Through the overall lifting equipment of the steel bar frame, the outer suspension track platform and lifting mechanism are used to achieve pre-installation and efficient transportation of the steel bar frame, which solves the problem of low construction efficiency of small span continuous beams, and improves the bridge construction efficiency and the safety of lifting equipment.

CN115231450BActive Publication Date: 2024-12-06SHANDONG SHITONG HIGHWAY CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210809158.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-11
Publication Date
2024-12-06
Estimated Expiration
2042-07-11

AI Technical Summary

Technical Problem

In highway bridge projects, the steel frame binding and cast-in-place formwork of small span continuous beams have a long time, resulting in an extended construction period and poor construction continuity, which reduces the efficiency of bridge construction.

Method used

The reinforced skeleton is used to hoist the entire lifting equipment, including the outer suspension track platform, the mobile sling, the lifting assembly and the mobile component. The reinforced skeleton is pre-installed and lifted and transported to the place to be installed through the lifting mechanism. Then the concrete is poured, and fixed components and limiting parts are used. Improve the installation and safety of lifting equipment.

Benefits of technology

It improves the efficiency of bridge construction, shortens construction period, enhances the installation and stability of the steel frame lifting process, and improves the safety of lifting equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115231450B_ABST
    Figure CN115231450B_ABST
Patent Text Reader

Abstract

The present application relates to an overall lifting equipment for a steel frame and a method of using the equipment, and relates to the technical field of construction production, including an externally suspended track platform disposed on the pier of an uncast bridge, wherein a lifting mechanism is disposed on the externally suspended track platform, and the lifting mechanism includes: a mobile hanger, which is slidingly disposed on the externally suspended track platform and can be moved to a cast bridge; a lifting assembly, which is disposed on the mobile hanger and is used to lift the steel frame; and a moving assembly, which is disposed on the mobile hanger and is used to drive the mobile hanger to move. The present application improves the construction efficiency of the bridge by pre-installing the steel frame, then lifting and transporting the entire steel frame, and then pouring concrete, and the mobile hanger can be moved to the cast bridge for support after being moved out of the externally suspended track platform, thereby improving the efficiency of bridge construction and also improving the safety of the lifting equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction production, and in particular to a steel frame integral lifting equipment and a use method thereof. Background Art

[0002] Cast-in-place continuous beams with uniform cross-section are widely used in highway bridge projects. Their internal force state is relatively uniform, which can reduce the beam height and save materials. They also have high rigidity, good integrity, high overload capacity, high safety, large bridge deck expansion joints, and comfortable driving.

[0003] For small-span continuous beams, mobile formwork is generally used to tie steel bars and cast them section by section. However, the time consumed in tying the steel skeleton and assembling the cast-in-place formwork greatly delays the on-site construction period and the construction continuity of subsequent beam sections, thereby reducing the construction efficiency of the bridge. Summary of the invention

[0004] In order to improve the construction efficiency of bridges, the present application provides a steel frame integral lifting equipment and a use method.

[0005] In the first aspect, the present application provides a steel frame integral lifting equipment and a method of use, which adopts the following technical solutions:

[0006] A steel frame integral hoisting equipment, comprising an externally suspended track platform arranged on a pier of an uncast bridge, wherein a hoisting mechanism is arranged on the externally suspended track platform, and the hoisting mechanism comprises:

[0007] A mobile hanger, which is slidably arranged on an externally suspended track platform and can be moved to a cast bridge;

[0008] A lifting assembly, which is arranged on the mobile hanger and is used to lift the steel bar skeleton;

[0009] The moving assembly is arranged on the moving hanger and is used for driving the moving hanger to move.

[0010] By adopting the above technical scheme, an external suspended track platform is fixedly installed on the pier of the bridge to be cast, and then the lifting equipment is installed on the external suspended track platform, and the steel frame is prefabricated in advance, the moving component is started to drive the mobile hanger to move, the mobile hanger drives the lifting component to move above the steel frame, the lifting component is started to lift the steel frame, and then the moving component is started to drive the mobile hanger and the steel frame to move, and at the same time the mobile hanger located on the external suspended track platform can be moved to the cast bridge for support, so that the moving component is started to drive the steel frame to move to the installation location, and then the steel frame is placed at the installation location, and then concrete is poured on the steel frame, so that the poured concrete and the cast bridge are connected together, and then the cast external suspended track platform is disassembled and installed on the pier of the uncast bridge for recycling, and then the installation of the next steel frame is continued.

[0011] Therefore, the steel frame is installed in advance, and then the entire steel frame is hoisted and transported, and then concrete is poured, thereby improving the construction efficiency of the bridge. After the mobile hanger is moved out from the external suspended track platform, it can be moved to the bridge after pouring for support, thereby improving the installability and stability of the steel frame during the hoisting process. Therefore, while improving the efficiency of bridge construction, it also improves the safety of the hoisting equipment.

[0012] Optionally, the lifting assembly includes:

[0013] A winch, wherein the winch is arranged on a movable hanger and is provided with at least two winches, each of which is provided with a suspension rope wound around the winch;

[0014] A lifting sling, which is arranged on a lifting rope and is used to lift a steel bar skeleton, and is provided with a fixing component for fixing the steel bar skeleton;

[0015] A limiting member is arranged on the mobile hanger and is connected to the lifting sling and is used to limit the lifting sling.

