A material arrangement algorithm for wooden formwork in main structure construction based on BIM
Through BIM technology, the main structure model is established, the axis grid and elevation is defined, parameterized modeling and template calculation are carried out, and the wooden template processing drawings are generated, which solves the problems of complexity and low efficiency in traditional building template construction, and improves the construction accuracy and Efficiency enhances the guidance and uniformity of construction.
Patent Information
- Application Number
- CN202111675796.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-12-31
AI Technical Summary
The construction of traditional building formwork is complicated and the construction efficiency is low, which affects the construction quality, and the process model standards are not unified and the construction guidance is poor.
The material discharge algorithm of wooden formwork during main structure construction based on BIM is adopted. By establishing the main structure model, defining the axis grid and elevation, parametric modeling and template calculations are carried out, wood formwork processing drawings are generated, and on-site construction is guided.
It improves construction accuracy and efficiency, reduces error rework, enhances the guidance of construction and the uniformity of process model technical standards, and realizes refined management of formwork construction.
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a material arrangement algorithm of wooden formwork in main structure construction based on BIM. Background Art
[0002] BIM technology (Building Information Model) is the direct application of digital technology in construction projects. It solves the problem of describing construction projects in software, enables designers and engineering technicians to respond correctly to various building information, and provides a solid foundation for collaborative work. Building Information Model is also a digital method applied to design, construction, and management. This method supports the integrated management environment of construction projects, which can significantly improve the efficiency and reduce risks of construction projects throughout their entire process.
[0003] In the traditional construction formwork engineering process model construction, the plane construction drawings are used for formwork support, reinforcement design and material planning. However, the plane drawings cannot show the data information and logical association of the entire process. At present, the formwork construction mainly relies on the carpenters to arrange and adjust on site based on their experience. Due to the differences in personal skills, there is no unified standard, and the construction quality defects are difficult to control, which often cannot play the role that the process model should play. In addition, the work efficiency is low, the calculation accuracy is low, it is easy to make mistakes, and it is inconvenient to adjust. Once adjustments are made, the engineering quantity calculation needs to be calculated from scratch. Summary of the invention
[0004] The problem to be solved by the present invention is to provide a material arrangement algorithm for wooden formwork in main structure construction based on BIM, so as to solve the problems that the current formwork engineering construction process is complex, the construction efficiency is low, there are many factors affecting the construction quality, and the process sample standards are not unified and the construction guidance is poor.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a material arrangement algorithm of wooden formwork in main structure construction based on BIM, the steps are:
[0006] Use BIM software to build the main structure model according to the preliminary construction plan;
[0007] The main structure model is subjected to formwork layout and layout calculation, and a wood formwork processing drawing is directly generated to guide on-site construction.
[0008] Furthermore, the steps of establishing the main structure model using BIM software according to the preliminary construction plan are:
[0009] Define the grid and elevations;
[0010] Parametric modeling of the main structure;
[0011] A template calculation is performed on the main structure.
[0012] Furthermore, the steps of defining the axis grid and elevation are:
[0013] Define the axis grid according to the construction plan, input the axis grid dimensions in the longitudinal and transverse directions, and define each axis grid number;
[0014] Define components that are not located in the grid by auxiliary lines, and define names for the auxiliary lines according to the offset distance from the grid;
[0015] According to the floor elevations in the drawings, enter the elevations of each structural layer and define the floor names.
[0016] Furthermore, the parameters contained in the main structure include: beams, plates, columns and walls;
[0017] According to the axis grid defined above, the main structure beams, slabs, columns and wall components are modeled; attributes are assigned to the beams, slabs, columns and walls, and the attributes include: component name, template thickness, concrete grade, component volume, axis grid position, expected start time, expected end time, actual start time, actual end time, planned start time, and planned end time.
[0018] Furthermore, the step of performing parametric modeling on the main structure includes:
[0019] Parametric modeling of beam and column components:
[0020] Predefine the cross sections of beam components and column components in the axis grid, and select a multi-point or multi-segment path to sweep along a curve to form the beam components and column components by predefine the cross sections of the beam components and column components;
[0021] Presetting the wood formwork thickness of the beam member and the column member, the connection method between the side membrane and the bottom formwork, and the node connection method;
[0022] According to the preset information, the beam template and the column template are directly generated after the solid modeling of the beam component and the column component is completed.
