Rock mass monitoring system, rock mass stability analysis method and device
By using microseismic sensors and analysis devices during tunnel excavation, micro-rupture signals can be monitored and analyzed in real time, rock mass stability is evaluated and early warning is issued, the problem of traditional methods being difficult to prevent rock collapse and ensuring safe and efficient tunnel construction.
Patent Information
- Application Number
- CN202210181104.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-25
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-02-25
AI Technical Summary
During the tunnel excavation process, traditional microseismic monitoring methods are difficult to capture the precursors of the collapse of rocks, and cannot effectively prevent the collapse of rocks, especially during the TBM excavation process, which leads to the impact of construction progress and great safety hazards.
A rock mass monitoring system was designed, including microseismic sensors, data collectors, analysis devices and display alarm devices. By receiving and analyzing the micro-rupture signals generated during tunnel excavation, the macro-rupture trend of rock mass is inverted and the stability of rock mass is evaluated. and issue a warning in real time.
Real-time prediction and early warning of the risk of rock collapse is achieved, safe and efficient construction of the tunnel, and effectively solve the problem that traditional methods are difficult to capture the precursors of disaster displacement.
Smart Images

Figure CN114518592B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of tunnel microseismic monitoring, and in particular, relates to a rock mass monitoring system, a rock mass stability analysis method and a device. Background Art
[0002] Boulder collapse is a phenomenon of local instability of rock mass caused by the disruption of the original equilibrium state during tunnel excavation. Especially when crossing active fault zones, boulder collapse disasters are very likely to occur. During the excavation process of TBM (Tunnel Boring Machine), the secondary structural surface and the original structural surface formed by the disturbance will intersect with the air-facing surface formed by excavation to form isolated or semi-isolated rock blocks, breaking the original state balance, causing boulder collapse, causing TBM jamming and damage, seriously affecting the construction progress, and even causing casualties and economic losses.
[0003] The main characteristics of rock collapse are "small size, high frequency, and strong instantaneity". In addition, due to the special environment of dark, dusty and humid underground tunnels, traditional microseismic monitoring methods are difficult to effectively capture the precursors of catastrophic displacement and cannot prevent the occurrence of rock collapse. Summary of the invention
[0004] In view of this, the present invention provides a rock mass monitoring system, a rock mass stability analysis method and a rock mass stability analysis device, aiming to solve the problem that the existing technology cannot meet the demand for high-frequency and high-power amplifiers.
[0005] A first aspect of an embodiment of the present invention provides a rock mass monitoring system, including a microseismic sensor, a data collector, an analysis device, and a display alarm device;
[0006] The microseismic sensor is used to receive elastic waves generated by micro-fractures of the rock mass during the tunneling process, convert them into electrical signals and send them to the data collector;
[0007] The data collector is used to convert the electrical signal into a digital signal to obtain a micro-fracture signal of the rock mass, and send the digital signal to the analysis device;
[0008] The analysis device is used to perform inversion analysis on each micro-fracture signal to determine the development trend of macroscopic fracture of the rock mass; wherein the development trend of macroscopic fracture of the rock mass includes basic physical parameters, position information and trend of the boulder to be formed by the fracture; the ratio of the weight of the boulder to the weight of the surrounding rock at the lower edge of the boulder from the tunnel vault is determined according to the basic physical parameters of the boulder; the stability score of the rock mass is determined according to the ratio, the position information of the boulder, and the angle between the trend of the boulder and the tunnel face, and sent to the display and early warning device;
[0009] The display alarm device is used to issue early warnings of corresponding levels according to the stability score of the rock mass.
[0010] A second aspect of an embodiment of the present invention provides a rock mass stability analysis method, the method comprising:
[0011] During tunnel excavation, multiple micro-fracture signals collected by a data collector are received; wherein each micro-fracture signal is a signal corresponding to an elastic wave formed by micro-fracture of a rock mass during tunnel excavation;
[0012] Perform inversion analysis on each micro-fracture signal to determine the development trend of macroscopic fracture of the rock mass; wherein the development trend of macroscopic fracture of the rock mass includes basic physical parameters, position information and trend direction of the boulder to be formed by the fracture;
[0013] Determine the ratio of the weight of the boulder to the weight of the surrounding rock at the distance from the lower edge of the boulder to the tunnel vault according to the basic physical parameters of the boulder;
[0014] The stability score of the rock mass is determined according to the ratio, the location information of the boulder, and the angle between the trend of the boulder and the tunnel face.
[0015] A third aspect of an embodiment of the present invention provides an analysis device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the rock stability analysis method described in the second aspect above are implemented.
