Titanium tetrachloride production system and chlorination furnace slag discharge and cyclone discharge control method
By setting up slag discharge pipelines and rotary valves in the titanium tetrachloride production system, and controlling the slag discharge and cyclone discharge at intervals of chlorinated sub-grou, the problem of interference between slag discharge and cyclone separation in the existing system is solved and the product quality is improved.
Patent Information
- Application Number
- CN202111430390.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2041-11-29
AI Technical Summary
In the existing titanium tetrachloride production system, chlorinated grate drainage and cyclone cutting are prone to interference, affecting product quality.
A titanium tetrachloride production system was designed. By setting up a slag discharge pipeline and rotary valve between the chlorinated sub-furnace and the cyclone separation device, the interval control between the slag discharge and cyclone discharge is realized to ensure cyclone discharge. Not affected by secondary grate slag.
It effectively avoids interference with cyclone cutting by chlorinated grate drainage, and improves the quality of titanium tetrachloride products.
Smart Images

Figure CN114014356B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of titanium tetrachloride production, in particular to a titanium tetrachloride production system and a chlorination furnace slagging and cyclone feeding control method. Background Art
[0002] Titanium tetrachloride is the main raw material for industrial products such as chloride-process titanium dioxide and sponge titanium. The main production methods at home and abroad are boiling chlorination and molten salt chlorination. Both methods generate titanium tetrachloride by reacting titanium-containing raw materials with chlorine at high temperature. The titanium tetrachloride gas after the reaction will carry fine particles of dust to the subsequent system. The dust is usually removed by cyclone or gravity sedimentation. However, the existing titanium tetrachloride slag discharge and cyclone separation are prone to mutual interference, affecting product quality.
[0003] Based on this, the existing technology still needs to be improved. Summary of the invention
[0004] In order to solve the above technical problems, the embodiments of the present invention provide a titanium tetrachloride production system and a chlorination furnace slag discharge and cyclone discharge control method to solve the slag discharge and cyclone separation interference problems in the prior art.
[0005] On the one hand, a titanium tetrachloride production system disclosed in an embodiment of the present invention comprises: a chlorination main furnace, a chlorination auxiliary furnace and a cyclone separation device, wherein the slag discharge port of the chlorination main furnace is connected to the chlorination auxiliary furnace through a first slag discharge pipe, and the slag discharge port of the chlorination auxiliary furnace is connected to a slag pot through a second slag discharge pipe;
[0006] The gas phase outlet of the chlorination main furnace and the chlorination main furnace are both connected to the cyclone separation device, and the lower end of the cyclone separation device is connected to the slag pot through the third slag discharge pipeline;
[0007] The second slag discharge pipe is provided with a second slag discharge valve.
[0008] Furthermore, a first rotary valve and a second rotary valve are arranged in series on the third slag discharge pipe, and when the cyclone separation device is started, the first rotary valve and the second rotary valve are opened alternately.
[0009] Furthermore, a connecting hole is provided on the upper portion of the auxiliary chlorination furnace, and the connecting hole is connected to the slag pot through a connecting pipe, and a connecting valve is provided on the connecting pipe.
[0010] Furthermore, the gas phase outlet of the cyclone separation device is connected to a washing system.
[0011] Furthermore, it also includes a raw material warehouse, which is connected to the feed port of the chlorination main furnace through a feed pipeline.
[0012] Furthermore, a weighing and unloading mechanism and a feed valve are provided on the feed pipeline.
[0013] Furthermore, it also includes a nitrogen delivery system, which is connected to the feed pipeline between the weighing and unloading mechanism and the feed valve.
[0014] Furthermore, it also includes a chlorine gas delivery system, which is connected to the bottom of the chlorination main furnace.
[0015] Furthermore, the chlorine gas delivery system is provided with a flow control device.
[0016] Furthermore, it also includes a PLC controller, which is connected to the first slag discharge valve, the second slag discharge valve, the connecting valve, the first rotary valve, the second rotary valve and the cyclone separation device.
[0017] On the other hand, the embodiment of the present invention further discloses a method for controlling slag discharge and cyclone feeding of a low-temperature chlorination furnace, wherein the slag discharge of the auxiliary chlorination furnace and the feeding of the cyclone separation device are performed at intervals.
[0018] Furthermore, when the auxiliary chlorination furnace is discharging slag, the connecting valve on the connecting pipe between the upper part of the auxiliary chlorination furnace and the slag pot is opened to ensure that the pressure of the slag pot and the auxiliary chlorination furnace is balanced.
