Single-tube coring method for Quaternary soft strata
By monitoring the mud pump pressure and dry drilling operations in real time, combined with the ball dropping procedure, the problems of core loss and low collection rate in the Quaternary soft strata were solved, and the stable extraction of cores and protection of the drill bit were achieved.
Patent Information
- Application Number
- CN202211198385.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-29
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-09-29
AI Technical Summary
During core sampling in the soft Quaternary strata, cores are easily lost due to damage or scattering, making it difficult to judge the core burning effect, and resulting in low core collection rate and short drill bit lifespan.
By controlling the pressure and rotation of the mud pump, and monitoring the pressure changes of the mud pump in real time, combined with dry drilling and ball dropping operations, the core is ensured to enter the core tube stably. The core burning effect is judged by observing the mud flow, and core residue is avoided.
This effectively prevented core loss, improved core collection rate, extended drill bit lifespan, and ensured the complete extraction of cores.
Smart Images

Figure CN115506739B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of geological coring methods, and in particular relates to a single-tube coring method for Quaternary soft strata. Background Art
[0002] In order to study geological structures, a coring system is needed for coring analysis. The single-tube coring system currently used mainly includes a mud pump, a mud pump water inlet pipe, a mud pump return pipe, a mud pressure pipe, a vertical shaft, a drill rod, a ball-dropping reducer, a core tube, and a coring drill bit. The soil of the Quaternary soft strata is soft. When using the above system to coring the Quaternary soft strata, there are the following defects:
[0003] First, during the coring process, the vibration of the core tube side wall or the scouring of mud can easily cause part of the core column in the core tube to be damaged or scattered. At this time, if drilling continues downward, the mud inside the core tube can easily wash away the entire core column, causing the core to be lost and the coring to fail. Because the core drill bit is located underground, people cannot observe it. This problem is more likely to occur in the soft strata of the Quaternary system:
[0004] Secondly, when the core tube drilling position is 200mm away from the required position, the pump and rotation are stopped and a steel ball is thrown to the reducer. When dry drilling is required to burn the core, the operator cannot judge whether the core burning is successful. Due to different geological structures, it is easy to cause incomplete core burning, causing the core to fall off during the drilling process, resulting in coring failure. In order to ensure the success of core burning as much as possible, the core bit is used for multiple dry drillings to burn the core, which not only causes serious wear of the core bit and shortens the service life of the defective drill bit, but also makes it more difficult to remove the core from the core tube when the core tube is pulled out.
[0005] Third, after the core burning is completed, when the core tube is taken out, due to the relatively soft geological structure, part of the core is easy to fall out of the core tube. If no verification is performed at this time and the core tube is directly taken out, part of the core will remain in the wellbore. If a large pump volume is used to punch the bottom of the hole when coring again, the residual core will be lost, reducing the core collection rate. Summary of the invention
[0006] The technical problem to be solved by the present invention is to provide a single-tube coring method for Quaternary soft strata, which can avoid core washout or core loss caused by partial core scattering, accurately judge the core burning effect and whether core scattering occurs, effectively improve the core collection rate and extend the service life of the core drill bit.
[0007] In order to solve the above problems, the technical solution adopted by the method for single-tube coring in soft quaternary formations of the present invention is as follows: the method comprises the following steps:
[0008] The first step is to lower the core drill to the bottom of the hole.
[0009] After the core drill bit reaches the bottom of the hole, a large amount of pump is used to punch the hole. The mud flows from the core tube to the core drill bit, and then returns to the surface through the gap between the core tube and the hole wall. During the return process, the sediment at the bottom of the hole is carried out of the borehole.