[0016] By adopting the above technical solution, the hoisting machine is started to drive the lifting sling to move, so that the lifting sling is moved above the steel frame, and then the lifting sling and the steel frame are fixedly connected together through the fixing assembly, and then the hoisting machine is started to drive the lifting sling and the steel frame to move upward for transportation, so as to realize the lifting of the steel frame;

[0017] The fixing components improve the convenience of fixing and disassembling the steel frame and the lifting slings, thereby further improving the construction efficiency of the bridge, while the limiting parts limit the lifting slings and the steel frame, improving the safety of the lifting equipment during operation, thereby improving the construction efficiency of the bridge and also improving the safety of the lifting equipment.

[0018] Optionally, the fixing component includes:

[0019] A sliding frame, wherein the sliding frame is slidingly arranged on the lifting sling;

[0020] A fixing rope, which is arranged on the sliding frame and the lifting sling and connected to the lifting rope through a connecting assembly;

[0021] The hook is arranged on the sliding frame and is provided with a plurality of hooks and is used for hoisting the steel bar skeleton. When the hook hoists the steel bar skeleton, the sliding frame pulls the hook to press against the lower surface of the hoisting sling under the pulling of the fixed rope and is used to prevent the steel bar skeleton from detaching from the hook.

[0022] By adopting the above technical scheme, the winch releases the lifting rope, places the lifting sling on the steel frame, and then continues to release the lifting rope, so that the sliding frame moves downward under the action of gravity, and then the mobile hanger moves to drive the lifting sling, the sliding frame and the hook to move, so that the hook is hooked on the steel bars of the steel frame, and then the winch retracts the lifting rope, so that the lifting rope pulls the sliding frame and the hook upward through the fixed rope, so that the hook is pressed against the lower surface of the lifting sling, and then continues to move upward to drive the lifting sling, the steel frame, and the sliding frame to move at the same time, so as to achieve the fixed connection between the steel frame and the lifting sling; when disassembly is required, the steel frame is placed at the installation location, and then the lifting rope is continued to be released so that the sliding frame continues to move downward, and then the mobile hanger moves to drive the hook to separate from the steel frame, thereby improving the convenience of fixing and disassembling the steel frame and the lifting sling, thereby improving the construction efficiency of the bridge, and when the steel frame is hoisted, the hook is pressed on the lifting sling to prevent the steel frame from separating from the hook, thereby improving the construction efficiency of the bridge, and also improving the safety of the lifting equipment.

[0023] Optionally, the connection component includes:

[0024] A first sliding wheel and a second sliding wheel, wherein the first sliding wheel and the second sliding wheel are connected together through a connecting seat, the first sliding wheel and the second sliding wheel are both rotatably connected to the connecting seat, the suspension rope passes around the first sliding wheel and the fixed rope passes around the second sliding wheel.

[0025] By adopting the above technical solution, the lifting rope passes around the first sliding wheel. Therefore, when the lifting rope is released, the first sliding wheel rotates under the action of gravity, and the second sliding wheel rotates under the tension of the fixed rope. Therefore, the movable pulley is used to achieve a labor-saving effect, and the probability of the lifting rope and the fixed rope being damaged by friction is also reduced. At the same time, the lifting rope passes around the first sliding wheel, and the fixed rope passes around the second sliding wheel, so as to divide the tension received. Therefore, while achieving labor-saving, the safety of the lifting equipment is also improved.

[0026] Optionally, the limiting member includes a plurality of limiting tubes and a plurality of limiting rings, the diameters of the plurality of limiting tubes and the limiting rings gradually decrease and the limiting rings are slidably mounted together, the plurality of limiting rings are arranged on the limiting tubes and are used to prevent two adjacent limiting tubes from detaching from each other, one of the limiting tubes is arranged on the movable hanger and the other limiting tube is connected to the lifting sling.

[0027] By adopting the above technical solution, multiple limit tubes and limit ring sliding sleeves are set together, and the limit ring is used to prevent two adjacent sliding tubes from detaching from each other. Therefore, when the lifting sling moves, the limit tube connected to it is pulled to move, thereby realizing the limitation of the lifting sling during movement, thereby improving the safety of the lifting equipment.

[0028] Optionally, the mobile component includes:

[0029] A slide rail, wherein the slide rail is arranged on an externally suspended track platform;

[0030] A moving wheel, which is rotatably mounted on the moving hanger and rolls on the slide rail, and is provided with an annular moving groove for limiting position;

[0031] A moving motor is arranged on the moving hanger and connected with the moving wheel.

[0032] By adopting the above technical solution, the moving motor starts to drive the moving wheel to rotate, and the slide rail limits the moving trajectory of the moving wheel. Therefore, the rotation of the moving wheel drives the moving hanger to move, thereby realizing that the moving motor starts to drive the moving hanger to move.

[0033] Optionally, the mobile hanger is formed with an installation space for the steel bar skeleton to pass through, the mobile hanger is provided with a spiral upward guide groove, and the mobile hanger is provided with a transformation mechanism for transforming the moving position of the mobile hanger, and the transformation mechanism includes:

[0034] A movable sleeve, wherein the movable sleeve is slidably disposed on the guide groove;

[0035] Support legs, which are arranged on a movable sleeve and are rotatably provided with support wheels for rolling on the cast bridge, and the upward movement of the movable sleeve can drive the support legs and the support wheels to rotate outside the installation space;

[0036] A supporting motor, wherein the supporting motor is arranged on the supporting foot and connected to the supporting wheel;

[0037] A lifting component is arranged on the moving hanger and is rotatably connected with the moving sleeve and is used to drive the moving sleeve to move up and down.

