An oxygen dispatch calculation method combining production and consumption forecasting and pipeline network calculation
By combining the method of oxygen production and consumption prediction with pipe network calculation, the inaccuracy problem of traditional oxygen scheduling method when production plan changes is solved, stable scheduling and energy optimization of the oxygen system are achieved, and the accuracy and accuracy of oxygen consumption prediction are improved. System stability.
Patent Information
- Application Number
- CN202111088740.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-16
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-09-16
AI Technical Summary
Traditional oxygen scheduling methods fail to accurately predict changes in oxygen consumption and provide real-time scheduling, especially when production plans change, and are not combined with oxygen pipeline network calculations, causing the stability of the oxygen system to be affected.
Adopting an oxygen scheduling method that combines production and consumption prediction and pipe network calculation, by constructing an oxygen production and consumption prediction model and a pipe network calculation model, predicting oxygen consumption and correcting the results, optimizing oxygen system scheduling, using moving average autoregression and BP neural network. Forecast, make real-time corrections based on converter production process data and schedule, and calculate pipe network pressure changes through the node method and gas state equation.
It improves the accuracy of oxygen consumption prediction, avoids the accumulation of prediction errors, ensures the stability of the oxygen system, and optimizes energy use to meet user needs by intervening in advance for pressure fluctuations in the oxygen pipe network.
Smart Images

Figure CN113962050B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of industrial information technology and relates to an oxygen scheduling calculation method combining production and consumption prediction and pipeline network calculation. Background Art
[0002] Energy conservation and emission reduction has always been one of the production goals that steel companies focus on. Oxygen, as one of the important energy media for steel companies, will have a great impact on the production of blast furnaces and converters. Oxygen in steel companies is mainly prepared by oxygen generators and then sent to oxygen users through oxygen pipelines. The main users of oxygen in steel companies are blast furnaces in the ironmaking process and converters in the steelmaking process: the consumption of oxygen in the blast furnace process is mainly used for oxygen-enriched ironmaking. The production of the blast furnace process is stable, and its oxygen consumption is relatively stable. Therefore, the prediction of blast furnace oxygen consumption is a prediction of stable data, and its prediction is relatively easy. The consumption of oxygen in the converter process is mainly used for converter blowing. The production rhythm of the converter is based on the production schedule, which has the characteristics of discontinuity and complex influencing factors. The blowing process in converter steelmaking is the main link of oxygen consumption in steel plants, and the oxygen consumption of the converter accounts for more than 50% of the total oxygen consumption of the Hong Kong High Speed Rail. Converter steelmaking is a veritable oxygen consumer, and its oxygen supply method has a significant impact on the stability of the entire oxygen system.
[0003] At present, the common oxygen consumption prediction generally adopts a data-driven method to complete the oxygen load prediction on a time granularity. According to historical data, a kernel learning model represented by a neural network and a support vector machine is used, and a prediction model based on a fuzzy system is used to perform an iterative mechanism prediction algorithm (Bums E, Rural W. Iterative-deepening search with on-line tree size prediction [J]. Annals of Mathematics and Artificial Intelligence, 2013, 69 (2): 183-205.). (Zhang L, Zhou WD, Chang PC, et al. Iterated time series prediction with multiple support vector regression models [J]. Neurocomputing, 2013, 99: 411-422.) Or, considering the staged production characteristics, the data is divided into particles of different lengths, and then fuzzy clustering and fuzzy reasoning are performed with the data segment as the basic analysis unit, and finally the oxygen load prediction is completed. (Han Zhongyang. Prediction and scheduling methods and applications of steelmaking process gas energy system [D]. Dalian University of Technology, 2016.). SVM and other models are used to predict the oxygen consumption of a single furnace, but the prediction results are in the form of total points, which cannot be predicted at the time granularity and cannot meet the needs of actual production on site. (Jiang Weijie. Research on prediction and optimization scheduling model of oxygen system in steel enterprises [D]. Tianjin University of Technology, 2017.)