[0010] Step 2: Core Drilling
[0011] Reduce the amount of mud delivered by the mud pump, rotate the drill bit, and drill the core of the formation. The core column cut by the inner blade enters the core tube wrapped in mud. During the drilling process, it is strictly forbidden to move the core tube up and down to cause the core column to break;
[0012] Step 3: Pay close attention to the mud pump pressure during core drilling
[0013] (I) Before the core drilling distance of the core tube reaches the set requirement of 200mm, if the mud pump pressure increases instantly during the core drilling process, it indicates that the core column in the core tube is damaged or scattered, resulting in the annular gap between the core column and the core tube being blocked. At this time, the core column is easily washed away without the mud wrapping. In order to prevent the core in the core tube from being washed away and ensure the core recovery rate, the pump and rotation should be stopped immediately at this time; go directly to step 4;
[0014] (ii) During the coring process, the mud pump pressure is within the normal range. When the core tube drilling position is 200 mm away from the required position, stop the pump immediately, open the return pipe valve, keep the mud pump tee open, and stop rotating at the same time;
[0015] Step 4: Pitch
[0016] After stopping coring drilling, immediately open the tap to drop the bullet hole, drop the bullet into the drill pipe, and drop it to the reducer bullet joint seat by its own weight, sealing the mud column pressure in the drill pipe above, so that the core in the core tube is not affected by the pressure of the liquid column, and at the same time prevent the core tube from being sucked out due to the small gap between the core tube and the borehole during the drilling process, causing the core to fall off from the core tube;
[0017] Step 5: Dry Drilling
[0018] After throwing the ball, make the inner hole of the drill pipe, the mud pump and the mud pump return pipe connected. When the pump is stopped and the mud cannot flow, drill the core drill 80-100mm downwards to perform dry drilling and core burning. At the same time, observe whether there is mud flowing out of the mud pump return pipe.
[0019] (i) If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step 6;
[0020] (ii) If there is no mud flowing out of the mud pump return pipe at this time, it means that the bottom of the core drill bit and the inner hole of the core tube are not blocked by the core, and the gap between the core tube and the hole wall is still in a connected state. At this time, continue dry drilling for 80-100mm until mud flows out of the mud pump return pipe;
[0021] Step 6: Heartburn
[0022] After the core tube is dry drilled in situ for about 30-60 seconds, the drilling tool is lifted up by about 80-100 mm with the drilling rig oil pressure to allow mud to enter the bottom of the hole from the gap between the core tube and the hole wall to lubricate and cool the drill bit to prevent the drill bit from burning out. Repeat 1-2 times;
[0023] Step 7: Verify whether there is any residue in the core
[0024] Pull up the drill bit 300-500mm, quickly lower the drill bit to the bottom of the hole, observe whether the drill bit is lowered to the bottom of the hole, and observe whether there is mud flowing out of the return pipe of the mud pump;
[0025] (i) If there is no mud flowing out of the mud pump return pipe and the drill bit is lowered to the bottom of the hole, it means that there is no core falling off at the bottom of the hole, indicating that all the cores have entered the core tube and all the cores have been burned, then go directly to step 11;
[0026] (ii) If there is no mud flowing out of the mud pump return pipe and the drill bit cannot be lowered to the bottom of the hole, it means that the core has been burned, but there is core remaining in the hole, go directly to step 8;
[0027] (III) If there is mud flowing out of the return pipe of the mud pump, regardless of whether the drill bit is lowered to the bottom of the hole, it indicates that the core tube and the borehole are still connected, and there is no burning or loss of the core. At this time, perform the following steps:
[0028] Step 1: Dry Drill Again
[0029] When the pump is stopped and mud cannot flow, drill the core drill 80-100mm downwards to perform core drilling, and observe whether there is mud flowing out of the mud pump return pipe at the same time;
[0030] (i) If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step (ii);
[0031] (ii) If there is no mud flowing out of the mud pump return pipe at this time, it means that the bottom of the core drill bit and the inner hole of the core tube are not blocked by the core, and the gap between the core tube and the hole wall is still connected. At this time, continue dry drilling for 80-100mm;
[0032] 1. If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step (2);
[0033] 2. If there is still no mud flowing out, the core may be lost, and go directly to step 13;
[0034] Step 2: Heartburn again
[0035] After the core tube is dry drilled in situ for about 30-60 seconds, the drilling tool is lifted up by about 80-100 mm with the drilling rig oil pressure to allow mud to enter the bottom of the hole from the gap between the core tube and the hole wall to lubricate and cool the drill bit to prevent the drill bit from burning out. Repeat 1-2 times;
[0036] Step (3) Verify again whether there is any residue in the core
[0037] Pull up the drill bit 300-500mm, quickly lower the drill bit to the bottom of the hole, observe whether the drill bit is lowered to the bottom of the hole, and observe whether there is mud flowing out of the return pipe of the mud pump;
[0038] (i) If there is no mud flowing out of the mud pump return pipe and the drill bit is lowered to the bottom of the hole, it means that there is no core falling off at the bottom of the hole, indicating that all the cores have entered the core tube and all the cores have been burned, then go directly to step 11;
[0039] (ii) If there is no mud flowing out of the mud pump return pipe and the drill bit cannot be lowered to the bottom of the hole, it means that the core has been burned, but there is core remaining in the hole, go directly to step 8;
[0040] (III) If there is mud flowing out of the mud pump return pipe, go directly to step 13;
[0041] Step 8: Lift the drill
[0042] Lift the core tube containing the core at a uniform speed to avoid negative pressure between the core tube and the hole wall, which may cause the core to fall off.