[0016] A fourth aspect of an embodiment of the present invention provides a method for installing microseismic sensors during tunneling, which is applied to the rock mass monitoring system of the first aspect above, wherein at least two groups of microseismic sensors are provided in the rock mass monitoring system, each group including two unidirectional microseismic sensors and two three-directional microseismic sensors; the maximum monitoring range of the microseismic sensors in the rock mass of the monitored tunnel is L meters; the method comprises:
[0017] Step 1: Take the straight line offset 1 meter downward from the center line of the bottom plate of the current excavation layer of the tunnel as the rotation center line, face the tunnel excavation face, take the direction directly above the rotation center line as 0°, and take the clockwise direction as the angle increasing direction;
[0018] Step 2, installing the first group of microseismic sensors: installing the first unidirectional sensor at 45° direction of the tunnel section at d meters in front of the face, the first three-directional sensor at 135° direction of the tunnel section at (d-2) meters in front of the face, the second unidirectional sensor at 225° direction of the tunnel section at (d-4) meters in front of the face, and the second three-directional sensor 202 at 315° direction of the tunnel section at (d-6) meters in front of the face;
[0019] Step 3, install the second group of microseismic sensors: the third three-way sensor is installed at the 45° direction of the tunnel section at (Ld) meters behind the tunnel face, the third unidirectional sensor is installed at the 135° direction of the tunnel section at (L-d+2) meters behind the tunnel face, the fourth three-way sensor is installed at the 225° direction of the tunnel section at (L-d+4) meters behind the tunnel face, and the fourth unidirectional sensor is installed at the 315° direction of the tunnel section at (L-d+6) meters behind the tunnel face;
[0020] Step 4: When the current excavation layer face advances to the tunnel section where the second three-dimensional microseismic sensor is located, a new first group of microseismic sensors is installed d meters in front of the original first group of microseismic sensors, and the original first group of microseismic sensors is used as the new second group of microseismic sensors until the tunnel excavation is completed.
[0021] The rock mass monitoring system, rock mass stability analysis method and device provided by the embodiment of the present invention include: microseismic sensor, data acquisition device, analysis device, display alarm device; the analysis device is used to perform inversion analysis on each microfracture signal acquired by the microseismic sensor and processed by the data acquisition device to determine the development trend of macroscopic fracture of the rock mass; wherein the development trend of macroscopic fracture of the rock mass includes the basic physical parameters, position information and trend of the boulder to be formed by the fracture; the ratio of the weight of the boulder to the weight of the surrounding rock at the lower edge of the boulder to the tunnel vault is determined according to the basic physical parameters of the boulder; the stability score of the rock mass is determined according to the ratio, the position information of the boulder, the trend of the boulder and the angle between the tunnel face, and the stability score of the rock mass is sent to the display alarm device; the display alarm device is used to give a warning of the corresponding level according to the stability score of the rock mass. By monitoring the microfracture signal during the excavation process, analyzing the monitoring signal to determine the macroscopic development trend of the boulder, and then performing the stability score of the rock mass, the state of the boulder can be obtained in real time without affecting the construction, and the risk of boulder collapse during the excavation process can be predicted to ensure the safe and efficient construction of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0023] Figure 1 is a schematic structural diagram of a rock mass monitoring system provided by an embodiment of the present invention;
[0024] Figure 2 is a structural schematic diagram of a rock mass monitoring system provided by another embodiment of the present invention;
[0025] Figure 3 is a flow chart of the implementation of the rock mass stability analysis method provided by an embodiment of the present invention;
[0026] Figure 4 is a flow chart of the implementation of the method for installing microseismic sensors during excavation provided by an embodiment of the present invention;
[0027] Figure 5 It is a schematic diagram of the operation of the advance drilling machine;
[0028] Figure 6 A projection diagram of the longitudinal section for the arrangement of microseismic monitoring sensors in front of the tunnel face;
[0029] Figure 7 A projection diagram on the longitudinal section of the arrangement of microseismic monitoring sensors behind the tunnel face;
[0030] Figure 8 It is a schematic diagram of the structure of the analysis device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0031] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0032] Figure 1 FIG. 1 is a schematic diagram of the structure of the rock mass monitoring system provided by an embodiment of the present invention. Figure 1 As shown, in this embodiment, the rock mass monitoring system 1 includes a microseismic sensor 11, a data collector 12, an analysis device 13, and a display alarm device 14.
[0033] The microseismic sensor 11 is used to receive elastic waves generated by micro-fractures of the rock mass during tunneling, convert them into electrical signals and send them to the data collector 12 .
[0034] The data collector 12 is used to convert the electrical signal into a digital signal to obtain a micro-fracture signal of the rock mass, and send the digital signal to the analysis device 13 .