[0004] However, these methods only analyze historical oxygen production and consumption data and then use algorithms to make predictions. However, when there is a sudden change in the production plan, it is impossible to make corresponding predictions based on historical data alone. The changing pattern of oxygen consumption is closely related to the scheduling of the production plan. By extracting the scheduling of the production plan and combining it with historical data, it is not only possible to explain the changing trend of the prediction from a mechanistic perspective, but also to achieve greater accuracy. For example, the patent "A method for predicting oxygen load for steel enterprises based on production planning" with publication number CN111353656A, although it solves the above factors affecting the prediction of oxygen production and consumption data, does not make real-time corrections to the prediction model (because during the oxygen consumption process, the oxygen consumption changes dynamically in real time), and does not provide an oxygen scheduling method. The traditional oxygen scheduling method does not take into account oxygen production and consumption prediction and oxygen network calculation. Therefore, it is necessary to design an oxygen scheduling calculation method that combines production and consumption prediction with pipeline network calculation. Summary of the invention
[0005] In view of this, the purpose of the present invention is to provide an oxygen scheduling calculation method that combines production and consumption prediction and pipeline network calculation to solve the problem of inaccurate oxygen scheduling by traditional oxygen scheduling methods based only on production and consumption balance.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] An oxygen scheduling calculation method combining production and consumption prediction and pipeline network calculation specifically includes the following steps:
[0008] S1: Construct an oxygen consumption prediction model to predict the oxygen consumption of blast furnaces, converters and other users in the future; and modify the prediction results of the oxygen consumption prediction model according to the actual production situation of the converter;
[0009] S2: construct an oxygen pipeline network calculation model, input the prediction result corrected in step S1 as a boundary condition into the oxygen pipeline network calculation model, and calculate the change of oxygen pipeline network pressure in the future period of time;
[0010] S3: Oxygen scheduling: Optimize the scheduling of the oxygen system based on the prediction results corrected in step S1 and the changes in the oxygen network pressure in the future calculated in step S2.
[0011] Furthermore, in step S1, the constructed oxygen production and consumption prediction model includes the prediction of the blast furnace oxygen enrichment flow rate, and the prediction is performed using a moving average autoregressive method or a BP neural network.
[0012] Furthermore, the moving average autoregression method is used for prediction, specifically, the model is trained by historical data to determine the number of regression items, the number of sliding average items and the number of difference items.
[0013] Furthermore, the prediction using BP neural network specifically involves training the model with historical data to determine the weights within the neural network.
[0014] Furthermore, in step S1, the constructed oxygen production and consumption prediction model also includes the analysis and statistics of the converter oxygen consumption, by finding the relationship between the converter production process data and the corresponding furnace oxygen consumption and fitting the oxygen consumption calculation formula; specifically including: converter blowing oxygen consumption prediction, first collecting a large amount of historical data of the converter production process, and then determining the correlation between parameters such as molten iron volume, scrap steel volume, molten iron composition and oxygen consumption through data analysis, and then selecting the parameters that have the greatest impact on oxygen consumption according to the level of correlation, and finally fitting the calculation formula between the selected process parameters and oxygen consumption through the formula fitting method.
[0015] Furthermore, in step S1, the constructed oxygen production and consumption prediction model also includes converter cycle prediction; in the converter cycle prediction, cycle prediction through converter historical data and real-time correction of converter cycle and consumption are introduced; specifically, the converter cycle prediction model predicts the smelting time of each furnace and the interval time between furnaces according to the converter production schedule, and then calculates the oxygen consumption of each furnace through the molten iron data in the inspection and testing system and the weighing system; when the data in the converter production schedule, the inspection and testing system or the weighing system is missing or updated untimely, the system reads the historical data of converter production and completes the data required for cycle prediction by weighted moving average; secondly, the converter cycle prediction model compares in real time whether there is a deviation between the oxygen consumption prediction data and the actual oxygen consumption data of converter production. If there is a deviation, the converter oxygen consumption cycle and consumption are corrected to ensure that the predicted value is always consistent with the actual production.