[0023] Furthermore, the step of performing parameterized design on the main structure also includes:
[0024] Parametric modeling of slab and wall components:
[0025] Predefine the cross sections of the plate components and the wall components in the axis grid, select multiple points or closed line segments to define the cross sections of the plate components and the wall components, and then stretch them along the set direction to form the plate components and the wall components;
[0026] Presetting the thickness of the wooden formwork of the plate component and the wall component, the connection method between the formworks, and the node connection method;
[0027] According to the preset information, after the solid modeling of the plate component and the wall component is completed, the plate formwork and the wall formwork are directly generated;
[0028] Parametric modeling of other concrete components:
[0029] Construct the concrete model and wooden formwork separately, and merge them with the model by calling the part files separately.
[0030] Furthermore, the step of performing template calculation on the main structure includes:
[0031] Carry out column formwork calculation for the column member:
[0032] In the modeling stage, the surrounding plate size in the template parameters is pre-set under the plate template size according to the column template height;
[0033] According to the engineering quantity calculation rules, the connection between each component and the column component node is completed, and the connection between the column template and the beam template, the plate template and the wall template is cut Boolean operation;
[0034] The dimension data of the column template is extracted, and the data format storage of the column template is completed according to the data format of using a reverse closed vector for the outer contour and a clockwise closed vector for the inner contour.
[0035] Furthermore, the step of performing template calculation on the main structure also includes:
[0036] Perform beam formwork calculation on the beam member:
[0037] In the modeling stage, the size of the surrounding plates in the template parameters is pre-set according to the height of the beam template below the size of the plate template;
[0038] According to the engineering quantity calculation rules, the connection between each component and the beam component node is completed, and the cutting Boolean operation is performed at the connection between the beam template and the column template, the plate template and the wall template;
[0039] The dimension data of the beam template is extracted, and the data format storage of the beam template is completed according to the data format of using reverse closed vectors for the outer contour and clockwise closed vectors for the inner contour.
[0040] Furthermore, the step of performing template calculation on the main structure also includes:
[0041] Calculate the wall formwork, slab formwork and other component formwork for the wall components, slab components and other concrete components:
[0042] According to the engineering quantity calculation rules, the connection between each component and the wall component node is completed, and the connection between the wall formwork and the column formwork, the plate formwork and the beam formwork is cut and Boolean operation is performed;
[0043] According to the engineering quantity calculation rules, the nodes of each component and the plate component are connected, and the cutting Boolean operation is performed at the connection between the plate template and the column template, the wall template and the beam template;
[0044] Other component templates perform cutting Boolean operations on node connections according to the same calculation rules;
[0045] The dimension data of the wall template, the plate template and the other component template are extracted, and the data format storage of the wall template, the plate template and the other component template is completed according to the data format of using reverse closed vectors for outer contours and clockwise closed vectors for inner contours.
[0046] Furthermore, the steps of performing template nesting and nesting calculation on the main structure model are:
[0047] Select the new template or old template to be arranged in the template material library;
[0048] Select the set of wooden templates to be arranged according to the production plan and flow section;
[0049] Optimize the layout: According to the principle of minimum residual material, the size data of the template is selected with length or width as the layout condition, and they are arranged in sequence along the new template or old template to be arranged, and the optimized layout result is directly generated. According to the optimized layout result, the wooden template processing drawing is output to guide the on-site construction.
[0050] The above technical solution has the following beneficial effects:
[0051] The present invention applies BIM technology to the entire life cycle of modular building design, production, and on-site construction, thereby realizing the fine management of the entire life cycle of modular buildings. Through digital virtualization and information-based description of various system elements, it realizes information-based collaborative design and visual design, realizes fine design, and improves design efficiency and accuracy.