[0035] The analysis device 13 is used to perform inversion analysis on each micro-fracture signal to determine the development trend of macroscopic fracture of the rock mass; wherein, the development trend of macroscopic fracture of the rock mass includes the basic physical parameters, position information and trend of the boulder that will be formed by the fracture; the ratio of the weight of the boulder to the weight of the surrounding rock at the lower edge of the boulder from the tunnel arch is determined according to the basic physical parameters of the boulder; according to the ratio, the position information of the boulder, the angle between the trend of the boulder and the tunnel face, the stability score of the rock mass is determined and sent to the display warning device 14.
[0036] The display alarm device 14 is used to issue an early warning of a corresponding level according to the stability score of the rock mass.
[0037] In this embodiment, the microseismic sensor 11 can be a unidirectional microseismic sensor or a three-directional microseismic sensor, which is not limited here. The microseismic sensor 11 can be one or more. When there are multiple microseismic sensors, the multiple microseismic sensors can be of the same type or different types. Different types of microseismic sensors can work together, which is conducive to earthquake source location. During the TBM excavation process, the disturbance will cause many small cracks in the rock mass. The microcracks will generate elastic waves in the form of elastic energy release. The microseismic sensor can receive the elastic waves within the effective range and convert them into a measurable electrical signal.
[0038] Exemplarily, at least two groups of microseismic sensors are arranged in the rock mass monitoring system, each group includes two unidirectional microseismic sensors and two tridirectional microseismic sensors; the maximum monitoring range of the microseismic sensors in the rock mass of the monitored tunnel is L meters. In this example, the sensor arrangement includes:
[0039] Step 1: Take the straight line offset 1 meter downward from the center line of the bottom plate of the current excavation layer of the tunnel as the rotation center line, face the tunnel excavation face, take the direction directly above the rotation center line as 0°, and take the clockwise direction as the angle increasing direction;
[0040] Step 2, installing the first group of microseismic sensors: installing the first unidirectional sensor at 45° direction of the tunnel section at d meters in front of the face, the first three-directional sensor at 135° direction of the tunnel section at (d-2) meters in front of the face, the second unidirectional sensor at 225° direction of the tunnel section at (d-4) meters in front of the face, and the second three-directional sensor 202 at 315° direction of the tunnel section at (d-6) meters in front of the face;
[0041] Step 3, install the second group of microseismic sensors: the third three-way sensor is installed at the 45° direction of the tunnel section at (Ld) meters behind the tunnel face, the third unidirectional sensor is installed at the 135° direction of the tunnel section at (L-d+2) meters behind the tunnel face, the fourth three-way sensor is installed at the 225° direction of the tunnel section at (L-d+4) meters behind the tunnel face, and the fourth unidirectional sensor is installed at the 315° direction of the tunnel section at (L-d+6) meters behind the tunnel face;
[0042] Step 4, when the current excavation layer face advances to the tunnel section where the second three-dimensional microseismic sensor is located, a new first group of microseismic sensors is installed d meters in front of the original first group of microseismic sensors, and the original first group of microseismic sensors is used as the new second group of microseismic sensors until the tunnel excavation is completed.
[0043] In this embodiment, the analysis device 13 can obtain the time, location and nature of rock mass microfractures through the inversion method, that is, the so-called "time, space and strength" three elements in geophysics, so as to determine the rock mass fracture area. According to the size, concentration, fracture density of microfractures in the rock mass fracture area and the current state of the surrounding rock, the development trend of the rock mass macro fracture is inferred and the stability score is calculated. The display alarm device 14 adopts three-dimensional visualization technology to realize the joint display of microseismic events, engineering models and rock mass models, and issues early warnings based on the stability score.
[0044] In this embodiment, by monitoring the micro-fracture signals during the excavation process and analyzing the monitoring signals to determine the macroscopic development trend of the boulders, and then performing a stability score for the rock mass, the status of the boulders can be obtained in real time without affecting the construction, and the risk of boulder collapse during the excavation process can be predicted to ensure safe and efficient construction of the tunnel.
[0045] In some embodiments, the analysis device 13 is specifically used for:
[0046] Determine a first score of the rock mass according to the ratio and a preset first score table;
[0047] Determine a second score of the rock mass according to the location information of the boulder and a preset second scoring table;
[0048] Determine the third score of the rock mass according to the angle between the boulder trend and the tunnel face and the preset third score table;
[0049] A stability score is determined based on the first score, the second score, the third score, and the preset weight.