[0016] Furthermore, when there is a deviation between the oxygen consumption forecast data and the actual production consumption data of the converter, the oxygen consumption rhythm and consumption of the converter are corrected, including: judging and correcting the forecast situation, first judging whether the difference occurs at the beginning of a cycle or at the end of a cycle;
[0017] The first case: if the difference occurs at the beginning of a cycle, and the actual cycle starts first, but the predicted cycle starts later, that is, the actual blowing starts in advance, then not only the predicted value needs to be adjusted to align with the actual value, but also because a new Gap_t appears, the Gap_t calculation value needs to be updated in combination with the scheduling data or converter production history data; Gap_t represents the time interval between two smelting furnaces;
[0018] The second case: if there is a difference at the beginning of a cycle, and the predicted cycle appears first, while the actual cycle appears later, that is, the predicted blowing starts in advance, at this time the measured time is too early, so Q_t and Q_O2 are reassigned, and the predicted time is moved backward; Q_t represents the duration of oxygen blowing for a single furnace, and Q_O2 represents the total oxygen consumption for a single furnace;
[0019] In the third case, if at the end of a cycle, the actual cycle ends first, while the predicted cycle has not yet ended, that is, the actual blowing ends ahead of schedule, then not only the predicted value needs to be adjusted to align with the actual value, but also because new Q_t and Q_O2 appear, the calculated values of Q_t and Q_O2 need to be updated in combination with the scheduling data or the converter production history data;
[0020] In the fourth case, if at the end of a cycle, the predicted cycle ends first, but the actual cycle has not ended, that is, the predicted blowing ends early, then Q_t and Q_O2 need to be reassigned, and the cycle end time is pushed back.
[0021] Furthermore, in step S2, the constructed oxygen pipe network calculation model includes two parts: one part is the hydraulic calculation of the pipe, and the other part is the pressure calculation of the oxygen spherical tank.
[0022] Furthermore, the hydraulic calculation of the pipeline is solved by the node method to solve the hydraulic calculation of the branch pipe network and the ring pipe network. The solution process includes three equations: a) node flow continuity equation; b) pipe section pressure drop equation; c) pipe section flow equation;
[0023] The pressure calculation of the oxygen spherical tank uses a gas state equation to obtain the pressure change of the oxygen spherical tank caused by the imbalance of oxygen production and consumption.
[0024] Further, in step S3, the oxygen scheduling specifically includes: judging whether there will be large pressure fluctuations in the oxygen pipeline network in the future period of time according to the corrected prediction results and the results calculated by the oxygen pipeline network calculation model, if a sudden increase in pressure will cause oxygen release and cause uneconomical energy use, if a sudden decrease in pressure will cause illegal satisfaction of user needs and affect process production; through judgment, if the imbalance of oxygen production and consumption in the future period of time will cause large pipeline network pressure fluctuations, the oxygen scheduling system needs to intervene in advance, first of all, through the load adjustment of the oxygen generator to meet the changes in oxygen user demand, but when the load adjustment of the oxygen generator is not sufficient to meet the adjustment demand, the oxygen scheduling system will also give the steelmaking process a suggestion for adjusting the converter oxygen blowing rhythm, so as to avoid drastic fluctuations in oxygen pipeline network pressure caused by long-term simultaneous blowing of multiple converters or no simultaneous blowing.
[0025] The beneficial effects of the present invention are as follows: the present invention introduces oxygen production and consumption prediction and oxygen pipeline network calculation on the basis of the traditional oxygen scheduling algorithm, and organically combines them. The introduction of the oxygen production and consumption prediction function can predict the imbalance of oxygen production and consumption in a certain period of time in the future, so that the scheduling system can intervene in advance to achieve the purpose of better stabilizing the pressure of the oxygen system; further, in view of the particularity of converter oxygen blowing, the prediction method combining oxygen prediction with process parameters is used to improve the accuracy of oxygen consumption prediction, and a method for correcting oxygen prediction according to the actual production situation of the converter is proposed, which effectively avoids the accumulation of prediction errors. Finally, the introduction of the oxygen pipeline network calculation function can more clearly calculate the pressure and flow fluctuations of the pipeline network and oxygen storage tank caused by the imbalance of oxygen production and consumption, so as to avoid excessive fluctuations in pressure or flow affecting the normal production of oxygen users, so that oxygen scheduling has more sufficient data basis.
