Ultra-deep TRD wall construction method in gravel-rich water strata based on assembled "L"-shaped guide wall
By adopting the combination method of prefabricated 'L'-type guide wall and TRD equipment in ultra-deep foundation pit project, the environmental disturbance and enclosure structure in the construction of round gravel water-rich formations are solved, and the construction safety and quality.
Patent Information
- Application Number
- CN202111590790.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-23
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-12-23
AI Technical Summary
In ultra-deep foundation pit projects, there are high environmental disturbances and enclosure problems during construction of round gravel water-rich formations, resulting in increased construction difficulty and reduced safety.
The construction method based on the prefabricated 'L' type guide wall is adopted, including sample trench excavation, prefabricated 'L' type guide wall construction, hole guide and backfilling, and TRD wall construction, through the internal and external prefabricated 'L' type guide The assembly of wall modules and the use of TRD equipment ensure the positioning accuracy of I-shaped steel and the stability of soil.
It improves the lateral force resistance strength and uniformity of the TRD wall, reduces soil deformation and tool wear, and ensures the verticality and safety of construction.
Smart Images

Figure CN114215070B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of ground-connected wall construction, and in particular to an ultra-deep TRD wall construction method in a gravel-rich water stratum based on an assembled "L"-shaped guide wall. Background Art
[0002] As foundation pit projects continue to develop towards the "super-large" and "super-deep" fields, the safety of foundation pit support is becoming more and more important, and it is particularly important to choose a reasonable retaining structure. When carrying out foundation pit retaining construction in ultra-deep water-rich strata, you will encounter a gravel stratum, which is a groundwater storage area with pressurized water. During the earthwork excavation construction, pressurized water may surge, so the gravel layer must be pre-treated.
[0003] The current method of pre-treating the gravel layer is to use a rotary drilling machine to drill holes in advance and then construct the retaining structure. However, as a poor geological condition, the water-rich gravel stratum has strong water permeability. When excavating the soil, the soil is relatively loose and has weak cohesion, causing serious landslides and making it difficult to layer evenly. Therefore, when constructing in the gravel water-rich stratum, the disturbance to the stratum is significantly higher than that of the soft soil stratum. The construction process needs to strictly control the deformation of the stratum to ensure the stability of the retaining structure and the safety of the foundation pit; the presence of pressurized water will also cause the retaining structure to tilt, resulting in poor uniformity of the retaining structure. Summary of the invention
[0004] The purpose of the present invention is to provide an ultra-deep TRD wall construction method in gravel and water-rich strata based on an assembled "L"-shaped guide wall, so as to solve the problem of large disturbance to the surrounding environment when TRD construction passes through gravel and water-rich strata in ultra-deep foundation pit projects.
[0005] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:
[0006] The present invention relates to an ultra-deep TRD wall construction method in a gravel water-rich stratum based on an assembled "L"-shaped guide wall, which comprises the following steps:
[0007] 1) Sample trench excavation: level the site and lay the roadbed on the site surface, and excavate the sample trench in the direction parallel to the center coordinate line of the designed TRD wall;
[0008] 2) Construction of assembled "L"-shaped guide wall: Assemble assembled "L"-shaped guide wall modules on the inner and outer walls of the sample trench to form inner and outer assembled "L"-shaped guide walls. There is a gap between the inner and outer assembled "L"-shaped guide walls, and backfill the gap between the inner and outer assembled "L"-shaped guide walls with soil;
[0009] 3) Drilling and backfilling: Design the number and location of holes between the inner and outer assembled "L"-shaped guide walls, use the skipping method to drill holes, remove large stones in the soil, and backfill the holes with the soil produced by drilling;
[0010] 4) TRD wall construction: Use TRD equipment to cut the soil and inject solidifying liquid, insert I-beams into the solidifying liquid, and hang the I-beams between the inner and outer assembled "L"-shaped guide walls through steel pipes to form a TRD wall.
