the support hook, insert the pin plate into the square pin hole, clamp it together with pipeline B, and hang the lifting lug on the hook of the crane. The staff removes the cross plate and bottom plate, and pulls pipeline B upward until the upper port of pipeline C is moved to 0.5m above the wellhead;

[0030] ④. Repeat the above steps until all pipes are lifted out and removed.

[0031] The positive beneficial effects of the present invention are:

[0032] 1. The present invention provides a support plate on the bottom plate and a bracket on the support plate, so that the flange at the pipe port is supported, which is convenient for removing or connecting bolts between adjacent pipes; a cross plate is provided at the bottom of the bottom plate and the cross plate is placed above the wellhead, so that the device is supported when in use, ensuring the overall stability, thereby improving the construction efficiency.

[0033] 2. The present invention clamps the pin plate and the pipeline together, so that when the pipeline is lifted, it is fixed together with the support hook to prevent the pipeline from falling from the support hook, thereby ensuring the safety of construction, and is easy to disassemble and assemble, and easy to promote.

[0034] 3. The bottom plate of the present invention is distributed in a U-shape. When in use, the pipeline is moved to the inner hole of the bottom plate so that the pipeline is limited to a certain position. The mechanism is used to install or remove the pipeline to avoid the falling of parts and components, and the installation time of bolts or nuts is reduced. It is easy to use and simple to operate. Description of the drawings:

[0036] Figure 1 It is a structural schematic diagram of the present invention in a hoisting state;

[0037] Figure 2 is the distribution diagram of the present invention;

[0038] Figure 3 It is a structural schematic diagram of the invention support state;

[0039] Figure 4 It is a structural schematic diagram of the pipeline installation state of the present invention. Specific implementation method:

[0041] The present invention will be further explained and illustrated below in conjunction with the accompanying drawings:

[0042] Embodiment 1:

[0043] See also Figure 1-Figure 4 , a geothermal pipeline quick disassembly and assembly mechanism, a base 1, a cross plate 2 and a support hook 6, the cross plates 2 are two, respectively located at the two ends of the bottom of the base 1, the base 1 is U-shaped, and the closed end of the base 1 is fixedly connected to one of the cross plates 2 through a stud 14 and a matching nut 15; a support plate 4 is respectively provided on both sides of the inner hole of the base 1, and the support plate 4 is fixedly connected to the base 1 by bolts; a bracket 5 is respectively provided on each support plate 4; a lifting assembly is provided above the bracket 5, and the lifting assembly consists of a support hook 6, a connecting plate 8, a pin plate 11 and a limit plate 10, there are two support hooks 6, which are symmetrically distributed, and a connecting plate 8 is provided between the two support hooks 6, and a lifting ear 7 is provided at the upper end of the two support hooks 6; a square pin hole 9 is provided on the connecting plate 8, a matching pin plate 11 is provided in the square pin hole 9, and a limit plate 10 is provided at the upper end of the pin plate 11, and a handle 12 is provided at the upper end of the limit plate 11.

[0044] The side surfaces of the bracket 5 are distributed in a right-angle trapezoidal shape, and the brackets 5 located on both sides of the inner hole are distributed symmetrically.

[0045] The lower end of the pin plate 11 is distributed in a cone shape, and the size of the front end of the pin plate 11 is smaller than the inner diameter of the pipe 3, and the size of the rear end of the pin plate 11 is larger than the inner diameter of the pipe 3, and the pin plate 11 and the pipe 3 are clamped together.

[0046] The distance between the inner walls of the lower ends of the two support hooks 6 is larger than the outer diameter of the pipeline 3 and smaller than the outer diameter of the flange at the upper end of the pipeline. The outer diameter of the flange at the upper end of the pipeline is smaller than the width of the connecting plate 8.

[0047] The size of the inner hole of the base 1 matches the outer diameter of the pipe 3, and the horizontal plate 2 is located above the geothermal wellhead.

[0048] A through hole is provided at the closed end of the base 1 , and a stud 14 is provided at a position of the through hole corresponding to one of the horizontal plates 2 . The right end of the base 1 is sleeved on the stud 14 and fixed by a matching nut 15 .

[0049] In the above description, the size of the square through hole is larger than the size of the pin plate 11 , but smaller than the size of the limiting plate 10 .

[0050] In the above description, the lifting lug 7 and the two support hooks are an integrated structure, and the support hooks are distributed in an L shape.