[0026] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0028] Figure 1 The general diagram of the oxygen optimization scheduling calculation process of the present invention;
[0029] Figure 2 A flow chart for predicting oxygen production and consumption;
[0030] Figure 3 This is a statistical flow chart for converter oxygen consumption analysis;
[0031] Figure 4 Flow chart for converter cycle prediction;
[0032] Figure 5 It is the predicted data and parameter diagram of converter oxygen consumption;
[0033] Figure 6 It is a schematic diagram of real-time correction of converter oxygen rhythm and consumption;
[0034] Figure 7 Calculate the model flow chart for the oxygen network;
[0035] Figure 8 Calculate a flow chart for oxygen scheduling. DETAILED DESCRIPTION
[0036] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0037] See also Figures 1 to 8Before using the oxygen optimization scheduling model of the present invention, it is necessary to predict the oxygen consumption of blast furnaces, converters and other users in the future. During the prediction process, the stable prediction of oxygen consumption data of blast furnaces and other users is more accurate and reliable, but the production rhythm of converters is relatively complex, so it is necessary to further analyze the data information such as molten iron volume, scrap steel volume, molten iron temperature, molten iron composition, etc. in the historical data of the converter production inspection and testing system and the inspection system to find out the production data related to the converter oxygen consumption. The prediction of the converter oxygen demand must also be combined with the converter production scheduling plan. According to the scheduling plan, the furnace blowing time and furnace interval time in the future period are predicted. When there is a difference between the actual production and the converter production schedule, the system will automatically correct the predicted data according to the actual production situation to avoid the continuous accumulation of prediction errors, thereby ensuring that the data always matches the actual production.
[0038] The predicted results of oxygen consumption for blast furnaces, converters and other users are used as boundary input conditions to enter the oxygen network calculation. The calculation of the oxygen network can quantitatively analyze whether the oxygen network and spherical tanks will experience overpressure or depressurization. When the pressure or flow in the pipeline exceeds a certain range, the network calculation function will give corresponding alarm information based on the calculation results. Finally, the oxygen optimization scheduling function will give scheduling instructions to the oxygen system based on the production and consumption balance of the predicted results and whether there are alarms in the network calculation: for example, when oxygen production is greater than oxygen consumption, it will give suggestions to appropriately reduce the load of the oxygen generator unit; when oxygen consumption is greater than expected production, it will give suggestions to appropriately adjust the converter production rhythm to avoid the situation where multiple converters are blowing at the same time. The flow of the oxygen optimization scheduling calculation method is as follows: Figure 1 As shown, the specific steps include:
[0039] Step 1: Construct an oxygen consumption prediction model to predict the oxygen consumption of blast furnaces, converters and other users in the future; and revise the prediction results of the oxygen consumption prediction model according to the actual production situation of the converter.
[0040] The construction of oxygen production and consumption prediction model specifically includes:
[0041] 1) Oxygen production and consumption prediction
[0042] Oxygen production and consumption prediction refers to the function of predicting the oxygen consumption of blast furnaces and other oxygen users. Blast furnace oxygen enrichment is a large user of oxygen consumption. Due to the characteristics of blast furnace production process, the oxygen consumption is relatively stable. Taking the oxygen enrichment flow data of a blast furnace as an example, its data characteristics, according to the 48-hour statistical data of the oxygen enrichment flow of a blast furnace, its average fluctuation per minute is less than 1.8%, which can be regarded as stable data. The prediction of blast furnace oxygen enrichment flow can be carried out by moving average autoregression or BP neural network method, and its calculation process is as follows Figure 2 shown.
[0043] If the moving average autoregression method is used for prediction, the model is trained through historical data to determine the number of regression items, sliding average items, and difference items; if the BP neural network is used for prediction, the model is trained through historical data to determine the weights inside the neural network. Due to the stability of blast furnace oxygen consumption, whether the moving average autoregression method or the BP neural network is used for prediction, the prediction results can achieve good results.
[0044] 2) Analysis and statistics of converter oxygen consumption
[0045] The statistical analysis of converter oxygen consumption is carried out by finding the relationship between the converter production process data and the oxygen consumption of the corresponding furnace and fitting the oxygen consumption calculation formula. During the oxygen blowing period of the converter production, the oxygen blowing time and the total oxygen consumption are closely related to the molten iron composition. The amount of molten iron, the amount of scrap steel (molten iron ratio), the composition of molten iron (carbon, silicon, manganese, phosphorus, sulfur) and other components can be considered in the oxygen prediction process. In the process of predicting oxygen consumption in converter blowing, it is first necessary to collect a large amount of historical data of the converter production process, and then determine the correlation between parameters such as the amount of molten iron, the amount of scrap steel, the molten iron composition and oxygen consumption through data analysis. Secondly, according to the level of correlation, select the parameters that have the greatest impact on oxygen consumption. Finally, the calculation formula is fitted between the selected process parameters and oxygen consumption through the formula fitting method. The calculation process is as follows: Figure 3 shown.
