A hybrid energy power scheduling method and system based on power balance

Through the hybrid energy power scheduling method based on power balance and the synchronous rectified Buck circuit, the problems of power output mismatch and power loss of hybrid power systems are solved, and personalized power adjustment and efficient power supply are achieved.

CN115189455BActive Publication Date: 2024-12-03葛子翔 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210684993.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-15
Publication Date
2024-12-03
Estimated Expiration
2042-06-15

AI Technical Summary

Technical Problem

The existing hybrid system works in a single way in power output scheme, and cannot make personalized output power adjustments according to the specific requirements of various loads. In addition, the traditional power prediction method has a large deviation when the lighting conditions change, resulting in power mismatch problems. , the diode voltage drop in the asynchronous Buck circuit causes power loss.

Method used

Adopting a hybrid energy power scheduling method based on power balance, automatically switch the working mode by collecting load data, adjusting the weight using a linear weighted dual-objective optimization model and an adaptive particle swarm optimization algorithm, combining maximum power point tracking control and change step of segmented sampling Long disturbance observation method, a synchronous rectification Buck circuit is designed to reduce power loss.

Benefits of technology

Personalized power adjustment according to load requirements is realized, power supply efficiency is improved, mismatch problems caused by power prediction errors are reduced, power loss is reduced, and the system is environmentally friendly and economical.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115189455B_ABST
    Figure CN115189455B_ABST
Patent Text Reader

Abstract

A hybrid energy power scheduling method and system based on power balance, the method includes: collecting loads, collecting the output power of photovoltaic cells, collecting the power of storage batteries and the corresponding charging threshold; based on power balance, using the collected data to automatically switch the control working mode of the hybrid energy system; based on the linear weighted method, using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system to establish a dual-objective optimization model; using an adaptive particle swarm optimization algorithm to adjust the weight coefficient to obtain the optimal solution of the dual-objective optimization model; according to the operating conditions, using the control working mode corresponding to the optimal solution of the dual-objective optimization model to schedule the hybrid energy system, and adjusting the voltage of the hybrid energy system based on the variable step size perturbation observation method of segmented sampling. The present invention automatically switches the output power and input power matching mode of the hybrid energy system, provides stable voltage and current output in a timely manner, and achieves higher power supply efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of hybrid energy scheduling control, and in particular, relates to a hybrid energy power scheduling method and system based on power balance. Background Art

[0002] With the continuous development and improvement of hybrid power systems, their application scenarios are becoming more and more diverse. The performance of their energy management system determines the standby time and operating capacity of the application object. At present, hybrid energy is mainly provided by a hybrid power system consisting of an electric motor and a fuel generator. However, when the fuel engine is working, it will emit a large amount of toxic gas, which is not environmentally friendly. In addition, the electric motor and the fuel engine need to perform two energy conversions for hybrid power supply, resulting in large energy losses.

[0003] In order to improve the shortcomings of traditional hybrid power systems, cleaner new energy sources are used as hybrid power sources. The current hybrid energy regulation process has large energy losses and lacks the best matching solution for the diversified power requirements of the load. How to design a hybrid energy system power scheduling strategy based on power balance, realize automatic and rapid switching of working modes according to the external environment and operating conditions, provide the most optimized power supply solution for the system's diversified loads, and achieve higher power supply efficiency and good environmental protection effects has become an important research direction.

[0004] The existing hybrid power system power output scheme has a single working mode and lacks optimal control, and cannot automatically adjust the output power according to the specific power requirements of various loads. At the same time, when the traditional power prediction method is used to determine the output power of photovoltaic cells in the hybrid energy system, due to the sudden change of outdoor lighting conditions, there will be a large deviation between the power prediction curve and the actual power curve, resulting in the mismatch between the output power of the hybrid energy system and the load demand power due to power prediction errors. Finally, in the commonly used asynchronous Buck circuit, since a diode is used as a freewheeling channel, a voltage drop of 0.4 to 1.2V will be generated on the diode during freewheeling, and this voltage drop will cause power loss. Therefore, there are still many problems that need to be improved in the existing hybrid energy control system based on power balance. Summary of the invention

[0005] In order to solve the deficiencies in the prior art, the purpose of the present invention is to provide a hybrid energy power scheduling method and system based on power balance, which automatically switches the output power and input power matching mode of the hybrid energy management and control system by analyzing the load's diverse output power requirements for the energy system, and promptly provides stable voltage and current output to achieve higher power supply efficiency.

[0006] The present invention adopts the following technical solution.

[0007] On one hand, the present invention proposes a hybrid energy power scheduling method based on power balance. The hybrid energy system includes: energy provided by photovoltaic cells and energy provided by storage batteries.

[0008] The method comprises the following steps:

[0009] Step 1: Collect the load, the output power of the photovoltaic cell, the battery power and the corresponding charging threshold;

[0010] Step 2: Based on power balance, the data collected in step 1 is used to automatically switch the control working mode of the hybrid energy system;

[0011] Step 3: Based on the linear weighted method, a dual-objective optimization model is established using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system; the weight coefficient is adjusted using an adaptive particle swarm optimization algorithm to obtain the optimal solution of the dual-objective optimization model;

[0012] Step 4: According to the operating conditions, the hybrid energy system is scheduled using the control working mode corresponding to the optimal solution of the dual-objective optimization model, and the voltage of the hybrid energy system is adjusted based on the variable step size disturbance observation method with segmented sampling.

[0013] Both the photovoltaic cell and the storage battery adopt maximum power point tracking control; and the output voltage of the maximum power point tracking control is clamped at the battery voltage.