[0052] BIM technology is used to model the main structure, determine the design plan of the main structure formwork support and node connection details, and improve the efficiency and accuracy of engineering technical briefings. Workers only need to design and construct according to the three-dimensional model. The construction requirements are clear, which reduces errors and rework, improves the efficiency of formwork construction, and is more conducive to unifying the technical standards of process models and enhancing the guidance of construction.
[0053] According to the actual situation of the construction project, three-dimensional modeling is carried out, and the node connection relationship between different components can be truly reflected; through the real three-dimensional model and customized calculation rules, the template parameters of various complex components can be calculated, and the optimized wood template layout algorithm can be obtained, and production drawings can be directly generated, and the engineering quantity accuracy is sufficient to meet the actual work needs. By implementing this invention, a layout algorithm for wood templates in the main structure construction based on BIM is provided, which has high construction accuracy, strong operability, and good social and economic benefits. DETAILED DESCRIPTION
[0054] The present invention will be further described below in conjunction with embodiments:
[0055] In one embodiment of the present invention, a nesting algorithm for wooden formwork in main structure construction based on BIM comprises the following steps:
[0056] S1: Use BIM software to establish the main structure model according to the preliminary construction plan. Specifically, the steps of using BIM software to establish the main structure model according to the preliminary construction plan are as follows:
[0057] S11: Define the axis grid and elevation;
[0058] Define the axis grid according to the construction plan, input the axis grid dimensions in the longitudinal and transverse directions, and define each axis grid number; in this embodiment, the longitudinal axis grid uses digital axis numbers, and the transverse axis grid uses letter axis numbers.
[0059] Define components that are not located in the grid by auxiliary lines, and define names for the auxiliary lines according to the offset distance from the grid;
[0060] According to the floor elevation of the drawing, input the elevation of each structural layer and define the floor name. That is, after the plane axis grid is defined, define the axis grid in the direction of the vertical plane axis grid; specifically, in this embodiment, each structural layer includes beams, plates, columns and wall components in the main structure. The layout of the template needs to be determined by determining the specific position, height and modeling of the beams, plates, columns and wall structures in the axis grid, and then arrange and calculate the template.
[0061] According to the axis grid defined above, the main structure beams, slabs, columns and wall components are modeled; attributes are assigned to the beams, slabs, columns and walls, and the attributes include: component name, template thickness, concrete grade, component volume, axis grid position, expected start time, expected end time, actual start time, actual end time, planned start time, and planned end time.
[0062] S12: Perform parametric modeling on the main structure. The steps of performing parametric modeling on the main structure include:
[0063] S121: Parametric modeling of beam and column components:
[0064] The cross sections of beam and column components are predefined in the axis network. By predefining the cross sections of beam and column components, multi-point or multi-segment paths are selected to sweep along the curve to form beam and column components. When constructing the cross sections of beam and column components, the rectangular length and width are input for rectangular cross sections; the diameter is input for circular cross sections for parameterized settings, and other special columns are defined according to the slab wall parameters. At the same time, the component number, component elevation, and concrete grade information are set, and other production management information is input during the construction phase. The sweep path is defined by multi-point selection and multi-segment selection. The bending and torsion components can be pre-processed in multi-segment mode, and the path data can be parsed into an array for storage for further editing.
[0065] The thickness of the wooden formwork for beam and column components, the connection method between the side membrane and the bottom formwork, and the node connection method are pre-set; there are two connection methods between the side membrane and the bottom formwork: clamping and squatting. The size of the side membrane and the bottom formwork is determined by determining the connection method between the side membrane and the bottom formwork, and selected according to construction requirements. At the same time, it is also necessary to set reserved openings on the beam formwork and column formwork according to the electromechanical reserved information. The preset size of the side formwork of the beam formwork and column formwork should directly calculate the thickness of the plate component, that is, the length of the side formwork minus the thickness of the corresponding plate component to avoid secondary cutting.
[0066] According to the above-mentioned pre-set information, beam templates and column templates are directly generated after the solid modeling of beam components and column components is completed. The beam templates and column templates are attached to the outer sides of the beam components and the main components respectively.