[0050] In this embodiment, the relative weight of the boulder and the supporting rock mass is taken into consideration, so the first score Q1 is defined as one of the scoring parameters: boulder weight / rock weight from the lower edge of the boulder to the arch (m / M). The score is calculated by linear interpolation, as shown in Table 1:
[0051] Table 1. Rating criteria for boulder weight / rock mass from the lower edge of the boulder to the arch
[0052] m / M <0.1 0.1≤m / M≤0.4 0.4≤m / M≤0.8 0.8≤m / M≤1 m / M>1 Points 100-90 90-60 60-30 30-0 0
[0053] In this embodiment, the influence of the position relationship between the boulder and the tunnel on the operation hazard is considered, so the second score Q2 is defined: the boulder position is used as one of the scoring parameters, the boulder position is the specific position corresponding to the center of gravity line of the boulder, and the scores of other positions are calculated by interpolation, as shown in Table 2:
[0054] Table 2. Boulder location scoring table
[0055] Location Arch foot Arched waist dome Points 100 60 0
[0056] In this embodiment, the influence of the movement trend of boulders on the danger of the operation is considered, so the third score Q3 is defined: the angle between the boulder trend and the tunnel face at that location is used as one of the scoring parameters, as shown in Table 3:
[0057] Table 3. Scoring table of the boulder trend and the angle between the tunnel face
[0058] Angle θ(°) <10 10≤θ≤30 30≤θ≤60 60≤θ≤90 Points 90 90-60 60-20 20-0
[0059] In some embodiments, the preset weight W0=(0.6, 0.27, 0.13);
[0060] The expression of stability score is:
[0061] Q=0.6Q1+0.27Q2+0.13Q3 (1)
[0062] Among them, Q is the stability score, Q1 is the first score, Q2 is the second score, and Q3 is the third score.
[0063] In this embodiment, the weights of the three parameters can be determined according to the hierarchical analysis method. The judgment matrix constructed based on expert experience in the hierarchical analysis method is shown in Table 4:
[0064] Table 4 Judgment Matrix
[0065]
[0066] MATLAB can be used to calculate the maximum eigenvalue λ = 3.0055 and the eigenvector W = (0.9, 0.4, 0.2), and then the parameters and the preset weights W0 = (0.6, 0.27, 0.13) can be obtained through normalization. Finally, the judgment matrix needs to be checked for consistency.
[0067] In some embodiments, the basic physical parameters of the boulder include: the volume, maximum length, maximum width, and distance of the bottom of the boulder from the tunnel face after the boulder is broken; the analysis device 13 is specifically used for:
[0068] Determine the boulder weight based on the boulder weight and the boulder volume;
[0069] Determine the weight of the surrounding rock from the lower edge of the boulder to the tunnel vault based on the weight of the rock mass and the maximum length, maximum width, and distance of the lowest part of the boulder from the tunnel face;
[0070] The ratio is determined based on the weight of the boulder and the weight of the surrounding rock.
[0071] In this embodiment, the expression of the boulder weight is:
[0072] m=γ 石 V 石 (2)
[0073] Among them, V 石 is the volume of the boulder, γ 石 is the weight of the boulder (i.e., gravitational density), which can be determined by the following formula:
[0074] γ 石 =-0.5159138*x+14.67685(KN / m 3 ) (3)
[0075] Among them, x is the preset surrounding rock grade, which is mainly affected by factors such as rock type, scale, structure, etc. The value of x can be determined by consulting a large amount of literature and monitoring data. In this embodiment, the value of x is shown in the following table:
[0076] Table 5 Surrounding rock grade table
[0077] Surrounding rock grade Ⅰ Ⅱ Ⅲ Ⅳ Ⅴ Ⅵ x -24.7 -21.0 -17.1 -13.2 -9.3 -6.0
[0078] In this embodiment, the expression of the surrounding rock weight from the lower edge of the boulder to the vault is:
[0079] M=γ 岩 abd (4)
[0080] Where M is the weight of the surrounding rock from the lower edge of the boulder to the vault; γ 岩 is the weight of the rock mass, which can be obtained through detection; a is the maximum length of the boulder, which can be obtained through monitoring information; b is the maximum width of the boulder, which can be obtained through monitoring information; d is the distance from the bottom of the boulder to the tunnel face, which can be obtained through monitoring information.
[0081] In some embodiments, the analysis device 13 is specifically used for:
[0082] Inverse analysis is performed on each micro-fracture signal to determine the size, concentration, and fracture density of the micro-fractures in the rock mass;
[0083] The development trend of macroscopic fractures in rock mass is determined according to the size, concentration and fracture density of micro-fractures.
