By digging a combination of horizontal guide holes and inner longitudinal guide holes in the weak geological areas, the problems of slow progress and low safety in traditional tunnel construction in weak areas are solved, and rapid construction and high-quality tunnel construction are achieved. The rock enclosed structure improves construction safety and quality.

CN113982602BActive Publication Date: 2024-11-15CHONGQING URBAN CONSTR HLDG GRP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111245194.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-26
Publication Date
2024-11-15
Estimated Expiration
2041-10-26

AI Technical Summary

Technical Problem

When traditional urban tunnel construction methods encounter geological weak areas, the construction progress is slow, safety and quality are affected, making it difficult to effectively ensure the stability of construction nodes and surrounding rocks.

Method used

The tunnel construction method based on the combination of longitudinal and transverse guide holes is adopted. By excavating transverse guide holes and inner longitudinal guide holes in front and back in weak geological areas, a closed structure of surrounding rock is formed to reduce surrounding rock disturbances and improve construction safety and quality.

Benefits of technology

Rapid construction in weak geological areas has been achieved, construction risks have been reduced, construction progress and safety have been improved, and surrounding rock stability has been improved through surrounding rock sealed structures, ensuring construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113982602B_ABST
    Figure CN113982602B_ABST
Patent Text Reader

Abstract

The present invention provides a tunnel construction method based on a combination of longitudinal and transverse guide tunnels, comprising the following steps: S1, the tunnel is excavated along the excavation direction to a geologically weak area; S2, the tunnel excavates a first transverse guide tunnel behind the geologically weak area, and the first transverse guide tunnel transversely penetrates the entire cross section of the tunnel; S3, the tunnel excavates an inner longitudinal guide tunnel along the excavation direction on the side away from the geologically weak area, and the inner longitudinal guide tunnel extends to the front of the geologically weak area; S4, the tunnel excavates a second transverse guide tunnel in front of the geologically weak area, and the second transverse guide tunnel transversely penetrates the entire cross section of the tunnel to create a construction working surface for subsequent tunnel construction; S5, the tunnel is excavated in the direction of excavation to continue excavating a large cross section of the tunnel; S6, after the tunnel support in front of the geologically weak area is stable, return to the geologically weak area to construct the geologically weak area. The present invention has simple procedures, ensures the main line construction node, improves construction safety, speeds up the construction progress, and ensures construction quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, and in particular to a tunnel construction method based on a combination of longitudinal and transverse guide tunnels. Background Art

[0002] With the rapid development of my country's urban road network, the demand for urban tunnels is increasing. Urban tunnels are often located in areas with broken geology and shallow burial depth. The traditional urban tunnel construction method is to dig along one direction of the tunnel until it is through, or to dig from both ends of the tunnel and close them together to penetrate.

[0003] Its defects are: (1) When encountering high-risk areas such as geologically weak areas, a large amount of construction time is required, which leads to slow construction progress and the failure to ensure the construction nodes of the entire project; (2) When constructing tunnels near geologically weak areas, it will cause great disturbance to the surrounding rock of the geologically weak areas, seriously affecting the construction safety and quality.

[0004] Therefore, how to provide a tunnel construction method that can improve construction progress and ensure construction safety and quality has become a technical problem that needs to be urgently solved by technical personnel in this field. Summary of the invention

[0005] In view of the defects in the prior art, the present invention provides a tunnel construction method based on a combination of longitudinal and transverse guide tunnels, which has fast construction progress and high construction quality.

[0006] In order to achieve the above object, the present invention provides a tunnel construction method based on a combination of longitudinal and transverse guide tunnels, comprising the following steps:

[0007] S1. The tunnel is excavated along the excavation direction until it approaches the geological weak area;

[0008] S2: The first transverse guide tunnel is excavated behind the geologically weak area, and the first transverse guide tunnel runs horizontally through the entire section of the tunnel;

[0009] S3: An inner longitudinal guide tunnel is excavated along the excavation direction on the side of the tunnel away from the geologically weak area, and the inner longitudinal guide tunnel extends to the front of the geologically weak area;

[0010] S4: The second transverse guide tunnel is excavated in front of the geologically weak area. The second transverse guide tunnel runs horizontally through the entire section of the tunnel to create a construction working surface for subsequent tunnel construction;

[0011] S5, continue to excavate the large section of the tunnel forward along the excavation direction;

[0012] S6. After the tunnel support in front of the geologically weak area is stabilized, return to the geologically weak area to carry out construction in the geologically weak area.