[0067] S122: Parametric modeling of plate and wall components:
[0068] Predefine the cross-section of plate components and wall components in the axis grid, select multi-point or closed line segment path to define the cross-section of plate components and wall components, and then stretch them along the set direction to form plate components and wall components; define the sweep path by multi-point selection and multi-segment selection, and parse the path section into an array for storage for further editing.
[0069] Preset the thickness of the wooden formwork for the plate components and wall components, the connection method between the formworks, and the node connection method; there are two connection methods between the side membrane and the bottom formwork: wrapping and squatting. By determining the connection method between the side membrane and the bottom formwork, the size of the side membrane and the bottom formwork is determined and selected according to the construction requirements. According to the actual input of the plate thickness or wall height, set the component number, component elevation, and concrete grade information. Other production management information is input during the construction stage; at the same time, it is necessary to set reserved openings on the plate formwork and wall formwork according to the electromechanical reserved information.
[0070] According to the above pre-set information, after the solid modeling of the plate component and the wall component is completed, the plate formwork and the wall formwork are directly generated, and the plate formwork and the wall formwork are attached to the outer sides of the beam component and the main component respectively;
[0071] S123: Parametric modeling of other components:
[0072] Construct the concrete model and wooden formwork separately, and merge them with the model by calling the part files separately.
[0073] S13: Perform template calculation on the main structure, specifically:
[0074] S131: Calculate the column formwork for column components:
[0075] During the modeling stage, the surrounding plate dimensions in the template parameters are pre-set according to the column template height under the plate template dimensions; that is, when parametric modeling of beam components and column components is performed in step S121, the preset dimensions of the side template of the column template should directly include the thickness of the plate component, that is, the length of the side template minus the thickness of the corresponding plate component for position layout to avoid secondary cutting.
[0076] According to the engineering quantity calculation rules, the nodes of each component and the column component are connected, and the connection between the column formwork and the beam formwork, slab formwork and wall formwork is cut by Boolean operation; the cutting principle of the node connection when connecting the beam and column is: the beam including the entire outer formwork is completely entered into the column formwork, that is, the width of the incision opened on the column to connect with the beam needs to be subtracted from the thickness of the side formwork and the thickness of the bottom formwork of the beam formwork to prevent leakage during pouring.
[0077] The outer dimension data of the column template is extracted according to the data format of using a reverse closed vector for the outer contour and a clockwise closed vector for the inner contour, where the inner contour is a hole in construction, etc. At the same time, the outer dimension data of the outer contour and the inner contour are distinguished to complete the data format storage of the column template. In this embodiment, the data of the column template is stored in a database to facilitate subsequent selection and calculation.
[0078] S132: Beam formwork calculation for beam components:
[0079] During the modeling stage, the surrounding plate dimensions in the template parameters are pre-set according to the beam template height under the plate template dimensions; that is, when parametric modeling of beam components and column components is performed in step S121, the preset dimensions of the side template of the beam template should directly include the thickness of the plate component, that is, the length of the side template minus the thickness of the corresponding plate component for position layout to avoid secondary cutting.
[0080] According to the engineering quantity calculation rules, the connection between each component and the beam component node is completed, and the cutting Boolean operation is performed at the connection between the beam formwork and the column formwork, the slab formwork and the wall formwork; the beam mouth cutting principle for the connection between the main beam and the secondary beam is that the secondary beam including the entire outer formwork is completely entered into the column formwork, that is, the width of the incision opened on the main beam to connect with the secondary beam needs to be subtracted from the thickness of the side formwork and the bottom formwork of the secondary beam formwork to prevent leakage during pouring.
[0081] The dimension data of the beam template is extracted, and the data format of the outer contour is a reverse closed vector, and the inner contour is a clockwise closed vector, where the inner contour is a hole in construction, etc. At the same time, the outer contour and the inner contour are distinguished, and the data format storage of the beam template is completed. In this embodiment, the data of the beam template is stored in the database, which is convenient for subsequent selection and calculation. In particular, for the wooden template of the bending and twisting beam component, the size processing is carried out to complete the data format storage of the curved template.