[0014] Step 2 includes:

[0015] Step 2.1: When the battery power is less than the charging threshold and the output power of the photovoltaic cell is greater than or equal to 1.2 times the load, the hybrid energy system is in the first control working mode, the battery enters the charging state, the photovoltaic cell is in the maximum power point tracking state, and the photovoltaic cell supplies energy to the load and the battery at the same time, satisfying the following power balance first relationship:

[0016] P s =P bi +P l

[0017] In the formula,

[0018] P s is the output power of the photovoltaic cell,

[0019] P bi is the charging power of the battery,

[0020] P l is the total power of each load in the system;

[0021] Step 2.2: When the battery power is greater than the charging threshold, the output power of the photovoltaic cell is greater than or equal to 0.9 times the battery capacity, and the output power of the photovoltaic cell is equal to the load, the hybrid energy system is in the second control working mode, the battery does not supply energy to the load, and the output power of the photovoltaic cell satisfies the following second power balance relationship:

[0022] P s =P l

[0023] Step 2.3, when the load is greater than or equal to 1.5 times the output power of the photovoltaic cell, the hybrid energy system is in the third control working mode, the photovoltaic cell is in the maximum power output state, and the battery and the photovoltaic cell supply energy to the load at the same time, satisfying the following power balance third relationship:

[0024] P l =P bo +P s

[0025] Where P bo is the charging and discharging power of the battery;

[0026] Step 2.4: When the output power of the photovoltaic cell is less than or equal to 0.1 times the rated output power, the hybrid energy system is in the fourth control working mode, the photovoltaic cell does not supply energy to the load, and the discharge power of the battery satisfies the following fourth power balance relationship:

[0027] P l =P bo

[0028] Where P bo is the charging and discharging power of the battery.

[0029] Step 3 includes:

[0030] Step 3.1, based on the linear weighted method, a dual-objective optimization model is established using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system to satisfy the following relationship:

[0031] minF=w1F1+(1-w1)F2

[0032] In the formula,

[0033] minF is a dual-objective optimization model,

[0034] F1 is the primary energy utilization rate of the hybrid energy system,

[0035] F2 is the total cost of a single operation of the hybrid energy system,

[0036] w1 is the weight coefficient of primary energy utilization rate of hybrid energy system;

[0037] In step 3.2, the weight coefficient w1 is adjusted using the adaptive particle swarm optimization algorithm to obtain the optimal solution of the dual-objective optimization model minF.

[0038] The primary energy utilization rate of the hybrid energy system satisfies the following relationship:

[0039]

[0040] In the formula,

[0041] P out is the total output power of the hybrid energy system in a single operation,

[0042] P in It is the total input power of the hybrid energy system in a single operation.

[0043] The total cost of a single operation of the hybrid energy system satisfies the following relationship:

[0044] F2=F b +F c

[0045] In the formula,

[0046] F b The cost of charging the battery for a single operation of the hybrid energy system,

[0047] F c Equipment operation and maintenance costs for a single operation of the hybrid energy system.

[0048] The initial value of the weight coefficient w1 of the primary energy utilization rate of the hybrid energy system is 0.5.

[0049] Step 3.2 includes:

[0050] Step 3.2.1, after setting the initial values ​​of random particle velocity and position, for particle i, the velocity vector v is calculated as follows: i and the position vector x i renew:

[0051]

[0052]

[0053] In the formula,

[0054] d is the number of iterations,

[0055] w is the inertia factor,

[0056] c1 is the individual particle learning factor,

[0057] c2 is the particle group learning factor,

[0058] r1 and r2 are both random numbers between 0 and 1.

[0059] is the velocity vector of particle i in the dth iteration,

[0060] is the velocity vector of particle i in the d-1th iteration,

[0061] is the position vector of particle i in the dth iteration,

[0062] is the position vector of particle i in the d-1th iteration,

[0063] is the historical optimal position of particle i in the d-1th iteration, that is, the optimal solution obtained by the individual search of the i-th particle after the d-1th iteration,

[0064] is the historical optimal position of the group in the d-1th iteration, that is, the optimal solution in the entire particle group after the d-1th iteration;

[0065] Step 3.2.2, for the inertia factor w, use the nonlinear decreasing adaptive inertia weight to update:

[0066]

[0067] In the formula,

[0068] w max 、w min are the maximum and minimum values ​​of the inertia weight, respectively.

[0069] t, t max are the current number of iterations and the maximum number of iterations respectively;

[0070] Step 3.2.3, during the continuous iteration process, when the particle velocity and position reach the maximum number of iterations or the minimum error, the optimal solution of the dual-objective optimization model minF is output.

[0071] Step 4 includes:

[0072] Step 4.1, perform three samplings within a sampling period T, sample the output voltage U and output current I at time 0, T / 3 and 2T / 3 respectively, and calculate the output power P at the three sampling times; perturb the system at time 2T / 3 to obtain the output power at time 0 of the next sampling period;

[0073] Step 4.2, use Newton interpolation method to establish the voltage prediction value and power prediction value model of the three sampling points t, t+T / 3 and t+2T / 3, which satisfy the following relationship:

[0074] U′(t)=U(t)-3U(t+T / 3)+3U(t+2T / 3)

[0075] P'(t)=P(t)-3P(t+T / 3)+3P(t+2T / 3)

[0076] In the formula,

[0077] U′(t) is the predicted voltage value at sampling point t,

[0078] U(t) is the voltage sampling value at sampling point t,

[0079] U(t+T / 3) is the voltage sampling value at the sampling point t+T / 3,

[0080] U(t+2T / 3) is the voltage sampling value at the sampling point t+2T / 3,

[0081] P′(t) is the power prediction value at sampling point t,

[0082] P(t) is the power sampling value at sampling point t,

[0083] P(t+T / 3) is the power sampling value at sampling point t+T / 3,

[0084] P(t+2T / 3) is the power sampling value at sampling point t+2T / 3;

[0085] Step 4.3, establish a model of the output power change dP and voltage change dU of the hybrid energy system, satisfying the following relationship:

[0086] dU=U(t+1)-U′(t)

[0087] dP=P(t+1)-P′(t)

[0088] In the formula,

[0089] U(t+1) is the voltage sampling value at sampling point t+1,

[0090] P(t+1) is the power sampling value at sampling point t+1;

[0091] The positive or negative value of the voltage change dU and the power change dP determines the direction of adding voltage disturbance in the next sampling period;

[0092] Step 4.4, using dP / dU as the variable step size of the perturbation observation method, and using the variable step size to adjust the voltage of the hybrid energy system in the next cycle according to the following relationship:

[0093]

[0094] In the formula,

[0095] U(T+1) is the voltage of the hybrid energy system in the next cycle,

[0096] U(T) is the voltage of the hybrid energy system in the current cycle,

[0097] α is the speed variable with variable step length;

[0098] Step 4.5, setting a threshold of the variable step length; when the variable step length is less than the threshold, the output power of the hybrid energy system reaches the maximum power point and the maximum power point tracking is stopped; when the variable step length is greater than or equal to the threshold, the maximum power point tracking is maintained.