[0038] By adopting the above technical solution, when one end of the mobile hanger moves out of the external suspended track platform, the lifting assembly starts to drive the moving sleeve to move downward, and the moving sleeve rotates under the action of the guide groove. The rotation of the moving sleeve drives the supporting feet and the supporting wheels to rotate close to the installation space, so that the supporting wheels are placed on the cast bridge for support. Therefore, the mobile hanger and the supporting wheels support the lifting equipment at the same time, thereby improving the safety of the lifting equipment.

[0039] At the same time, when it is necessary to lower the steel frame, the lifting assembly starts to drive the moving sleeve to move upward, and the moving sleeve moves upward to drive the supporting wheel to move upward and rotate away from the steel frame, and then the steel frame can be lowered. Therefore, when designing the size of the installation space, the installation space is minimized while meeting the movement of the steel frame, so that the vacant distance of the mobile hanger is minimized, thereby improving the strength of the mobile hanger. Therefore, the placement space is minimized, so when lowering the steel frame, it is necessary to rotate the supporting feet and supporting wheels to the outside of the placement space, thereby reducing the probability of the steel frame moving down and colliding with the supporting feet, thereby achieving the goal of improving the strength of the mobile hanger while also improving the safety of the lifting equipment.

[0040] When the support wheel enters or rotates out of the installation space, the support wheel moves up and down and rotates the support foot and the support wheel at the same time, thereby reducing the probability of wear between the support wheel and the upper surface of the bridge, thereby increasing the life of the support wheel and reducing the probability of collision between the support wheel and the unevenness of the bridge. Therefore, while improving the life of the support wheel, it also allows the support foot and the support wheel to enter or rotate out of the installation space.

[0041] Optionally, the lifting assembly includes:

[0042] A mounting sleeve, wherein the mounting sleeve is detachably mounted on the moving sleeve and an annular mounting groove is formed on a side wall close to the moving sleeve;

[0043] A telescopic rod is arranged on the movable hanger and a piston rod is provided with a rotating wheel rotatably arranged on the mounting groove.

[0044] By adopting the above technical solution, the movement of the telescopic rod drives the installation sleeve to move, and the rotation of the installation sleeve drives the rotating wheel to rotate, so that the telescopic rod drives the movable sleeve to move and rotate at the same time, and the rotating wheel reduces the friction generated during movement, thereby driving the movable sleeve to move and rotate, and also achieving energy-saving and environmental protection effects.

[0045] Optionally, two mounting sleeves are provided and spliced ​​together and detachably connected to the movable sleeve by mounting screws, and mounting holes for the telescopic rod piston rod to pass through are provided on the two mounting sleeves.

[0046] By adopting the above technical solution, the rotating wheel, the mounting sleeve and the movable sleeve can be disassembled after the two mounting sleeves are disassembled respectively, and then the two mounting sleeves are spliced ​​together, and at the same time, the piston rod of the telescopic rod is passed through the mounting hole, and then the two mounting sleeves are fixedly installed on the movable sleeve, so as to realize the installation and disassembly of the telescopic rod, the mounting sleeve and the movable sleeve.

[0047] In the second aspect, the present application provides a method for using a steel frame integral lifting equipment, which adopts the following technical solution:

[0048] A method for using the steel frame integral hoisting equipment in the first aspect comprises the following steps:

[0049] S1. Transport the steel frame to the bottom of the lifting equipment;

[0050] S2, lifting the steel frame, the lifting assembly starts to drive the lifting sling to move down, and the lifting sling is connected to the steel frame through the fixing assembly;

[0051] S3, the lifting assembly starts to lift the steel frame, then transports the steel frame to the location to be installed, then moves down to place the steel frame at the installation location for installation, and finally unlocks the fixing assembly to disassemble the lifting sling from the steel frame;

[0052] S4, finally pouring concrete;

[0053] S4. Repeat S1-S4 and continue the installation of the next steel bar skeleton.

[0054] By adopting the above technical solution, the steel skeleton is transported to the bottom of the lifting equipment, the lifting sling is moved down, and then the lifting sling is fixed to the steel skeleton through the fixing assembly, and then the lifting sling is moved up to lift the steel skeleton, and then the steel skeleton is transported to the place to be installed, and then the steel skeleton is placed at the place to be installed, and then the fixing assembly is unlocked to disassemble the lifting sling and the steel skeleton, and finally concrete is poured to connect the poured concrete and the poured bridge, and then the installation of the next steel skeleton is repeated.