[0082] S133: Calculate the wall formwork, slab formwork and other component formwork for wall components, slab components and other components:
[0083] Complete the connection between each component and the wall component node according to the engineering quantity calculation rules, and perform cutting Boolean operations at the connection between the wall formwork and the column formwork, the plate formwork and the beam formwork;
[0084] Complete the connection between each component and the plate component node according to the engineering quantity calculation rules, and perform cutting Boolean operations at the connection between the plate formwork and the column formwork, beam formwork and wall formwork;
[0085] Other component templates perform cutting Boolean operations on node connections according to the same calculation rules.
[0086] The dimension data of the wall formwork, plate formwork and other component formworks are extracted in the data format of using a reverse closed vector for the outer contour and a clockwise closed vector for the inner contour, where the inner contour is a hole in construction, etc. At the same time, the outer dimension data of the outer contour and the inner contour are distinguished to complete the data format storage of the wall formwork, plate formwork and other component formworks. In this embodiment, the data of the wall formwork, plate formwork and other component formworks are stored in a database to facilitate subsequent selection and calculation.
[0087] S2: The steps for template layout and layout calculation for the main structure model are:
[0088] Select the new template or old template to be arranged in the template material library, and set the width of the new template or old template to W.
[0089] The set of wooden templates to be arranged is selected according to the production plan and the flow section. In this embodiment, template data of different widths with little difference in length direction are extracted, among which the data of the width of the minimum envelope rectangle of the special-shaped template is extracted.
[0090] Optimize the layout: According to the principle of minimum residual material, the size data of the template is selected with length or width as the layout condition, and they are arranged in sequence along the new template or old template to be arranged, and the optimized layout result is directly generated. According to the optimized layout result, the wooden template processing drawing is output to guide the on-site construction.
[0091] In this embodiment, according to the principle of minimum residual material, the template data of different widths with little difference in length direction are extracted and arranged in sequence on the new template or the old template to be arranged, and the size data of the wooden template is defined as a i ×b j, ; Among them: a i is the length of the wooden template; b j is the width of the wooden template; for solving the nesting on a new template with a width W, the mathematical model based on the principle of minimum residual material is used to solve the selected parts:
[0092]
[0093] Where, X i is a decision variable, which takes 0 or 1 to determine whether the template is selected, so that the width of the new template or the old template to be arranged is the smallest, that is, the least cut, saving processing costs. The wooden template processing drawing is directly output according to the optimized material arrangement results, and the template is laid corresponding to the corresponding components, and the construction of the corresponding position is carried out. It is more accurate and saves processing cycles, has high construction accuracy, strong operability, and improves the efficiency and accuracy of engineering technology disclosure. Workers only need to design and construct according to the three-dimensional model. The construction requirements are clear, which reduces errors and rework, improves the efficiency of template construction, and is more conducive to unifying the technical standards of process samples and enhancing the guidance of construction.
[0094] The embodiments of the present invention are described in detail above, but the contents described are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A BIM-based nesting algorithm for wooden formwork in main structure construction. It is characterized in that The steps are: Use BIM software to build the main structure model according to the preliminary construction plan; Perform template layout and layout calculation on the main structure model, directly generate wood template processing drawings, and guide on-site construction; The steps of establishing the main structure model using BIM software according to the preliminary construction plan are as follows: Define the grid and elevations; Parametric modeling of the main structure; Performing template calculation on the main structure; The steps of defining the axis grid and elevation are as follows: Define the axis grid according to the construction plan, input the axis grid dimensions in the longitudinal and transverse directions, and define each axis grid number; Define components that are not located in the grid by auxiliary lines, and define names for the auxiliary lines according to the offset distance from the grid; According to the floor elevation in the drawing, input the elevation of each structural layer and define the floor name; The parameters contained in the main structure include: beams, plates, columns and walls; According to the axis grid defined above, the main structure beams, plates, columns and wall components are modeled; attributes are assigned to the beams, plates, columns and walls, and the attributes include: component name, template thickness, concrete grade, component volume, axis grid position, expected start time, expected end time, actual start time, actual end time, planned start time and planned end time; The step of performing parametric modeling on the main structure includes: Parametric modeling of beam and column components: Predefine the cross sections of beam components