[0019] Furthermore, a first rotary valve and a second rotary valve are arranged in series on the third slag discharge pipe connecting the cyclone separation device and the slag pot. When the chlorination auxiliary furnace is discharging slag, the first rotary valve and the second rotary valve are closed.
[0020] Furthermore, when the cyclone separation device is unloading, the connecting valve on the connecting pipe between the chlorination auxiliary furnace and the slag pot is closed, and the second slag discharge valve on the second slag discharge pipe between the chlorination auxiliary furnace and the slag pot is closed at the same time.
[0021] Further, when the cyclone separation device is started, the first rotary valve and the second rotary valve are opened alternately.
[0022] Furthermore, the slag discharge of the chlorination auxiliary furnace includes:
[0023] S110 chlorination main furnace discharges slag to chlorination auxiliary furnace;
[0024] S120 opens the connecting valve between the auxiliary chlorination furnace and the slag pot, and issues a command to stop the cyclone unloading program;
[0025] S130 closes the first rotary valve and the second rotary valve between the cyclone separation device and the slag pot;
[0026] S140 opens the slag discharge valve between the chlorination auxiliary furnace and the slag pot;
[0027] After S150 slag discharge is completed, the auxiliary furnace slag discharge valve is closed and a command to start the cyclone discharge program is issued at the same time;
[0028] The unloading of cyclone separation device includes:
[0029] After receiving the instruction to start the cyclone unloading program,
[0030] S210 opens the second rotary valve;
[0031] S220 closes the second rotary valve;
[0032] S230 opens the first rotary valve;
[0033] S240 closes the first rotary valve;
[0034] Repeat S210 to S240 until receiving an instruction to close the cyclone unloading program, and then stop the first rotary valve and the second rotary valve.
[0035] By adopting the above technical solution, the present invention has at least the following beneficial effects:
[0036] The titanium tetrachloride production system and the chlorination furnace slag discharge and cyclone feeding control method provided by the present invention are suitable for titanium tetrachloride production systems in the titanium dioxide chlorination industry or the titanium sponge industry, can ensure that the cyclone feeding is not affected by the auxiliary furnace slag discharge, and effectively improve the product quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0038] Figure 1 A schematic diagram of a titanium tetrachloride production system disclosed in one embodiment of the present invention;
[0039] Figure 2 The present invention is a flowchart of a chlorination furnace slag discharge and cyclone discharge control method disclosed in one embodiment of the present invention. DETAILED DESCRIPTION
[0040] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the embodiments of the present invention are further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.
[0041] It should be noted that all expressions using "first" and "second" in the embodiments of the present invention are for distinguishing two non-identical entities with the same name or non-identical parameters. It can be seen that "first" and "second" are only for the convenience of expression and should not be understood as limitations on the embodiments of the present invention. The subsequent embodiments will not explain this one by one.
[0042] like Figure 1 As shown, some embodiments of the present invention disclose a titanium tetrachloride production system, comprising: a chlorination main furnace 1, a chlorination auxiliary furnace 2 and a cyclone separation device 4, wherein the slag discharge port of the chlorination main furnace 1 is connected to the chlorination auxiliary furnace 2 through a first slag discharge pipeline, and the slag discharge port of the chlorination auxiliary furnace 2 is connected to a slag pot 3 through a second slag discharge pipeline;
[0043] The chlorination main furnace 1 and the gas phase outlet of the chlorination main furnace 1 are both connected to the cyclone separation device 4, and the lower end of the cyclone separation device 4 is connected to the slag pot 3 through the third slag discharge pipeline;
[0044] The first slag discharge pipe is provided with a first slag discharge valve 6, and the second slag discharge pipe is provided with a second slag discharge valve 7. When in use, the slag discharge of the auxiliary chlorination furnace 2 is performed at intervals from the cyclone discharge, ensuring that the cyclone discharge is not affected by the slag discharge of the auxiliary furnace.
[0045] Some embodiments of the present invention disclose a titanium tetrachloride production system. On the basis of the above embodiments, the third slag discharge pipe is provided with a first rotary valve 9 and a second rotary valve 10 in series. When the cyclone separation device 4 is started, the first rotary valve 9 and the second rotary valve 10 are opened alternately. When the cyclone rotary valve stops running, the material forms a material seal above one of the rotary valves. When the rotary valve is running, the upper and lower rotary valves are operated alternately to always maintain a certain material seal above one of the rotary valves, which can effectively prevent the gas in the slag pot 3 from flowing up to the cyclone system.