[0055] In summary, the present application includes at least one of the following beneficial technical effects:

[0056] The steel frame is pre-installed, the entire steel frame is hoisted and transported, and then concrete is poured, thereby improving the construction efficiency of the bridge. After the mobile hanger is moved out from the external suspended track platform, it can be moved to the bridge after pouring for support, thereby improving the installability and stability of the steel frame during the hoisting process. Therefore, while improving the efficiency of bridge construction, it also improves the safety of the hoisting equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1It is a three-dimensional structural schematic diagram of the present application;

[0058] Figure 2 It is a schematic diagram of the structure of the lifting assembly in this application;

[0059] Figure 3 It is a schematic diagram of the structure of the fixing assembly and the connecting assembly in the present application, wherein the side wall of the connecting seat is cut away;

[0060] Figure 4 is a cross-sectional schematic diagram of the limiting tube and the limiting ring in the present application;

[0061] Figure 5 yes Figure 1 The enlarged schematic diagram of the middle A part;

[0062] Figure 6 It is a partial exploded view of the transformation mechanism and lifting assembly in this application.

[0063] Figure numerals: 1, bridge pier; 11, external hanging rail platform; 12, fixed frame; 13, support platform; 14, installation space; 2, lifting mechanism; 21, mobile hanger; 22, mobile frame; 23, beam frame; 24, avoidance hole; 25, installation column; 26, guide groove; 3, lifting assembly; 31, winch; 311, lifting rope; 32, lifting sling; 321, sliding cavity; 33, limiting member; 34, limiting tube; 341, first limiting hole; 342, second limiting hole; 35, limiting ring; 4, moving assembly; 41, slide rail; 42, moving wheel; 43, moving motor; 5, fixed assembly Parts; 51, sliding frame; 52, fixing rope; 53, hook; 6, connecting assembly; 61, first sliding wheel; 62, second sliding wheel; 63, first sliding groove; 64, second sliding groove; 65, connecting seat; 66, first connecting groove; 67, second connecting groove; 68, first mounting axis; 69, second mounting axis; 7, conversion mechanism; 71, moving sleeve; 72, supporting foot; 721, tilting section; 722, vertical section; 723, supporting wheel; 73, supporting motor; 8, lifting assembly; 81, mounting sleeve; 82, telescopic rod; 83, mounting groove; 85, mounting hole; 86, rotating wheel. DETAILED DESCRIPTION

[0064] The present application is further described in detail below in conjunction with the accompanying drawings 1-6.

[0065] The embodiments of the present application disclose a steel frame integral lifting equipment and a use method.

[0066] Reference Figure 1 The steel frame integral hoisting equipment includes an externally suspended track platform 11 arranged on a pier 1 of an uncast bridge, and a hoisting mechanism 2 for hoisting the steel frame integrally is arranged on the externally suspended track platform 11.

[0067] Reference Figure 1 The externally suspended track platform 11 extends to the bridge that has been cast. The externally suspended track platform 11 includes a fixing frame 12 and a supporting platform 13. The fixing frame 12 is fixedly installed on the pier 1 of the uncast bridge and extends to both sides of the pier 1; the supporting platform 13 is fixedly installed on the upper surface of the fixing frame 12, and two supporting platforms 13 are provided and located on both sides of the pier 1. At the same time, the top of the supporting platform 13 extends above the pier 1, and the length direction of the supporting platform 13 is parallel to the length direction of the bridge. After the bridge is cast, the externally suspended track platform 11 can be dismantled as needed, and then the externally suspended track platform 11 is fixedly installed to the subsequent uncast bridge for recycling.

[0068] Reference Figure 1 The hoisting mechanism 2 includes a mobile hanger 21, a lifting assembly 3 and a mobile assembly 4. The mobile hanger 21 includes two mobile frames 22 and a crossbeam frame 23. The two mobile frames 22 are arranged in a one-to-one correspondence with the two support platforms 13, and the mobile frames 22 are slidably arranged on the top of the support platform 13 along the length direction of the support platform 13, and the length direction of the mobile frames 22 is parallel to the length direction of the support platform 13; and the crossbeam frame 23 is fixedly installed on the top of the two mobile frames 22, and the crossbeam frame 23 fixedly connects the two mobile frames 22 together.

[0069] Reference Figure 1 and Figure 2 The lifting assembly 3 is arranged on the cross beam frame 23 and is used to lift the steel skeleton. There are multiple lifting assemblies 3 arranged at horizontal intervals, and the number of lifting assemblies 3 is at least two or more. The lifting assembly 3 includes a winch 31 and a lifting sling 32. The winch 31 is fixedly installed on the upper surface of the cross beam frame 23, and there are multiple winches 31. The number of winches 31 is at least two or more, and each winch 31 is wound with a lifting rope 311; the lifting sling 32 is fixedly installed on the bottom ends of multiple lifting ropes 311, and the lifting sling 32 is a frame-like structure with a sliding cavity 321 formed at the bottom end.

[0070] Reference Figure 2 and Figure 3 The lifting sling 32 is provided with a fixing component 5 for fixing the steel bar skeleton. The fixing component 5 includes a sliding frame 51, a fixing rope 52 and a hook 53. The sliding frame 51 is vertically slidably installed on the sliding cavity 321, and the bottom end of the sliding frame 51 extends to the bottom of the lifting sling 32. At the same time, the sliding frame 51 can be moved into the sliding cavity 321, so that the lower surfaces of the sliding frame 51 and the lifting sling 32 are flush; one end of the fixing rope 52 is fixedly connected to the upper surface of the lifting sling 32, and the other end of the fixing rope 52 passes through the upper surface of the lifting sling 32 and is fixedly connected to the upper surface of the sliding frame 51.