[0043] Step 9: Remove the core
[0044] Take the core out of the core tube by holding down the pressure through the return pipe of the mud pump;
[0045] Step 10: Coring Again
[0046] Lower the coring drill to the bottom of the hole. If there is a core left in the hole from the last time, do not pump a large amount of water to punch the bottom of the hole to prevent the residual core from being washed away. The footage should be calculated from the position of the residual core and should not exceed the total length of the core tube. Start the coring drilling process from the second step and start the cycle.
[0047] Step 11: Lift the drill
[0048] Lift the core tube containing the core at a uniform speed to avoid negative pressure between the core tube and the hole wall, which may cause the core to fall off.
[0049] Step 12: Remove the core
[0050] Take the core out of the core tube by holding the pressure in the return pipe of the mud pump, and go directly to step 14;
[0051] Step 13: Drill Lift and Overhaul
[0052] Lift the core tube and inspect or replace the core tube, drill bit, etc. according to the specific situation. After the repair is completed, continue with the following steps;
[0053] Step 14: Re-coring
[0054] The coring drilling cycle begins from the first step until all the cores are taken out.
[0055] Compared with the prior art, the single-tube coring method for Quaternary soft formations provided by the present invention has the following advantages:
[0056] First, if the pressure of the mud pump increases instantly during the coring drilling process before the core tube coring drilling distance reaches the set requirement of 200 mm, it indicates that the core column in the core tube is damaged or scattered, resulting in the blockage of the annular gap between the core column and the core tube. At this time, the core column is easily washed away without the wrapping of mud. In order to prevent the core in the core tube from being washed away and ensure the core recovery rate, the pump should be stopped immediately to open the return water pipeline and stop rotating; directly enter the steps of ball throwing, dry drilling, core burning, and drill lifting to take out the core. In this way, it is avoided that the core column in part of the core tube is damaged or scattered, and the core in the core tube is washed away under the mud pressure due to continued injection of mud, so as to ensure the core recovery rate;
[0057] Secondly, in the dry drilling step, after throwing the ball, open the mud pump tee to make the inner hole of the drill pipe, the mud pump and the mud pump return pipe connected. When the pump is stopped and the mud cannot flow, drill the core drill downward 80-100㎜ to perform core drilling. At the same time, observe whether there is mud flowing out of the mud pump return pipe. (i) If there is mud flowing out of the mud pump return pipe at this time, it indicates that the bottom of the drill bit has been blocked by the core. Go directly to the core burning, drill lifting and other steps to take out the core and complete a coring process. (ii) If there is no mud flowing out of the mud pump return pipe at this time, it indicates that the bottom of the coring drill bit and the core are blocked. The hole in the tube is not blocked by the core, and the gap between the core tube and the hole wall is still connected. At this time, continue dry drilling for 80-100mm until mud flows out of the mud pump return pipe; it indicates that the bottom of the drill bit has been blocked by the core; directly proceed to the steps of burning the core and lifting the drill to take out the core and complete a coring process; the operator can judge whether the bottom of the drill bit has been blocked by the core according to whether there is mud flowing out during the dry drilling process. If the bottom of the drill bit is not blocked by the core, it is not possible to achieve core burning. During the process of lifting the drill, it is easy to cause the core to fall off from the core tube, resulting in core loss;