[0084] In some embodiments, the display alarm device 14 is specifically used to perform the following steps:
[0085] Obtain and store the development trend of rock mass macroscopic fracture and stability score from the analysis device;
[0086] According to the development trend of macroscopic fracture of rock mass, the spatial and temporal positioning images of boulders are displayed dynamically in real time;
[0087] Determine and display the corresponding level of warning information based on the stability score.
[0088] In this embodiment, the display warning device 14 uses three-dimensional visualization technology to realize the joint display of microseismic events, engineering models and rock models, and is used to display the spatiotemporal positioning of boulders in real time and dynamically. It is also possible to view the information of historical events and realize the dynamic demonstration of monitoring information, and display the information on the LCD screen after image processing. According to the boulder stability score, an early warning signal is issued for boulder collapse, and the early warning signal is displayed through an early warning indicator light for easy reading. For example, the early warning indicator light shown in Table 6 can be used to realize early warning:
[0089] Table 6 Warning indicator light display
[0090] Score ≤60 60<Q≤75 75<Q≤90 Q>90 red light Yellow Light Blue Light Green Light
[0091] Figure 2 FIG. 1 is a schematic diagram of the structure of a rock mass monitoring system provided by another embodiment of the present invention. Figure 2 As shown, in some embodiments, the system further includes a mobile terminal 15;
[0092] The mobile terminal 15 is used to obtain the spatiotemporal positioning image and warning information from the display alarm device 14 .
[0093] In this embodiment, the warning signal of the display warning device 14 and the spatiotemporal positioning image of the boulder are sent to the user interface. The user interface can be implemented by a mobile terminal. The construction personnel receive the image processed by the display warning device through the mobile terminal, so that the construction personnel can accurately grasp the status of the boulder inside the tunnel in real time. For the place where the warning signal occurs, the corresponding processing and solution measures are taken in time, so that the TBM can pass through the dangerous area safely and efficiently, and ensure the safety of construction.
[0094] Figure 3 FIG. 1 is a flow chart of the implementation of the rock mass stability analysis method provided by the embodiment of the present invention. Figure 3As shown, in this embodiment, a rock mass stability analysis method comprises:
[0095] S301, during tunnel excavation, receiving a plurality of micro-fracture signals collected by the data collector 12; wherein each micro-fracture signal is a signal corresponding to an elastic wave formed by micro-fracture of a rock mass during tunnel excavation.
[0096] S302, performing inversion analysis on each micro-fracture signal to determine the development trend of macroscopic fracture of the rock mass; wherein the development trend of macroscopic fracture of the rock mass includes basic physical parameters, position information and trend direction of the boulder to be formed by the fracture;
[0097] S303, determining the ratio of the weight of the boulder to the weight of the surrounding rock at the distance from the lower edge of the boulder to the tunnel vault according to the basic physical parameters of the boulder;
[0098] S304, determining the stability score of the rock mass according to the ratio, the location information of the boulder, and the angle between the trend of the boulder and the tunnel face.
[0099] Optionally, S304 may include:
[0100] Determine a first score of the rock mass according to the ratio and a preset first score table;
[0101] Determine a second score of the rock mass according to the location information of the boulder and a preset second scoring table;
[0102] Determine the third score of the rock mass according to the angle between the boulder trend and the tunnel face and the preset third score table;
[0103] A stability score is determined based on the first score, the second score, the third score, and the preset weight.
[0104] Optionally, preset weight W0=(0.6, 0.27, 0.13);
[0105] The expression of stability score is:
[0106] Q=0.6Q1+0.27Q2+0.13Q3
[0107] Among them, Q is the stability score, Q1 is the first score, Q2 is the second score, and Q3 is the third score.
[0108] Optionally, the basic physical parameters of the boulder include: the volume, maximum length, maximum width, and the distance from the bottom of the boulder to the tunnel face; S303 may include:
[0109] Determine the boulder weight based on the boulder weight and the boulder volume;
[0110] Determine the weight of the surrounding rock from the lower edge of the boulder to the tunnel vault based on the weight of the rock mass and the maximum length, maximum width, and distance of the lowest part of the boulder from the tunnel face;
[0111] The ratio is determined based on the weight of the boulder and the weight of the surrounding rock.
[0112] Optionally, S302 may include:
[0113] Inverse analysis is performed on each micro-fracture signal to determine the size, concentration, and fracture density of the micro-fractures in the rock mass;
[0114] The development trend of macroscopic fractures in rock mass is determined according to the size, concentration and fracture density of micro-fractures.