[0011] Preferably, the upper edges of the opposite sides of the inner and outer assembled "L"-shaped guide walls formed by the construction of step 2) are both provided with chamfers, and the two ends of the steel pipe in step 4) are respectively mounted on the chamfers of the inner and outer assembled "L"-shaped guide walls, and the top end of the I-beam is suspended on the steel pipe by a number of hooks.
[0012] Preferably, during the construction of the assembled "L"-shaped guide wall in step 2), adjacent assembled "L"-shaped guide wall modules are connected to each other by means of mortise and tenon joints.
[0013] Preferably, in the step 2), a waterproof adhesive strip is provided at the joint between adjacent assembled “L”-shaped guide wall modules.
[0014] Preferably, after the construction of the inner and outer assembled "L"-shaped guide walls in step 2) is completed, wooden supports are used to temporarily support the inner and outer assembled "L"-shaped guide walls, and the wooden supports are removed when the soil is backfilled into the gap between the inner and outer assembled "L"-shaped guide walls.
[0015] Preferably, in the step 2), the backfill depth of the backfill soil in the gap between the inner and outer assembled "L"-shaped guide walls is 0.5m, and the wooden supports used to temporarily support the inner and outer assembled "L"-shaped guide walls are arranged in a group every 2 to 3m, and each group of wooden supports includes two wooden supports, which are respectively supported at the upper and lower positions of the inner and outer assembled "L"-shaped guide walls.
[0016] Preferably, in step 3), the diameter of the holes drilled by skipping is 800-1000 mm, and one hole is drilled every 1-2 holes.
[0017] Preferably, the soil used for backfilling the lead hole in step 3) is a mixed soil obtained by adding bentonite or yellow mud to the soil produced by removing large rocks from the lead hole.
[0018] Preferably, the step 4) is performed three times by cutting the soil using the cutting box of the TRD equipment, wherein the cutting fluid is sprayed during the first two times of cutting the soil, and the solidifying fluid is sprayed at the same time as the cutting fluid during the third time of cutting the soil.
[0019] Preferably, the cutting fluid is expansive soil slurry; the solidifying fluid is a mixed slurry of cement slurry, cellulose, sugar and soda ash, and the mass ratio of cement slurry, cellulose, sugar, soda ash and expansive soil slurry is: 2000:0.67:0.7:2:460.
[0020] The technical solution of the present invention has the following characteristics and beneficial effects:
[0021] 1. The present invention relates to an ultra-deep TRD wall construction method for gravel water-rich strata based on an assembled "L"-shaped guide wall. A sample trench is first excavated on the site, and an assembled "L"-shaped guide wall is constructed at the sample trench. During the TRD wall construction process, the I-beam inside the TRD wall is erected between the inner and outer assembled "L"-shaped guide walls through steel pipes to ensure the positioning accuracy of the I-beam, so that the I-beam does not move and the verticality of the I-beam is ensured. At the same time, the operating platform of the TRD equipment can be set at the top plate of the assembled "L"-shaped guide wall, and the flatness of the operating surface of the TRD equipment is guaranteed, so that the verticality accuracy of the later troughing and the wall of the enclosure structure is guaranteed, thereby ensuring the lateral force resistance of the TRD wall and improving the uniformity of the TRD wall.
[0022] 2. The present invention relates to an ultra-deep TRD wall construction method for gravel water-rich strata based on an assembled "L"-shaped guide wall. The assembled "L"-shaped guide wall module adopts a mortise and tenon structure, which is easy to assemble and can achieve tightness of the splicing.