[0058] Third, before lifting the drill, determine whether there is any core residue: pull up the drill bit 300-500㎜, quickly lower the drill bit to the bottom of the hole, observe whether the drill bit is lowered to the bottom of the hole, and observe whether there is mud flowing out of the mud pump return pipe; (i) If there is no mud flowing out of the mud pump return pipe and the drill bit is lowered to the bottom of the hole, it means that no core has fallen off at the bottom of the hole, indicating that all the cores have entered the core tube and all the cores have been burned. Then lift the drill, take out the core, and enter the coring step of the next layer of cores again. In the first step of the coring process of this layer of cores, lower the coring drill bit to the bottom of the hole. When the coring drill bit reaches the bottom of the hole, a large amount of pumping is performed to punch the hole, and mud flows from the core tube to the coring drill. The mud goes from the core tube to the coring drill bit, and returns to the ground through the gap between the core tube and the hole wall. In the process of returning, the sediment at the bottom of the hole is carried out of the borehole; this ensures that there are no impurities in the core; (ii) If there is no mud flowing out of the mud pump return pipe and the drill bit cannot be lowered to the bottom of the hole, it means that the core has been burned, but there is core residue in the hole. The drill is lifted and the core is taken out, and the coring step of the next layer of core is entered again. In the coring process of this layer of core, no large-volume punching is performed. The mud goes from the core tube to the coring drill bit, and returns to the ground through the gap between the core tube and the hole wall. In the process of returning, the sediment at the bottom of the hole is carried out of the drilling step, and the cycle is started directly from the second step of coring drilling, and the drill rod with the core tube at the lower end is lowered to the bottom of the hole. To prevent the residual core from being washed out, the bottom of the hole cannot be punched with a large amount of pump. The footage should be calculated from the position of the residual core and should not exceed the total length of the core tube. In this way, the residual core can be completely taken out during the coring process, and the residual core will not be lost, thereby improving the core collection rate. (iii) If mud flows out of the mud pump return pipe, regardless of whether the drill bit is lowered to the bottom of the hole, it indicates that the core tube and the borehole are still connected, and there is no burning or core loss. At this time, perform the following steps: dry drill again and observe whether there is mud flowing out of the mud pump return pipe: 1. If mud flows out of the mud pump return pipe at this time, it indicates that the bottom of the drill bit has been blocked by the core; directly enter again Burn the core and verify again whether there is any residue in the core; 2. If no mud flows out of the mud pump return pipe at this time, it means that the bottom of the coring drill bit and the inner hole of the core tube are not blocked by the core, and the gap between the core tube and the hole wall is still connected. Continue dry drilling for 80-100mm; (1) If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; directly proceed to burn the core again and verify again whether there is any residue in the core; (2) If mud still flows out, directly proceed to the drill lifting and maintenance steps; when the lower end of the core tube cannot be sealed due to damage to the coring drill bit or the core tube, the drill can be lifted for maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] Figure 1 It is a schematic diagram of the structure of a single-tube coring system;
[0060] Figure 2 It is a structural schematic diagram of the core being located in the core tube under normal circumstances;
[0061] Figure 3 It is a schematic diagram of the structure of the core in the core tube after partial collapse;
[0062] Figure 4 It is a structural schematic diagram of a ball-throwing reducer. DETAILED DESCRIPTION
[0063] The single-tube coring method for Quaternary soft formations of the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0064] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, it is a structural schematic diagram of a single-tube coring system. The single-tube coring system of the present invention includes a mud pump 1, a mud pump water inlet pipe 2, a mud pump return pipe 3, a mud pressure pipe 4, a mud pump tee 11, a vertical shaft 12, a drill rod 5, a ball-dropping reducer 6, a marble 10, a core tube 7, and a coring drill bit 8.
[0065] The method for single-tube coring in soft quaternary formations comprises the following steps:
[0066] The first step is to lower the core drill to the bottom of the hole.
[0067] After the core drill bit reaches the bottom of the hole, a large amount of pump is used to punch the hole. The mud flows from the core tube to the core drill bit, and then returns to the surface through the gap between the core tube and the hole wall. During the return process, the sediment at the bottom of the hole is carried out of the borehole.
