Combined mining method of temporary top pillar induced caving and pillarless sublevel caving
Through the combination mining method of temporary top column-induced collapse and bottomless column-less section-based collapse, the ore depletion and mining accident problems caused by the increase in the mining depth of metal mines are solved, and efficient and safe ore mining and mining management are achieved, reducing the Mining costs and risks.
Patent Information
- Application Number
- CN202210201251.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-03
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-03-03
AI Technical Summary
As the depth of metal mines increases, the ground stress increases, and the degree of ore rock breakage increases, leading to the increase of ore depletion rate and mining accidents. The existing air-field method has great challenges in terms of safety and production costs.
The combination of mining methods for temporary top column-induced collapse and bottomless column-less section-level collapse is adopted. Through segmented rock drilling and blasting, the temporary top column-induced collapse is used to recover ore, reduce the exposed area of surrounding rock, reduce ore loss and depletion rate, and Optimize the mining process with backward mining and millisecond delay blasting techniques.
It effectively reduces ore loss and poverty reduction rate, improves mining safety and production efficiency, reduces mining site pressure, simplifies operation organization management, and improves the degree of mechanization and production capacity.
Smart Images

Figure CN114592867B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a mining method for underground mining in a metal mine, in particular to a mining method combining temporary top pillar induced caving and bottom pillar-free sublevel caving for medium-thick ore bodies. Background Art
[0002] Low-value steeply inclined thin to medium-thick ore bodies with moderately stable or above surrounding rocks and ores, which account for a large proportion of my country's mineral resources, are often mined using open-stop methods such as ore retention method and staged rock drilling and chamber method. This type of open-stop method is widely used in metal mines because of its simple technical form, high recovery rate and low dilution rate.
[0003] However, as the mining depth increases, the ground stress increases, the degree of ore and rock fragmentation intensifies, the ore depletion rate increases, and mining accidents occur frequently, which has now become a common problem in the industry.
[0004] The direction of the open-field method reform mainly includes improving it to a top-controlled open-field method or converting it to a filling method or a caving method. The top-controlled open-field method mainly uses anchor rods and cables to control the top. Although it has certain effects in small areas, it has high support costs, large on-site workload, and high technical risks, and it cannot fundamentally solve the applicability problem of mining methods for large-scale buried ore bodies. Although the filling method has certain technical advantages, it is limited by the filling cost and is difficult to promote in low-value ore bodies. The caving method in a general sense generally has a large depletion rate and loss rate, but it has great advantages in production costs, safety, and process continuity. Summary of the invention
[0005] Under the guidance of the concept of coordinated mining, the present invention gives full play to the respective characteristics and advantages of induced collapse technology, the chamber method in the stage of rock drilling, and the stage collapse method without bottom pillars. A combined mining method of temporary top pillar induced collapse and stage collapse without bottom pillars is proposed. It uses the advantages of low loss rate, low depletion rate and high recovery rate of ore in the open field of the chamber method in the stage of rock drilling to set up a temporary top pillar; before the temporary top pillar is recovered, each segment is in the open field for rock drilling, blasting, ore dropping and ore removal; with the advancement of the mining work of each segment, the length of the temporary top pillar and the exposed area of the upper and lower plate surrounding rock gradually increase, causing the top pillar and the upper and lower plate surrounding rock to reach a critical instability state; at this time, the temporary top pillar is induced to collapse and recovered, reducing the length of the temporary top pillar, so that the length of the temporary top pillar is always maintained within a safe range; due to the induced collapse of the temporary top pillar, the upper waste rock falls from the induced collapse part into the open field, filling part of the goaf to reduce the exposed area of the upper plate and lower plate surrounding rock. In this way, while continuously advancing mining and inducing collapse to recover the top pillar, the goaf is treated so that the upper 1-3 sections are always mined under the empty field, so as to reduce the ore loss rate and depletion rate, and solve the aforementioned technical problems caused by the increase in the buried depth of the ore body.