[0115] Figure 4 It is a flow chart of the implementation of the method for installing microseismic sensors during excavation provided by an embodiment of the present invention. Figure 5 This is a schematic diagram of the operation of the advance drilling machine. Figure 6 Projection diagram of the longitudinal section for the arrangement of microseismic monitoring sensors in front of the tunnel face. Figure 7 This is a projection diagram of the longitudinal section of the arrangement of microseismic monitoring sensors behind the tunnel face. Figure 4-7 As shown, in this embodiment, the method for installing microseismic sensors during tunneling is applied to the rock mass monitoring system 1 shown in any of the above embodiments, and at least two groups of microseismic sensors 11 are provided in the rock mass monitoring system 1, each group including two unidirectional microseismic sensors and two three-directional microseismic sensors; the maximum monitoring range of the microseismic sensor 11 in the rock mass of the monitored tunnel is L meters; the method comprises:
[0116] S401, take the straight line offset 1 meter downward from the center line of the bottom plate of the current excavation layer of the tunnel as the rotation center line, face the tunnel excavation face, take the direction directly above the rotation center line as 0°, and take the clockwise direction as the angle increasing direction;
[0117] S402, install the first group of microseismic sensors: install the first unidirectional sensor at 45° on the tunnel section d meters in front of the face, the first three-directional sensor at 135° on the tunnel section (d-2) meters in front of the face, the second unidirectional sensor at 225° on the tunnel section (d-4) meters in front of the face, and the second three-directional sensor 202 at 315° on the tunnel section (d-6) meters in front of the face;
[0118] S403, install the second set of microseismic sensors: the third three-way sensor is installed at the 45° direction of the tunnel section at (Ld) meters behind the tunnel face, the third unidirectional sensor is installed at the 135° direction of the tunnel section at (L-d+2) meters behind the tunnel face, the fourth three-way sensor is installed at the 225° direction of the tunnel section at (L-d+4) meters behind the tunnel face, and the fourth unidirectional sensor is installed at the 315° direction of the tunnel section at (L-d+6) meters behind the tunnel face;
[0119] S404, when the current excavation layer face advances to the tunnel section where the second three-dimensional microseismic sensor is located, a new first group of microseismic sensors is installed d meters in front of the original first group of microseismic sensors, and the original first group of microseismic sensors is used as the new second group of microseismic sensors until the tunnel excavation is completed.
[0120] In this embodiment, d is the deepest distance that the drilling device of the TBM can drill. The hole can be drilled by the advance drilling rig of the TBM. After the hole is cleaned, the staff will install the microseismic sensor in the borehole and inject grout into the borehole to fix the microseismic sensor with the rock mass. The burial depth must exceed the relaxation depth of the surrounding rock, which is conducive to the microseismic sensor receiving the vibration signal. The burial depth is set to m meters. The drilling depth is greater than the arrangement depth of the microseismic sensor to prevent the slag in the hole from piling up at the bottom of the borehole to block the space for the microseismic sensor to be installed. The drilling depth is set to (m+0.2) meters.
[0121] In this embodiment, the same group of microseismic sensors are staggered 2m in the axial direction of the tunnel to avoid being arranged on the same plane and affecting the positioning of the microseismic source. The exposed part of the microseismic sensor connection line is protected by a protective shell to prevent damage to the connection line during excavation, and the sensor is connected to the data acquisition instrument.
[0122] In this embodiment, the installation arrangement of the microseismic sensors always follows the movement of the face and keeps a certain distance from the face to prevent damage to the microseismic sensors and lines caused by face excavation blasting, rock destruction, etc., and to ensure the safety of the personnel who install the microseismic monitoring system. The microseismic sensors arranged in front of the face make full use of the TBM advance drilling machine. With continuous excavation, the microseismic sensors in front of the face become the microseismic sensors behind the face, which always ensures the joint effect of the microseismic sensors in front of and behind the face, realizes accurate early warning of boulder collapse, and prolongs the protection time.
[0123] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0124] Figure 8 Schematic diagram of the structure of the analysis device provided by the embodiment of the present invention. Figure 8As shown, an analysis device 8 provided by one embodiment of the present invention comprises: a processor 80, a memory 81, and a computer program 82 stored in the memory 81 and executable on the processor 80. When the processor 80 executes the computer program 82, the steps in the above-mentioned rock mass stability analysis method embodiments are implemented, for example Figure 3 Steps 301 to 304 are shown.
[0125] Exemplarily, the computer program 82 may be divided into one or more modules / units, one or more modules / units are stored in the memory 81, and are executed by the processor 80 to implement the present invention. One or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, and the instruction segments are used to describe the execution process of the computer program 82 in the analysis device 8.