[0013] Preferably, step S6 comprises:

[0014] S61, excavating an outer longitudinal guide tunnel along the excavation direction at the other side of the geologically weak area away from the inner longitudinal guide tunnel;

[0015] S62. After the support of the outer longitudinal guide tunnel in the geologically weak area is stabilized, an intermediate longitudinal guide tunnel located between the outer longitudinal guide tunnel and the inner longitudinal guide tunnel is excavated along the excavation direction.

[0016] Preferably, in step S3, a horizontal brace is provided between two side walls of the inner longitudinal guide tunnel.

[0017] Preferably, when constructing a large tunnel section in step S1 and step S5, excavation is performed in layers from top to bottom.

[0018] Preferably, the upper section of the tunnel is excavated mechanically, and the lower section of the tunnel is excavated by loosening blasting.

[0019] The present invention has the following beneficial effects:

[0020] 1. The present invention avoids high-risk areas (geologically weak areas) that require a large amount of investment in safety and construction period, and effectively ensures the main line construction nodes.

[0021] 2. The present invention adopts the inner longitudinal guide tunnel to go through the geologically weak section quickly, thereby reducing the disturbance of the construction to the surrounding rock in the geologically weak area and improving the construction safety and quality.

[0022] 3. The second transverse guide tunnel and the first transverse guide tunnel are located in front and behind the geologically weak area respectively. The two are temporarily closed into a ring with the surrounding rocks in front and behind the geologically weak area, which improves the stability of the surrounding rock and further improves the construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0024] Figure 1 It is the plan layout of the main line tunnel;

[0025] Figure 2 This is the cross-sectional layout of the main line tunnel;

[0026] Reference Numbers

[0027] 1-main line tunnel; 2-branch tunnel; 3-geologically weak area; 4-first transverse guide tunnel; 5-inner longitudinal guide tunnel; 6-second transverse guide tunnel; 7-outer longitudinal guide tunnel; 8-middle longitudinal guide tunnel; 9-cross brace. DETAILED DESCRIPTION

[0028] In order to make the technical solutions and advantages in the embodiments of the present application more clearly understood, the examples of the present application are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict.

[0029] See also Figure 1 , Figure 1 The following is a plan view of an urban tunnel. The urban tunnel includes a main line tunnel 1 and a branch line tunnel 2. The specific construction steps of the main line tunnel 1 are carried out as follows:

[0030] S1, the main line tunnel is excavated along the excavation direction to the geological weak area 3( Figure 1 middle shaded area);

[0031] S2. The first transverse guide tunnel 4 is excavated behind the geologically weak area 3 of the main tunnel 1. The first transverse guide tunnel 4 runs through the entire section of the main tunnel 1 transversely;

[0032] S3, the main line tunnel 1 excavates an inner longitudinal guide tunnel 5 along the excavation direction on the side away from the geologically weak area 3, and the inner longitudinal guide tunnel 5 extends to the front of the geologically weak area 3;

[0033] S4. The second transverse guide tunnel 6 is excavated in front of the geologically weak area 3 of the main line tunnel 1. The second transverse guide tunnel 6 runs through the entire section of the main line tunnel 1 horizontally to create a construction working surface for the subsequent main line tunnel construction;

[0034] S5, continue to excavate the main line tunnel section forward along the excavation direction;

[0035] S6. After the support of the main line tunnel 1 in front of the geologically weak area 3 is stabilized, return to the geologically weak area 3 to carry out construction on the geologically weak area 3.

[0036] It should be noted that the front of the geologically weak zone in this article refers to the front of the geologically weak zone along the excavation direction of the main line tunnel 1.

[0037] When the main line tunnel construction encounters a geologically weak area 3, the present invention first passes through the inner longitudinal guide tunnel 5 to quickly pass through the geologically weak section, and then horizontally excavates the second transverse guide tunnel 6 in front of the geologically weak area 3 to carry out normal excavation of the subsequent main line tunnel large section. After the large section support of the main line tunnel in front of the geologically weak area 3 is stabilized, it returns to the geologically weak section and carries out construction on the geologically weak section.