[0051] Embodiment 2: The construction method of the above-mentioned geothermal pipeline quick disassembly and assembly mechanism comprises the following steps:

[0052] A. Construction preparation:

[0053] ①, according to the size of the geothermal wellhead 13, determine the length of the horizontal plate 2;

[0054] ②. Determine the size of the inner hole of the bottom plate 1 according to the size of the geothermal pipeline;

[0055] ③. Sleeve the through hole on the right end of the base 1 on one of the horizontal plates 2 and fix it with the matching nut 15. Place the other horizontal plate 2 under the left end of the base 1, and place the two horizontal plates on the upper ends of the geothermal wellhead 13 respectively;

[0056] B. Lowering of geothermal pipes:

[0057] ① Place a pipe A on the inner hole of the bottom plate 1, and place the flange of the upper port of the pipe A on the upper end of the bracket 5, so that the pipe A is fixed;

[0058] ②, hang the lifting lug 7 on the hook of the crane, place the flange of the upper end of the other pipe B above the bent hook at the bottom of the support hook 6, then insert the pin plate 11 into the square pin hole 9, and gently hit it with a hammer to clamp the pin plate 11 and the upper end of the pipe B together; use the crane to place the lower end of pipe B above pipe A, and finally the staff will fix the two pipes together with bolts;

[0059] ③. After the pipes are fixed, remove the bottom plate 1, the horizontal plate 2 and the support hook 6.

[0060] The two pipelines are lowered until the upper end of pipeline B is 0.5 m away from the geothermal wellhead below, and the horizontal plate with the bottom plate 1 fixed thereon is placed at the wellhead. At the same time, the inner hole of the bottom plate 1 is moved toward pipeline B, and another horizontal plate 2 is placed below the left end of the bottom plate 1.

[0061] ④. Continue to lower the pipe B until the flange at the upper end of the pipe B is placed on the bracket 5, remove the pin plate (11) from the pipe B, and remove the support hook 6;

[0062] ⑤. Repeat the above operation, lowering and fixing at the same time, until the pipe is lowered to the required length;

[0063] C. Dismantling of geothermal pipelines:

[0064] ①. Place the flange at the upper end of pipe A on the support hook and fix it to pipe A through the pin plate 11. Hang the lifting lug 7 on the crane and pull the pipe upward until the upper end of pipe B moves to 0.5m above the wellhead. Place the bottom plate with a horizontal plate on the wellhead and move the left end of the bottom plate inner hole toward pipe B until pipe B is located in the inner hole. Then place another horizontal plate below the left end of the bottom plate.

[0065] ② Place the upper port of pipe B on the bracket 5. At this time, the upper end of pipe B is connected to the lower end of pipe A by bolts. Place the flange at the upper end of pipe B on the bracket 5. The staff quickly removes the bolts between the two pipes, removes pipe A, and then separates the support hook 6 from pipe A.

[0066] ③. Place the flange of the upper port of pipe B above the bottom of the support hook 6, insert the pin plate 11 into the square pin hole, clamp it together with pipe B, and hang the lifting lug 7 on the hook of the crane. The staff removes the cross plate and the bottom plate, and pulls pipe B upward until the upper port of pipe C is moved to 0.5m above the wellhead;

[0067] ④. Repeat the above steps until all pipes are lifted out and removed.

[0068] In the above description, the lifting lug can be directly hung on the hook of the crane, and can also be connected to the hook of the crane through a rope.

[0069] The present invention provides a support plate on the bottom plate and a bracket on the support plate, so that the flange of the upper port of the pipeline can be supported, which is convenient for workers to install bolts or remove bolts on the pipeline and avoid the falling of parts; the pin plate is clamped together with the pipeline to avoid the pipeline falling from the support hook when the pipeline is hoisted; the safety of construction is guaranteed, the installation time of bolts or nuts is reduced, and the disassembly and installation are convenient, which is easy to promote.

Claims

1. A geothermal pipeline quick disassembly and assembly mechanism, comprising a base (1), a transverse plate (2) and a support hook (6), Features: The number of the transverse plates (2) is two, and they are respectively located at the two ends of the bottom of the base (1). The base (1) is U-shaped, and the closed end of the base (1) is fixedly connected to one of the transverse plates (2) by means of a stud (14) and a matching nut (15). Support plates (4) are respectively arranged on both sides of the inner hole of the base (1), and the support plates (4) are fixedly connected to the base (1) by means of bolts. A bracket (5) is respectively arranged on each of the support plates (4). A hanging assembly is arranged above the bracket (5), and the hanging assembly consists of a support hook (6), a connecting plate (8), a pin plate (11) and a limit plate (10). The number of the support hooks (6) is two, and they are symmetrically distributed. A connecting plate (8) is arranged between the two support hooks (6), and a lifting ear (7) is arranged at the upper end of the two support hooks (6). A square pin hole (9) is arranged on the connecting plate (8), and a matching pin plate (11) is arranged in the square pin hole (9). A limit plate (10) is provided at the upper end of the pin plate (11), and a handle (12) is provided at the upper end of the limit plate (10); the lower end of the pin plate (11) is distributed in a cone shape, and the size of the front end of the pin plate (11) is smaller than the inner diameter of the pipeline (3), and the size of the rear end of the pin plate (11) is larger than the inner diameter of the pipeline (3), and the pin plate (11) and the pipeline (3) are clamped together; the distance between the inner walls of the lower ends of the two support hooks (6) is larger than the outer diameter of the pipeline (3) and smaller than the outer diameter of the flange at the upper end of the pipeline, and the outer diameter of the flange at the upper end of the pipeline is smaller than the width of the connecting plate (8); the size of the inner hole of the base (1) matches the outer diameter of the pipeline (3), and the horizontal plate (2) is located above the geothermal wellhead; the closed end of the base (1) is provided with a through hole, and a stud (14) is provided at the position of the through hole corresponding to one of the horizontal plates (2), and the right end of the base (1) is sleeved on the stud (14) and fixed by a matching nut (15).