[0046] The historical data of 230 heats of Chongqing Iron and Steel was used during the testing of the functional module, including 10 types of data: scrap steel weight, molten iron weight, molten iron silicon content, molten iron manganese content, molten iron phosphorus content, molten iron sulfur content, molten iron temperature, molten iron carbon content, molten iron titanium content, and oxygen consumption.
[0047] In the process of data analysis, not only the correlation between a single parameter and oxygen consumption should be considered, but also the relationship between the combination of multiple parameters and oxygen consumption. For example, when considering the relationship between molten iron composition and oxygen consumption alone, the correlation is not high, but if the data after the combination of molten iron weight and molten iron composition (molten iron weight * molten iron composition) is considered, the correlation with oxygen consumption will increase. From the perspective of technology, it can be explained as follows: the actual oxygen consumption has a high correlation with the total mass of various components in the molten iron (molten iron weight * molten iron composition), and the actual oxygen consumption has a low correlation with the percentage of various components in the unit molten iron (molten iron composition).
[0048] The correlation calculation values in Table 1 can be used to indicate the correlation between the corresponding parameters and the oxygen consumption per furnace: positive values indicate positive correlation, negative values indicate negative correlation, and the larger the absolute value of the value, the greater the correlation. Before fitting the oxygen consumption calculation formula, it is necessary to select parameters with higher correlation. In a certain calculation case, the selected parameters are: molten iron weight*molten iron temperature, molten iron weight*molten iron Si, molten iron weight*molten iron Mn, molten iron weight*molten iron P, molten iron weight*molten iron S, molten iron weight*molten iron C, molten iron weight*molten iron Ti.
[0049] Table 1 Correlation analysis results between process parameters and oxygen consumption
[0050]
[0051]
[0052] If the selected fitting formula is a linear function, the fitting formula is as follows:
[0053] Q 氧气消耗 =a molten iron weight * molten iron temperature + b molten iron weight * molten iron Si + c molten iron weight * molten iron Mn + d molten iron weight * molten iron P + e molten iron weight * molten iron S + f molten iron weight * molten iron C + g molten iron weight * molten iron Ti
[0054] Among them, a, b, c, d, e, f, and g are the calculation coefficients of each parameter. It can be seen from the results that the fitted curve can basically reflect the changes in oxygen consumption during each furnace smelting process. For example, after 150 furnaces, the oxygen consumption may increase significantly due to the change in molten iron composition. Through error statistics, it can be seen that the average error between the calculated oxygen consumption and the actual oxygen consumption per furnace is 4.6%. The fitting calculation results can not only serve as the basis for oxygen prediction calculation, but also as the basis for the classification of converter furnace characteristics.
[0055] 3) Converter cycle prediction
[0056] The converter is the main user of the oxygen system. The converter oxygen consumption is closely related to the converter production cycle, so the oxygen consumption prediction needs to be closely combined with the converter production cycle prediction. The converter cycle prediction function calculation flow chart is as follows: Figure 4 shown.
[0057] In the production process of steel enterprises, the steelmaking process will schedule the production of the converter according to the production schedule. If the converter smelting is strictly carried out according to the production schedule, the converter beat prediction can be completed by simply using the production schedule as the input of the program. However, in many cases, the production schedule of the steelmaking process is missing or not updated in time. It may also be due to unexpected situations in actual production or personal operating habits that the actual converter beat deviates from the production schedule. In order to ensure that the converter beat prediction function can operate normally under any circumstances, the converter beat prediction function is introduced in the converter beat prediction function through the converter historical data and the real-time correction of the converter beat and consumption according to the actual production situation.
[0058] First, the converter beat prediction function will predict the smelting time of each furnace and the interval time between furnaces according to the converter production schedule, and then calculate the oxygen consumption of each furnace through the molten iron data in the inspection and testing system and the weighing system. When the data in the converter production schedule, inspection and testing system or weighing system is missing or updated in a timely manner, the system will read the historical data of converter production and use the weighted moving average method to complete the data required for the beat prediction. Secondly, the converter beat prediction function will compare in real time whether there is a deviation between the oxygen consumption prediction data and the actual oxygen consumption data of converter production. If there is a deviation, the converter oxygen consumption beat and consumption will be corrected to ensure that the predicted value is always consistent with the actual production.