[0046] Some embodiments of the present invention disclose a titanium tetrachloride production system. On the basis of the above embodiments, a connecting hole is provided on the upper part of the chlorination auxiliary furnace 2, and the connecting hole is connected to the slag pot 3 through a connecting pipe, and a connecting valve 8 is provided on the connecting pipe. When the auxiliary furnace is slag-discharging, the connecting valve 8 needs to be opened to ensure that the pressure of the slag pot 3 and the auxiliary furnace is balanced, and to ensure smooth slag-discharging of the auxiliary furnace. When the cyclone is discharging, the connecting valve 8 and the auxiliary furnace slag-discharging valve need to be closed to ensure that the cyclone is not affected by the pressure of the auxiliary furnace.
[0047] Some embodiments of the present invention disclose a titanium tetrachloride production system. On the basis of the above embodiments, the gas phase outlet of the cyclone separation device 4 is connected to the leaching system. The raw material bin 5 is connected to the feed port of the chlorination main furnace 1 through a feed pipeline. A weighing and unloading mechanism 11 and a feed valve are provided on the feed pipeline. A nitrogen delivery system 12 and a chlorine delivery system 13 are also included, and the nitrogen delivery system is connected to the feed pipeline between the weighing and unloading mechanism and the feed valve. The chlorine delivery system is connected to the bottom of the chlorination main furnace 1. A flow control device is provided on the chlorine delivery system. The first slag discharge valve, the second slag discharge valve 7, the connecting valve 8, the first rotary valve 9, the second rotary valve 10 and the cyclone separation device 4 are connected through a PLC controller.
[0048] like Figure 2 As shown, the embodiment of the present invention also discloses a method for controlling slag discharge and cyclone feeding of a low-temperature chlorination furnace, wherein the slag discharge of the chlorination auxiliary furnace and the feeding of the cyclone separation device are performed at intervals.
[0049] When the auxiliary chlorination furnace is discharging slag, open the connecting valve on the connecting pipe between the upper part of the auxiliary chlorination furnace and the slag pot to ensure that the pressure of the slag pot and the auxiliary chlorination furnace is balanced.
[0050] A first rotary valve and a second rotary valve are arranged in series on the third slag discharge pipeline connecting the cyclone separation device and the slag pot. When the chlorination auxiliary furnace is discharging slag, the first rotary valve and the second rotary valve are closed.
[0051] When the cyclone separation device is unloading, the connecting valve on the connecting pipe between the chlorination auxiliary furnace and the slag pot is closed, and the second slag discharge valve on the second slag discharge pipe between the chlorination auxiliary furnace and the slag pot is closed at the same time.
[0052] When the cyclone separation device is started, the first rotary valve and the second rotary valve are opened alternately.
[0053] The slag discharge of the auxiliary chlorination furnace may include:
[0054] S110 chlorination main furnace discharges slag to chlorination auxiliary furnace;
[0055] S120 opens the connecting valve between the auxiliary chlorination furnace and the slag pot, and issues a command to stop the cyclone unloading program;
[0056] S130 closes the first rotary valve and the second rotary valve between the cyclone separation device and the slag pot;
[0057] S140 opens the slag discharge valve between the chlorination auxiliary furnace and the slag pot;
[0058] After S150 slag discharge is completed, the auxiliary furnace slag discharge valve is closed and a command to start the cyclone discharge program is issued at the same time;
[0059] The unloading of cyclone separation device may include:
[0060] After receiving the instruction to start the cyclone unloading program,
[0061] S210 opens the second rotary valve;
[0062] S220 closes the second rotary valve;
[0063] S230 opens the first rotary valve;
[0064] S240 closes the first rotary valve;
[0065] Repeat S210 to S240 until receiving an instruction to close the cyclone unloading program, and then stop the first rotary valve and the second rotary valve.
[0066] The control method can be manual operation by the DCS operator or automatic control through a pre-programmed sequence program.
[0067] It should be particularly pointed out that the various components or steps in the above-mentioned embodiments can be cross-linked, replaced, added, or deleted with each other. Therefore, the combinations formed by these reasonable arrangements and combinations should also fall within the scope of protection of the present invention, and the scope of protection of the present invention should not be limited to the embodiments.