and column components in the axis grid, and select a multi-point or multi-segment path to sweep along a curve to form the beam components and column components by predefine the cross sections of the beam components and column components; Presetting the wood formwork thickness of the beam member and the column member, the connection method between the side membrane and the bottom formwork, and the node connection method; According to the preset information, after the solid modeling of the beam component and the column component is completed, the beam template and the column template are directly generated; Parametric modeling of slab and wall components: Predefine the cross sections of the plate components and the wall components in the axis grid, select multiple points or closed line segments to define the cross sections of the plate components and the wall components, and then stretch them along the set direction to form the plate components and the wall components; Presetting the thickness of the wooden formwork of the plate component and the wall component, the connection method between the formworks, and the node connection method; According to the preset information, after the solid modeling of the plate component and the wall component is completed, the plate formwork and the wall formwork are directly generated; Parametric modeling of other concrete components: Build concrete model and wooden formwork separately, and merge them with the model by calling part files separately; The steps of performing template nesting and nesting calculation on the main structure model are as follows: Select the new template or old template to be arranged in the template material library; Select the set of wooden templates to be arranged according to the production plan and flow section; Optimize the layout: According to the principle of minimum residual material, the size data of the template is selected with length or width as the layout condition, and they are arranged in sequence along the new template or old template to be arranged, and the optimized layout result is directly generated. According to the optimized layout result, the wooden template processing drawing is output to guide the on-site construction.
2. According to the arrangement algorithm of wooden formwork in the main structure construction based on BIM according to claim 1, Features: The step of performing template calculation on the main structure comprises: Carry out column formwork calculation for the column member: In the modeling stage, the surrounding plate size in the template parameters is pre-set under the plate template size according to the column template height; According to the engineering quantity calculation rules, the connection between each component and the column component node is completed, and the connection between the column template and the beam template, the plate template and the wall template is cut Boolean operation; The dimension data of the column template is extracted, and the data format storage of the column template is completed according to the data format of using a reverse closed vector for the outer contour and a clockwise closed vector for the inner contour.
3. According to the arrangement algorithm of wooden formwork in the main structure construction based on BIM according to claim 2, Features: The step of performing template calculation on the main structure also includes: Perform beam formwork calculation on the beam member: In the modeling stage, the size of the surrounding plates in the template parameters is pre-set according to the height of the beam template below the size of the plate template; According to the engineering quantity calculation rules, the connection between each component and the beam component node is completed, and the cutting Boolean operation is performed at the connection between the beam template and the column template, the plate template and the wall template; The dimension data of the beam template is extracted, and the data format storage of the beam template is completed according to the data format of using reverse closed vectors for the outer contour and clockwise closed vectors for the inner contour.
4. According to claim 2, a material arrangement algorithm for wooden formwork in main structure construction based on BIM, Features: The step of performing template calculation on the main structure also includes: Calculate the wall formwork, plate formwork and other component formwork for the wall components, plate components and other concrete components: complete the connection between each component and the wall component node according to the engineering quantity calculation rules, and perform cutting Boolean operations on the connection between the wall formwork and the column formwork, the plate formwork and the beam formwork; Complete the connection between each component and the plate component node according to the engineering quantity calculation rules, and perform cutting Boolean operation on the connection between the plate template and the column template, the wall template and the beam template; Other component templates perform cutting Boolean operations on node connections according to the same calculation rules; The dimension data of the wall template, the plate template and the other component template are extracted, and the data format storage of the wall template, the plate template and the other component template is completed according to the data format of using reverse closed vectors for outer contours and clockwise closed vectors for inner contours.
Citation Information
Patent Citations
Template editing system and method based on template induction, and template arrangement system and method
CN105631071A
Construction method of construction technology model of housing construction template based on BIM
CN108252519A
Transfer station standard template drawing method and transfer station construction method based on REVIT
CN108268707A
BIM technology-based project amount calculation method
CN110046364A
Thermal power plant visual construction management system based on virtual reality
CN110689605A