[0099] Step 4.4 includes:

[0100] Step 4.4.1, respectively collecting the output power P(T) of the hybrid energy system in the current cycle and the output power P(T-1) of the hybrid energy system in the previous cycle; respectively collecting the voltage U(T) of the hybrid energy system in the current cycle and the voltage U(T-1) of the hybrid energy system in the previous cycle;

[0101] Step 4.4.2: If the output power P(T) of the hybrid energy system in the current cycle is less than or equal to the output power P(T-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is greater than the voltage U(T-1) of the hybrid energy system in the previous cycle, then adjust the voltage of the hybrid energy system in the next cycle according to the following relationship:

[0102] U(T+1)=U(T)+αdP / dU

[0103] If the output power P(T) of the hybrid energy system in the current cycle is less than or equal to the output power P(T-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is less than or equal to the voltage U(T-1) of the hybrid energy system in the previous cycle, then the voltage of the hybrid energy system in the next cycle is adjusted according to the following relationship:

[0104] U(T+1)=U(T)-αdP / dU

[0105] Step 4.4.3, if the output power P(T) of the hybrid energy system in the current cycle is greater than the output power P(T-1)P(t-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is less than the voltage U(T-1)U(t-1) of the hybrid energy system in the previous cycle, then adjust the voltage of the hybrid energy system in the next cycle according to the following relationship:

[0106] U(T+1)=U(T)-αdP / dU

[0107] If the output power P(t) of the hybrid energy system in the current cycle is greater than the output power P(t-1) of the hybrid energy system in the previous cycle, and the voltage U(t) of the hybrid energy system in the current cycle is greater than or equal to the voltage U(t-1) of the hybrid energy system in the previous cycle, then the voltage of the hybrid energy system in the next cycle is adjusted according to the following relationship:

[0108] U(T+1)=U(T)+αdP / dU

[0109] The adjusted voltage of the hybrid energy system in the next cycle is used as the voltage control instruction of the hybrid energy system.

[0110] The variable step size threshold is set to 0.1.

[0111] On the other hand, the present invention proposes a hybrid energy power dispatching system based on power balance, which is used to implement a hybrid energy power dispatching method based on power balance. The system includes: a control module, a hybrid energy power dispatching module, and a DC / DC module.

[0112] The control module is used to send the energy management and control working mode to the hybrid energy power scheduling module; the hybrid energy power scheduling module is used to schedule the hybrid energy system according to the energy management and control working mode; and the hybrid energy power scheduling module also controls the output voltage of the DC / DC module based on the variable step size disturbance observation method of segmented sampling.

[0113] The control module includes: an information acquisition unit and a working mode switching unit; wherein the information acquisition unit is used to use sensors to collect the input voltage and input current of each load, the output voltage and output current of the photovoltaic cell, the input voltage and input current when the battery is charged, and the output voltage and output current when the battery is discharged; the working mode switching unit is used to establish a dual-objective optimization model based on the voltage and current information obtained by the information acquisition unit, based on a linear weighted method, using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system; an adaptive particle swarm optimization algorithm is used to adjust the weight coefficient to obtain the optimal solution of the dual-objective optimization model; and the energy management and control working mode signal corresponding to the optimal solution of the dual-objective optimization model is sent to the hybrid energy power scheduling module.

[0114] The DC / DC module includes a synchronous rectification Buck circuit; wherein the synchronous rectification Buck circuit includes a first MOS transistor, a second MOS transistor, a rectification inductor, and a rectification capacitor; the input voltage is connected to the drain of the first MOS transistor, the source of the first MOS transistor is connected to the drain of the second MOS transistor and one end of the rectification inductor, and the other end of the rectification inductor is connected to the rectification capacitor and the output voltage.

[0115] The input of the hybrid energy power dispatching module includes: load, output power of the volt battery, power of the collected battery and the corresponding charging threshold; the output end of the hybrid energy power dispatching module is respectively connected to the relay module at the battery output port and the relay module at the photovoltaic cell output port;

[0116] The relay module at the output port of the battery is used to control the working state of the battery according to the relay action signal output by the hybrid energy power scheduling module; the working state of the battery includes: charging state, discharging state and no energy supply to the load;

[0117] The relay module at the output port of the photovoltaic cell is used to control the working state of the photovoltaic cell according to the relay action signal output by the hybrid energy power scheduling module; the working state of the photovoltaic cell includes: supplying energy to the load and not supplying energy to the load.

[0118] The beneficial effect of the present invention is that, compared with the prior art, the hybrid energy power dispatching method and system designed by the present invention can make personalized output power automatic adjustment according to the specific requirements of various loads for power. Under the premise of comprehensively considering the two indicators of economy and primary energy utilization rate, a linear weighted dual-objective optimization model is established, and an inertia weight adjustment algorithm based on a particle swarm algorithm is designed to obtain the most reasonable weight coefficient, thereby determining the current optimal working mode. At the same time, in order to reduce the problem of mismatch between the output power of the hybrid energy system and the load demand power caused by the sudden change of outdoor lighting conditions and the power prediction error, the present invention designs a variable step-length perturbation observation method based on segmented sampling to adjust the output of the hybrid energy system, proposes to establish a multi-point sampling model based on the Newton interpolation method, performs three samplings within a sampling period T, and adds perturbations at the intermediate time, which makes up for the shortcomings of the existing variable step-length perturbation observation method. Finally, in order to avoid the power loss in the commonly used asynchronous Buck circuit, the present invention designs a synchronous rectification Buck circuit, uses MOS transistors instead of diodes, and improves the circuit structure to reduce the output power loss. BRIEF DESCRIPTION OF THE DRAWINGS

[0119] Figure 1 This is a structural block diagram of the hybrid energy power dispatching system based on power balance proposed by the present invention;

[0120] Figure 2 is a flow chart of automatic switching of the control working mode of the hybrid energy system in an embodiment of the present invention;

[0121] Figure 3 It is a flow chart of adjusting the voltage of a hybrid energy system based on a variable step size in an embodiment of the present invention;

[0122] Figure 4 is a synchronous rectification Buck circuit diagram in an embodiment of the present invention. DETAILED DESCRIPTION

[0123] The present application is further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present application.