[0006] The technical solution adopted by the present invention is: a mining method combining temporary top pillar induced caving and bottom pillar-free sublevel caving, comprising the following steps:
[0007] (1) According to the occurrence conditions of the ore body, the mine is divided into stages, sections and temporary top pillars. For medium-thick and thicker ore bodies, the stopes are arranged along the strike direction, and the length of the mine room is the same as the spacing between the chute;
[0008] (2) The stage transportation tunnel should be arranged outside the boundary of the lower stage ore body. The stope and the stage transportation tunnel should be connected through the stope contact road and the mine exit tunnel. The ramp is connected to the stage transportation tunnel to connect the various sections. The bottom tunnel is arranged in the ore body close to the side of the lower wall surrounding rock. The pedestrian ventilation skylight, chute, ramp and equipment well are all arranged in the lower wall rock mass, not less than 10m away from the ore body;
[0009] (3) The mining route is arranged parallel to the ore body. Upward fan-shaped blastholes are drilled in the mining route. Two to five rows of blastholes are blasted each time. The mining is carried out in a backward manner. The upper segment is mined ahead of the lower segment within a stage, and the lowest segment is mined later.
[0010] (4) As the mining face advances, when the length of the top pillar and the exposed area of the upper wall surrounding rock reach the critical span-fall value, the top pillar is gradually induced to collapse from the first mining position of the stope to recover the top pillar. The collapsed top pillar ore falls into the open area and is recovered synchronously during the mining of the lowest sub-level.
[0011] (5) The ore that falls from the mining area and the top pillars that fall into the open area due to induced collapse are transported to the stage chute by a scraper, and then the ore is transported to the surface through the stage transportation tunnel.
[0012] In step (3), the mining route has one section for mining, one section for rock drilling, one section for ore dropping, and one section for ore extraction in one stage.
[0013] The stage height of the divided stages described in step (1) is 50~60m, the length of the ore block is the distance between adjacent chutes, which is 60~80m, the segment height is 10~15m, and the thickness of the temporary top pillar is 6~10m.
[0014] The stage transport tunnel specifications in step (2) are 3.5×3.5m 2 The specifications of the stope connection road are 2×2m 2 The specifications of the mine tunnel are 2.5×2.5 m 2 The pedestrian ventilation skylight has a size of 2×2 m 2 The chute size is 3×3m 2 The ramp specifications are 2.5×2 m 2 The bottom lane size is 2.5×2.5 m 2 .
[0015] The spacing between the blasthole rows in step (3) is 1.5 to 1.8 m. The distance that the upper segment leads the lower segment is 8 to 15 m, and the distance that the lowest segment lags behind the mining is ≥ 30 m.
[0016] The specific operation steps of the induced collapse recovery top column described in step (4) are as follows:
[0017] A drilling tunnel is excavated downward every 10m from the upper stage transport tunnel to induce collapse and recover temporary top pillars. The end of the drilling tunnel must not be less than 5m away from the temporary top pillar. Fan-shaped medium-deep holes are drilled in the drilling tunnel towards the top pillar to be recovered, and the explosives are loaded in sections, using millisecond delayed blasting. The fallen top pillar is recovered together with the mining tunnel of the lowest section, and the overlying waste rock falls from the position where the top pillar is recovered due to induced collapse, flows into and fills part of the goaf.
[0018] The rock drilling tunnel specifications are 2×2m 2 , the millisecond delay time is 20 to 80 ms.
[0019] The fan-shaped medium-deep hole has a length of 12 to 20 meters.
[0020] The outstanding advantages of the present invention are:
[0021] (1) Setting up temporary top pillars to create open-pit mining conditions and improve ore recovery rate;
[0022] (2) It has the advantages of the pillarless sublevel caving method. During the rock drilling, blasting, and ore extraction processes in the mining process, all personnel and equipment drill and extract ore in the tunnels, and do not enter the goaf or the mining area, thus ensuring the safety of personnel during construction;
[0023] (3) With the retreat of this mining method, the length of the top pillar and the area of the open space will continue to increase. When the length of the top pillar and the exposed area of the upper wall surrounding rock reach the critical span value, the top pillar is gradually induced to collapse and recover from the first mining position of the stope, thereby improving the ore recovery rate;
[0024] (4) The overlying waste rock falls from the top pillar of the induced collapse recovery, flows into and fills part of the goaf, thereby reducing the exposed area of the goaf and better controlling the ground pressure of the mine.
[0025] (5) Low loss rate. This mining method does not leave intermediate pillars, but only temporary top pillars. As mining progresses, the temporary top pillars are gradually recovered, and all ore is recovered as much as possible to reduce the loss rate.