[0059] Figure 5 The forecast data and parameter description of the converter oxygen cycle and consumption are as follows. The forecast of converter oxygen cycle and consumption is actually the forecast of three parameters, such as Figure 5 As shown, the three parameters are: Gap_t, Q_t and Q_O2, where Gap_t represents the time interval between two smelting furnaces, Q_t represents the oxygen blowing duration of a single furnace, and Q_O2 represents the total oxygen consumption of a single furnace (i.e., the curve area surrounded by the instantaneous flow curve of each furnace in the figure and the time axis), where the total oxygen consumption of a single furnace is equal to the oxygen blowing duration of a single furnace multiplied by the instantaneous oxygen flow rate.
[0060] Finally, the predicted oxygen cycle and consumption results will be compared with the actual oxygen consumption in production to see if there is a deviation between the predicted value and the actual value. If there is a deviation, the converter blowing cycle and oxygen consumption need to be corrected in real time. The function of real-time correction of the predicted results according to the actual situation is only used in the converter oxygen prediction, because the converter oxygen consumption is closely related to the converter furnace cycle. If it is found that there is a deviation between the predicted amount and the actual production situation and no error correction is performed, the error will continue to accumulate and cause the predicted value to deviate seriously from the actual production situation. The schematic diagram of the real-time correction of the converter oxygen cycle and consumption is as follows Figure 6 As shown, Figure 6The horizontal axis in the middle represents the time axis, and the vertical axis represents the oxygen consumption. The black vertical line represents the current moment, the dark gray line represents the predicted oxygen consumption, and the light gray line represents the actual oxygen consumption. Figure 6 The data in is used for function development and testing, so it can be clear about the oxygen consumption in the future. When there is a deviation between the predicted data and the actual production consumption data, that is, when the dark gray line and the light gray line do not overlap, correction is required. In the function development, the corresponding correction method is determined by analyzing all possible deviations between the prediction and the actual. To judge and correct the predicted situation, it is necessary to first judge whether the difference occurs at the beginning of a cycle or at the end of a cycle. The first case: If the difference occurs at the beginning of a cycle, and the actual cycle starts first, and the predicted cycle starts later, that is, the actual blowing starts early, then not only the predicted value needs to be adjusted to align with the actual value, but also because a new Gap_t appears, it is necessary to combine the scheduling data or the converter production history data to update the Gap_t calculation value; the second case, if the difference occurs at the beginning of a cycle, and the predicted cycle appears first, and the actual cycle appears later, that is, the predicted blowing starts early, then the measured time is early, so Q_t and Q_O2 are reassigned, and the predicted time is Move backward; the third case, if at the end of a cycle, the actual cycle ends first, and the predicted cycle has not ended, that is, the actual blowing ends ahead of schedule, then not only the predicted value needs to be adjusted to align with the actual value, but also because new Q_t and Q_O2 have appeared, it is necessary to update the calculated values of Q_t and Q_O2 in combination with the scheduling data or the converter production history data; the fourth case, if at the end of a cycle, the predicted cycle ends first, and the actual cycle has not ended, that is, the predicted blowing ends ahead of schedule, then Q_t and Q_O2 need to be reassigned, and the cycle end time needs to be moved backward.
[0061] Step 2: Construct an oxygen pipeline network calculation model, and input the corrected prediction results from step 1 as boundary conditions into the oxygen pipeline network calculation model to calculate the changes in oxygen pipeline network pressure over a period of time in the future.
[0062] The oxygen network calculation model is an important reference for oxygen scheduling. When the consumption of oxygen users increases sharply, the oxygen stored in the spherical tanks in the oxygen network will not be enough to meet the users' needs, and the pressure of the oxygen network will drop accordingly. In serious cases, it may even affect the normal production of the user units. On the contrary, when the consumption of oxygen users drops sharply, the oxygen stored in the spherical tanks in the oxygen network will increase, and the pressure of the oxygen network will also rise. In serious cases, it will cause the oxygen network to release, resulting in uneconomical energy use.
[0063] The boundary condition for oxygen network calculation is the predicted data of oxygen production and consumption (corrected). By combining the network calculation with the oxygen production and consumption prediction, the change of oxygen network pressure in the future period of time can be calculated.