[0071] Reference Figure 2 and Figure 3The fixing rope 52 is connected to the suspension rope 311 through a connecting assembly 6, and the connecting assembly 6 includes a first sliding wheel 61 and a second sliding wheel 62; the first sliding wheel 61 and the second sliding wheel 62 are connected together through a connecting seat 65, and the connecting seat 65 is in a rectangular shape, and a first connecting groove 66 is provided on the top of the connecting seat 65, and a second connecting groove 67 is provided on the bottom of the connecting seat 65, a first mounting shaft 68 is fixedly installed on the first connecting groove 66, and a second mounting shaft 69 is fixedly installed on the second connecting groove 67, and the first mounting shaft 68 and the second mounting shaft 69 are both in a horizontal state and the axes of the two are perpendicular to each other.

[0072] Reference Figure 2 and Figure 3 The first sliding wheel 61 is rotatably mounted on the first mounting shaft 68, and a first annular sliding groove 63 is coaxially provided on the first sliding wheel 61, and the second sliding wheel 62 is rotatably mounted on the second mounting shaft 69, and a second annular sliding groove 64 is coaxially provided on the second sliding wheel 62. The lifting rope 311, the fixed rope 52 and the winch 31 are all arranged in a one-to-one correspondence; the lifting rope 311 is connected to the winch 31 after bypassing the first sliding wheel 61, and the fixed rope 52 bypasses the second sliding wheel 62, so the first sliding groove 63 limits the lifting rope 311, and the second sliding groove 64 limits the fixed rope 52.

[0073] Reference Figure 2 and Figure 3 The hook 53 is fixedly installed on the lower surface of the sliding frame 51, and the hook 53 can extend into the steel frame and is horizontally spaced. At the same time, the hook 53 can be hooked onto the steel bars of the steel frame. When the hook 53 is hooked onto the steel bars of the steel frame, the end of the hook 53 away from the sliding frame 51 extends above the steel frame, and the upward movement of the sliding frame 51 drives the hook 53 to move upward, which can make the end of the hook 53 away from the sliding frame 51 press against the lower surface of the lifting sling 32, thereby preventing the steel frame from detaching from the hook 53, and the weight of the lifting sling 32 is greater than the sum of the weights of the sliding frame 51 and the hook 53.

[0074] Reference Figure 1 and Figure 3The hoist 31 is started to move the hoisting rope 311 downward, and the downward movement of the hoisting rope 311 drives the first sliding wheel 61 to rotate and move downward at the same time. The downward movement of the first sliding wheel 61 drives the connecting seat 65 and the second sliding wheel 62 to move downward, and the second sliding wheel 62 drives the fixed rope 52 and the lifting sling 32 to move downward, so that the lifting sling 32 is placed on the upper surface of the steel frame, and then the fixed rope 52 continues to move downward, and the sliding frame 51 and the hook 53 continue to move downward under the action of gravity, so that the hook 53 extends into the steel frame, and then the mobile hanger 2 The movement drives the lifting sling 32, the sliding frame 51 and the hook 53 to move horizontally, so that the hook 53 is hooked on the steel bar of the steel frame, and then the fixed rope 52 moves upward. The weight of the lifting sling 32 is greater than the sum of the weights of the sliding frame 51 and the hook 53. Therefore, the upward movement of the fixed rope 52 drives the sliding frame 51 and the hook 53 to move upward, so that the end of the hook 53 away from the sliding frame 51 is pressed against the lifting sling 32, and then the upward movement of the fixed rope 52 can drive the steel frame, the lifting sling 32 and the sliding frame 51 to move upward at the same time.

[0075] Reference Figure 1 , Figure 2 and Figure 4 The lifting assembly 3 also includes a limit piece 33, which is arranged on the cross beam frame 23 and connected to the lifting sling 32. At the same time, the limit piece 33 is used to limit the lifting sling 32, and multiple limit pieces 33 are arranged at horizontal intervals; the limit piece 33 includes multiple limit tubes 34 and multiple limit rings 35, and the multiple limit tubes 34 are in a vertical state. The diameters of the limit tubes 34 and the limit rings 35 gradually decrease, and the limit tubes 34 and the limit rings 35 are arranged together with a mutually movable sleeve 71. At the same time, the top end of the limit tube 34 located at the highest point is fixedly installed on the lower surface of the cross beam frame 23, and the bottom end of the limit tube 34 located at the lowest point is fixedly installed on the upper surface of the lifting sling 32.

[0076] Reference Figure 2 and Figure 4 The limiting tube 34 is coaxially provided with a first limiting hole 341 and a second limiting hole 342 connected together, and the diameter of the first limiting hole 341 is smaller than that of the second limiting hole 342; the limiting ring 35 is coaxially fixedly installed on the outer wall of one end of the limiting tube 34, and the limiting ring 35 is used to prevent two adjacent limiting tubes 34 from detaching from each other, and at the same time, the first limiting hole 341 of the previous limiting tube 34 is slidably sleeved on the subsequent limiting tube 34, and the second limiting hole 342 of the previous limiting tube 34 is slidably sleeved on the subsequent limiting ring 35.