[0038] It is not difficult to understand that the present invention avoids high-risk areas (weak geological areas) that require a lot of investment in safety and construction period, and effectively guarantees the main line construction nodes. In addition, the present invention adopts the inner longitudinal guide tunnel 3 first, quickly passes through the geological weak section, reduces the disturbance of the construction to the surrounding rock of the geological weak area 3, and improves the construction safety and construction quality. In addition, the second transverse guide tunnel 6 and the first transverse guide tunnel 4 are respectively located in front and behind the geological weak area 3, and the two are temporarily closed into a ring with the surrounding rock in front and behind the geological weak area 3, which improves the stability of the surrounding rock.

[0039] Further, step S6 includes:

[0040] S61, excavating an outer longitudinal guide tunnel 7 along the excavation direction at the other side of the geologically weak area away from the inner longitudinal guide tunnel 5;

[0041] S62, after the support of the outer longitudinal guide tunnel in the geologically weak area is stabilized, an intermediate longitudinal guide tunnel 8 located between the outer longitudinal guide tunnel 7 and the inner longitudinal guide tunnel 5 is excavated along the excavation direction.

[0042] Through the above process, the construction quality of the geologically weak area 3 is ensured while the construction progress of the geologically weak area 3 is accelerated.

[0043] Furthermore, in step S3 , a transverse brace 9 is provided between two side walls of the inner longitudinal guide tunnel 5 , thereby facilitating the control of the sinking of the vault of the inner longitudinal guide tunnel 5 .

[0044] Furthermore, when constructing the main line tunnel 1 in step S1 and step S5, the main line tunnel 1 is excavated in layers from top to bottom. The upper section of the main line tunnel is excavated mechanically, and the lower section of the main line tunnel is excavated by loosening blasting.

[0045] Through the above-mentioned technology, the construction quality and progress of the conventional section of the main line tunnel are guaranteed.

[0046] Obviously, those skilled in the art may make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A tunnel construction method based on a combination of longitudinal and transverse guide tunnels, characterized in that: The following steps are involved: S1. The tunnel is excavated along the excavation direction until it approaches the geological weak area; S2: The first transverse guide tunnel is excavated behind the geologically weak area, and the first transverse guide tunnel runs horizontally through the entire section of the tunnel; S3: An inner longitudinal guide tunnel is excavated along the excavation direction on the side of the tunnel away from the geologically weak area, and the inner longitudinal guide tunnel extends to the front of the geologically weak area; S4, a second transverse guide tunnel is excavated in front of the geologically weak area, and the second transverse guide tunnel runs through the entire section of the tunnel horizontally to create a construction surface for subsequent tunnel construction; the first transverse guide tunnel, the second transverse guide tunnel and the surrounding rocks in front and behind the geologically weak area are closed into a ring; S5, continue to excavate the large section of the tunnel forward along the excavation direction; S6. After the tunnel support in front of the geologically weak area is stabilized, return to the geologically weak area to carry out construction in the geologically weak area; S61, excavating an outer longitudinal guide tunnel along the excavation direction at the other side of the geologically weak area away from the inner longitudinal guide tunnel; S62. After the support of the outer longitudinal guide tunnel in the geologically weak area is stabilized, an intermediate longitudinal guide tunnel located between the outer longitudinal guide tunnel and the inner longitudinal guide tunnel is excavated along the excavation direction.

2. The tunnel construction method based on the combination of longitudinal and transverse guide tunnels according to claim 1 is characterized in that: In step S3, a horizontal brace is provided between two side walls of the inner longitudinal guide tunnel.

3. The tunnel construction method based on the combination of longitudinal and transverse guide tunnels according to claim 1 is characterized in that: When constructing a large tunnel section in step S1 and step S5, excavation is performed in layers from top to bottom.

4. The tunnel construction method based on the combination of longitudinal and transverse guide tunnels according to claim 3 is characterized in that: The upper section of the tunnel is excavated mechanically, while the lower section of the tunnel is excavated by loosening blasting.