By designing the architectural project design software system, using multiple modules and storage servers to achieve data security and resource interoperability, the problem of excessive design time and low information exchange efficiency in the architectural project design process is solved, and the design efficiency and convenience of information exchange are improved sex.
Patent Information
- Application Number
- CN202111568515.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-21
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2041-12-21
AI Technical Summary
The design time of existing building projects takes too long and the information exchange efficiency is low, resulting in a reduced design and construction efficiency.
A software system for designing an architectural project is designed, including multiple modules such as site selection input module, basic setting planning module, project planning module, etc., to achieve data storage security and resource interoperability through storage servers and network auxiliary storage, and improve design efficiency.
The security of data storage and interoperability of resources are realized, reference deviations are avoided, data exchange efficiency and design efficiency in the design process are improved, and information exchange is more convenient.
Smart Images

Figure CN114201805B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction projects, and specifically refers to a construction project design software system. Background Art
[0002] Construction projects refer to the engineering entities formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, residence, study, and public activities.
[0003] Architectural Design refers to the process before a building is built. Designers, in accordance with the construction task, prepare a comprehensive plan for the problems that may exist or occur during the construction and use process, and formulate solutions and plans to solve these problems, which are expressed in drawings and documents. It serves as a common basis for material preparation, construction organization work, and the cooperation and collaboration of various types of work in production and construction. It facilitates the entire project to proceed smoothly within the predetermined investment limit, in accordance with the carefully considered predetermined plan, in a unified pace, and to ensure that the completed building fully meets the various requirements and uses expected by users and society.
[0004] The existing construction project design needs to be carried out step by step during the design process, which makes the design process take too long. The personnel and customers can only exchange the required information through point-to-point communication, which reduces the design and construction efficiency. Summary of the invention
[0005] In view of the above situation, in order to overcome the defects of the prior art, the present invention provides a construction project design software system with secure data storage, interoperable public resources, no reference deviation, data communication during the design process, improved design efficiency, and convenient information exchange between customers and personnel.
[0006] The technical solution adopted by the present invention is as follows: A construction project design software system of the present invention includes a first central storage module, a site selection input module, an infrastructure planning module, a project planning module, a cost estimation module, a general layout planning module, a second central storage module, a preliminary design module, a construction drawing design module and a network module, the site selection input module is connected to the first central storage module, the infrastructure planning module is connected to the first central storage module, the project planning module is connected to the first central storage module, the general layout planning module is connected to the first central storage module, the fraud estimation module is connected to the first central storage module, the second central storage module is connected to the first central storage module, the preliminary design module is connected to the second central storage module, the construction drawing design module is connected to the second central storage module, and the network module is connected to the second central storage module.
[0007] Furthermore, a geographic information storage module is provided between the site selection input module and the infrastructure planning module, and an infrastructure information module is provided between the project planning module and the infrastructure planning module.
[0008] Furthermore, the first storage module and the second storage module are storage servers, and the first storage module and the second storage module back up each other.
[0009] Furthermore, the geographic information storage module and the basic setting information module are network attached storage, the geographic information storage module is connected to the site selection input module through a local area network, the geographic information storage module is connected to the basic setting module through a local area network, the basic setting information module is connected to the basic setting module through a local area network, and the basic setting information module is connected to the project planning module through a local area network.
[0010] Furthermore, the first storage module is connected to the second storage module via an optical fiber.
[0011] Furthermore, the network module is a gateway device, and the network module is connected with field personnel, purchasing personnel and customers through the network.
[0012] Furthermore, the infrastructure planning module, site selection input module, project planning module, general plan planning module, cost estimation module, preliminary design module and construction drawing design module are personal computers.
[0013] The beneficial effects achieved by the present invention using the above structure are as follows: This scheme is a construction project design software system, because of the setting of the first storage module and the second storage module, data storage is safe, because of the setting of the geographic information storage module and the basic setting module, the shared resources are interoperable and there will be no reference deviation, because of the setting of the first storage module, the data in the design process is interoperable, which improves the design efficiency, and because of the setting of the network module, it is convenient for customers and personnel to exchange information. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The present invention is a schematic diagram of the overall structure of a building project design software system.
[0015] Among them, 1. The first central storage module, 2. The site selection input module, 3. The infrastructure planning module, 4. The project planning module, 5. The cost estimation module, 6. The master plan module, 7. The second central storage module, 8. The preliminary design module, 9. The construction drawing design module, 10. The network module, 11. The geographic information storage module, 12. The infrastructure information module, 13. The on-site personnel, 14. The purchasing personnel, 15. The customers.