[0068] Step 2: Core Drilling
[0069] Reduce the amount of mud delivered by the mud pump, rotate the drill bit, and drill the core of the formation. The core column cut by the inner blade enters the core tube wrapped in mud. During the drilling process, it is strictly forbidden to move the core tube up and down to cause the core column to break;
[0070] Step 3: Pay close attention to the mud pump pressure during core drilling
[0071] (I) Before the core drilling distance of the core tube reaches the set requirement of 200mm, if the mud pump pressure increases instantly during the core drilling process, it indicates that the core column in the core tube is damaged or scattered, resulting in the annular gap between the core column and the core tube being blocked. At this time, the core column is easily washed away without the mud wrapping. In order to prevent the core in the core tube from being washed away and ensure the core recovery rate, the pump and rotation should be stopped immediately at this time; go directly to step 4;
[0072] (ii) During the coring process, the mud pump pressure is within the normal range. When the core tube drilling position is 200 mm away from the required position, stop the pump immediately, open the return pipe valve, keep the mud pump tee open, and stop rotating at the same time;
[0073] Step 4: Pitch
[0074] After stopping coring drilling, immediately open the tap to drop the bullet hole, drop the bullet into the drill pipe, and drop it to the reducer bullet joint seat by its own weight, sealing the mud column pressure in the drill pipe above, so that the core in the core tube is not affected by the pressure of the liquid column, and at the same time prevent the core tube from being sucked out due to the small gap between the core tube and the borehole during the drilling process, causing the core to fall off from the core tube;
[0075] Step 5: Dry Drilling
[0076] After throwing the ball, make the inner hole of the drill pipe, the mud pump and the mud pump return pipe connected. When the pump is stopped and the mud cannot flow, drill the core drill 80-100mm downwards to perform dry drilling and core burning. At the same time, observe whether there is mud flowing out of the mud pump return pipe.
[0077] (i) If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step 6;
[0078] (ii) If there is no mud flowing out of the mud pump return pipe at this time, it means that the bottom of the core drill bit and the inner hole of the core tube are not blocked by the core, and the gap between the core tube and the hole wall is still in a connected state. At this time, continue dry drilling for 80-100mm until mud flows out of the mud pump return pipe;
[0079] Step 6: Heartburn
[0080] After the core tube is dry drilled in situ for about 30-60 seconds, the drilling tool is lifted up by about 80-100 mm with the drilling rig oil pressure to allow mud to enter the bottom of the hole from the gap between the core tube and the hole wall to lubricate and cool the drill bit to prevent the drill bit from burning out. Repeat 1-2 times;
[0081] Step 7: Verify whether there is any residue in the core
[0082] Pull up the drill bit 300-500mm, quickly lower the drill bit to the bottom of the hole, observe whether the drill bit is lowered to the bottom of the hole, and observe whether there is mud flowing out of the return pipe of the mud pump;
[0083] (i) If there is no mud flowing out of the mud pump return pipe and the drill bit is lowered to the bottom of the hole, it means that there is no core falling off at the bottom of the hole, indicating that all the cores have entered the core tube and all the cores have been burned, then go directly to step 11;
[0084] (ii) If there is no mud flowing out of the mud pump return pipe and the drill bit cannot be lowered to the bottom of the hole, it means that the core has been burned, but there is core remaining in the hole, go directly to step 8;
[0085] (III) If there is mud flowing out of the return pipe of the mud pump, regardless of whether the drill bit is lowered to the bottom of the hole, it indicates that the core tube and the borehole are still connected, and there is no burning or loss of the core. At this time, perform the following steps:
[0086] Step 1: Dry Drill Again
[0087] When the pump is stopped and mud cannot flow, drill the core drill 80-100mm downwards to perform core drilling, and observe whether there is mud flowing out of the mud pump return pipe at the same time;
[0088] (i) If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step (ii);
[0089] (ii) If there is no mud flowing out of the mud pump return pipe at this time, it means that the bottom of the core drill bit and the inner hole of the core tube are not blocked by the core, and the gap between the core tube and the hole wall is still connected. At this time, continue dry drilling for 80-100mm;
[0090] 1. If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step (2);
[0091] 2. If there is still no mud flowing out, the core may be lost, and go directly to step 13;
[0092] Step 2: Heartburn again
[0093] After the core tube is dry drilled in situ for about 30-60 seconds, the drilling tool is lifted up by about 80-100 mm with the drilling rig oil pressure to allow mud to enter the bottom of the hole from the gap between the core tube and the hole wall to lubricate and cool the drill bit to prevent the drill bit from burning out. Repeat 1-2 times;
[0094] Step (3) Verify again whether there is any residue in the core
[0095] Pull up the drill bit 300-500mm, quickly lower the drill bit to the bottom of the hole, observe whether the drill bit is lowered to the bottom of the hole, and observe whether there is mud flowing out of the return pipe of the mud pump;
[0096] (i) If there is no mud flowing out of the mud pump return pipe and the drill bit is lowered to the bottom of the hole, it means that there is no core falling off at the bottom of the hole, indicating that all the cores have entered the core tube and all the cores have been burned, then go directly to step 11;
[0097] (ii) If there is no mud flowing out of the mud pump return pipe and the drill bit cannot be lowered to the bottom of the hole, it means that the core has been burned, but there is core remaining in the hole, go directly to step 8;
[0098] (III) If there is mud flowing out of the mud pump return pipe, go directly to step 13;
[0099] Step 8: Lift the drill
[0100] Lift the core tube containing the core at a uniform speed to avoid negative pressure between the core tube and the hole wall, which may cause the core to fall off.