[0064] The calculation of oxygen pipe network can be divided into two parts, one is the hydraulic calculation of pipes, and the other is the pressure calculation of oxygen spherical tanks. In the calculation of pipes, the node method is mainly used for solution, which can solve the hydraulic calculation of branch pipe networks and ring pipe networks. The solution process mainly includes three equations: a) node flow continuity equation; b) pipe section pressure drop equation; c) pipe section flow equation. In the calculation of pressure change of oxygen spherical tanks, the gas state equation is used, which can obtain the pressure change of oxygen spherical tanks caused by the imbalance of oxygen production and consumption.
[0065] The flow and pressure data calculated using the oxygen production and consumption forecast data as the input conditions for the pipeline network calculation can be regarded as the pressure and flow changes of the oxygen pipeline network in the future period of time, while ensuring the accuracy of the forecast, and can be used as a reference for oxygen scheduling.
[0066] Step 3: Oxygen scheduling module: Optimize the scheduling of the oxygen system based on the oxygen consumption forecast value corrected in step 1 and the changes in oxygen network pressure in the future calculated in step 2.
[0067] The gas source in the oxygen system is the oxygen generator, and the users are blast furnaces, converters and other users. Among them, blast furnaces, converters and other users are non-adjustable users for the oxygen system, so only the oxygen generator can be used as an adjustable unit in the oxygen scheduling process. Only when there are multiple converters blowing oxygen at the same time, and the oxygen generator cannot meet the oxygen demand even at full load, the oxygen scheduling module will make scheduling suggestions for multiple converters to avoid simultaneous oxygen blowing for the steelmaking process. The flow diagram of the entire oxygen scheduling module is shown below. Figure 7 shown.
[0068] The main function of the oxygen scheduling module is to determine whether there will be large pressure fluctuations in the oxygen network in the future based on the results of prediction and network calculation: if the pressure suddenly increases, it will cause oxygen to be released and energy use will be uneconomical; if the pressure suddenly decreases, it will not meet user needs and affect process production. Through judgment, if the imbalance of oxygen production and consumption in the future will cause large fluctuations in network pressure, the oxygen scheduling system needs to intervene in advance. First, the load adjustment of the oxygen generator unit is used to meet the changes in oxygen user demand. However, when the load adjustment of the oxygen generator unit is not enough to meet the adjustment demand, the oxygen scheduling system will also give the steelmaking process a suggestion for adjusting the converter oxygen blowing rhythm, so as to avoid long-term simultaneous blowing of multiple converters or no simultaneous blowing, which will cause drastic fluctuations in oxygen network pressure.
[0069] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. An oxygen dispatch calculation method combining production and consumption prediction and pipeline network calculation, It is characterized in that The calculation method specifically includes the following steps: S1: Construct an oxygen consumption prediction model to predict the oxygen consumption of blast furnaces, converters and other users in the future; and modify the prediction results of the oxygen consumption prediction model according to the actual production situation of the converter; The constructed oxygen production and consumption prediction model includes the analysis and statistics of the oxygen consumption of the converter, by finding the relationship between the converter production process data and the oxygen consumption of the corresponding furnace and fitting the oxygen consumption calculation formula; specifically, it includes: the prediction of oxygen consumption in the converter blowing, firstly collecting a large amount of historical data of the converter production process, then determining the correlation between the amount of molten iron, the amount of scrap steel, the composition of molten iron and the oxygen consumption through data analysis, then selecting the parameters with the greatest impact on the oxygen consumption according to the level of correlation, and finally fitting the calculation formula between the selected process parameters and the oxygen consumption through the formula fitting method; The constructed oxygen production and consumption prediction model includes converter beat prediction; the converter beat prediction is introduced in the converter beat prediction through converter historical data and the converter beat and consumption are corrected in real time according to the actual production situation; specifically, first, the converter beat prediction model predicts the smelting time of each furnace and the interval time between furnaces according to the converter production schedule, and then calculates the oxygen consumption of each furnace through the molten iron data in the inspection and testing system and the weight inspection system; when the data in the converter production schedule, inspection and testing system or the weight inspection system is missing or updated untimely, the system reads the historical data of the converter production and completes the data required for the beat prediction by weighted moving average; secondly, the converter beat prediction model compares in real time whether there is a deviation between the oxygen consumption prediction data and the actual oxygen consumption data of the converter production. If there is a deviation, the converter oxygen consumption beat and consumption are corrected to ensure that the predicted value is always consistent with the actual production; S2: construct an oxygen pipeline network calculation model, input the prediction result corrected in step S1 as a boundary condition into the oxygen pipeline network calculation model, and calculate the change of oxygen pipeline network pressure in the future period of time; In step S2, the constructed oxygen pipe network calculation model includes two parts: one part is the hydraulic calculation of the pipe, and the other part is the pressure calculation of the oxygen spherical tank; S3: Oxygen scheduling: Optimize the scheduling of the oxygen system based on the oxygen consumption forecast value corrected in step S1 and the change in oxygen network pressure in the future period calculated in step S2.
