A construction technique and anti-seepage wall technology, which is applied in the direction of foundation structure engineering, sheet pile walls, buildings, etc., can solve problems such as the soil layer is prone to collapse, and achieve the effects of reducing shedding, improving quality, and reducing waste
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2022-02-11
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The present application relates to the field of anti-seepage wall structures, in particular to a double-wheel milling anti-seepage wall structure and its construction technology. Background technique
[0002] The anti-seepage wall is an underground anti-seepage structure built by using special machines to create holes in the loose permeable foundation of the gate dam, and pouring concrete or cement clay mortar into the holes. The anti-seepage wall is built in sections, a slot is built into a wall section, and many wall sections are continuous to form a whole wall, so it is also called an underground continuous wall. Double-wheel milling is a kind of excavation equipment, which has the advantages of strong stratum adaptability and high drilling efficiency and precision, so it is widely used in the construction of cut-off walls.
[0003] The Chinese patent with the application number CN201911221395.7 in the related technology proposes a construction pro...
Examples
Embodiment Construction
[0045] The following is attached Figure 1-7 The application is described in further detail.
[0046] The embodiment of the present application discloses a double-wheel milling anti-seepage wall structure. refer to figure 1 The double-wheel milling cut-off wall structure includes a plurality of first slots 11 and second slots 12 vertically set on the ground, the plurality of first slots 11 and the plurality of second slots 12 communicate with each other and Arranged alternately along the horizontal direction, the first slots 11 and the second slots 12 are filled with concrete layers 13 .
[0047] refer to figure 2 , the embodiment of the present application also discloses a construction process of a double-wheel milling cut-off wall structure, which is used to manufacture the above-mentioned double-wheel milling cut-off wall structure, including the following steps:
[0048] S1. Pre-excavation: first use the grab machine to open multiple first-stage slots arranged at inte...