[0077] Reference Figure 1 and Figure 5, avoidance holes 24 are opened on both ends of the length direction of the moving frame 22, and vertical mounting columns 25 are fixedly installed on both ends of the length direction of the moving frame 22; the lifting mechanism 2 also includes a moving component 4, the moving component 4 is arranged on the moving hanger 21 and is used to drive the moving hanger 21 to move, and two moving components 4 are arranged and located on two support platforms 13. The moving component 4 includes a slide rail 41, a moving wheel 42 and a moving motor 43. The slide rail 41 is fixedly installed on the upper surface of the support platform 13, and the length direction of the slide rail 41 is parallel to the length direction of the support platform 13. At the same time, the cross-section of the support platform 13 is trapezoidal and the top cross-sectional area is smaller than the cross-sectional area.

[0078] Reference Figure 1 and Figure 5 The moving wheel 42 is horizontally rotatably mounted on the bottom end of the mounting column 25, and the axis of the moving wheel 42 in the direction of rotation is perpendicular to the length of the slide rail 41. At the same time, the moving wheels 42 are also arranged at intervals on the lower surface of the moving frame 22 along the length direction of the slide rail 41, and an annular moving groove is coaxially opened on the outer wall of the moving wheel 42. At the same time, the moving wheel 42 rolls on the slide rail 41, and the slide rail 41 extends into the moving groove 44 to limit the moving wheel 42. The moving wheel 42 rotates to drive the moving frame 22 to move; the moving motor 43 is fixedly mounted on the side wall of the mounting column 25, and the output shaft of the moving motor 43 is connected to the moving wheel 42. The moving motor 43 is started to drive the moving wheel 42 to rotate, and the moving wheel 42 rotates to drive the moving frame 22 and the crossbeam frame 23 to move simultaneously.

[0079] Reference Figure 1 and Figure 6 The space between the two mobile frames 22 and the crossbeam frame 23 forms an installation space 14 for the steel frame to pass through. A spiral upward guide groove 26 is opened on the side wall of the installation column 25. The mobile frame 22 can be moved to the cast bridge. The mobile frame 22 is provided with a transformation mechanism 7 for changing the moving position of the mobile hanger 21.

[0080] Reference Figure 5 and Figure 6 The conversion mechanism 7 includes a moving sleeve 71, a supporting foot 72, a supporting motor 73 and a lifting assembly 8. The moving sleeve 71 is vertically slidably sleeved on the mounting column 25, and the moving sleeve 71 is located at a position corresponding to the avoidance hole 24. At the same time, a guide column extending into the guide groove 26 is fixedly installed on the moving sleeve 71, so that the moving sleeve 71 can rotate simultaneously when moving up and down. At the same time, the guide column rotates 90 degrees from the top end to the bottom end of the guide groove 26, so that the rotation angle range of the moving sleeve 71 is 90 degrees.

[0081] Reference Figure 1 and Figure 6The supporting foot 72 includes an inclined section 721 and a vertical section 722 connected together, one end of the inclined section 721 is fixedly mounted on the side wall of the movable sleeve 71 close to the installation space 14, and the inclined section 721 is inclined downward and extends into the installation space 14; the vertical section 722 is located on the end of the inclined section 721 away from the movable sleeve 71, and the vertical section 722 is vertically downward, and at the same time, the bottom end of the vertical section 722 is rotatably mounted on a support wheel 723, and the axis of the support wheel 723 is parallel to the axis of the movable wheel 42; when the movable frame 22 moves out of the supporting platform 13 near one end of the completed cast bridge, the support wheel 723 can be supported on the upper surface of the cast bridge for support; the supporting motor 73 is fixedly mounted on the side wall of the vertical section 722, and the output shaft of the supporting motor 73 is connected to the supporting wheel 723, and the support motor 73 is started to drive the supporting wheel 723 to rotate.

[0082] Reference Figure 5 and Figure 6 The lifting assembly 8 is arranged on the mobile frame 22 and is rotatably connected to the upper surface of the mobile sleeve 71. At the same time, the lifting assembly 8 is used to drive the mobile sleeve 71 to move up and down; the lifting assembly 8 includes a mounting sleeve 81 and a telescopic rod 82. The mounting sleeve 81 is provided with two and is in a semicircular ring shape. At the same time, the mounting sleeve 81 is composed of two concentrically arranged semicircular ring structures, and the mounting sleeves 81 are detachably connected to the top of the mobile sleeve 71 through mounting screws; at the same time, the two mounting sleeves 81 are spliced ​​together, and mounting holes 85 are provided on the side walls of the two mounting sleeves 81 on the opposite sides, and the mounting holes 85 on the two mounting sleeves 81 cooperate to form a whole ring; a semi-circular mounting groove 83 is provided on the side wall of the mounting sleeve 81 close to the mobile sleeve 71, that is, on the lower surface, and the mounting grooves 83 located at the two mounting sleeves 81 cooperate to form a whole ring, and the axis of the mounting hole 85, the axis of the mounting groove 83 and the axis of the mobile sleeve 71 all coincide.

[0083] Reference Figure 5 and Figure 6 The telescopic rod 82 can be a hydraulic cylinder or an electric push rod. The hydraulic cylinder is fixedly mounted on the side wall of the mounting column 25 located above the movable sleeve 71, and the hydraulic cylinder piston rod is arranged vertically downward. At the same time, the hydraulic cylinder piston rod passes through the mounting hole 85 and extends into the mounting groove 83. At the same time, a rotating wheel 86 that rolls on the mounting groove 83 is rotatably mounted on the hydraulic cylinder piston rod, and the thickness of the rotating wheel 86 is the same as the height of the mounting groove 83; therefore, after disassembling the mounting sleeve 81, the rotating wheel 86 is removed from the mounting groove 83, thereby realizing the disassembly of the hydraulic cylinder piston rod and the movable sleeve 71.