[0124] On the one hand, the present invention proposes a hybrid energy power scheduling method based on power balance. Figure 1 Shown include: energy provided by photovoltaic cells and energy provided by batteries.

[0125] Methods include:

[0126] Step 1: collect the load, collect the output power of the photovoltaic cell, collect the battery power and the corresponding charging threshold.

[0127] Both photovoltaic cells and batteries use maximum power point tracking control; and the output voltage of the maximum power point tracking control is clamped at the battery voltage. In this embodiment, photovoltaic cells are used as one energy source of the hybrid energy system, and the photovoltaic cells are connected to the input end of the MPPT (Maximum Power Point Tracking) module. The battery is used as another energy source of the hybrid energy system, and the output port of the MPPT module is connected to the battery and the DC / DC module. The battery clamps the output voltage of the MPPT module at the battery voltage to achieve energy storage and conversion.

[0128] Step 2: Based on power balance, the data collected in step 1 is used to automatically switch the control working mode of the hybrid energy system.

[0129] Step 2 includes:

[0130] Step 2.1: When the battery power is less than the charging threshold and the output power of the photovoltaic cell is greater than or equal to 1.2 times the load, the hybrid energy system is in the first control working mode, the battery enters the charging state, the photovoltaic cell is in the maximum power point tracking state, and the photovoltaic cell supplies energy to the load and the battery at the same time, satisfying the following power balance first relationship:

[0131] P s =P bi +P l

[0132] In the formula,

[0133] P s is the output power of the photovoltaic cell,

[0134] P bi is the charging power of the battery,

[0135] P lis the total power of each load in the system;

[0136] In this embodiment, the charging threshold adopts the factory parameters of the battery, and those skilled in the art can also set the charging threshold according to operation requirements.

[0137] Step 2.2: When the battery power is greater than the charging threshold, the output power of the photovoltaic cell is greater than or equal to 0.9 times the battery capacity, and the output power of the photovoltaic cell is equal to the load, the hybrid energy system is in the second control working mode, the battery does not supply energy to the load, and the output power of the photovoltaic cell satisfies the following second power balance relationship:

[0138] P s =P l

[0139] Step 2.3, when the load is greater than or equal to 1.5 times the output power of the photovoltaic cell, the hybrid energy system is in the third control working mode, the photovoltaic cell is in the maximum power output state, and the battery and the photovoltaic cell supply energy to the load at the same time, satisfying the following power balance third relationship:

[0140] P l =P bo +P s

[0141] Where P bo is the charging and discharging power of the battery;

[0142] Step 2.4: When the output power of the photovoltaic cell is less than or equal to 0.1 times the rated output power, the hybrid energy system is in the fourth control working mode, the photovoltaic cell does not supply energy to the load, and the discharge power of the battery satisfies the following fourth power balance relationship:

[0143] P l =P bo

[0144] Where P bo is the charging and discharging power of the battery.

[0145] Figure 2 The process of automatically switching the control working mode of the hybrid energy system in the embodiment of the present invention includes:

[0146] Step A1, collect P bo , P s and P l ;

[0147] Step A2, set P s The threshold of the battery SOC is set to 80%;

[0148] Step A3, when P sLess than or equal to P s When the threshold is reached, the fourth control working mode M4 is entered, otherwise, step A4 is entered;

[0149] Step A4, when P s Less than or equal to P l When , enter the third control working mode M3, otherwise enter step A5;

[0150] Step A5: when the battery SOC is less than the SOC threshold, enter the first control working mode M1, otherwise enter the second control working mode M2.

[0151] Step 3: Based on the linear weighted method, a dual-objective optimization model is established using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system; the weight coefficient is adjusted using the adaptive particle swarm optimization algorithm to obtain the optimal solution of the dual-objective optimization model.

[0152] Step 3 includes:

[0153] Step 3.1, based on the linear weighted method, a dual-objective optimization model is established using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system to satisfy the following relationship:

[0154] minF=w1F1+(1-w1)F2

[0155] In the formula,

[0156] minF is a dual-objective optimization model,

[0157] F1 is the primary energy utilization rate of the hybrid energy system,

[0158] F2 is the total cost of a single operation of the hybrid energy system,

[0159] w1 is the weight coefficient of primary energy utilization rate of hybrid energy system;

[0160] The primary energy utilization rate of the hybrid energy system satisfies the following relationship:

[0161]

[0162] In the formula,

[0163] P out is the total output power of the hybrid energy system in a single operation,

[0164] P in It is the total input power of the hybrid energy system in a single operation.

[0165] The total cost of a single operation of the hybrid energy system satisfies the following relationship:

[0166] F2=Fb +F c

[0167] In the formula,

[0168] F b The cost of charging the battery for a single operation of the hybrid energy system,

[0169] F c Equipment operation and maintenance costs for a single operation of the hybrid energy system.

[0170] In step 3.2, the adaptive particle swarm optimization algorithm is used to adjust the weight coefficient w1 to obtain the optimal solution of the dual-objective optimization model minF.

[0171] In this embodiment, the initial value of the weight coefficient w1 of the primary energy utilization rate of the hybrid energy system is 0.5.

[0172] Step 3.2 includes:

[0173] Step 3.2.1, after setting the initial values ​​of random particle velocity and position, for particle i, the velocity vector v is calculated as follows: i and the position vector x i renew:

[0174]

[0175]

[0176] In the formula,

[0177] d is the number of iterations,

[0178] w is the inertia factor,

[0179] c1 is the individual particle learning factor,

[0180] c2 is the particle group learning factor,

[0181] r1 and r2 are both random numbers between 0 and 1.

[0182] is the velocity vector of particle i in the dth iteration,

[0183] is the velocity vector of particle i in the d-1th iteration,

[0184] is the position vector of particle i in the dth iteration,

[0185] is the position vector of particle i in the d-1th iteration,

[0186] is the historical optimal position of particle i in the d-1th iteration, that is, the optimal solution obtained by the individual search of the i-th particle after the d-1th iteration,

[0187] is the historical optimal position of the group in the d-1th iteration, that is, the optimal solution in the entire particle group after the d-1th iteration;

[0188] Step 3.2.2, for the inertia factor w, use the nonlinear decreasing adaptive inertia weight to update:

[0189]

[0190] In the formula,

[0191] w max 、w min are the maximum and minimum values ​​of the inertia weight, respectively.