[0126] The analysis device 8 can be a computing device such as a single chip microcomputer, MCU, desktop computer, notebook, PDA, cloud server, etc. It can include, but is not limited to, a processor 80 and a memory 81. Those skilled in the art can understand that Figure 8 It is only an example of the analysis device 8 and does not constitute a limitation of the analysis device 8. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the terminal may also include input and output devices, network access devices, buses, etc.
[0127] The processor 80 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0128] The memory 81 may be an internal storage unit of the analysis device 8, such as a hard disk or memory of the analysis device 8. The memory 81 may also be an external storage device of the analysis device 8, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the analysis device 8. Further, the memory 81 may also include both an internal storage unit of the analysis device 8 and an external storage device. The memory 81 is used to store computer programs and other programs and data required by the terminal. The memory 81 may also be used to temporarily store data that has been output or is to be output.
[0129] An embodiment of the present invention provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps in the above-mentioned steel industry chain logistics cost analysis system embodiment based on blockchain technology are implemented.
[0130] The computer readable storage medium stores a computer program 82, which includes program instructions. When the program instructions are executed by the processor 80, all or part of the processes in the above-mentioned embodiment method are implemented. The computer program 82 can also be used to instruct the relevant hardware to complete. The computer program 82 can be stored in a computer readable storage medium. When the computer program 82 is executed by the processor 80, the steps of each of the above-mentioned method embodiments can be implemented. Among them, the computer program 82 includes computer program code, which can be in source code form, object code form, executable file or some intermediate form. The computer readable medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, the computer readable medium does not include electric carrier signal and telecommunication signal.
[0131] The computer-readable storage medium may be an internal storage unit of the terminal of any of the foregoing embodiments, such as a hard disk or memory of the terminal. The computer-readable storage medium may also be an external storage device of the terminal, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the terminal. Further, the computer-readable storage medium may also include both an internal storage unit of the terminal and an external storage device. The computer-readable storage medium is used to store computer programs and other programs and data required by the terminal. The computer-readable storage medium may also be used to temporarily store data that has been output or is to be output.
[0132] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0133] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0134] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0135] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0136] In the embodiments provided by the present invention, it should be understood that the disclosed devices / terminals and methods can be implemented in other ways. For example, the device / terminal embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0137] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0138] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0139] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, the computer-readable medium does not include electric carrier signals and telecommunication signals.
[0140] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.
Claims
1. A rock mass monitoring system, characterized in that: It includes microseismic sensors, data collectors, analysis devices, and display and alarm devices; The microseismic sensor is used to receive elastic waves generated by micro-fractures of the rock mass during tunneling, convert them into electrical signals and send them to the data collector; The data collector is used to convert the electrical signal into a digital signal to obtain a micro-fracture signal of the rock mass, and send the digital signal to the analysis device; The analysis device is used to perform inversion analysis on each micro-fracture signal to determine the development trend of macroscopic fracture of the rock mass; wherein the development trend of macroscopic fracture of the rock mass includes basic physical parameters, position information and trend of the boulder to be formed by the fracture; the ratio of the weight of the boulder to the weight of the surrounding rock at the lower edge of the boulder from the tunnel vault is determined according to the basic physical parameters of the boulder; the stability score of the rock mass is determined according to the ratio, the position information of the boulder, and the angle between the trend of the boulder and the tunnel face, and sent to the display alarm device; The display alarm device is used to issue a corresponding level of early warning according to the stability score of the rock mass; The analysis device is specifically used for: Determining a first score of the rock mass according to the ratio and a preset first scoring table; Determine a second score of the rock mass according to the location information of the boulder and a preset second scoring table; Determining a third score of the rock mass according to the angle between the trend of the boulder and the tunnel face and a preset third scoring table; Determining the stability score according to the first score, the second score, the third score and a preset weight; The basic physical parameters of the boulder include: the volume, maximum length, maximum width, and the distance between the bottom of the boulder and the tunnel face. The analysis device is specifically used for: Determine the boulder weight based on the boulder weight and the boulder volume; Determine the weight of the surrounding rock from the lower edge of the boulder to the tunnel vault based on the weight of the rock mass, the maximum length and width of the boulder, and the distance from the lowest point of the boulder to the tunnel face; Determining the ratio according to the weight of the boulder and the weight of the surrounding rock; The analysis device is specifically used for: Inverse analysis is performed on each micro-fracture signal to determine the size, concentration, and fracture density of the micro-fractures in the rock mass; The development trend of macroscopic fractures in rock mass is determined according to the size, concentration and fracture density of micro-fractures.
2. The rock mass monitoring system according to claim 1, characterized in that: The preset weight W 0=(0.6,0.27,0.13); The expression of the stability score is: Q =0.6 Q 1+0.27 Q 2+0.13 Q 3 in, Q Score the stability, Q 1 is the first score, Q 2 is the second score, Q 3 is the third score.