[0084] Reference Figure 1 and Figure 6The hydraulic cylinder piston rod moves upward, driving the installation sleeve 81 and the movable sleeve 71 to move upward. The movable sleeve 71 moves upward and rotates downward toward the side away from the installation space 14 under the action of the guide groove 26. Therefore, the movable sleeve 71 drives the supporting foot 72 and the supporting wheel 723 to move upward and away from the installation space 14 at the same time, so that the supporting foot 72 and the supporting wheel 723 rotate to the outside of the installation space 14, and then the lifting sling 32 can move down and put down the steel frame, thereby reducing the probability of the steel frame colliding with the supporting foot 72 and the supporting wheel 723. At the same time, it also reduces the probability of the supporting foot 72 and the supporting wheel 723 colliding with the steel frame just put down when the movable frame 22 moves back to transport the steel frame again.

[0085] The working principle of the embodiment of the present application is as follows:

[0086] The steel frame is prefabricated and installed in advance, the moving motor 43 is started to drive the lifting sling 32 to move above the steel frame, and then the winch 31 is started to lower the lifting rope 311 to make the lifting sling 32 move down, so that the lifting sling 32 is placed on the steel frame, and then the lifting rope 311 is lowered to make the hook 53 extend into the steel frame, and then the lifting sling 32 moves horizontally to drive the hook 53 to hook onto the steel bar of the steel frame, and then the winch 31 is started to drive the lifting rope 311 to move up to drive the hook 53 to move up, so that the hook 53 is pressed against the lower surface of the lifting sling 32, and then the lifting rope 311 continues to move up to drive the steel frame to move up, and then the moving frame 22 moves to drive the steel frame to move horizontally, and when one end of the moving frame 22 moves to the outside of the support platform 13, the hydraulic cylinder moves to drive the moving sleeve 71 down The movable sleeve 71 moves downward to drive the supporting feet 72 and the supporting wheels 723 to move toward the installation space 14, so that the supporting wheels 723 are supported on the upper surface of the cast bridge, and the supporting motor 73 is started to drive the supporting wheels 723 to rotate. When the steel skeleton moves horizontally into place, the hydraulic cylinder piston rod moves upward to drive the supporting feet 72 and the supporting wheels 723 to rotate to the outside of the installation space 14, and then the steel skeleton can be lowered, and then concrete is poured, so that the poured concrete and the cast bridge are connected together, thereby improving the construction efficiency of the bridge, and the movable frame 22 moves out of the support platform 13 and moves to the cast bridge for support, thereby improving the installability and stability of the steel skeleton during lifting. Therefore, while improving the efficiency of bridge construction, it also improves the safety of lifting equipment.

[0087] The embodiment of the present application discloses a method for using equipment for hoisting an entire steel frame.

[0088] Reference Figure 1 and Figure 2 , the steel frame overall lifting equipment and use method include the following steps:

[0089] S1. Transport the steel frame to the bottom of the lifting equipment;

[0090] S2, lifting the steel bar skeleton, the hoisting machine 31 is started to drive the lifting sling 32 to move downward, and then the lifting sling 32 is connected to the steel bar skeleton through the fixing assembly 5;

[0091] S3, the lifting assembly 3 is started to lift the steel frame, and then the moving motor 43 is started to drive the steel frame to the place to be installed, and then the steel frame is moved down to place it at the place to be installed for installation, and finally the fixing assembly 5 is unlocked to disassemble the lifting sling 32 from the steel frame;

[0092] S4, finally pouring concrete, so that the poured concrete is fixedly connected to the poured bridge;

[0093] S5. Repeat steps S1-S4 to continue installing the next steel bar skeleton.

[0094] The working principle of the embodiment of the present application is as follows:

[0095] The steel skeleton is transported to the bottom of the lifting equipment, the winch 31 is started to drive the lifting sling 32 to move downward, and then the lifting sling 32 is fixed to the steel skeleton through the fixing component 5, and then the lifting sling 32 is moved up to lift the steel skeleton, and then the steel skeleton is transported to the installation location, and then the steel skeleton is placed at the installation location, and then the fixing component 5 is unlocked to disassemble the lifting sling 32 and the steel skeleton, and finally concrete is poured to connect the poured concrete and the poured bridge, and then the installation of the next steel skeleton is repeated.