[0192] t, t max are the current number of iterations and the maximum number of iterations respectively;

[0193] Step 3.2.3, during the continuous iteration process, when the particle velocity and position reach the maximum number of iterations or the minimum error, the optimal solution of the dual-objective optimization model minF is output.

[0194] Step 4: According to the operating conditions, the hybrid energy system is scheduled using the control working mode corresponding to the optimal solution of the dual-objective optimization model, and the voltage of the hybrid energy system is adjusted based on the variable step size disturbance observation method with segmented sampling.

[0195] like Figure 3 , step 4 includes:

[0196] Step 4.1, perform three samplings within a sampling period T, sample the output voltage U and output current I at time 0, T / 3 and 2T / 3 respectively, and calculate the output power P at the three sampling times; perturb the system at time 2T / 3 to obtain the output power at time 0 of the next sampling period;

[0197] Step 4.2, use Newton interpolation method to establish the voltage prediction value and power prediction value model of the three sampling points t, t+T / 3 and t+2T / 3, which satisfy the following relationship:

[0198] U′(t)=U(t)-3U(t+T / 3)+3U(t+2T / 3)

[0199] P'(t)=P(t)-3P(t+T / 3)+3P(t+2T / 3)

[0200] In the formula,

[0201] U′(t) is the predicted voltage value at sampling point t,

[0202] U(t) is the voltage sampling value at sampling point t,

[0203] U(t+T / 3) is the voltage sampling value at the sampling point t+T / 3,

[0204] U(t+2T / 3) is the voltage sampling value at the sampling point t+2T / 3,

[0205] P′(t) is the power prediction value at sampling point t,

[0206] P(t) is the power sampling value at sampling point t,

[0207] P(t+T / 3) is the power sampling value at sampling point t+T / 3,

[0208] P(t+2T / 3) is the power sampling value at sampling point t+2T / 3;

[0209] Step 4.3, establish a model of the output power change dP and voltage change dU of the hybrid energy system, satisfying the following relationship:

[0210] dU=U(t+1)-U′(t)

[0211] dP=P(t+1)-P′(t)

[0212] In the formula,

[0213] U(t+1) is the voltage sampling value at sampling point t+1,

[0214] P(t+1) is the power sampling value at sampling point t+1;

[0215] The positive or negative value of the voltage change dU and the power change dP determines the direction of adding voltage disturbance in the next sampling period;

[0216] Step 4.4, using dP / dU as the variable step size of the perturbation observation method, and using the variable step size to adjust the voltage of the hybrid energy system in the next cycle according to the following relationship:

[0217]

[0218] In the formula,

[0219] U(T+1) is the voltage of the hybrid energy system in the next cycle,

[0220] U(T) is the voltage of the hybrid energy system in the current cycle,

[0221] α is the speed variable with variable step length;

[0222] Step 4.5, setting a threshold of the variable step length; when the variable step length is less than the threshold, the output power of the hybrid energy system reaches the maximum power point and the maximum power point tracking is stopped; when the variable step length is greater than or equal to the threshold, the maximum power point tracking is maintained.

[0223] In this embodiment, the threshold value of the variable step size is 0.1.

[0224] When the distance from the maximum power point is far, the value of dp / du is large. As the step size is also large, the value can be adjusted quickly near the maximum power point; when it reaches the maximum power point, the dp / du value is close to 0, and the step size is close to 0, which can stabilize the output power at the maximum power point. This method solves the shortcomings of the traditional fixed step size method that cannot consider speed and accuracy.

[0225] When working near the maximum power point, due to the inevitable data fluctuation problem of current sampling and voltage sampling, it cannot always maintain the maximum power state even when dp / du is 0. Therefore, a dp / du threshold is set, and the threshold is set to 0.01. When dp / du is less than the threshold, it is considered that the maximum power point has been reached and tracking is stopped until the external environment changes; when dp / du is greater than the threshold, the normal tracking state is maintained.

[0226] like Figure 3 , step 4.4 includes:

[0227] Step 4.4.1, respectively collecting the output power P(T) of the hybrid energy system in the current cycle and the output power P(T-1) of the hybrid energy system in the previous cycle; respectively collecting the voltage U(T) of the hybrid energy system in the current cycle and the voltage U(T-1) of the hybrid energy system in the previous cycle;

[0228] Step 4.4.2: If the output power P(T) of the hybrid energy system in the current cycle is less than or equal to the output power P(T-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is greater than the voltage U(T-1) of the hybrid energy system in the previous cycle, then adjust the voltage of the hybrid energy system in the next cycle according to the following relationship:

[0229] U(T+1)=U(T)+αdP / dU

[0230] If the output power P(T) of the hybrid energy system in the current cycle is less than or equal to the output power P(T-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is less than or equal to the voltage U(T-1) of the hybrid energy system in the previous cycle, then the voltage of the hybrid energy system in the next cycle is adjusted according to the following relationship:

[0231] U(T+1)=U(T)-αdP / dU

[0232] Step 4.4.3, if the output power P(T) of the hybrid energy system in the current cycle is greater than the output power P(T-1)P(t-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is less than the voltage U(T-1)U(t-1) of the hybrid energy system in the previous cycle, then adjust the voltage of the hybrid energy system in the next cycle according to the following relationship:

[0233] U(T+1)=U(T)-αdP / dU

[0234] If the output power P(t) of the hybrid energy system in the current cycle is greater than the output power P(t-1) of the hybrid energy system in the previous cycle, and the voltage U(t) of the hybrid energy system in the current cycle is greater than or equal to the voltage U(t-1) of the hybrid energy system in the previous cycle, then the voltage of the hybrid energy system in the next cycle is adjusted according to the following relationship:

[0235] U(T+1)=U(T)+αdP / dU

[0236] The adjusted voltage of the hybrid energy system in the next cycle is used as the voltage control instruction of the hybrid energy system.