[0101] Step 9: Remove the core
[0102] Take the core out of the core tube by holding down the pressure through the return pipe of the mud pump;
[0103] Step 10: Coring Again
[0104] Lower the coring drill to the bottom of the hole. If there is a core left in the hole from the last time, do not pump a large amount of water to punch the bottom of the hole to prevent the residual core from being washed away. The footage should be calculated from the position of the residual core and should not exceed the total length of the core tube. Start the coring drilling process from the second step and start the cycle.
[0105] Step 11: Lift the drill
[0106] Lift the core tube containing the core at a uniform speed to avoid negative pressure between the core tube and the hole wall, which may cause the core to fall off.
[0107] Step 12: Remove the core
[0108] Take the core out of the core tube by holding the pressure in the return pipe of the mud pump, and go directly to step 14;
[0109] Step 13: Drill Lift and Overhaul
[0110] Lift the core tube and inspect or replace the core tube, drill bit, etc. according to the specific situation. After the repair is completed, continue with the following steps;
[0111] Step 14: Re-coring
[0112] The coring drilling cycle begins from the first step until all the cores are taken out.
[0113] The protection scope of the present invention is not limited to the above-mentioned embodiments. As long as the single-tube coring method for Quaternary soft formations is the same or similar, it falls within the protection scope of the present invention.
Claims
1. A single-tube coring method for soft quaternary formations, characterized in that: The method comprises the following steps: The first step is to lower the core drill to the bottom of the hole. After the core drill bit reaches the bottom of the hole, a large amount of pump is used to punch the hole. The mud flows from the core tube to the core drill bit, and then returns to the surface through the gap between the core tube and the hole wall. During the return process, the sediment at the bottom of the hole is carried out of the borehole. Step 2: Core Drilling Reduce the amount of mud delivered by the mud pump, rotate the drill bit, and drill the core of the formation. The core column cut by the inner blade enters the core tube wrapped in mud. During the drilling process, it is strictly forbidden to move the core tube up and down to cause the core column to break; Step 3: Pay close attention to the mud pump pressure during core drilling Before the core drilling distance of the core tube reaches the set requirement of 200mm, if the mud pump pressure increases instantly during the core drilling process, it indicates that the core column in the core tube is damaged or scattered, resulting in the annular gap between the core column and the core tube being blocked. At this time, the core column is easily lost due to the lack of mud wrapping. In order to prevent the core in the core tube from being lost, the pump and rotation should be stopped immediately; go directly to step 4; During the coring process, the mud pump pressure is within the normal range. When the core tube drilling position is 200 mm away from the required position, stop the pump immediately, open the return pipe valve, keep the mud pump three-way, and stop rotating at the same time; Step 4: Pitch After stopping coring drilling, immediately open the tap to drop the bullet hole, drop the bullet into the drill pipe, and drop it to the reducer bullet joint seat by its own weight, sealing the mud column pressure in the drill pipe above, so that the core in the core tube is not affected by the pressure of the liquid column, and at the same time prevent the core tube from being sucked out due to the small gap between the core tube and the borehole during the drilling process, causing the core to fall off from the core tube; Step 5: Dry Drilling After throwing the ball, make the inner hole of the drill pipe, the mud pump and the mud pump return pipe connected. When the pump is stopped and the mud cannot flow, drill the core drill 80-100mm downwards to perform dry drilling and core burning. At the same time, observe whether there is mud flowing out of the mud pump return pipe. If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step 6; If there is no mud flowing out of the mud pump return pipe at this time, it means that the bottom of the core drill bit and the inner hole of the core tube are not blocked by the core, and the gap between the core tube and the hole wall is still connected. At this time, continue dry drilling for 80-100mm until mud flows out of the mud pump return pipe; Step 6: Heartburn After the core tube is dry drilled in situ for 30-60 seconds, the drilling tool is lifted up by 80-100 mm with the drilling rig oil pressure to allow the mud to