2. The geothermal pipeline quick disassembly and assembly mechanism according to claim 1, Features: The side surfaces of the brackets (5) are distributed in a right-angled trapezoidal shape, and the brackets (5) located on both sides of the inner hole are distributed in a symmetrical shape.

3. The construction method of the geothermal pipeline quick disassembly and assembly mechanism according to claim 1, Features: The steps include: A. Construction preparation: ①, according to the size of the geothermal wellhead (13), determine the length of the horizontal plate (2); ②. Determine the size of the inner hole of the base (1) according to the size of the geothermal pipe; ③. The through hole on the right end of the base (1) is sleeved on the stud on one of the horizontal plates (2) and fixed with a matching nut (15). The other horizontal plate (2) is placed below the left end of the base (1), and the two horizontal plates are placed at the upper ends of the geothermal wellhead (13) respectively. B. Lowering of geothermal pipes: ①, placing a pipe A on the inner hole of the base (1), and placing the flange of the upper port of the pipe A on the upper end of the bracket (5), so that the pipe A is fixed; ②. Hang the lifting lug (7) on the hook of the crane, place the flange at the upper end of the other pipe B above the bent hook at the bottom of the support hook (6), then insert the pin plate (11) into the square pin hole (9), and gently hit it with a hammer to clamp the pin plate (11) and the upper end of the pipe B together; use the crane to place the lower end of pipe B above pipe A, and finally the staff will fix the two pipes together with bolts; ③ After the pipes are fixed, remove the base (1), cross plate (2) and support hook (6). The two pipes are lowered until the upper end of pipe B is 0.5 m away from the geothermal wellhead below, and a horizontal plate fixed with the base (1) is placed at the wellhead. At the same time, the inner hole of the base (1) is moved toward pipe B, and another horizontal plate (2) is placed below the left end of the base (1); ④. Continue to lower pipe B until the flange at the upper end of pipe B is placed on the bracket (5), remove the pin plate (11) from pipe B, and remove the support hook (6); ⑤. Repeat the operation in step B, lowering and fixing at the same time, until the pipe is lowered to the required length; C. Dismantling of geothermal pipelines: ① Place the flange at the upper end of pipe A on the support hook and fix it to pipe A through the pin plate (11). Hang the lifting lug (7) on the crane and pull the pipe upward until the upper end of pipe B moves to 0.5 m above the wellhead. Place a bottom plate with a horizontal plate on the wellhead and move the left end of the inner hole of the bottom plate toward pipe B until pipe B is located in the inner hole. Then place another horizontal plate below the left end of the bottom plate. ② Place the upper end of pipe B on the bracket (5). At this time, the upper end of pipe B is connected to the lower end of pipe A by bolts. Place the flange at the upper end of pipe B on the bracket (5). The staff quickly removes the bolts between the two pipes, removes pipe A, and then separates the support hook (6) from pipe A. ③. Place the flange of the upper end of pipe B above the bottom of the support hook (6), insert the pin plate (11) into the square pin hole, clamp it together with pipe B, and hang the lifting lug (7) on the hook of the crane. The staff removes the cross plate and the bottom plate, and pulls pipe B upward until the upper end of pipe C is moved to 0.5m above the wellhead; ④. Repeat the operation in step C until all the pipes are lifted out and removed.

Citation Information

Patent Citations

  • Auxiliary device for ascending and descending well pump for geothermal well

    CN108773762A

  • Pipeline connecting device for petroleum refining

    CN112723214A

  • Closed hoisting device for deep well submersible pump

    CN212769350U

  • Quick dismounting and mounting mechanism for geothermal pipeline

    CN217177666U

  • Lifting method of unit house and lifting metal tool therefor

    JP1997250182A