[0026] (6) Low depletion rate. This mining method makes full use of the role of temporary top pillars during the mining process to ensure that as many sections as possible are mined in the open area. During the mining process, there is no contact between the ore and the waste rock, which can reduce the depletion rate when mining in the open area.
[0027] (7) The mine site layout is simple and easy to implement, which reduces the difficulty of organizing and managing the operating personnel.
[0028] (8) Make full use of construction machinery, achieve high rock drilling efficiency, high ore extraction efficiency, high production capacity and high degree of mechanization. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a cross-sectional view of the temporary top pillar induced caving and bottom pillar-free segmented caving combined mining method Ⅰ-Ⅰ described in the present invention.
[0030] Figure 2 This is a cross-sectional view II-II of the combined mining method of temporary top pillar induced caving and bottom pillar-free segmented caving described in the present invention.
[0031] Figure 3 This is a cross-sectional view III-III of the combined mining method of temporary top pillar induced caving and bottom pillar-free segmented caving described in the present invention.
[0032] Figure 4 It is a schematic diagram of top pillar recovery by inducing caving using a combined mining method of temporary top pillar induced caving and bottom pillar-free segmented caving as described in the present invention.
[0033] Marked in the figure are: mine exit tunnel 1; mining area connecting road 2; mining area drilling tunnel 3; blast hole 4; unmined ore 5; top pillar drilling tunnel 6; temporary top pillar 7; open space 8; top pillar blast hole 9; ramp 10; stage transportation tunnel 11; chute 12; pedestrian ventilation shaft 13; waste rock 14; upper stage transportation tunnel 15; top pillar induced collapse ore 16. DETAILED DESCRIPTION
[0034] The technical solution of the present invention is further described below through drawings and examples.
[0035] like Figures 1 to 4 As shown, the combined mining method of temporary top pillar induced caving and bottom pillar-free sublevel caving of the present invention comprises the following steps:
[0036] (1) The combined mining method of temporary top pillar induced caving and pillarless sublevel caving is divided into stages. The stage height is 56m, the thickness of the temporary top pillar is 8m, and it is divided into 4 sub-segments. The height of each sub-segment is 12m. The mining area is arranged along the strike of the medium-thick and above ore body. The length of the mine room is 60m and the width of the mine room is 10m.
[0037] (2) Excavation steps of 3.5×3.5m beyond the boundary of the ore body recovery in the lower stage 2 Section transport tunnel 11, the section transport tunnel is 16m away from the ore body, and 2×2 m is excavated every 60m from section transport tunnel 11 2 After reaching the ore body, the stope contact road 2 is excavated parallel to the ore body for 2.5×2.5 m.2 The rock drilling tunnel 3 runs through the entire ore vein; it is 30m away from the connecting road 2 and excavated 2.5×2.5 m 2 The distance between adjacent mine tunnels is 60m; excavation from the other side of stage transport tunnel 11 is 2.5×2m 2 Inclined road 10, which connects each section; the same works as above are carried out in each section; excavation parallel to the ore body from the contact road 2 of the mining area is 1.5×1.5m 2 Pedestrian ventilation shaft 13, pedestrian ventilation shaft 13 connects each section; 3×3 m excavation at the end of mine tunnel 1 2 The stage chute 12 is connected with each section, and the mine outlet of the stage chute 12 is connected with the stage transport tunnel 11.
[0038] (3) From the topmost drilling tunnel, 4 fan-shaped medium-depth holes are drilled upward, with a blasthole spacing of 2m, and 2 rows of blastholes are blasted at a time; after the upper section is advanced by 8m, the next section is drilled and blasted, and the process is the same. The bottom section is mined with a delay of 30m. During the mining process, one section is used for mining, one section is used for drilling, one section is used for ore dropping, and one section is used for ore extraction.
[0039] (4) A 2×2m tunnel is excavated downward from the upper stage transport tunnel 15. 2 The top pillar induces collapse in the rock drilling tunnel 6, the end of the rock drilling tunnel 6 is 5m away from the temporary top pillar 7, the top pillar induces collapse in the rock drilling tunnel 6 is 10m apart, and the top pillar is recovered every time the induced collapse is the same as 10m; a medium-depth blasthole 9 of 12~16m is drilled towards the top pillar in the rock drilling tunnel 6, and millisecond differential blasting is adopted, with a millisecond differential time of 20~80ms.