[0237] In order to reduce the large error between the power prediction algorithm and the output power of photovoltaic cells caused by sudden changes in ambient light, a variable-step perturbation observation method based on segmented sampling is designed to adjust the voltage of the hybrid energy system. An optimized perturbation observation method with a variable step size is proposed to stabilize the output power of the hybrid power supply, thereby solving the problem of oscillation of the fixed-step perturbation observation method near the maximum power point.

[0238] The present invention also proposes a hybrid energy power dispatching system based on power balance, which is used to implement a hybrid energy power dispatching method based on power balance. The system includes: a control module, a hybrid energy power dispatching module, and a DC / DC module.

[0239] The control module is used to send the energy management and control working mode to the hybrid energy power scheduling module; the hybrid energy power scheduling module is used to schedule the hybrid energy system according to the energy management and control working mode; and the hybrid energy power scheduling module also controls the output voltage of the DC / DC module based on the variable step size disturbance observation method of segmented sampling.

[0240] The control module includes: an information acquisition unit and a working mode switching unit; wherein the information acquisition unit is used to use sensors to collect the input voltage and input current of each load, the output voltage and output current of the photovoltaic cell, the input voltage and input current when the battery is charged, and the output voltage and output current when the battery is discharged; the working mode switching unit is used to establish a dual-objective optimization model based on the voltage and current information obtained by the information acquisition unit, based on a linear weighted method, using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system; an adaptive particle swarm optimization algorithm is used to adjust the weight coefficient w1 to obtain the optimal solution of the dual-objective optimization model minF; and the energy management and control working mode signal corresponding to the optimal solution of the dual-objective optimization model minF is sent to the hybrid energy power scheduling module.

[0241] The control module is the core part of the energy management system. The information acquisition unit uses sensors to collect the output of each part and the output voltage and current information; the working mode switching unit analyzes the information obtained, switches the working mode based on the analysis results, and then sends the signal. The working mode switching unit turns the switching of the hybrid energy system working mode into an automated process, providing power balance output and sufficient energy guarantee for the load system.

[0242] The DC / DC module includes a synchronous rectification Buck circuit; wherein the synchronous rectification Buck circuit includes a first MOS transistor, a second MOS transistor, a rectification inductor, and a rectification capacitor; the input voltage is connected to the drain of the first MOS transistor, the source of the first MOS transistor is connected to the drain of the second MOS transistor and one end of the rectification inductor, and the other end of the rectification inductor is connected to the rectification capacitor and the output voltage.

[0243] In this embodiment, a synchronous rectifier Buck circuit is used to improve the energy conversion efficiency of the voltage converter. The use of MOS transistors to replace the diodes in the traditional asynchronous Buck circuit can reduce the voltage required when the MOS transistor is turned on. Figure 4 In the embodiment, when the MOS transistor Q1 is turned off, the MOS transistor Q2 is turned on as a freewheeling channel, and such a Buck circuit becomes a synchronous rectification Buck circuit. Compared with the traditional asynchronous Buck circuit, the use of MOS transistors significantly reduces the power loss caused by the diode voltage drop.

[0244] Figure 4 The parameters of each component in the circuit are calculated as follows:

[0245] First calculate the equivalent load resistance R of all loads L :

[0246]

[0247] In the formula,

[0248] U o is the output voltage of the synchronous rectification Buck circuit,

[0249] I o1 ,I o2 ,……I on They are the output current of the synchronous rectification Buck circuit to each load,

[0250] I o It is the total current output by the synchronous rectification Buck circuit.

[0251] Then calculate the critical inductance L c :

[0252]

[0253] In the formula,

[0254] U i is the input voltage of the synchronous rectification Buck circuit,

[0255] U o is the output voltage of the synchronous rectification Buck circuit,

[0256] f is the operating frequency of the synchronous rectification Buck circuit.

[0257] Then calculate the duty cycle d based on the output voltage and input voltage of the synchronous rectification Buck circuit:

[0258]

[0259] Calculate the output inductance L:

[0260]

[0261] In the formula,

[0262] T is the duty cycle, T = 1 / f,

[0263] I rms is the ripple current of the DC / DC converter.

[0264] When the output inductance L is greater than the inductance critical value Lc, the Buck circuit can operate in CCM mode (Continuous Conduction Mode), which meets the requirements of the energy management system.

[0265] The output capacitor C is

[0266]

[0267] In the formula,

[0268] Urms is the ripple voltage of the DC / DC converter.

[0269] The input of the hybrid energy power dispatching module includes: load, output power of the volt battery, power of the collected battery and the corresponding charging threshold; the output end of the hybrid energy power dispatching module is respectively connected to the relay module at the battery output port and the relay module at the photovoltaic cell output port;

[0270] The relay module at the battery output port is used to control the working state of the battery according to the relay action signal output by the hybrid energy power dispatching module; the working state of the battery includes: charging state, discharging state and no energy supply to the load;

[0271] The relay module at the output port of the photovoltaic cell is used to control the working state of the photovoltaic cell according to the relay action signal output by the hybrid energy power scheduling module; the working state of the photovoltaic cell includes: supplying energy to the load and not supplying energy to the load.

[0272] The input parameters of the hybrid energy power dispatch module are battery power, solar cell output power, and load power. The output signal is the relay module at the output port of the battery and photovoltaic cell. The module can automatically switch the working mode according to the input parameters. During the implementation, the battery charging threshold is set to 80% and the photovoltaic disconnection threshold is set to 5W.

[0273] The beneficial effect of the present invention is that, compared with the prior art, the hybrid energy power dispatching method and system designed by the present invention can make personalized output power automatic adjustment according to the specific requirements of various loads for power. Under the premise of comprehensively considering the two indicators of economy and primary energy utilization rate, a linear weighted dual-objective optimization model is established, and an inertia weight adjustment algorithm based on a particle swarm algorithm is designed to obtain the most reasonable weight coefficient, thereby determining the current optimal working mode. At the same time, in order to reduce the problem of mismatch between the output power of the hybrid energy system and the load demand power caused by the sudden change of outdoor lighting conditions and the power prediction error, the present invention designs a variable step-length perturbation observation method based on segmented sampling to adjust the output of the hybrid energy system, proposes to establish a multi-point sampling model based on the Newton interpolation method, performs three samplings within a sampling period T, and adds perturbations at the intermediate time, which makes up for the shortcomings of the existing variable step-length perturbation observation method. Finally, in order to avoid the power loss in the commonly used asynchronous Buck circuit, the present invention designs a synchronous rectification Buck circuit, uses MOS transistors instead of diodes, and improves the circuit structure to reduce the output power loss.