enter the bottom of the hole from the gap between the core tube and the hole wall to lubricate and cool the drill bit to prevent the drill bit from burning out. Repeat 1-2 times; Step 7: Verify whether there is any residue in the core Pull up the drill bit 300-500mm, quickly lower the drill bit to the bottom of the hole, observe whether the drill bit is lowered to the bottom of the hole, and observe whether there is mud flowing out of the return pipe of the mud pump; If there is no mud flowing out of the return pipe of the mud pump and the drilling tool is lowered to the bottom of the hole, it means that there is no core falling off at the bottom of the hole, indicating that all the cores have entered the core tube and all the cores have been burned, then go directly to step 11; If there is no mud flowing out of the mud pump return pipe and the drill bit cannot be lowered to the bottom of the hole, it means that the core has been burned, but there is core remaining in the hole, go directly to step 8; If there is mud flowing out of the mud pump return pipe, regardless of whether the drill bit is lowered to the bottom of the hole, it indicates that the core tube and the borehole are still connected, and there is no burning or loss of the core. At this time, perform the following steps: Step 1: Dry Drill Again When the pump is stopped and mud cannot flow, drill the core drill 80-100mm downwards to perform core drilling, and observe whether there is mud flowing out of the mud pump return pipe at the same time; (i) If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step (ii); (ii) If there is no mud flowing out of the mud pump return pipe at this time, it means that the bottom of the core drill bit and the inner hole of the core tube are not blocked by the core, and the gap between the core tube and the hole wall is still connected. At this time, continue dry drilling for 80-100mm; If mud flows out of the mud pump return pipe at this time, it means that the bottom of the drill bit has been blocked by the core; go directly to step (2); If there is still no mud flowing out, the core may be lost, and go directly to step 13; Step 2: Heartburn again After the core tube is dry drilled in situ for 30-60 seconds, the drilling tool is lifted up by 80-100 mm with the drilling rig oil pressure to allow the mud to enter the bottom of the hole from the gap between the core tube and the hole wall to lubricate and cool the drill bit to prevent the drill bit from burning out. Repeat 1-2 times; Step (3) Verify again whether there is any residue in the core Pull up the drill bit 300-500mm, quickly lower the drill bit to the bottom of the hole, observe whether the drill bit is lowered to the bottom of the hole, and observe whether there is mud flowing out of the return pipe of the mud pump; If there is no mud flowing out of the return pipe of the mud pump and the drilling tool is lowered to the bottom of the hole, it means that there is no core falling off at the bottom of the hole, indicating that all the cores have entered the core tube and all the cores have been burned, then go directly to step 11; If there is no mud flowing out of the mud pump return pipe and the drill bit cannot be lowered to the bottom of the hole, it means that the core has been burned, but there is core remaining in the hole, go directly to step 8; If there is mud flowing out of the mud pump return pipe, go directly to step 13; Step 8: Lift the drill Lift the core tube containing the core at a uniform speed to avoid negative pressure between the core tube and the hole wall, which may cause the core to fall off. Step 9: Remove the core Take the core out of the core tube by holding down the pressure through the return pipe of the mud pump; Step 10: Coring Again Lower the coring drill to the bottom of the hole. If there is a core left in the hole from the last time, do not pump a large amount of water to punch the bottom of the hole to prevent the residual core from being washed away. The footage should be calculated from the position of the residual core and should not exceed the total length of the core tube. Start the coring drilling process from the second step and start the cycle. Step 11: Lift the drill Lift the core tube containing the core at a uniform speed to avoid negative pressure between the core tube and the hole wall, which may cause the core to fall off. Step 12: Remove the core Take the core out of the core tube by holding the pressure in the return pipe of the mud pump, and go directly to step 14; Step 13: Drill Lift and Overhaul Lift the core tube and repair or replace the new core tube and drill bit according to the specific situation. After the repair is completed, continue with the following steps; Step 14: Re-coring The coring drilling cycle begins from the first step until all the cores are taken out.