[0023] 3. The present invention relates to a method for constructing an ultra-deep TRD wall in a gravel-rich water-bearing stratum based on an assembled "L"-shaped guide wall. Before the construction of the TRD wall, a hole is first drilled to replace part of the soil to reduce large stones in the soil, thereby reducing the wear of the TRD tool. The hole is drilled in a skipping manner, which can effectively reduce the deformation of the surrounding soil. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a flow chart of the construction method of ultra-deep TRD wall in gravel-rich water-bearing strata based on assembled "L"-shaped guide wall;
[0025] Figure 2 Schematic diagram for assembling an "L" shaped guide wall;
[0026] Figure 3 It is a schematic diagram of the connection structure of adjacent assembled "L"-shaped guide wall modules;
[0027] Figure 4 This is a schematic diagram of the operation route of the rotary drilling rig to backfill the hole and the TRD equipment to cut the soil;
[0028] Figure 5 This is a schematic diagram of the final formed rounded gravel water-rich ultra-deep TRD wall;
[0029] Figure 6 This is a top view of the final formed rounded gravel water-rich ultra-deep TRD wall;
[0030] Explanation of the reference numerals: 1-assembled "L"-shaped guide wall, 11-assembled "L"-shaped guide wall module, 2-wood support, 3-waterproof rubber strip, 5-TRD wall, 6-I-beam, 7-bolt, 8-steel pipe, 9-hook. DETAILED DESCRIPTION
[0031] The present invention is described in detail below, and the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] See attached Figure 1 As shown, the present invention relates to an ultra-deep TRD wall construction method in a gravel water-rich stratum based on an assembled "L"-shaped guide wall, which comprises the following steps:
[0033] 1) Sample trench excavation: Level the site and lay the roadbed on the site surface, and excavate the sample trench in the direction parallel to the center coordinate line of the designed TRD wall, which specifically includes:
[0034] 1.1) Construction preparation
[0035] According to the geological survey data and geological condition report, investigate the adverse geological conditions of the site, formulate a reasonable emergency plan, prepare the construction organization design plan according to the construction requirements, prepare the equipment and materials required for construction, connect the water and electricity of the construction site and install the drainage pipes to ensure the normal operation and safety of the construction site;
[0036] 1.2) Measurement and layout
[0037] According to the construction design drawing, determine the center coordinate point of the TRD wall, use the total station to set out, use white lime to mark the position of the center line, and then arrange staff to check and reconfirm the position of the center coordinate point, and complete the inspection procedures of the measurement data in time;
[0038] 1.3) Sample trench excavation
[0039] After the surveying and setting out is completed, the site is leveled and the roadbed is laid. The excavator excavates the trench in the parallel direction of the central coordinate line of the TRD wall until the excavation work is completed;
[0040] The trench excavation depth is 1.5m and the width is 900mm.
[0041] 2) Construction of assembled "L"-shaped guide wall 1: Assemble assembled "L"-shaped guide wall modules 11 at the inner and outer side walls of the sample ditch respectively to form inner and outer assembled "L"-shaped guide walls. The width of the assembled "L"-shaped guide wall module 11 is 1m, the depth is 1.55m, and the thickness is 300mm. The upper edges of the assembled "L"-shaped guide wall modules 11 are all provided with chamfers; during assembly, adjacent assembled "L"-shaped guide wall modules 11 are connected to each other by mortise and tenon joints, and waterproof strips 3 are provided at the joints between adjacent assembled "L"-shaped guide wall modules. There is a gap between the inner and outer assembled "L"-shaped guide walls. After the construction of the inner and outer assembled "L"-shaped guide walls is completed, the inner and outer assembled "L"-shaped guide walls are temporarily supported by wooden supports 2. The wooden supports 2 are arranged in groups every 2 to 3m. Each group of wooden supports includes two wooden supports, which are respectively supported at the upper and lower positions of the inner and outer assembled "L"-shaped guide walls, as shown in the attached figure. Figure 2 and attached Figure 3 As shown; after all the inner and outer assembled "L"-shaped guide walls are constructed, remove the wooden support 2 and backfill the gap between the inner and outer assembled "L"-shaped guide walls with a backfill depth of 0.5m.