[0016] Furthermore, the infrastructure planning module, site selection input module, project planning module, general plan planning module, cost estimation module, preliminary design module and construction drawing design module are personal computers.
[0017] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention. DETAILED DESCRIPTION
[0018] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0019] like Figure 1 As shown, the present invention provides a construction project design software system, including a first central storage module 1, a site selection input module 2, an infrastructure planning module 3, a project planning module 4, a cost estimation module 5, a general plan planning module 6, a second central storage module 7, a preliminary design module 8, a construction drawing design module 9 and a network module 10, the site selection input module 2 is connected to the first central storage module 1, the infrastructure planning module 3 is connected to the first central storage module 1, the project planning module 4 is connected to the first central storage module 1, the general plan planning module 6 is connected to the first central storage module 1, the fraud estimation module is connected to the first central storage module 1, the second central storage module 7 is connected to the first central storage module 1, the preliminary design module 8 is connected to the second central storage module 7, the construction drawing design module 9 is connected to the second central storage module 7, and the network module 10 is connected to the second central storage module 7.
[0020] Among them, a geographic information storage module 11 is provided between the site selection input module 2 and the basic setting planning module 3, and a basic setting information module 12 is provided between the project planning module 4 and the basic setting planning module 3. The first intermediate storage module 1 and the second intermediate storage module 7 are storage servers, and the first intermediate storage module 1 and the second intermediate storage module 7 are backups for each other. The geographic information storage module 11 and the basic setting information module 12 are network attached storage, the geographic information storage module 11 is connected to the site selection input module 2 through a local area network, the geographic information storage module 11 is connected to the basic setting module through a local area network, the basic setting information module 12 is connected to the basic setting module through a local area network, and the basic setting information module 12 is connected to the project planning module 4 through a local area network. The network module 10 is a gateway device, and the network module 10 is connected to the on-site personnel 13, the purchasing personnel 14 and the customer 15 through the network. The basic setting planning module 3, the site selection input module 2, the project planning module 4, the general plan planning module, the cost estimation module 5, the preliminary design module 8 and the construction drawing design module 9 are personal computers.
[0021] During specific use, the site selection area is delineated through the project site selection module, and then the infrastructure planning module 3 is used to carry out infrastructure planning according to the geography of the site selection, and then the project planning module 4 is used to carry out project planning based on the infrastructure planning. This information will be stored in the first storage module 1 and backed up with the second storage module 7 at all times. The general layout planning module 6, the fraud estimation module, the preliminary setting module and the construction drawing design module 9 carry out various aspects of design according to the determined data, and the on-site personnel 13, the purchasing personnel 14 and the customers 15 exchange information through the network module 10.
[0022] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
[0024] The present invention and its embodiments are described above, and such description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. In short, if ordinary technicians in the field are inspired by it, without departing from the purpose of the invention, they can design a structure and embodiment similar to the technical solution without creativity, which should belong to the protection scope of the present invention.
Claims
1. A construction project design software system, characterized by: It includes a first central storage module, a site selection input module, an infrastructure planning module, a project planning module, a cost estimation module, a general plan planning module, a second central storage module, a preliminary design module, a construction drawing design module and a network module, wherein the site selection input module is connected to the first central storage module, the infrastructure planning module is connected to the first central storage module, the project planning module is connected to the first central storage module, the general plan planning module is connected to the first central storage module, the cost estimation module is connected to the first central storage module, the second central storage module is connected to the first central storage module, the preliminary design module is connected to the second central storage module, the construction drawing design module is connected to the second central storage module, and the network module is connected to the second central storage module; A geographic information storage module is provided between the site selection input module and the infrastructure planning module, and an infrastructure information module is provided between the project planning module and the infrastructure planning module; The first storage module and the second storage module are storage servers, and the first storage module and the second storage module are backup for each other; The geographic information storage module and the basic setting information module are network attached storage, the geographic information storage module is connected to the site selection input module through a local area network, the geographic information storage module is connected to the basic setting module through a local area network, the basic setting information module is connected to the basic setting module through a local area network, and the basic setting information module is connected to the project planning module through a local area network; The network module is a gateway device, and the network module is connected with on-site personnel, purchasing personnel and customers through the network; The infrastructure planning module, site selection input module, project planning module, general plan planning module, cost estimation module, preliminary design module and construction drawing design module are personal computers.
Citation Information
Patent Citations
High-speed image missile-borne data recording device
CN107135365A
Capital construction application system and method
CN112232761A