2. The oxygen scheduling calculation method according to claim 1, It is characterized in that In step S1, the constructed oxygen production and consumption prediction model includes the prediction of the blast furnace oxygen enrichment flow rate, which is predicted by using a moving average autoregressive method or a BP neural network.
3. The oxygen scheduling calculation method according to claim 2, It is characterized in that The moving average autoregression method is used for prediction, specifically, the model is trained through historical data to determine the number of regression items, the number of sliding average items and the number of difference items.
4. The oxygen scheduling calculation method according to claim 2, It is characterized in that The BP neural network is used for prediction, specifically, the model is trained by historical data to determine the weights inside the neural network.
5. The oxygen scheduling calculation method according to claim 1, It is characterized in that When there is a deviation between the oxygen consumption forecast data and the actual production consumption data of the converter, the oxygen consumption rhythm and consumption of the converter are corrected, including: judging and correcting the forecast situation, first judging whether the difference occurs at the beginning of a cycle or at the end of a cycle; The first case: If the difference occurs at the beginning of a cycle, and the actual cycle starts first, while the predicted cycle starts later, that is, the actual blowing starts in advance, then it is necessary not only to adjust the predicted value to align it with the actual value, but also to update the Gap_t calculation value in combination with the scheduling data or converter production history data; Gap_t represents the time interval between two smelting furnaces; The second case: If the difference occurs at the beginning of a cycle, and the predicted cycle occurs first, while the actual cycle occurs later, that is, the predicted blowing starts early, Q_t and Q_O 2 Re-assign the value, and the prediction time moves backward; Q_t represents the oxygen blowing duration of a single furnace, Q_O 2 Indicates the total oxygen consumption of a single furnace; In the third case, if at the end of a cycle, the actual cycle ends first, while the predicted cycle has not yet ended, that is, the actual blowing ends early, then it is necessary not only to adjust the predicted value to align it with the actual value, but also to combine the scheduling data or the converter production history data to adjust Q_t and Q_O. 2 The calculated value is updated; In the fourth case, if at the end of a cycle, the predicted cycle ends first, but the actual cycle has not yet ended, that is, the predicted blowing ends early, then Q_t and Q_O need to be adjusted. 2 Reassign the value and move the end time of the period backward.
6. The oxygen scheduling calculation method according to claim 1, It is characterized in that The hydraulic calculation of the pipeline is solved by the node method to solve the hydraulic calculation of the branch pipe network and the ring pipe network. The solution process includes three equations: a) node flow continuity equation; b) pipe section pressure drop equation; c) Pipe flow equation; The pressure calculation of the oxygen spherical tank uses a gas state equation to obtain the pressure change of the oxygen spherical tank caused by the imbalance of oxygen production and consumption.
7. The oxygen scheduling calculation method according to claim 1, It is characterized in that In step S3, the oxygen scheduling specifically includes: judging whether there will be large pressure fluctuations in the oxygen pipeline network in the future period according to the corrected prediction results and the results calculated by the oxygen pipeline network calculation model; if there is an imbalance in oxygen production and consumption in the future period, the oxygen scheduling system will intervene in advance, first by load regulation of the oxygen generator to meet the changes in demand of oxygen users; however, when the load regulation of the oxygen generator is not sufficient to meet the regulation demand, the oxygen scheduling system will also give suggestions for adjusting the converter oxygen blowing rhythm to the steelmaking process, so as to avoid drastic fluctuations in the oxygen pipeline network pressure caused by long-term simultaneous blowing of multiple converters or no simultaneous blowing.