[0042] 3) Drilling and backfilling: Design the number and position of holes between the inner and outer assembled "L"-shaped guide walls, and use the jump-drilling method to drill holes. The diameter of the drilling holes is 800-1000mm, and one hole is drilled every 1-2 holes. After drilling, it is necessary to remove large stones from the soil produced by drilling, and then add bentonite or yellow mud to form a mixed soil. Use the mixed soil to backfill the drilling holes. The specific steps are as follows:
[0043] 3.1) Drilling machine drilling
[0044] Before drilling, corresponding precipitation, anti-seepage and anti-leakage measures must be taken; after the guide wall construction is completed, the number and position of the rotary drilling holes are clarified and numbered in sequence, the rotary drilling machine is fixed on the hole to be excavated, and the rotary drilling rig is driven into the soil to drill holes. The hole spacing of the rotary drilling machine is set to 800-1000mm. The rotary drilling machine drills holes by "jumping". When one rotary drilling machine drills the first hole, the second rotary drilling machine drills the third hole, and so on, until the drilling is completed; for soil layers with poor geological conditions, drilling can also be performed at intervals of 2 holes. When one rotary drilling machine drills the first hole, the second rotary drilling machine drills the fourth hole, and so on. After the rotary drilling machine has finished drilling holes, remove pebbles and other large stones with a particle size greater than 10cm from the excavated soil.
[0045] 3.1) Backfilling by excavator
[0046] Use an excavator to backfill the soil excavated during the boring stage, and then add bentonite or yellow mud, as well as the replacement soil from the previous construction section.
[0047] 4) TRD wall construction: TRD equipment is used to cut the soil and inject solidifying liquid. The cutting box of the TRD equipment cuts the soil three times. The cutting liquid is sprayed when the soil is cut for the first two times. When the soil is cut for the third time, the solidifying liquid is sprayed at the same time as the cutting liquid. The cutting liquid is an expansive soil slurry, and the solidifying liquid is a mixed slurry of cement slurry, cellulose, white sugar and soda ash. The mass ratio of cement slurry, cellulose, white sugar, soda ash and expansive soil slurry is: 2000: 0.67: 0.7: 2: 460; then insert the I-beam 6 into the solidifying liquid, and the I-beam 6 is suspended between the inner and outer assembled "L"-shaped guide walls through the steel pipe 8, that is, the two ends of the I-beam 6 are fixed to the chamfers of the inner and outer assembled "L"-shaped guide walls 1 by bolts 7, and the top of the steel pipe 8 is hung on the steel pipe 8 by a hook 9. After the solidifying liquid is completely hardened, it can be formed as shown in the figure. Figure 5 and 6 The TRD wall 5 with I-beam 6 inside is shown, and the specific construction method of this step is:
[0048] 4.1) Pile driver in place and cutting box installed
[0049] Use an excavator to dig a rectangular trench along the center line of the TRD wall, the trench is 3-5m deep and 1m wide, use a crawler crane to put the cutting box into the trench, and tighten the cutting box and chain connecting bolts 7. The TRD equipment 11 moves to drill down to the depth of a section of the cutting box, and then dismantles the connected cutting box. The crawler crane places a section of the cutting box in the original rectangular trench, and the main machine is connected to the cutting box in the rectangular trench, and moves to the position of the cutting box to be drilled down to connect the second section of the cutting box and drill down to the depth of the second section of the cutting box. Repeat the above steps until the designed depth is reached;
[0050] 4.2) Install the inclinometer
[0051] After the cutting box is installed and lowered to the designed depth, the inclinometer is installed. The inclinometer is the main means to control the verticality of the wall during the entire TRD construction process. It is installed inside the cutting box. The inclinometer tube is installed on the bottom cover of the tube and fixed with screws or glue. The inclinometer tubes are connected with pipes and fixed with screws to connect with the electronic display in the cab. During construction, real-time observation and real-time correction can be made. The verticality required by the general design is controlled within 1 / 300;
[0052] 4.3) TRD wall construction
[0053] After the TRD equipment cutting box is installed, inject the excavation fluid (expansive soil slurry, add 4808kg of expansive soil) through the grouting pump, refer to the attached Figure 4As shown, the cutting box moves forward, excavates the loosened original soil layer, and cuts a groove for a certain distance. In order to ensure the quality of the TRD wall, the cutting box is withdrawn to the starting point, the slurry is replaced, and the solidifying liquid (cement slurry, which needs to add 21.64 tons of cement, 14.5 kg of cellulose, 15 kg of sugar, and 43.3 kg of soda ash) is injected through the grouting pump. The cutting box moves forward and mixes the slurry with the excavated liquid to form a cement soil mixing wall of equal thickness. Repeat the above steps until all cement soil walls of equal thickness in the same direction are completed.