[0040] (5) The ore 5 dropped from the mining area and the top pillar 16 recovered from the induced collapse and dropped into the open area are transported out of the mine by a scraper and transported to the stage chute 12, and then the ore is transported to the surface through the stage transport tunnel 11.
Claims
1. A mining method combining temporary top pillar induced caving and bottom pillarless sublevel caving, characterized in that: The following steps are involved: (1) According to the occurrence conditions of the ore body, the mine is divided into stages, sections and temporary top pillars. For medium-thick and thicker ore bodies, the stopes are arranged along the strike direction, and the length of the mine room is the same as the spacing between the chute; (2) The stage transportation tunnel should be arranged outside the boundary of the lower stage ore body. The stope and the stage transportation tunnel should be connected through the stope contact road and the mine exit tunnel. The ramp is connected to the stage transportation tunnel to connect the various sections. The bottom tunnel is arranged in the ore body close to the lower wall surrounding rock. The pedestrian ventilation skylight, chute, ramp and equipment well are all arranged in the lower wall rock mass, and the distance from the ore body is not less than 10m; The stage transport tunnel specifications in step (2) are 3.5×3.5m 2 The specifications of the stope connection road are 2×2 m 2 The specifications of the mine tunnel are 2.5×2.5 m 2 The pedestrian ventilation skylight has a size of 2×2 m 2 The chute size is 3×3m 2 The ramp specifications are 2.5×2 m 2 The bottom lane size is 2.5×2.5 m 2 ; (3) The mining route is arranged parallel to the ore body. Upward fan-shaped blastholes are drilled in the mining route. Two to five rows of blastholes are blasted each time. The mining is carried out in a backward manner. The upper segment is mined ahead of the lower segment within a stage, and the lowest segment is mined later. (4) As the mining face advances, when the length of the top pillar and the exposed area of the upper wall surrounding rock reach the critical span-fall value, the top pillar is gradually induced to collapse from the first mining position of the stope to recover the top pillar. The collapsed top pillar ore falls into the open area and is recovered synchronously during the mining of the lowest sub-level. The specific operation steps of the induced collapse recovery top column described in step (4) are as follows: A drilling tunnel is excavated downward every 10m from the upper stage transport tunnel to induce collapse and recover the temporary top pillar. The end of the drilling tunnel shall not be less than 5m away from the temporary top pillar. A fan-shaped medium-deep hole is drilled in the drilling tunnel towards the top pillar to be recovered, and the explosives are charged in sections, using millisecond delayed blasting. The fallen top pillar is recovered together with the mining tunnel of the lowest section, and the overlying waste rock falls from the position of the top pillar recovered by induced collapse, flows into and fills part of the goaf; (5) The ore that falls from the mining area and the top pillars that fall into the open area due to induced collapse are transported to the stage chute by a scraper, and then the ore is transported to the surface through the stage transportation tunnel.
2. The combined mining method of temporary top pillar induced caving and bottom pillar-free sublevel caving according to claim 1 is characterized by: In step (3), the mining route has one section for mining, one section for rock drilling, one section for ore dropping, and one section for ore extraction in one stage.
3. The combined mining method of temporary top pillar induced caving and bottom pillar-free sublevel caving according to claim 1 is characterized by: The stage height of the divided stages described in step (1) is 50~60m, the length of the ore block is the distance between adjacent chutes, which is 60~80m, the segment height is 10~15m, and the thickness of the temporary top pillar is 6~10m.
4. The combined mining method of temporary top pillar induced caving and bottom pillar-free sublevel caving according to claim 1 is characterized by: The spacing between the blasthole rows in step (3) is 1.5 to 1.8 m, the distance between the upper segment and the lower segment is 8 to 15 m, and the lagging recovery distance of the lowest segment is ≥ 30 m.
5. The combined mining method of temporary top pillar induced caving and bottom pillar-free sublevel caving according to claim 1 is characterized by: The rock drilling tunnel specifications are 2×2m 2 The fan-shaped medium-deep hole has a length of 12 to 20 meters.
6. The combined mining method of temporary top pillar induced caving and bottom pillar-free sublevel caving according to claim 1 is characterized by: The millisecond delay time is 20 to 80 ms.