3. The rock mass monitoring system according to claim 1, characterized in that: The display alarm device is specifically used to perform the following steps: Acquire and store the development trend of rock mass macroscopic fracture and stability score from the analysis device; According to the development trend of the macroscopic fracture of the rock mass, the space-time positioning image of the boulder is displayed dynamically in real time; According to the stability score, a warning message of a corresponding level is determined and displayed.
4. The rock mass monitoring system according to claim 3, characterized in that: The system also includes a mobile terminal; The mobile terminal is used to obtain the spatiotemporal positioning image and the early warning information from the display alarm device.
5. A rock mass stability analysis method, characterized in that: The method comprises: During tunnel excavation, multiple micro-fracture signals collected by a data collector are received; wherein each micro-fracture signal is a signal corresponding to an elastic wave formed by micro-fracture of a rock mass during tunnel excavation; Perform inversion analysis on each micro-fracture signal to determine the development trend of macroscopic fracture of the rock mass; wherein the development trend of macroscopic fracture of the rock mass includes basic physical parameters, position information and trend direction of the boulder to be formed by the fracture; Determine the ratio of the weight of the boulder to the weight of the surrounding rock at the distance from the lower edge of the boulder to the tunnel vault according to the basic physical parameters of the boulder; Determining a first score of the rock mass according to the ratio and a preset first scoring table; Determine a second score of the rock mass according to the location information of the boulder and a preset second scoring table; Determining a third score of the rock mass according to the angle between the trend of the boulder and the tunnel face and a preset third scoring table; Determining the stability score according to the first score, the second score, the third score and a preset weight; The basic physical parameters of the boulder include: the volume, maximum length, maximum width, and the distance of the bottom of the boulder from the tunnel face; the ratio of the weight of the boulder to the weight of the surrounding rock from the bottom edge of the boulder to the tunnel vault is determined based on the basic physical parameters of the boulder, including: Determine the boulder weight based on the boulder weight and the boulder volume; Determine the weight of the surrounding rock from the lower edge of the boulder to the tunnel vault based on the weight of the rock mass, the maximum length and width of the boulder, and the distance from the lowest point of the boulder to the tunnel face; Determining the ratio according to the weight of the boulder and the weight of the surrounding rock; Inverse analysis is performed on each micro-fracture signal to determine the development trend of macroscopic fractures in the rock mass, including: Inverse analysis is performed on each micro-fracture signal to determine the size, concentration, and fracture density of the micro-fractures in the rock mass; The development trend of macroscopic fractures in rock mass is determined according to the size, concentration and fracture density of micro-fractures.
6. An analysis device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the rock mass stability analysis method as described in claim 5 are implemented.
7. A method for installing microseismic sensors during excavation, characterized in that: A rock mass monitoring system according to any one of claims 1 to 4, wherein at least two groups of microseismic sensors are provided in the rock mass monitoring system, each group including two unidirectional microseismic sensors and two three-directional microseismic sensors; the maximum monitoring range of the microseismic sensors in the rock mass of the monitored tunnel is L meters; and the method comprises: Step 1: Take the straight line offset 1 meter downward from the center line of the bottom plate of the current excavation layer of the tunnel as the rotation center line, face the tunnel excavation face, take the direction directly above the rotation center line as 0°, and take the clockwise direction as the angle increasing direction; Step 2, installing the first group of microseismic sensors: installing the first unidirectional sensor at 45° direction of the tunnel section at d meters in front of the face, the first three-directional sensor at 135° direction of the tunnel section at (d-2) meters in front of the face, the second unidirectional sensor at 225° direction of the tunnel section at (d-4) meters in front of the face, and the second three-directional sensor at 315° direction of the tunnel section at (d-6) meters in front of the face; Step 3, install the second group of microseismic sensors: the third three-way sensor is installed at the 45° direction of the tunnel section at (Ld) meters behind the tunnel face, the third unidirectional sensor is installed at the 135° direction of the tunnel section at (L-d+2) meters behind the tunnel face, the fourth three-way sensor is installed at the 225° direction of the tunnel section at (L-d+4) meters behind the tunnel face, and the fourth unidirectional sensor is installed at the 315° direction of the tunnel section at (L-d+6) meters behind the tunnel face; Step 4: When the current excavation layer face advances to the tunnel section where the second three-way sensor is located, a new first group of microseismic sensors is installed d meters in front of the original first group of microseismic sensors, and the original first group of microseismic sensors is used as the new second group of microseismic sensors until the tunnel excavation is completed.