[0054] During construction, first weld the hook 9 to the I-beam 6, and insert the I-beam 6 according to the design strength of the TRD wall. The insertion depth is the support depth. After reaching the support depth, hang the hook 9 of the I-beam 6 on the steel pipe 8 that spans the chamfer of the inner and outer guide walls, and screw the bolt 7 into the bolt hole reserved in the steel pipe 8.
[0055] TRD wall construction uses a three-step cutting method, that is, after the TRD equipment cuts to the depth of the water-stop curtain, the first two steps only spray out the cutting fluid, and the third cutting sprays out the solidifying fluid and mixes it into a wall. Cement-soil mixing walls of equal thickness should be constructed continuously, and the step distance should not exceed 50mm.
[0056] For the corners of the TRD wall, a "cross" shaped overlap should be made, with 2m extension on both sides for overlap construction. The grouting pressure and mixing speed at the corners should be slow and uniform to ensure the overlap length and prevent the formation of cold joints or local weak points. The overlap of the formed wall on the same day should not be less than 500mm. The excavation speed should be strictly controlled in the overlap area to fully mix and stir the solidifying liquid and the mixed mud. The mixing speed must be slowed down during the overlap construction to ensure the overlap quality. The flow rate of the grouting pump should be adjusted according to the actual excavation speed.
[0057] 4.4) Pull out the cutting box
[0058] After the wall is shotcrete-formed, inject the same proportion of solidifying liquid into the area where the cutting box is to be pulled out, and grouting is performed while pulling out. Use a 2000t crawler crane to pull out the cutting box, with a pulling length of 3 to 4 sections of cutting boxes, and grouting is performed simultaneously to maintain the liquid level balance, and lift the disassembled cutting box to the designated location. Repeat the above steps until all the cutting boxes are pulled out.
[0059] See attached Figure 5 and 6As shown, the gravel-rich water-rich ultra-deep TRD wall constructed by the gravel-rich water-rich stratum ultra-deep TRD wall construction method based on the assembled "L"-shaped guide wall of the present invention comprises two sets of assembled "L"-shaped guide walls 1, an I-beam 6 and a TRD wall body 5. The assembled "L"-shaped guide wall 1 is composed of a plurality of assembled "L"-shaped guide wall modules 11, and the adjacent assembled "L"-shaped guide wall modules 11 are connected by mortise and tenon joints, and waterproof rubber strips 3 are arranged between the adjacent assembled "L"-shaped guide wall modules 11. A steel pipe 8 is arranged between the inner and outer sets of assembled "L"-shaped guide walls 1, and the I-beam 6 is arranged in the TRD wall body 5, and the top of the I-beam is connected to the steel pipe 8 by a hook 9.