[0274] The applicant of the present invention has made a detailed explanation and description of the implementation examples of the present invention in conjunction with the drawings in the specification. However, those skilled in the art should understand that the above implementation examples are only preferred implementation schemes of the present invention, and the detailed description is only to help readers better understand the spirit of the present invention, but not to limit the scope of protection of the present invention. On the contrary, any improvements or modifications based on the inventive spirit of the present invention should fall within the scope of protection of the present invention.

Claims

1. A hybrid energy power scheduling method based on power balance, the hybrid energy system comprising: Energy provided by photovoltaic cells and energy provided by batteries; characterized in that, The method comprises the following steps: Step 1: Collect the load, the output power of the photovoltaic cell, the battery power and the corresponding charging threshold; Step 2: Based on power balance, the data collected in step 1 is used to automatically switch the control working mode of the hybrid energy system; Step 2 includes: Step 2.1: When the battery power is less than the charging threshold and the output power of the photovoltaic cell is greater than or equal to 1.2 times the load, the hybrid energy system is in the first control working mode, the battery enters the charging state, the photovoltaic cell is in the maximum power point tracking state, and the photovoltaic cell supplies energy to the load and the battery at the same time, satisfying the following power balance first relationship: P s =P bi +P l Where P s is the output power of the photovoltaic cell, P bi is the charging power of the battery, P l is the total power of each load in the system; Step 2.2: When the battery power is greater than the charging threshold, the output power of the photovoltaic cell is greater than or equal to 0.9 times the battery capacity, and the output power of the photovoltaic cell is equal to the load, the hybrid energy system is in the second control working mode, the battery does not supply energy to the load, and the output power of the photovoltaic cell satisfies the following second power balance relationship: P s =P l Step 2.3, when the load is greater than or equal to 1.5 times the output power of the photovoltaic cell, the hybrid energy system is in the third control working mode, the photovoltaic cell is in the maximum power output state, and the battery and the photovoltaic cell supply energy to the load at the same time, satisfying the following power balance third relationship: P l =P bo +P s Where P bo is the charging and discharging power of the battery; Step 2.4: When the output power of the photovoltaic cell is less than or equal to 0.1 times the rated output power, the hybrid energy system is in the fourth control working mode, the photovoltaic cell does not supply energy to the load, and the discharge power of the battery satisfies the following fourth power balance relationship: P l =P bo Where P bo is the charging and discharging power of the battery; Step 3: Based on the linear weighted method, a dual-objective optimization model is established using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system; the weight coefficient is adjusted using an adaptive particle swarm optimization algorithm to obtain the optimal solution of the dual-objective optimization model; Step 3 includes: Step 3.1, based on the linear weighted method, a dual-objective optimization model is established using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system to satisfy the following relationship: minF=w1F1+(1-w1)F2 In the formula, minF is a dual-objective optimization model, F1 is the primary energy utilization rate of the hybrid energy system, F2 is the total cost of a single operation of the hybrid energy system, and w1 is the weight coefficient of the primary energy utilization rate of the hybrid energy system; Step 3.2, the weight coefficient w1 is adjusted using the adaptive particle swarm optimization algorithm to obtain the optimal solution of the dual-objective optimization model minF; Step 3.2 includes: Step 3.2.1, after setting the initial values ​​of random particle velocity and position, for particle i, the velocity vector v is calculated as follows: i and the position vector x i renew: In the formula, d is the number of iterations, w is the inertia factor, c1 is the individual particle learning factor, c2 is the particle group learning factor, r1 and r2 are both random numbers between 0 and 1. is the velocity vector of particle i in the dth iteration, is the velocity vector of particle i in the d-1th iteration, is the position vector of particle i in the dth iteration, is the position vector of particle i in the d-1th iteration, is the historical optimal position of particle i in the d-1th iteration, that is, the optimal solution obtained by the individual search of the i-th particle after the d-1th iteration, is the historical optimal position of the group in the d-1th iteration, that is, the optimal solution in the entire particle group after the d-1th iteration; Step 3.2.2, for the inertia factor w, use the nonlinear decreasing adaptive inertia weight to update: In the formula, w max 、w min are the maximum and minimum values ​​of the inertia weight, t and t max are the current number of iterations and the maximum number of iterations respectively; Step 3.2.3, during the continuous iteration process, when the particle velocity and position reach the maximum number of iterations or the minimum error, the optimal solution of the dual-objective optimization model minF is output; Among them, the primary energy utilization rate of the hybrid energy system satisfies the following relationship: Where P out is the total output power of the hybrid energy system in a single operation, P in The total input power of the hybrid energy system in a single operation; The total cost of a single operation of the hybrid energy system satisfies the following relationship: F2=F b +F c In the formula, F b The battery charging cost for a single operation of the hybrid energy system, F c Equipment operation and maintenance costs for a single operation of the hybrid energy system; The initial value of the weight coefficient w1 of the primary energy utilization rate of the hybrid energy system is 0.5; Step 4: According to the operating conditions, the hybrid energy system is scheduled using the control working mode corresponding to the optimal solution of the dual-objective optimization model, and the voltage of the hybrid energy system is adjusted based on the variable step size disturbance observation method of segmented sampling; Step 4 includes: Step 4.1, perform three samplings within a sampling period T, sample the output voltage U and output current I at time 0, T / 3 and 2T / 3 respectively, and calculate the output power P at the three sampling times; perturb the system at time 2T / 3 to obtain the output power at time 0 of the next sampling period; Step 4.2, use Newton interpolation method to establish the voltage prediction value and power prediction value model of the three sampling points t, t+T / 3 and t+2T / 3, which satisfy the following relationship: U(t)=U(t)-3U(t+T / 3)+3U(t+2T / 3) P(t)=P(t)-3P(t+T / 3)+3P(t+2T / 3) Wherein, U′(t) is the voltage prediction value at sampling point t, U(t) is the voltage sampling value at sampling point t, U(t+T / 3) is the voltage sampling value at sampling point t+T / 3, U(t+2T / 3) is the voltage sampling value at sampling point t+2T / 3, P′(t) is the power prediction value at sampling point t, P(t) is the power sampling value at sampling point t, P(t+T / 3) is the power sampling value at sampling point t+T / 3, and P(t+2T / 3) is the power sampling value at sampling point t+2T / 3; Step 4.3, establish a model of the output power change dP and voltage change dU of the hybrid energy system, satisfying the following relationship: dU=U(t+1)-U'(t) dP=P(t+1)-P'(t) Wherein, U(t+1) is the voltage sampling value at sampling point t+1, and P(t+1) is the power sampling value at sampling point t+1; The positive or negative value of the voltage change dU and the power change dP determines the direction of adding voltage disturbance in the next sampling period; Step 4.4, using dP / dU as the variable step size of the perturbation observation method, and using the variable step size to adjust the voltage of the hybrid energy system in the next cycle according to the following relationship: In the formula, U(T+1) is the voltage of the hybrid energy system in the next cycle, U(T) is the voltage of the hybrid energy system in the current cycle, and α is the speed variable with variable step size; Step 4.4 includes: Step 4.4.1, respectively collecting the output power P(T) of the hybrid energy system in the current cycle and the output power P(T-1) of the hybrid energy system in the previous cycle; respectively collecting the voltage U(T) of the hybrid energy system in the current cycle and the voltage U(T-1) of the hybrid energy system in the previous cycle; Step 4.4.2: If the output power P(T) of the hybrid energy system in the current cycle is less than or equal to the output power P(T-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is greater than the voltage U(T-1) of the hybrid energy system in the previous cycle, then adjust the voltage of the hybrid energy system in the next cycle according to the following relationship: U(T+1)=U(T)+αdP / dU If the output power P(T) of the hybrid energy system in the current cycle is less than or equal to the output power P(T-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is less than or equal to the voltage U(T-1) of the hybrid energy system in the previous cycle, then the voltage of the hybrid energy system in the next cycle is adjusted according to the following relationship: U(T+1)=U(T)-αdP / dU Step 4.4.3, if the output power P(T) of the hybrid energy system in the current cycle is greater than the output power P(T-1)P(t-1) of the hybrid energy system in the previous cycle, and the voltage U(T) of the hybrid energy system in the current cycle is less than the voltage U(T-1)U(t-1) of the hybrid energy system in the previous cycle, then adjust the voltage of the hybrid energy system in the next cycle according to the following relationship: U(T+1)=U(T)-αdP / dU If the output power P(t) of the hybrid energy system in the current cycle is greater than the output power P(t-1) of the hybrid energy system in the previous cycle, and the voltage U(t) of the hybrid energy system in the current cycle is greater than or equal to the voltage U(t-1) of the hybrid energy system in the previous cycle, then the voltage of the hybrid energy system in the next cycle is adjusted according to the following relationship: U(T+1)=U(T)+αdP / dU The adjusted voltage of the hybrid energy system in the next cycle is used as a voltage control instruction of the hybrid energy system; Step 4.5, set the threshold of the variable step length; when the variable step length is less than the threshold, the output power of the hybrid energy system reaches the maximum power point and the maximum power point tracking is stopped; when the variable step length is greater than or equal to the threshold, the maximum power point tracking is maintained; the threshold of the variable step length is 0.