[0096] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A steel frame integral lifting equipment, characterized in that: It comprises an externally suspended track platform (11) arranged on a pier (1) of an uncast bridge, wherein a hoisting mechanism (2) is arranged on the externally suspended track platform (11), and the hoisting mechanism (2) comprises: A movable hanger (21), wherein the movable hanger (21) is slidably disposed on the externally suspended track platform (11) and can be moved to a cast bridge; A lifting assembly (3), wherein the lifting assembly (3) is arranged on the mobile hanger (21) and is used to lift the steel bar skeleton; A moving component (4), wherein the moving component (4) is arranged on the moving hanger (21) and is used to drive the moving hanger (21) to move; The movable hanger (21) is formed with an installation space (14) for a steel bar skeleton to pass through, the movable hanger (21) is provided with a spiral upward guide groove (26), and the movable hanger (21) is provided with a transformation mechanism (7) for transforming the moving position of the movable hanger (21), the transformation mechanism (7) comprising: A movable sleeve (71), wherein the movable sleeve (71) is slidably disposed on the guide groove (26); A supporting foot (72), the supporting foot (72) being arranged on the moving sleeve (71) and being rotatably provided with a supporting wheel (723) for rolling on the cast bridge, wherein the upward movement of the moving sleeve (71) can drive the supporting foot (72) and the supporting wheel (723) to rotate outside the installation space (14); A support motor (73), wherein the support motor (73) is arranged on the support foot (72) and connected to the support wheel (723); A lifting component (8) is arranged on the movable hanger (21) and is rotatably connected to the movable sleeve (71) and is used to drive the movable sleeve (71) to move up and down.

2. The steel bar skeleton integral lifting equipment according to claim 1 is characterized in that: The lifting assembly (3) comprises: A hoist (31), wherein the hoist (31) is arranged on the movable hanger (21) and at least two hoists (31) are arranged and each of the hoists (31) is provided with a hoisting rope (311) wound around the hoist (31); A lifting sling (32), the lifting sling (32) being arranged on the lifting rope (311) and used for lifting the steel bar skeleton, the lifting sling (32) being provided with a fixing component (5) for facilitating fixing the steel bar skeleton; A limiting member (33) is arranged on the movable hanger (21) and is connected to the lifting sling (32) and is used to limit the position of the lifting sling (32).

3. The steel bar skeleton integral lifting equipment according to claim 2 is characterized in that: The fixing assembly (5) comprises: A sliding frame (51), wherein the sliding frame (51) is slidingly arranged on the lifting sling (32); A fixing rope (52), the fixing rope (52) being arranged on the sliding frame (51) and the lifting sling (32) and being connected to the lifting rope (311) via a connecting assembly (6); A hook (53) is arranged on the sliding frame (51) and is provided with a plurality of hooks (53) for hoisting a steel bar skeleton. When the hook (53) is hoisting the steel bar skeleton, the sliding frame (51) is pulled by the fixed rope (52) to pull the hook (53) against the lower surface of the hoisting sling (32) and is used to prevent the steel bar skeleton from being separated from the hook (53).

4. The steel bar skeleton integral lifting equipment according to claim 3 is characterized in that: The connection component (6) comprises: A first sliding wheel (61) and a second sliding wheel (62), wherein the first sliding wheel (61) and the second sliding wheel (62) are connected together via a connecting seat (65), and the first sliding wheel (61) and the second sliding wheel (62) are both rotatably connected to the connecting seat (65), and the suspension rope (311) passes around the first sliding wheel (61) and the fixing rope (52) passes around the second sliding wheel (62).

5. The steel bar skeleton integral lifting equipment according to claim 2, characterized in that: The limiting member (33) comprises a plurality of limiting tubes (34) and a plurality of limiting rings (35); the diameters of the plurality of limiting tubes (34) and the limiting rings (35) gradually decrease and are slidably sleeved together; the plurality of limiting rings (35) are arranged on the limiting tubes (34) and are used to prevent two adjacent limiting tubes (34) from being separated from each other; one of the limiting tubes (34) is arranged on the movable hanger (21) and the other limiting tube (34) is connected to the lifting sling (32).

6. The steel bar skeleton integral lifting equipment according to claim 2, characterized in that: The mobile component (4) comprises: A slide rail (41), wherein the slide rail (41) is arranged on the externally suspended track platform (11); A moving wheel (42), the moving wheel (42) being rotatably mounted on the moving hanger (21) and rolling on the slide rail (41), the moving wheel (42) being provided with an annular moving groove for limiting position; A moving motor (43), wherein the moving motor (43) is arranged on the moving hanger (21) and connected to the moving wheel (42).

7. The steel bar skeleton integral lifting equipment according to claim 1, characterized in that: The lifting assembly (8) comprises: A mounting sleeve (81), the mounting sleeve (81) being detachably mounted on the moving sleeve (71) and having an annular mounting groove (83) formed on a side wall close to the moving sleeve (71); A telescopic rod (82) is arranged on the movable hanger (21) and a rotating wheel (86) rotatably arranged on the mounting groove (83) is arranged on the piston rod.

8. The steel bar skeleton integral lifting equipment according to claim 7, characterized in that: Two mounting sleeves (81) are provided and spliced ​​together and detachably connected to the movable sleeve (71) via mounting screws. Both mounting sleeves (81) are provided with mounting holes (85) for the piston rod of the telescopic rod (82) to pass through.

9. A method for using the steel frame integral lifting equipment according to any one of claims 1 to 8, characterized in that: S1. Transport the steel frame to the bottom of the lifting equipment; S2, lifting the steel frame, the lifting assembly (3) is started to drive the lifting sling (32) to move downward, and then the lifting sling (32) is connected to the steel frame through the fixing assembly (5); S3, the lifting assembly (3) starts to lift the steel frame, then transports the steel frame to the location to be installed, then moves down to place the steel frame at the location to be installed for installation, and finally unlocks the fixing assembly (5) to disassemble the lifting sling (32) from the steel frame; S4, finally pouring concrete; S4. Repeat S1-S4 and continue the installation of the next steel bar skeleton.