[0068] The above are exemplary embodiments disclosed in the present invention. The order disclosed in the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. However, it should be noted that the discussion of any of the above embodiments is only exemplary and is not intended to imply that the scope (including claims) disclosed in the embodiments of the present invention is limited to these examples. Various changes and modifications may be made without departing from the scope defined in the claims. The functions, steps and / or actions of the method claims according to the disclosed embodiments described herein do not need to be performed in any particular order. In addition, although the elements disclosed in the embodiments of the present invention may be described or required in individual form, they may also be understood as multiple unless explicitly limited to the singular.
[0069] A person skilled in the art should understand that the discussion of any of the above embodiments is only exemplary and is not intended to imply that the scope of the disclosure of the embodiments of the present invention (including the claims) is limited to these examples; under the concept of the embodiments of the present invention, the technical features in the above embodiments or different embodiments can also be combined, and there are many other changes in different aspects of the embodiments of the present invention as described above, which are not provided in detail for the sake of simplicity. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the embodiments of the present invention should be included in the protection scope of the embodiments of the present invention.
Claims
1. A method for controlling slagging and cyclone feeding of a low-temperature chlorination furnace, characterized in that: A titanium tetrachloride production system is used, which includes: a chlorination main furnace, a chlorination auxiliary furnace and a cyclone separation device, wherein the slag discharge port of the chlorination main furnace is connected to the chlorination auxiliary furnace through a first slag discharge pipeline, and the slag discharge port of the chlorination auxiliary furnace is connected to a slag pot through a second slag discharge pipeline; The gas phase outlet of the chlorination main furnace and the chlorination main furnace are both connected to the cyclone separation device, and the lower end of the cyclone separation device is connected to the slag pot through the third slag discharge pipeline; The second slag discharge pipe is provided with a second slag discharge valve; The slag discharge from the chlorination auxiliary furnace and the feeding of the cyclone separation device are carried out at intervals.
2. The control method according to claim 1, characterized in that: The third slag discharge pipe is provided with a first rotary valve and a second rotary valve in series. When the cyclone separation device is started, the first rotary valve and the second rotary valve are opened alternately.
3. The control method according to claim 2, characterized in that: A connecting hole is provided on the upper part of the auxiliary chlorination furnace. The connecting hole is connected to the slag pot through a connecting pipe. A connecting valve is provided on the connecting pipe.
4. The control method according to claim 1, characterized in that: The gas phase outlet of the cyclone separation device is connected to the leaching system.
5. The control method according to claim 1, characterized in that: When the auxiliary chlorination furnace is discharging slag, open the connecting valve on the connecting pipe between the upper part of the auxiliary chlorination furnace and the slag pot to ensure that the pressure of the slag pot and the auxiliary chlorination furnace is balanced.
6. The control method according to claim 5, characterized in that: A first rotary valve and a second rotary valve are arranged in series on the third slag discharge pipeline connecting the cyclone separation device and the slag pot. When the chlorination auxiliary furnace is discharging slag, the first rotary valve and the second rotary valve are closed.
7. The control method according to claim 5, characterized in that: When the cyclone separation device is unloading, the connecting valve on the connecting pipe between the chlorination auxiliary furnace and the slag pot is closed, and the second slag discharge valve on the second slag discharge pipe between the chlorination auxiliary furnace and the slag pot is closed at the same time.
8. The control method according to claim 6, characterized in that: When the cyclone separation device is started, the first rotary valve and the second rotary valve are opened alternately.
9. The control method according to claim 1, characterized in that: The slag discharge of the chlorination auxiliary furnace includes: S110 The main chlorination furnace discharges slag into the auxiliary chlorination furnace; S120 opens the connecting valve between the auxiliary chlorination furnace and the slag tank, and issues a command to stop the cyclone unloading procedure; S130 close the first rotary valve and the second rotary valve between the cyclone separation device and the slag pot; S140 Open the slag discharge valve between the auxiliary chlorination furnace and the slag tank; After S150 slag discharge is completed, the auxiliary furnace slag discharge valve is closed and a command to start the cyclone discharge program is issued at the same time; The unloading of cyclone separation device includes: After receiving the instruction to start the cyclone unloading program, S210 opens the second rotary valve; S220 closes the second rotary valve; S230 opens the first rotary valve; S240 closes the first rotary valve; Repeat S210 to S240 until receiving an instruction to close the cyclone unloading program, and then stop the first rotary valve and the second rotary valve.
Citation Information
Patent Citations
Titanium tetrachloride production system
CN216549658U