1.

2. The hybrid energy power scheduling method based on power balance according to claim 1 is characterized in that: Both the photovoltaic cell and the storage battery adopt maximum power point tracking control; and the output voltage of the maximum power point tracking control is clamped at the battery voltage.

3. A hybrid energy power dispatching system based on power balance, used to implement the hybrid energy power dispatching method based on power balance according to any one of claims 1 to 2, the system comprising: Control module, hybrid energy power scheduling module, DC / DC module; characterized in that, The control module is used to send the energy management and control working mode to the hybrid energy power scheduling module; the hybrid energy power scheduling module is used to schedule the hybrid energy system according to the energy management and control working mode; and the hybrid energy power scheduling module also controls the output voltage of the DC / DC module based on the variable step size disturbance observation method of segmented sampling.

4. The hybrid energy power dispatching system based on power balance according to claim 3 is characterized in that: The control module includes: an information acquisition unit and a working mode switching unit; wherein the information acquisition unit is used to use sensors to collect the input voltage and input current of each load, the output voltage and output current of the photovoltaic cell, the input voltage and input current when the battery is charged, and the output voltage and output current when the battery is discharged; the working mode switching unit is used to establish a dual-objective optimization model based on the voltage and current information obtained by the information acquisition unit, based on a linear weighted method, using the primary energy utilization rate of the hybrid energy system and the total cost of a single operation of the hybrid energy system; using an adaptive particle swarm optimization algorithm to adjust the weight coefficient to obtain the optimal solution of the dual-objective optimization model; and sending the energy management and control working mode signal corresponding to the optimal solution of the dual-objective optimization model to the hybrid energy power scheduling module.

5. The hybrid energy power dispatching system based on power balance according to claim 4 is characterized in that: The DC / DC module includes a synchronous rectification Buck circuit; wherein the synchronous rectification Buck circuit includes a first MOS transistor, a second MOS transistor, a rectification inductor, and a rectification capacitor; the input voltage is connected to the drain of the first MOS transistor, the source of the first MOS transistor is connected to the drain of the second MOS transistor and one end of the rectification inductor, and the other end of the rectification inductor is connected to the rectification capacitor and the output voltage.

6. The hybrid energy power dispatching system based on power balance according to claim 4 is characterized in that: The input of the hybrid energy power dispatching module includes: load, output power of the volt battery, power of the collected battery and the corresponding charging threshold; the output end of the hybrid energy power dispatching module is respectively connected to the relay module at the battery output port and the relay module at the photovoltaic cell output port; The relay module at the battery output port is used to control the working state of the battery according to the relay action signal output by the hybrid energy power dispatching module; the working state of the battery includes: charging state, discharging state and no energy supply to the load; The relay module at the output port of the photovoltaic cell is used to control the working state of the photovoltaic cell according to the relay action signal output by the hybrid energy power scheduling module; the working state of the photovoltaic cell includes: supplying energy to the load and not supplying energy to the load.