[0060] The present invention is described in detail above in combination with the embodiments, but the contents described are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made according to the scope of application of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A method for constructing ultra-deep TRD walls in gravel-rich water-bearing strata based on assembled "L"-shaped guide walls. It is characterized in that It includes the following steps: 1) Sample trench excavation: level the site and lay the roadbed on the site surface, and excavate the sample trench in the direction parallel to the center coordinate line of the designed TRD wall; 2) Construction of assembled "L"-shaped guide wall: Assemble assembled "L"-shaped guide wall modules on the inner and outer walls of the sample trench respectively to form inner and outer assembled "L"-shaped guide walls. There is a gap between the inner and outer assembled "L"-shaped guide walls. Backfill the gap between the inner and outer assembled "L"-shaped guide walls with soil. The upper edges of the opposite sides of the inner and outer assembled "L"-shaped guide walls formed by the construction are both chamfered; 3) Drilling and backfilling: Design the number and location of holes between the inner and outer assembled "L"-shaped guide walls, use skipping to drill holes, remove large stones in the soil, and backfill the holes with the soil produced by drilling; 4) TRD wall construction: Use TRD equipment to cut the soil and inject solidifying liquid, insert I-beams into the solidifying liquid, and hang the I-beams between the inner and outer assembled "L"-shaped guide walls through steel pipes. The two ends of the steel pipes are respectively installed at the chamfers of the inner and outer assembled "L"-shaped guide walls. The top of the I-beam is hung on the steel pipe through a number of hooks to form a TRD wall.
2. The method for constructing ultra-deep TRD wall in gravel water-rich strata based on assembled "L"-shaped guide wall according to claim 1, Features: During the construction of the assembled "L"-shaped guide wall in step 2), adjacent assembled "L"-shaped guide wall modules are connected to each other by using mortise and tenon joints.
3. The method for constructing ultra-deep TRD wall in gravel water-rich strata based on assembled "L"-shaped guide wall according to claim 2, Features: In the step 2), waterproof adhesive strips are provided at the joints between adjacent assembled "L"-shaped guide wall modules.
4. The method for constructing ultra-deep TRD wall in gravel water-rich strata based on assembled "L"-shaped guide wall according to claim 1, Features: In the step 2), after the construction of the inner and outer assembled "L"-shaped guide walls is completed, wooden supports are used to temporarily support the inner and outer assembled "L"-shaped guide walls, and the wooden supports are removed when the soil is backfilled in the gap between the inner and outer assembled "L"-shaped guide walls.
5. The method for constructing ultra-deep TRD wall in gravel water-rich strata based on assembled "L"-shaped guide wall according to claim 4, Features: In the step 2), the backfill depth of the backfill soil in the gap between the inner and outer assembled "L"-shaped guide walls is 0.5m, and the wooden supports used to temporarily support the inner and outer assembled "L"-shaped guide walls are arranged in a group every 2-3m, and each group of wooden supports includes two wooden supports, which are respectively supported at the upper and lower positions of the inner and outer assembled "L"-shaped guide walls.
6. The method for constructing ultra-deep TRD wall in gravel water-rich strata based on assembled "L"-shaped guide wall according to claim 1, Features: In the step 3), the diameter of the holes drilled by skipping is 800-1000 mm, and one hole is drilled every 1-2 holes.
7. The method for constructing ultra-deep TRD wall in gravel water-rich strata based on assembled "L"-shaped guide wall according to claim 1, Features: The soil used for backfilling the lead hole in step 3) is a mixed soil obtained by adding bentonite or yellow mud to the soil produced by removing large rocks from the lead hole.
8. The method for constructing ultra-deep TRD wall in gravel water-rich strata based on assembled "L"-shaped guide wall according to claim 1, Features: The step 4) using TRD equipment to cut the soil is to use the cutting box of the TRD equipment to cut the soil. The cutting of the soil by the cutting box of the TRD equipment is performed three times. The cutting fluid is sprayed during the first two times of cutting the soil, and the solidifying fluid is sprayed at the same time as the cutting fluid during the third time of cutting the soil.
9. The method for constructing ultra-deep TRD wall in gravel water-rich strata based on assembled "L"-shaped guide wall according to claim 8, Features: The cutting fluid is expansive soil slurry; the solidifying fluid is a mixed slurry of cement slurry, cellulose, sugar and soda ash, and the mass ratio of cement slurry, cellulose, sugar, soda ash and expansive soil slurry is: 2000:0.67:0.7:2:460.